CN205556020U - Cable shaft opener - Google Patents

Cable shaft opener Download PDF

Info

Publication number
CN205556020U
CN205556020U CN201620270466.8U CN201620270466U CN205556020U CN 205556020 U CN205556020 U CN 205556020U CN 201620270466 U CN201620270466 U CN 201620270466U CN 205556020 U CN205556020 U CN 205556020U
Authority
CN
China
Prior art keywords
cross bar
bracket
rope
hinged
brackets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620270466.8U
Other languages
Chinese (zh)
Inventor
林洪群
董波
张文健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Pingyin Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Pingyin Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Pingyin Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620270466.8U priority Critical patent/CN205556020U/en
Application granted granted Critical
Publication of CN205556020U publication Critical patent/CN205556020U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

一种电缆井开启器,涉及电力施工技术领域,用于实现快速高效的开启电缆井盖。所采用的技术方案是,一种电缆井开启器,其特征是,包括夹持装置、撬动装置和井盖拉绳,所述夹持装置包括第一横杆和第二横杆,第二横杆中沿横向设置有插孔,所述第一横杆右端滑动连接在插孔中,所述第一横杆的下侧固定连接有第一拉钩,第一拉钩靠近所述第一横杆的左端,所述第一拉钩呈“└”形,所述第二横杆的下侧固定连接有第二拉钩,第二拉钩靠近所述第二横杆的右端,所述第二拉钩呈“┘”形。夹持装置将井盖夹持,然后通过井盖拉绳和撬动装置来拉动电缆井盖。有益效果是,本实用新型适用于不同尺寸的电缆井盖的快速开启,具有方便携带的特点。

A cable well opener relates to the technical field of electric power construction and is used to realize fast and efficient opening of a cable well cover. The adopted technical solution is a cable well opener, which is characterized in that it includes a clamping device, a prying device and a manhole cover pull rope, and the clamping device includes a first cross bar and a second cross bar, and the second cross bar A jack is arranged in the bar along the transverse direction, and the right end of the first cross bar is slidably connected in the jack, and the lower side of the first cross bar is fixedly connected with a first pull hook, and the first pull hook is close to the side of the first cross bar. At the left end, the first drag hook is in the shape of "└", the second drag hook is fixedly connected to the lower side of the second cross bar, the second drag hook is close to the right end of the second cross bar, and the second drag hook is in the shape of "┘ "shape. The clamping device clamps the manhole cover, and then pulls the cable manhole cover through the manhole cover pull rope and the prying device. The beneficial effect is that the utility model is suitable for quick opening of cable well covers of different sizes, and has the characteristics of being convenient to carry.

Description

一种电缆井开启器cable well opener

技术领域technical field

本实用新型涉及电力施工技术领域,具体地说是一种电缆井开启器。The utility model relates to the technical field of electric power construction, in particular to a cable well opener.

背景技术Background technique

电缆井是线路铺设的重要设施,在每一个电缆井上都设置有一个电缆井盖,施工人员在检查和维修线路的过程中需要将电缆井盖打开。在现有技术中,施工人员通过使用杠杆撬动电缆井盖边缘的方式来将电缆井盖打开。但是因为大多数电缆井都设置在露天的环境下,所以会有很多尘土和载物堆积在井盖的边缘,而使用杠杆撬动电缆井盖的时候需要找一个支点和一个施力点,在电缆井盖边缘布满尘土的时候很难找到一个受力点和一个支点,所以这给电缆井盖的开启带来了很大的困难,这不但降低了检修的效率,而且极容易对电缆井盖造成破坏。Cable wells are important facilities for line laying, and a cable well cover is arranged on each cable well, and construction personnel need to open the cable well cover during inspection and maintenance of lines. In the prior art, construction workers open the cable well cover by using a lever to pry the edge of the cable well cover. But because most of the cable wells are set in the open environment, there will be a lot of dust and loads accumulated on the edge of the well cover, and when using the lever to pry the cable well cover, you need to find a fulcrum and a point of force, on the edge of the cable well cover When it is covered with dust, it is difficult to find a force point and a fulcrum, so this brings great difficulties to the opening of the cable well cover, which not only reduces the efficiency of maintenance, but also easily damages the cable well cover.

实用新型内容Utility model content

本实用新型的目的在于提供一种电缆井开启器,用于实现快速高效的开启电缆井盖。本实用新型具有易于折叠便于携带的特点,并且适用于不同直径的电缆井盖的开启。The purpose of the utility model is to provide a cable well opener, which is used to realize fast and efficient opening of the cable well cover. The utility model has the characteristics of easy folding and portability, and is suitable for opening cable well covers with different diameters.

本实用新型解决其技术问题所采取的技术方案是:一种电缆井开启器,包括夹持装置、撬动装置和井盖拉绳,所述夹持装置包括第一横杆和第二横杆,第二横杆中沿横向设置有插孔,所述第一横杆右端滑动连接在插孔中,所述第一横杆的上侧固定连接有第一拉环,所述第二横杆的上侧固定连接有第二拉环,所述井盖拉绳的一端系在第一拉环上,所述井盖拉绳的另一端系在第二拉环上;The technical solution adopted by the utility model to solve the technical problem is: a cable well opener, including a clamping device, a prying device and a manhole cover pull rope, the clamping device includes a first cross bar and a second cross bar, The second crossbar is provided with a socket along the transverse direction, the right end of the first crossbar is slidably connected in the socket, the upper side of the first crossbar is fixedly connected with a first pull ring, and the upper side of the second crossbar The upper side is fixedly connected with a second pull ring, one end of the manhole cover stay rope is tied to the first draw ring, and the other end of the manhole cover stay rope is tied to the second draw ring;

所述第一横杆的下侧固定连接有第一拉钩,第一拉钩靠近所述第一横杆的左端,所述第一拉钩呈“└”形,所述第二横杆的下侧固定连接有第二拉钩,第二拉钩靠近所述第二横杆的右端,所述第二拉钩呈“┘”形;The lower side of the first crossbar is fixedly connected with a first pull hook, the first pull hook is close to the left end of the first crossbar, the first pullhook is in the shape of "└", and the lower side of the second crossbar is fixed A second pull hook is connected, the second pull hook is close to the right end of the second cross bar, and the second pull hook is in the shape of "┘";

所述撬动装置包括连接板、压杆、安装轴、支架、和支架绳,所述连接板的一端设置有绳孔,所述井盖拉绳穿过绳孔,所述连接板的另一端铰接在压杆的一端,所述压杆转动安装在所述安装轴上,所述安装轴的每一端各设置有两个支架,所述每一个支架分别转动安装在安装轴上,每一个所述支架的中间位置处分别设置有支架孔;The prying device includes a connecting plate, a pressure rod, an installation shaft, a bracket, and a support rope, one end of the connecting plate is provided with a rope hole, the well cover stay rope passes through the rope hole, and the other end of the connecting plate is hinged At one end of the pressure rod, the pressure rod is rotatably mounted on the installation shaft, and each end of the installation shaft is respectively provided with two brackets, and each of the brackets is respectively rotatably mounted on the installation shaft, and each of the The middle positions of the brackets are respectively provided with bracket holes;

所述支架绳包括第一支架绳和第二支架绳,所述第一支架绳的一端系在位于转轴左端的其中一个支架的支架孔中,所述第一支架绳的另一端系在位于转轴左端的另一个支架的支架孔中,所述第二支架绳的一端系在位于转轴右端的其中一个支架的支架孔中,所述第二支架绳的另一端系在位于转轴右端的另一个支架的支架孔中。Described support rope comprises first support rope and second support rope, and one end of described first support rope is tied in the bracket hole of one of the brackets that is positioned at the left end of rotating shaft, and the other end of described first support rope is tied in the bracket hole that is positioned at rotating shaft. In the bracket hole of another bracket at the left end, one end of the second bracket rope is tied to the bracket hole of one of the brackets at the right end of the rotating shaft, and the other end of the second bracket rope is tied to another bracket at the right end of the rotating shaft. in the bracket hole.

进一步地,沿着所述安装轴的轴向等间距的分布有四个隔离螺纹孔,在每一个隔离螺纹孔中各配合有一个隔离螺栓,所述安装轴左端的两个支架位于最左侧的两个相邻的隔离螺栓之间,所述安装轴右端的两个支架位于最右侧的两个隔离相邻的螺栓之间,所述压杆位于中间的两个相邻的隔离螺栓之间。Further, four isolating threaded holes are equally spaced along the axial direction of the installation shaft, and each isolating threaded hole is equipped with an isolating bolt, and the two brackets at the left end of the installation shaft are located on the leftmost side. Between the two adjacent isolation bolts, the two brackets at the right end of the installation shaft are located between the rightmost two isolation adjacent bolts, and the pressure rod is located between the middle two adjacent isolation bolts between.

进一步地,所述第二横杆的上侧设置有横杆螺纹孔,横杆螺纹孔连通所述插孔,横杆螺纹孔中配合有压紧螺栓。Further, the upper side of the second cross bar is provided with a cross bar threaded hole, the cross bar threaded hole communicates with the insertion hole, and a compression bolt is fitted in the cross bar threaded hole.

进一步地,所述撬动装置还包括第一底座和第二底座,第一底座和第二底座各包括两个铰接架,所述铰接架呈“┐”形,位于转轴右端的其中一个支架的底部铰接在第一底座的其中一个铰接架上,位于转轴左端的其中一个支架的底部铰接在第一底座的另一个铰接架上,位于转轴右端的另一个支架的底部铰接在第二底座的其中一个铰接架上,位于转轴左端的另一个支架的底部铰接在第二底座的另一个铰接架上。Further, the prying device also includes a first base and a second base, and each of the first base and the second base includes two hinged frames, and the hinged frames are in the shape of "┐". The bottom is hinged on one of the hinged frames of the first base, the bottom of one of the brackets located at the left end of the rotating shaft is hinged on the other hinged frame of the first base, and the bottom of the other bracket located at the right end of the rotating shaft is hinged on one of the second bases. On a articulated frame, the bottom of another support positioned at the left end of the rotating shaft is hinged on another articulated frame of the second base.

进一步地,所述第一拉环位于第一拉钩的正上方,所述第二拉环位于第二拉钩的正上方。Further, the first draw ring is located directly above the first draw hook, and the second draw ring is located directly above the second draw hook.

进一步地,所述压杆的自由端固定连接有手柄,手柄上设置有防滑橡胶。Further, the free end of the pressure rod is fixedly connected with a handle, and the handle is provided with anti-slip rubber.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1、本实用新型提供的一种电缆井开启器,可用于快速高效的开启电缆井盖,第一搭构和第二搭构之间的间距可调,这不仅方便夹持电缆井盖,而且可以根据不同尺寸的电缆井盖来调节第一、二搭构之间的间距。各个支架和安装轴之间的连接关系满足了各个部件易于收放的要求,使得本实用新型易于拆装和携带。1. The utility model provides a cable well opener, which can be used to quickly and efficiently open the cable well cover. Cable manhole covers of different sizes are used to adjust the distance between the first and second structures. The connection relationship between each bracket and the installation shaft meets the requirement that each component is easy to be retracted, so that the utility model is easy to disassemble and carry.

2、本实用新型在工作的时候,各个隔离螺栓起到防止安装在安装轴上的部件从安装轴上滑落的作用,也起到了避免各个部件相互干扰的作用。2. When the utility model is working, each spacer bolt prevents the parts installed on the installation shaft from slipping off the installation shaft, and also plays a role in avoiding mutual interference of each part.

3、压紧螺栓可以将第一横杆压紧在第二横杆中,压紧螺栓在开启电缆井盖的时候可以起到固定第一搭构和第二搭构之间的间距的作用。3. The compression bolt can compress the first crossbar into the second crossbar, and the compression bolt can play the role of fixing the distance between the first construction and the second construction when the cable manhole cover is opened.

4、第一、二底座起到增大各支架底部与底面之间的摩擦力的作用,各个铰接架的结构可以方便对应的底座的安装。4. The first and second bases serve to increase the frictional force between the bottom and the bottom surface of each bracket, and the structure of each hinge frame can facilitate the installation of the corresponding base.

5、将第一拉环设置在第一搭构的正上方,将第二拉环设置在第二搭构的正上方,这样就可以避免井盖拉绳的拉力将第一横杆和第二横杆拉弯,这样就可以提高第一横杆和第二横杆的使用寿命。5. Set the first pull ring directly above the first structure, and set the second pull ring directly above the second structure, so that the tension of the manhole cover rope can be avoided from pulling the first crossbar and the second crossbar together. The bar is stretched and bent, so that the service life of the first cross bar and the second cross bar can be improved.

6、手柄和防滑橡胶可以提高使用的舒适程度。6. The handle and non-slip rubber can improve the comfort of use.

附图说明Description of drawings

图1为电缆井盖的结构示意图;Fig. 1 is the structural representation of cable manhole cover;

图2为本实用新型的总体结构示意图;Fig. 2 is the overall structural representation of the utility model;

图3为图2中的A部分局部放大图;Fig. 3 is a partially enlarged view of part A in Fig. 2;

图4为夹持装置的结构示意图;Fig. 4 is the structural representation of clamping device;

图5为第一支架的结构示意图;Fig. 5 is the structural representation of the first bracket;

图6为隔离螺栓的分布示意图;Figure 6 is a schematic diagram of the distribution of isolation bolts;

图中:1电缆井盖,11第一开启孔,12第二开启孔,13井盖拉绳,2第一横杆,21第一拉环,22第一拉钩,3第二横杆,31第二拉环,32第二拉钩,33压紧螺栓,4连接板,41绳孔,5压杆,51手柄,6安装轴,61第一支架,611第一支架孔,62第二支架,63第三支架,64第四支架,65第一隔离螺栓,66第二隔离螺栓,67第三隔离螺栓,68第四隔离螺栓,7第一底座,71第一铰接架,72第二铰接架,8第二底座,81第三铰接架,82第四铰接架,91第一支架绳,92第二支架绳。In the figure: 1 cable manhole cover, 11 first opening hole, 12 second opening hole, 13 manhole cover stay rope, 2 first cross bar, 21 first pull ring, 22 first pull hook, 3 second cross bar, 31 second Pull ring, 32 second pull hook, 33 compression bolt, 4 connecting plate, 41 rope hole, 5 pressure bar, 51 handle, 6 installation shaft, 61 first bracket, 611 first bracket hole, 62 second bracket, 63 first bracket Three brackets, 64 fourth bracket, 65 first isolation bolt, 66 second isolation bolt, 67 third isolation bolt, 68 fourth isolation bolt, 7 first base, 71 first hinged frame, 72 second hinged frame, 8 Second base, 81 the 3rd articulated frame, 82 the 4th articulated frame, 91 first support ropes, 92 second support ropes.

具体实施方式detailed description

如图1所示,在电缆井盖1上设置有第一开启孔11和第二开启孔12两个开启孔,并且第一开启孔和第二开启孔分别贯穿电缆井盖的上下底面,一种电缆井开启器是针对此类电缆井盖进行设计的。As shown in Figure 1, two opening holes, the first opening hole 11 and the second opening hole 12, are provided on the cable well cover 1, and the first opening hole and the second opening hole respectively pass through the upper and lower bottom surfaces of the cable well cover. Well openers are designed for this type of cable manhole covers.

如图2至图6所示,一种电缆井开启器,包括夹持装置、撬动装置和井盖拉绳13。夹持装置包括第一横杆2和第二横杆3。撬动装置包括连接板4、压杆5、安装轴6,第一支架61、第二支架62、第三支架63、第四支架65共计四个支架和第一支架绳91、第二支架绳92共计两个支架绳。为了更好的说明本实用新型,下面结合附图来对本实用新型做详细的说明。As shown in FIGS. 2 to 6 , a cable well opener includes a clamping device, a prying device and a manhole cover pull rope 13 . The clamping device includes a first crossbar 2 and a second crossbar 3 . Prying device comprises connecting plate 4, depression bar 5, installation shaft 6, first support 61, second support 62, the 3rd support 63, the 4th support 65 altogether four supports and first support rope 91, the second support rope 92 total two support ropes. In order to better illustrate the utility model, the utility model will be described in detail below in conjunction with the accompanying drawings.

如图2和图4所示,第二横杆3中沿横向设置有插孔,第一横杆2右端滑动连接在插孔中,第二横杆3的上侧设置有横杆螺纹孔,横杆螺纹孔连通插孔,横杆螺纹孔中配合有压紧螺栓33。第一横杆2的上侧通过焊接的方式固定连接有第一拉环21,第二横杆3的上侧固定连接有第二拉环31,井盖拉绳13的一端系在第一拉环上21,井盖拉绳13的另一端系在第二拉环31上;第一横杆2的下侧固定连接有第一拉钩22,第一拉钩22靠近第一横杆3的左端,第一拉钩22呈“└”形,第二横杆3的下侧固定连接有第二拉钩32,第二拉钩靠近第二横杆的右端,第二拉钩32呈“┘”形。作为第一拉环21和第二拉环31的优选设置位置,第一拉环21位于第一拉钩22的正上方,第二拉环31位于第二拉钩32的正上防。As shown in Fig. 2 and Fig. 4, the second crossbar 3 is provided with a socket along the transverse direction, the right end of the first crossbar 2 is slidably connected in the socket, and the upper side of the second crossbar 3 is provided with a crossbar threaded hole. The threaded hole of the cross bar is connected to the jack, and the threaded hole of the cross bar is equipped with a compression bolt 33 . The upper side of the first cross bar 2 is fixedly connected with the first draw ring 21 by welding, the upper side of the second cross bar 3 is fixedly connected with the second draw ring 31, and one end of the manhole cover stay rope 13 is tied to the first draw ring. 21, the other end of the manhole cover stay rope 13 is tied on the second draw ring 31; the lower side of the first cross bar 2 is fixedly connected with the first draw hook 22, the first draw hook 22 is close to the left end of the first cross bar 3, the first The drag hook 22 is in the shape of "└", and the lower side of the second cross bar 3 is fixedly connected with a second drag hook 32, which is close to the right end of the second cross bar, and the second drag hook 32 is in the shape of "┘". As a preferred setting position of the first pull ring 21 and the second pull ring 31 , the first pull ring 21 is located directly above the first pull hook 22 , and the second pull ring 31 is located directly above the second pull hook 32 .

如图2所示,连接板4的一端设置有绳孔41,井盖拉绳13穿过绳孔,连接板4的另一端铰接在压杆5的一端,压杆5转动安装在安装轴6上,压杆5的自由端固定连接有手柄51,手柄上设置有防滑橡胶。安装轴的左端设置有第一支架61和第二支架62两个支架,安装轴的右端设置有第三支架63和第四支架64两个支架,各个支架分别转动安装在安装轴上。As shown in Figure 2, one end of the connecting plate 4 is provided with a rope hole 41, the well cover pull rope 13 passes through the rope hole, the other end of the connecting plate 4 is hinged on one end of the pressure rod 5, and the pressure rod 5 is rotatably mounted on the installation shaft 6 , the free end of the pressure rod 5 is fixedly connected with a handle 51, and the handle is provided with anti-slip rubber. The left end of the mounting shaft is provided with two supports of the first support 61 and the second support 62, and the right end of the mounting shaft is provided with two supports of the third support 63 and the fourth support 64, and each support is respectively rotatably mounted on the mounting shaft.

如图1和图6所示,为了防止在使用的过程中各支架或者压杆5从安装轴6上滑落,沿着安装轴6的轴向等间距的分布有四个隔离螺纹孔,在每一个隔离螺纹孔中各配合有一个隔离螺栓,图中从左往右依次是第一隔离螺栓65、第二隔离螺栓66、第三隔离螺栓67和第四隔离螺栓68,第一支架61与第二支架62位于第一隔离螺栓65和第二隔离螺栓66之间。第三支架63与第四支架64位于第三隔离螺栓67和第四隔离螺栓68之间。压杆5位于第二隔离螺栓66和第三隔离螺栓67之间。As shown in Figure 1 and Figure 6, in order to prevent the brackets or pressure rods 5 from slipping off the installation shaft 6 during use, four isolated threaded holes are distributed at equal intervals along the axial direction of the installation shaft 6, and each An isolating bolt is fitted in each isolating threaded hole, and in the figure from left to right are the first isolating bolt 65, the second isolating bolt 66, the third isolating bolt 67 and the fourth isolating bolt 68, the first support 61 and the The second bracket 62 is located between the first isolation bolt 65 and the second isolation bolt 66 . The third bracket 63 and the fourth bracket 64 are located between the third isolation bolt 67 and the fourth isolation bolt 68 . The compression rod 5 is located between the second isolation bolt 66 and the third isolation bolt 67 .

如图1和图5为例,在每一个支架的中间位置分别设置有支架孔,以第一支架61为例,在支架61的中间设置有第一支架孔611,第一支架绳91的一端系第一支架61的支架孔中,第一支架绳91的另一端系在第二支架62的支架孔中,第二支架绳92的一端系在第三支架63的支架孔中,第二支架92绳的另一端系在第四支架64的支架孔中。As shown in Figure 1 and Figure 5 as an example, a bracket hole is respectively provided at the middle position of each bracket, taking the first bracket 61 as an example, a first bracket hole 611 is arranged in the middle of the bracket 61, and one end of the first bracket rope 91 In the bracket hole of the first support 61, the other end of the first bracket rope 91 is tied in the bracket hole of the second bracket 62, and one end of the second bracket rope 92 is tied in the bracket hole of the third bracket 63, and the second bracket The other end of 92 ropes is tied in the support hole of the 4th support 64.

如图2和图3所示,为了增大各个支架与地面之间的摩擦力,撬动装置还包括第一底座7和第二底座8,第一底座7包括第一铰接架71和第二铰接架72两个铰接架,第二底座8包括第三铰接架81和第四铰接架82两个铰接架,各铰接架分别呈“┐”形,第一支架61的底部铰接在第一铰接架71上,第三支架63的底部铰接在第二铰接架72上,第四支架64的底部铰接在第三铰接架81上,第二支架62的底部铰接在第四铰接架82上。As shown in Figure 2 and Figure 3, in order to increase the frictional force between each support and the ground, the prying device also includes a first base 7 and a second base 8, and the first base 7 includes a first hinged frame 71 and a second The hinged frame 72 is two hinged frames, and the second base 8 includes a third hinged frame 81 and a fourth hinged frame 82. Each hinged frame is in the shape of "┐" respectively, and the bottom of the first bracket 61 is hinged on the first hinged frame. On the frame 71, the bottom of the third support 63 is hinged on the second articulated frame 72, the bottom of the fourth support 64 is hinged on the third articulated frame 81, and the bottom of the second support 62 is hinged on the fourth articulated frame 82.

如图1至图6所示,在使用本实用新型开启井盖的时候,首先将各个部件组装,然后将第一支架61、第二支架62、第三支架63和第四支架64支撑在底面上,然后通过第一横杆2和第二横杆3之间的相对滑动来调节第一搭构22和第二搭构32之间的距离,使得第一搭构22穿过第一开启孔11、第二搭构32穿过第二开启孔12,然后通过第一横杆2和第二横杆3之间的滑动来缩小第一搭构22和第二搭构32之间的距离,使得第一搭构22和第二搭构32的水平部分分别卡在电缆井盖的下底面上,然后手持压杆5的自由端,通过杠杆原理将电缆井盖拉起。As shown in Figures 1 to 6, when the utility model is used to open the well cover, firstly the various components are assembled, and then the first support 61, the second support 62, the third support 63 and the fourth support 64 are supported on the bottom surface , and then adjust the distance between the first truss 22 and the second truss 32 through the relative sliding between the first crossbar 2 and the second crossbar 3, so that the first truss 22 passes through the first opening 11 , the second truss 32 passes through the second opening 12, and then the distance between the first truss 22 and the second truss 32 is reduced by sliding between the first crossbar 2 and the second crossbar 3, so that The horizontal parts of the first structure 22 and the second structure 32 are respectively stuck on the lower surface of the cable well cover, and then the free end of the hand-holding pressure rod 5 is used to pull up the cable well cover by the principle of leverage.

Claims (6)

1.一种电缆井开启器,其特征是,包括夹持装置、撬动装置和井盖拉绳,所述夹持装置包括第一横杆和第二横杆,第二横杆中沿横向设置有插孔,所述第一横杆右端滑动连接在插孔中,所述第一横杆的上侧固定连接有第一拉环,所述第二横杆的上侧固定连接有第二拉环,所述井盖拉绳的一端系在第一拉环上,所述井盖拉绳的另一端系在第二拉环上;1. A cable shaft opener, characterized in that it comprises a clamping device, a prying device and a manhole cover stay rope, and the clamping device comprises a first cross bar and a second cross bar, and the second cross bar is arranged laterally There is a jack, the right end of the first cross bar is slidably connected in the jack, the upper side of the first cross bar is fixedly connected with a first pull ring, and the upper side of the second cross bar is fixedly connected with a second pull ring. ring, one end of the manhole cover stay rope is tied to the first draw ring, and the other end of the manhole cover stay rope is tied to the second draw ring; 所述第一横杆的下侧固定连接有第一拉钩,第一拉钩靠近所述第一横杆的左端,所述第一拉钩呈形,所述第二横杆的下侧固定连接有第二拉钩,第二拉钩靠近所述第二横杆的右端,所述第二拉钩呈形;A first draw hook is fixedly connected to the lower side of the first cross bar, and the first draw hook is close to the left end of the first cross bar, and the first draw hook is shape, the lower side of the second cross bar is fixedly connected with a second pull hook, the second pull hook is close to the right end of the second cross bar, and the second pull hook is shape; 所述撬动装置包括连接板、压杆、安装轴、支架、和支架绳,所述连接板的一端设置有绳孔,所述井盖拉绳穿过绳孔,所述连接板的另一端铰接在压杆的一端,所述压杆转动安装在所述安装轴上,所述安装轴的每一端各设置有两个支架,所述每一个支架分别转动安装在安装轴上,每一个所述支架的中间位置处分别设置有支架孔;The prying device includes a connecting plate, a pressure rod, an installation shaft, a bracket, and a support rope, one end of the connecting plate is provided with a rope hole, the well cover stay rope passes through the rope hole, and the other end of the connecting plate is hinged At one end of the pressure rod, the pressure rod is rotatably mounted on the installation shaft, and each end of the installation shaft is respectively provided with two brackets, and each of the brackets is respectively rotatably mounted on the installation shaft, and each of the The middle positions of the brackets are respectively provided with bracket holes; 所述支架绳包括第一支架绳和第二支架绳,所述第一支架绳的一端系在位于转轴左端的其中一个支架的支架孔中,所述第一支架绳的另一端系在位于转轴左端的另一个支架的支架孔中,所述第二支架绳的一端系在位于转轴右端的其中一个支架的支架孔中,所述第二支架绳的另一端系在位于转轴右端的另一个支架的支架孔中。Described support rope comprises first support rope and second support rope, and one end of described first support rope is tied in the bracket hole of one of the brackets that is positioned at the left end of rotating shaft, and the other end of described first support rope is tied in the bracket hole that is positioned at rotating shaft. In the bracket hole of another bracket at the left end, one end of the second bracket rope is tied to the bracket hole of one of the brackets at the right end of the rotating shaft, and the other end of the second bracket rope is tied to another bracket at the right end of the rotating shaft. in the bracket hole. 2.根据权利要求1所述的一种电缆井开启器,其特征是,沿着所述安装轴的轴向等间距的分布有四个隔离螺纹孔,在每一个隔离螺纹孔中各配合有一个隔离螺栓,所述安装轴左端的两个支架位于最左侧的两个相邻的隔离螺栓之间,所述安装轴右端的两个支架位于最右侧的两个隔离相邻的螺栓之间,所述压杆位于中间的两个相邻的隔离螺栓之间。2. A cable well opener according to claim 1, characterized in that there are four isolating threaded holes distributed at equal intervals along the axial direction of the installation shaft, and each isolating threaded hole is equipped with One spacer bolt, the two brackets at the left end of the installation shaft are located between the leftmost two adjacent spacer bolts, and the two brackets at the right end of the installation shaft are located between the rightmost two spacer adjacent bolts Between, the pressure bar is located between two adjacent spacer bolts in the middle. 3.根据权利要求1所述的一种电缆井开启器,其特征是,所述第二横杆的上侧设置有横杆螺纹孔,横杆螺纹孔连通所述插孔,横杆螺纹孔中配合有压紧螺栓。3. A cable well opener according to claim 1, characterized in that, the upper side of the second cross bar is provided with a cross bar threaded hole, the cross bar threaded hole communicates with the jack, and the cross bar threaded hole Fitted with compression bolts. 4.根据权利要求1所述的一种电缆井开启器,其特征是,所述撬动装置还包括第一底座和第二底座,第一底座和第二底座各包括两个铰接架,所述铰接架呈形,位于转轴右端的其中一个支架的底部铰接在第一底座的其中一个铰接架上,位于转轴左端的其中一个支架的底部铰接在第一底座的另一个铰接架上,位于转轴右端的另一个支架的底部铰接在第二底座的其中一个铰接架上,位于转轴左端的另一个支架的底部铰接在第二底座的另一个铰接架上。4. A cable well opener according to claim 1, wherein the prying device further comprises a first base and a second base, each of the first base and the second base comprises two hinged frames, so The hinged frame is The bottom of one of the brackets at the right end of the rotating shaft is hinged on one of the hinged frames of the first base, the bottom of one of the brackets at the left end of the rotating shaft is hinged on the other hinged frame of the first base, and the other at the right end of the rotating shaft The bottom of the support is hinged on one of the hinged frames of the second base, and the bottom of the other bracket positioned at the left end of the rotating shaft is hinged on the other hinged frame of the second base. 5.根据权利要求1所述的一种电缆井开启器,其特征是,所述第一拉环位于第一拉钩的正上方,所述第二拉环位于第二拉钩的正上方。5 . The cable well opener according to claim 1 , wherein the first draw ring is located directly above the first draw hook, and the second draw ring is located directly above the second draw hook. 6.根据权利要求1所述的一种电缆井开启器,其特征是,所述压杆的自由端固定连接有手柄,手柄上设置有防滑橡胶。6 . The cable well opener according to claim 1 , wherein the free end of the pressure rod is fixedly connected with a handle, and the handle is provided with non-slip rubber. 7 .
CN201620270466.8U 2016-03-31 2016-03-31 Cable shaft opener Expired - Fee Related CN205556020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620270466.8U CN205556020U (en) 2016-03-31 2016-03-31 Cable shaft opener

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620270466.8U CN205556020U (en) 2016-03-31 2016-03-31 Cable shaft opener

Publications (1)

Publication Number Publication Date
CN205556020U true CN205556020U (en) 2016-09-07

Family

ID=56813702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620270466.8U Expired - Fee Related CN205556020U (en) 2016-03-31 2016-03-31 Cable shaft opener

Country Status (1)

Country Link
CN (1) CN205556020U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108751085A (en) * 2018-05-24 2018-11-06 国网甘肃省电力公司经济技术研究院 A kind of new pattern manhole cover opener
CN109132972A (en) * 2018-10-23 2019-01-04 国网山东省电力公司昌乐县供电公司 Cable well lid Operation Van
CN109534251A (en) * 2019-01-29 2019-03-29 四川同风源建设工程有限公司 A kind of cable channel cover plate starts booster
CN111792593A (en) * 2020-07-15 2020-10-20 国网山东省电力公司德州市陵城区供电公司 Portable cable well lid instrument of taking off
CN112357858A (en) * 2020-11-20 2021-02-12 广东电网有限责任公司 Manhole cover opening device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108751085A (en) * 2018-05-24 2018-11-06 国网甘肃省电力公司经济技术研究院 A kind of new pattern manhole cover opener
CN109132972A (en) * 2018-10-23 2019-01-04 国网山东省电力公司昌乐县供电公司 Cable well lid Operation Van
CN109534251A (en) * 2019-01-29 2019-03-29 四川同风源建设工程有限公司 A kind of cable channel cover plate starts booster
CN111792593A (en) * 2020-07-15 2020-10-20 国网山东省电力公司德州市陵城区供电公司 Portable cable well lid instrument of taking off
CN112357858A (en) * 2020-11-20 2021-02-12 广东电网有限责任公司 Manhole cover opening device

Similar Documents

Publication Publication Date Title
CN205556020U (en) Cable shaft opener
CN104167687A (en) Tool for live-line replacement of suspension insulator and using working method thereof
CN101409434A (en) Ground wire raiser
CN104078888A (en) Auxiliary tool for suspending conducting wire
CN102040166A (en) Hoisting tool for equipment on pillar
CN201882847U (en) Hoisting tool of pole-mounted transformer
CN206375648U (en) A well cover opening device
CN203667940U (en) Well lid opening device
CN203942204U (en) The live line working of a kind of 35kV supply line is carried line apparatus with insulation
CN103738890A (en) Magnet type well lid taking and placing vehicle
CN103663306A (en) Cable Manhole Cover Lifter
CN207211918U (en) Internally lifting pole
CN105811301B (en) The insulation of the 35kV supply lines livewire work of low cost carries line apparatus
CN206789984U (en) A kind of ground wire lifting device
CN107069533B (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN102515068A (en) Material lifter for telegraph poles
CN206395795U (en) Hydraulic type cable well lid easy opening device
CN106992474A (en) 10kV ends dismount aid
CN206685815U (en) 10kV ends dismount aid
CN201440587U (en) a pay-off tackle
CN201682211U (en) Pay-off block for "swallow-wing crossarm"
CN110690589A (en) A grounding pile that can be pulled out quickly
CN207645705U (en) A kind of cable pit cover plate opener
CN102832564A (en) Pull-out device of power grounding bar
CN209329567U (en) Transmission line of electricity profession shaft tower overhead-groundwire lifter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20170331