CN205541575U - Real platform of instructing is synthesized to electrician's electron - Google Patents
Real platform of instructing is synthesized to electrician's electron Download PDFInfo
- Publication number
- CN205541575U CN205541575U CN201521144903.3U CN201521144903U CN205541575U CN 205541575 U CN205541575 U CN 205541575U CN 201521144903 U CN201521144903 U CN 201521144903U CN 205541575 U CN205541575 U CN 205541575U
- Authority
- CN
- China
- Prior art keywords
- power supply
- sided
- electrotechnical
- mesh
- training platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001681 protective effect Effects 0.000 claims description 10
- 239000003990 capacitor Substances 0.000 claims description 9
- 230000005611 electricity Effects 0.000 claims description 3
- 238000009413 insulation Methods 0.000 claims description 3
- 230000001012 protector Effects 0.000 claims 1
- 238000002474 experimental method Methods 0.000 abstract description 6
- 206010014357 Electric shock Diseases 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000006698 induction Effects 0.000 description 2
- 239000004065 semiconductor Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 241000405070 Percophidae Species 0.000 description 1
- 239000003054 catalyst Substances 0.000 description 1
- 239000010960 cold rolled steel Substances 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003792 electrolyte Substances 0.000 description 1
- 230000005284 excitation Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Instructional Devices (AREA)
Abstract
The utility model provides a real platform of instructing is synthesized to electrician's electron, including the table the front and back of table lower part is equipped with two symmetrical door box that run from opposite directions respectively and personally experiences sth. Part of the body the upper portion of table is equipped with the frame, the table with frame structure as an organic whole install two -sided instrument testing power supply dish and two two -sided mesh boards in the frame, wherein two -sided instrument testing power supply dish sets up in the middle of the frame, two two -sided mesh boards symmetry set up and be in the left and right sides of two -sided instrument testing power supply dish the front and back of two -sided mesh board is equipped with respectively and hangs the case it is equipped with the link plate to hang the case below. The utility model discloses real platform of instructing is synthesized to electrician's electron can change the unicity and the scattered nature of traditional electrician electronic teaching experimental facilities, avoids in the experiment risk of generating circuit short circuit and electric shock, ensures operating personnel's personal safety.
Description
Technical field
This utility model belongs to electrical and electronic technology field, especially relates to a kind of electrotechnical, electronic comprehensive practical traning
Platform.
Background technology
Electrical and electronic technology is the specialized courses that higher education portion is arranged in institution of higher learning, Ye You institution of higher learning
Teaching material as non-electrolyte water solution.Electrotechnical, electronic includes electrician's study course and e-course two parts, Qi Zhong electricity
Work study course includes Fundamental Theory of Circuit and analysis method, DC circuit, sinusoidal ac circuit, magnetic circuit and change
Depressor, threephase asynchronous and control;E-course includes semiconductor device, amplifying circuit, voltage stabilizing
Power supply, Digital Circuit Basics, combinational logic circuit and sequential logical circuit etc..
Electrical and electronic technology theoretical property is relatively strong, and some universities and colleges use procedural teaching model, uninteresting theory
Teaching weakens student learning interest, the effect of impact study.In teaching, teacher is also ready to use in fact
Test pedagogy, deepen student to the understanding of knowledge, the ability of practice of starting of having tempered student.But electrician
The experimental project that electronic technology relates to is more, and market teaching experimental equipment is mostly single or scattered, institute
These experimental facilitiess are bought in school, and the fund not only spent is many but also teaching and the upper difficulty of keeping are many, particularly
There is short circuit and the risk threats personal safety got an electric shock in Experiment of Electronics.
Summary of the invention
This utility model provides a kind of electrotechnical, electronic comprehensive training platform, it is possible to change tradition electrotechnical, electronic religion
Learn the unicity of experimental facilities and scattered property, it is to avoid experiment occurs short circuit and the risk of electric shock, really
Protect the personal safety of operator.
For solving above-mentioned technical problem, the technical solution adopted in the utility model is: a kind of electrotechnical, electronic is combined
Close training platform, including table, be respectively equipped with in the front and back of described table bottom two symmetrical
Clamshell doors casing, be provided with framework on the top of described table, described table and described framework are integrated knot
Structure, is provided with two-sided Meter Test power supply disks and two two-sided mesh plates in described framework, wherein said
Two-sided Meter Test power supply disks is arranged in the middle of described framework, and two described two-sided mesh plates are symmetrical arranged
In the left and right sides of described two-sided Meter Test power supply disks, divide in the front and back of described two-sided mesh plate
It is not provided with extension case, below described extension case, is provided with link plate.
Further, the front and back of described two-sided Meter Test power supply disks is respectively equipped with Meter Test group
Part, two voltmeters that described Meter Test assembly includes setting gradually from top to bottom, two ammeters,
Two power-factor meters, two ac power supply terminal, two DC source display modules and two friendships
Streaming socket, be from left to right sequentially provided with below described AC socket earth leakage protective device, emergency stop switch and
Power supply indicator.
Further, the bottom of described voltmeter is provided with voltmeter binding post, the bottom of described ammeter
Being provided with ammeter wiring terminal, the bottom of described power-factor meter is provided with power-factor meter binding post, institute
The bottom stating power supply display module is provided with direct current binding post and multi-turn adjustable potentiometer.
Further, the backboard of described two-sided Meter Test power supply disks is provided with a DC source, two
Individual Switching Power Supply, a capacitor and AC power cord, described DC source respectively with described DC source
Display module, described earth leakage protective device are connected, and two described Switching Power Supplies are straight with described two respectively
Stream power supply display module is connected, and described capacitor is connected with described emergency stop switch, and described AC power cord divides
It is not connected with described earth leakage protective device, described capacitor and earth lead.
Specifically, the desktop of described table is pasted with the rubber peel of 2mm heavy insulation and antistatic.
Specifically, being provided with dividing plate in described clamshell doors casing, described clamshell doors casing is divided by described dividing plate
It is segmented into multiple separate space for placing test matching appliances.
Specifically, the most each 60 of the mesh of arrangement on described mesh plate, each mesh is at described mesh
On plate transversely arranged, the long 10mm of described mesh, wide 5mm, the spacing of adjoining cells is 3mm.
Specifically, described extension case and described link plate use magnetic force to suck on described mesh plate.
1, this utility model electrotechnical, electronic comprehensive training platform, arranges framework on table, passes through framework
Being provided with two-sided Meter Test power supply disks and two two-sided mesh plates, before and after table bottom, two sides is respectively
Two clamshell doors casings are set, constitute two-sided four station tables, it is possible to for four operator simultaneously,
Not only save fund but also convenient teaching and keeping.
2, this utility model electrotechnical, electronic comprehensive training platform, concentrates on two-sided Meter Test power supply disks
It is mounted with multiple Meter Test components and parts, it is possible to carry out multinomial experimental project, changes tradition electrotechnical, electronic
The unicity of teaching experimental equipment and scattered property, easy to operate.
3, this utility model electrotechnical, electronic comprehensive training platform, installs on two-sided Meter Test power supply disks
While the reliable earth leakage protective device of high-quality, emergency stop switch, also it is connected to peace at complete machine and key position
Complete firm earth lead, it is possible to be prevented effectively from short circuit and the risk got an electric shock, it is ensured that test operation personnel's
Personal safety.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model electrotechnical, electronic comprehensive training platform;
Fig. 2 is table and the framework connection diagram of this utility model electrotechnical, electronic comprehensive training platform;
Fig. 3 is the Meter Test power supply disks schematic diagram of this utility model electrotechnical, electronic comprehensive training platform;
Fig. 4 is the circuit connection diagram of this utility model electrotechnical, electronic comprehensive training platform.
In figure: table 1, clamshell doors casing 2, framework 3, mesh plate 4, Meter Test power supply disks 5,
Hang case 6, link plate 7, voltmeter 8, ammeter 9, power-factor meter 10, AC 380V supply terminals
Son 11, DC 0~30V power supply display module 12, AC 220V socket 13, earth leakage protective device 14, anxious
Guard's valve 15, power supply indicator 16, voltmeter binding post 17, ammeter wiring terminal 18, power
Factor table binding post 19, DC 0~30V binding post 20, multi-turn adjustable potentiometer 21, AC 380V
Power line 22, DC 5V power supply 23, Switching Power Supply 24,400V capacitor 25, earth lead 26.
Detailed description of the invention
Below in conjunction with the accompanying drawings specific embodiment of the utility model is elaborated.
As shown in Figure 1-2, this utility model electrotechnical, electronic comprehensive training platform, including table 1, in institute
The front and back stating table 1 bottom is respectively equipped with two symmetrical clamshell doors casings 2, at described
The top of table 1 is provided with framework 3, is provided with two-sided Meter Test power supply disks 5 and two in described framework 3
Individual two-sided mesh plate 4, wherein said two-sided Meter Test power supply disks 5 is arranged in the middle of described framework 3,
Two described two-sided mesh plates 4 are symmetricly set on the left and right sides of described two-sided Meter Test power supply disks 5,
It is respectively equipped with extension case 6 in the front and back of described two-sided mesh plate 4, is provided with below described extension case 6
Link plate 7.Described extension case 6, described link plate 7 and kinds of experiments module use magnetic force to suck at described net
On orifice plate 4, easy to use, flexible operation.
Specifically, table with the size of described table 1 preferably for long 1800mm, wide 900mm, height
500mm, one side table length 1800,500mm wide by 450, high, desktop can use 25mm thickness duckbill
Plate, panel pastes 2mm heavy insulation and the rubber peel of antistatic.Described clamshell doors casing 2 can be selected for 40mm
× 40mm square steel tube makes the table case skeleton for load-bearing, arranges dividing plate, by described dividing plate in casing
It is divided into multiple separate space for placing test matching appliances, in casing, places experiments supporting apparatus,
Such as 3, catalyst, air switch 1, thermorelay 1, emergency stop switch 1, DIN35 lead
1 meter of rail, 24V display lamp 3, incandescent lamp holder 1, electric filament lamp 1, wire casing 1 meter, BVR0.75
Flexible cord 50 meters, 5A usher to seat insurance 5,24V auxiliary reclay 3,3, the 24V time relay etc.
Element.The size of the framework 3 on table surface top is preferably for there being the height frame for 1300mm × 1800mm
Frame, framework 3 is made load-bearing skeleton with the square steel tube of 40mm × 40mm, and is connected with the skeleton of table 1
It is integrally forming, it is ensured that the robustness of electrotechnical, electronic comprehensive training platform and stability.Before framework 3
Rear two sides be respectively mounted two pieces of thick 1.5mm cold-rolled steel sheet make mesh plate and one block of Meter Test power supply
Dish, constitutes two-sided Meter Test power supply disks 5 and two-sided mesh plate 4, every piece of mesh plate hight 1200mm, width
650mm, every piece of Meter Test power supply disks height 1200mm, wide 300mm, mesh plate and Meter Test power supply
Dish is designed as butterfly-like shape, and the outer surface ratio of the two-sided Meter Test power supply disks 5 being arranged on centre is arranged on
The outer surface of the two-sided mesh plate 4 of both sides highlights forward 300mm, and on every piece of mesh plate, the mesh of arrangement is horizontal
Perpendicular each 60, mesh adds up to 3600, and each mesh is transversely arranged on mesh plate 4, the long 10mm of mesh,
Wide 5mm, pitch of holes 3mm.
As shown in Figure 3-4, at the every block of Meter Test power supply constituting described two-sided Meter Test power supply disks 5
Being respectively equipped with Meter Test assembly on dish, described Meter Test assembly includes two set gradually from top to bottom
8, two ammeters of individual voltmeter, 10, two AC 380V supply terminals of 9, two power-factor meters
11, two DC 0~30V power supply display modules 12 of son and two AC 220V sockets 13, described
Earth leakage protective device 14, emergency stop switch 15 and power supply from left to right it is sequentially provided with below AC 220V socket 13
Display lamp 16.
The bottom of described voltmeter 8 is provided with voltmeter binding post 17, and the bottom of described ammeter 9 is provided with
Ammeter wiring terminal 18, the bottom of described power-factor meter 10 is provided with power-factor meter binding post 19,
The bottom of described DC 0~30V power supply display module 12 is provided with DC 0~30V binding post 20 and multi-turn
Adjustable potentiometer 21.
On the backboard of every piece of Meter Test power supply disks constituting described two-sided Meter Test power supply disks 5 respectively
It is provided with 24,400V capacitor 25 and AC 380V of 23, two Switching Power Supplies of a DC 5V power supply
Power line 22, described DC 5V power supply 23 respectively with described DC 0~30V power supply display module 12, institute
State earth leakage protective device 14 to be connected, two described Switching Power Supplies 24 respectively with described two DC 0~30V
Power supply display module 12 is connected, and described capacitor 25 is connected with described emergency stop switch 15, described AC 380V
Power line 22 is connected with described earth leakage protective device 14, described 400V capacitor 25 and earth lead 26 respectively.
This utility model electrotechnical, electronic comprehensive training platform, it is possible to the technology experiment content carried out includes: electricity
Road theoretical basis and the method for analysis, DC circuit, sinusoidal ac circuit, magnetic circuit and transformator, three different
Step motor and control, semiconductor device, amplifying circuit, regulated power supply, Digital Circuit Basics, combination
Logic circuit and sequential logical circuit etc..Can carry out electric filament lamp control circuit, human induction switch controls building
Ladder filament lamp circuit, audio-switch control stair filament lamp circuit, single-phase watt-hour meter is mounted directly circuit,
Single-phase motor control circuit, Shunt-excited DC Motors Based excitation control of DC motor speed circuit, current transformer and ammeter
Circuit is installed in adapted wiring, volometer, three-phase four-wire watt-hour meter is mounted directly circuit, three-phase
Four line active watt-hour meters install circuit, the current transformer connection circuit for single-phase loop, electric current indirectly
Transformer circuit, Induction Motor Control circuit, and sinusoidal ac circuit, amplifying circuit, direct current are steady
Experimental project is planted in the application of voltage source, IGCT, combinational logic circuit and sequential logical circuit etc. more than 40,
Change unicity and the defect of scattered property, an experimental facilities of tradition electrical and electronic teaching experimental facilities
Being available for four students to use, multiple stage experimental facilities can be combined specialized laboratory simultaneously, and fund of not only saving is many
And convenient teaching and keeping, especially it is avoided that short circuit and the risk got an electric shock, guarantees the personal safety of teachers and students.
Above preferred embodiment of the present utility model is described in detail, but described content has been only this reality
With novel preferred embodiment, it is impossible to be considered for limiting practical range of the present utility model.Fan Yiben
Impartial change that utility model application scope is made and improvement etc., all should still belong to of the present utility model specially
Within profit covering scope.
Claims (8)
1. an electrotechnical, electronic comprehensive training platform, it is characterised in that: include table, at described table
The front and back of bottom is respectively equipped with two symmetrical clamshell doors casings, sets on the top of described table
There are framework, described table to be structure as a whole with described framework, described framework are provided with two-sided instrument and survey
Examination power supply disks and two two-sided mesh plates, wherein said two-sided Meter Test power supply disks is arranged on described framework
Centre, two described two-sided mesh plates are symmetricly set on the left and right two of described two-sided Meter Test power supply disks
Side, is respectively equipped with extension case in the front and back of described two-sided mesh plate, is provided with extension below described extension case
Plate.
Electrotechnical, electronic comprehensive training platform the most according to claim 1, it is characterised in that: described
The front and back of two-sided Meter Test power supply disks is respectively equipped with Meter Test assembly, described Meter Test group
Two voltmeters that part includes setting gradually from top to bottom, two ammeters, two power-factor meters, two
Individual ac power supply terminal, two DC source display modules and two AC socket, in described friendship
Earth leakage protective device, emergency stop switch and power supply indicator from left to right it is sequentially provided with below streaming socket.
Electrotechnical, electronic comprehensive training platform the most according to claim 2, it is characterised in that: described
The bottom of voltmeter is provided with voltmeter binding post, and the bottom of described ammeter is provided with ammeter wiring terminal,
The bottom of described power-factor meter is provided with power-factor meter binding post, the bottom of described power supply display module
It is provided with direct current binding post and multi-turn adjustable potentiometer.
Electrotechnical, electronic comprehensive training platform the most according to claim 3, it is characterised in that: in institute
The backboard stating two-sided Meter Test power supply disks is provided with a DC source, two Switching Power Supplies, electricity
Container and AC power cord, described DC source respectively with described DC source display module, described electric leakage
Protector is connected, and two described Switching Power Supplies are connected with two described DC source display modules respectively,
Described capacitor is connected with described emergency stop switch, described AC power cord respectively with described earth leakage protective device,
Described capacitor is connected with earth lead.
Electrotechnical, electronic comprehensive training platform the most according to claim 1, it is characterised in that: described
The rubber peel of 2mm heavy insulation and antistatic it is pasted with on the desktop of table.
Electrotechnical, electronic comprehensive training platform the most according to claim 1, it is characterised in that: described
Being provided with dividing plate in clamshell doors casing, described clamshell doors casing is divided into multiple for placing by described dividing plate
The separate space of test matching appliances.
Electrotechnical, electronic comprehensive training platform the most according to claim 1, it is characterised in that: described
The most each 60 of the mesh of arrangement on mesh plate, each mesh is transversely arranged on described mesh plate, institute
Stating the long 10mm of mesh, wide 5mm, the spacing of adjoining cells is 3mm.
Electrotechnical, electronic comprehensive training platform the most according to claim 1, it is characterised in that: described
Hang case and described link plate uses magnetic force to suck on described mesh plate.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521144903.3U CN205541575U (en) | 2015-12-31 | 2015-12-31 | Real platform of instructing is synthesized to electrician's electron |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521144903.3U CN205541575U (en) | 2015-12-31 | 2015-12-31 | Real platform of instructing is synthesized to electrician's electron |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205541575U true CN205541575U (en) | 2016-08-31 |
Family
ID=56763475
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521144903.3U Expired - Fee Related CN205541575U (en) | 2015-12-31 | 2015-12-31 | Real platform of instructing is synthesized to electrician's electron |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205541575U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107633754A (en) * | 2017-11-08 | 2018-01-26 | 江苏省交通技师学院 | A kind of electrical practice training platform |
| CN108573646A (en) * | 2018-04-15 | 2018-09-25 | 武汉市整流器研究所 | A kind of power electronics major teaching experimentation device |
| CN108932901A (en) * | 2018-08-15 | 2018-12-04 | 韩小兵 | Electrician's integrating skills real training examines platform |
| CN109801533A (en) * | 2019-04-01 | 2019-05-24 | 广东海洋大学 | It is a kind of to fix the electrotechnical, electronic simulation and training device used convenient for adjusting |
-
2015
- 2015-12-31 CN CN201521144903.3U patent/CN205541575U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107633754A (en) * | 2017-11-08 | 2018-01-26 | 江苏省交通技师学院 | A kind of electrical practice training platform |
| CN108573646A (en) * | 2018-04-15 | 2018-09-25 | 武汉市整流器研究所 | A kind of power electronics major teaching experimentation device |
| CN108932901A (en) * | 2018-08-15 | 2018-12-04 | 韩小兵 | Electrician's integrating skills real training examines platform |
| CN109801533A (en) * | 2019-04-01 | 2019-05-24 | 广东海洋大学 | It is a kind of to fix the electrotechnical, electronic simulation and training device used convenient for adjusting |
| CN109801533B (en) * | 2019-04-01 | 2020-10-02 | 广东海洋大学 | An electrical and electronic simulation training device that is easy to adjust and use |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103390364B (en) | Comprehensive experiment platform for electronic technology | |
| WO2010060178A2 (en) | Mobile modular laboratory for electricity and electronics teaching | |
| CN202257990U (en) | Combined table for transformer verification simulation training | |
| CN201859578U (en) | Experiment training device for solar photovoltaic power generation system | |
| CN205264193U (en) | Wiring analog device for electric energy meter | |
| CN103996338B (en) | Intelligent open type multifunctional Power Electronic Experimentation device | |
| CN204614324U (en) | Movable mesh plate electrician training platform | |
| CN205354432U (en) | A maintenance electrician training equipment | |
| CN103559823A (en) | Electrical teaching practical training multifunctional cabinet | |
| CN206348986U (en) | A kind of electrician's skill operation training station | |
| CN108636480A (en) | A kind of electronic instrument combination experiment platform | |
| CN105006200B (en) | A kind of small multi-functional actual training device of floor space | |
| CN206908169U (en) | A kind of electric apparatus Commissioning field job platform | |
| CN103698560B (en) | High-frequency electromagnetic field anti-interference test fixture | |
| CN209133004U (en) | A kind of Multi-function electrician training experimental | |
| CN207038005U (en) | A kind of safe and efficient electronic-electric experiment platform | |
| CN106781930A (en) | A physics teaching experiment platform | |
| CN107633754A (en) | A kind of electrical practice training platform | |
| CN205487014U (en) | College physical experiment platform | |
| CN204130028U (en) | A kind of maintenance electrician technical ability real training device | |
| CN209328332U (en) | A kind of distribution experiment operation platform device | |
| CN206489808U (en) | A kind of building block system comprehensive practical traning platform | |
| CN203606638U (en) | Power supply console for power-on test | |
| CN203659296U (en) | Electric power practical training teaching display cabinet | |
| CN103177640A (en) | Fault simulation assessment device of three-phase asynchronous motor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20201231 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |