CN205538269U - To experiment platform in filling hydraulic support - Google Patents

To experiment platform in filling hydraulic support Download PDF

Info

Publication number
CN205538269U
CN205538269U CN201620266534.3U CN201620266534U CN205538269U CN 205538269 U CN205538269 U CN 205538269U CN 201620266534 U CN201620266534 U CN 201620266534U CN 205538269 U CN205538269 U CN 205538269U
Authority
CN
China
Prior art keywords
jack
loading
back timber
filling
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620266534.3U
Other languages
Chinese (zh)
Inventor
史磊
张文瑞
张芳卫
梁勇
孙艳
唐晓磊
郑永强
梁鹤
曹银苟
黄泉清
陈素芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Siwei Electromechanical Equipment Manufacturing Co Ltd
Original Assignee
Four-Dimensional Mining Machinery Co Ltd In Zhengzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Four-Dimensional Mining Machinery Co Ltd In Zhengzhou filed Critical Four-Dimensional Mining Machinery Co Ltd In Zhengzhou
Priority to CN201620266534.3U priority Critical patent/CN205538269U/en
Application granted granted Critical
Publication of CN205538269U publication Critical patent/CN205538269U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a to experiment platform in filling hydraulic support, including loading beam and loading jack that go up to connect, the loading beam extends along the fore -and -aft direction, loading portion and back loading portion before the front side of loading beam is equipped with, and the back jack of department is put at back loading position that the loading jack includes the preceding jack of the preceding loading position department of putting that is in the loading beam and is in the loading beam, the preceding hydraulic means who is used for controlling both relative independent telescope that is connected with on the jack after, the beam length of loading beam is not less than the beam length sum of filling side arm back timber and the after -frame back timber of support of treating the experiment, simultaneously the effect preceding, jack afterwards through relative independent telescope for jack load not in the front, under the independent loaded circumstances of back jack, the local load to the after -frame back timber can be realized to the loading beam, can simulate the solitary pressurized circumstances of after -frame back timber like this, fills the bearing capacity of hydraulic support's preceding, after -frame back timber with better experiment.

Description

A kind of experiment porch being directed to filling hydraulic support
Technical field
This utility model relates to a kind of experiment porch being directed to filling hydraulic support.
Background technology
At present; based on solving the purposes such as " three times " mining pressed coal, surface buildings protection and earth's surface solid waste process; Coal work person have developed solid filling coal-mining technique; the solidss such as earth's surface spoil, flyash and building waste are filled with goaf by this technology; while displacing " three times " pressure coal, effective control overlying mining rock moves and earth's surface precipitation.As disclosed in Chinese patent literature CN 103104275 A " a kind of waste filling hydraulic support ", including the front and back ends head bracket front and back arranged, side arm back timber is had by side arm upright supports on the side arm base of front end support, after-frame back timber is had by after-frame upright supports, to increase the supporting scope of hydraulic support by arranging of forward and backward frame back timber on the after-frame base of follower head support." press coal three times " for solution coal resources in China response rate recovery low, safe and efficient, utilize the solid waste such as gangue, protection mining area and soil and ecological environment problem to provide reliable method and technological approaches.Solid filling and coal mining integrated hydraulic support experienced by the design optimization in four generations, no matter in structure, function, or all had in terms of manufacturing process and develop largely, but have yet suffered from some problems and need to solve.First, the design of current support and optimization are mainly by conventional experience, and can not be simulated by the method for laboratory experiment and determine;Second, most of use problem of support is to find in application process at the scene, and improvement then needs the product of looking unfamiliar that quits work, and carries out in the small space of down-hole, has a strong impact on production;3rd, by implementing the feedback of mine at present, during the onsite application of support, in terms of stent length, working place and mining conditions adaptability, yet suffer from the space optimized further.And also there is no a set of experiment porch being applied to the test of filling support both at home and abroad, along with the popularization and application of filling support coal-mining technique, the detection of the quality system of filling hydraulic support, structure improvement and deep theory innovation work are extremely the most urgent.In order to solve the vacancy of domestic and international filling support experiment porch, improve solid filling coal mining theoretical research, simulation support each mechanism kinematic track testing, support each position forces testing, compacting, from apex distance test and compacting angle measurement etc., provide experimental basis for support force analysis, structure optimization, the perfect of reinforcement mechanism.Traditional hydraulic support experiment porch can only simulate front back timber by stressing conditions during roof weighting, have ignored the stressing conditions of after-frame back timber, and filling hydraulic pressure timberer when making after-frame back timber also by the pressure of top board, so, traditional hydraulic support experiment porch can not be simulated hydraulic support really and be changed by the stress at position each during roof pressure.
Utility model content
The purpose of this utility model is to provide a kind of experiment porch being directed to filling hydraulic support, it is intended to solve the problem that in prior art, the loading conditions of after-frame back timber cannot be simulated by traditional experiment platform.
In order to realize object above, the technical scheme of the experiment porch being directed to filling hydraulic support in this utility model is as follows:
It is directed to the experiment porch of filling hydraulic support, the loading jack for pressing downwards loading beam including the loading beam on the back timber for being pressed on filling support to be tested and upper connection thereof, loading beam extends along the longitudinal direction, the front loading unit that the front side of loading beam is provided with on the side arm back timber for being pressed on filling support and the rear loading unit on the after-frame back timber being pressed on filling support, load jack and include being in the front jack of the front loading unit position of loading beam and the rear jack of the rear loading unit position being in loading beam, before, connect on rear jack and have for controlling both relatively independent flexible hydraulic means.
The lower end loading jack is connected on loading beam, loads the upper end of jack and connects and have rigid bar, and rigid bar connects vertically extending column, and the bottom of column is fixed with for bracketing bearing base below filling support.
Column has two or more and arranges at fore-and-aft direction interval, is provided with the reinforcement diagonal brace being fixed between bearing base and rigid bar between two the most adjacent columns.
Rigid bar includes the back timber of framework shape, and back timber is fixed on the top of column, and bridge joint has fixing seat, the upper end of described loading jack to be assemblied on fixing seat between the left and right sides side bar of back timber.
Fixing seat has two or more and arranges at fore-and-aft direction interval, and adjacent two fix between seat and/or bridge joint is fixed with the buttress brace being between the beam of the left and right sides between fixing seat and the front side beam of back timber and/or between fixing seat and the rear side bar of back timber.
It is also equipped with two or more between rigid bar and loading beam to be connected to rigid bar upper and lower end be connected on loading beam in fore-and-aft direction spaced anticreep chain, the upper end of anticreep chain.
Anticreep chain includes the chain of splayed or the V-shaped being drifted apart from from top to bottom at left and right directions, the middle part of chain wear or around being located at above rigid bar, two ends between left and right every be connected on loading beam.
Anticreep chain has two and is respectively at the two ends of loading beam.
Loading the middle jack that jack also includes being between forward and backward jack, jack is connected on hydraulic means, relatively independent the stretching of hydraulic means jack before, during and after controlling.
Before, during and after the jack group that is all made up of plural jack monomer of jack, be intervally arranged with about jack each in group.
In this utility model, the beam length of loading beam is not less than side arm back timber and the beam length sum of after-frame back timber of filling support to be tested, this rear loading unit allowing for loading beam can load above after-frame back timber, simultaneously by relatively independent flexible before, the effect of rear jack, make to be not loaded with at front jack, in the case of rear jack individually loads, loading beam can realize the local loading to after-frame back timber, so can simulate after-frame back timber single pressurized situation, before preferably experiment filling hydraulic support, the bearing capacity of after-frame back timber, therefore in this utility model, experiment porch solves the problem that in prior art, the loading conditions of after-frame back timber cannot be simulated by traditional experiment platform, this experiment porch has loading position and is reasonably distributed, the feature that experiment versatility is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the A-A sectional view of Fig. 1.
Detailed description of the invention
This utility model is directed to the embodiment of the experiment porch of filling hydraulic support: as shown in Figure 1 to Figure 3, this experiment porch is applied to underground coal mine fully-mechanized coalface support apparatus technical field, it is adapted to little mining height, the experiment of little working resistance, it is capable of whole loading experiments of before and after's frame back timber, and local loading lower carriage integral top beam each position stress situation of change.Loading jack, loading beam 1 that this experiment porch is mainly arranged by loading support and top thereof form.
Load support to include for bracketing at the bearing base 5 of the rectangle of the lower section of filling support, this bearing base 5 extends along the longitudinal direction, on the edge, the left and right sides of bearing base 5, symmetry is equipped with some columns 4, each column 4 is at fore-and-aft direction uniformly at intervals, and it is fixed with rigid bar 2 at the top of each column 4, being provided with the reinforcement diagonal brace 6 being in bearing base 5 left and right sides between adjacent two columns 4, the lower end strengthening diagonal brace 6 is fixed on the bottom of a column 4, upper end is fixed on the top of adjacent upright posts 4.nullRigid bar 2 includes the back timber 21 of framework shape,Back timber 21 left and right sides side bar is erected at above the column 4 of bearing base 5 left and right sides,Before and after back timber 21, the side bar of both sides bridges respectively and is fixed on a left side、Between the end of the right beam,Left、Fixing seat 22 before also bridge joint is fixed with between right two side bars、In fix seat 23 and rear fixing seat 24,Front fixing seat 22、In fix seat 23 and rear fixing seat 24 time interval and arrange,At front fixing seat 22、In fix adjacent bridge joint between the two in seat 23 and rear fixing seat 24 and be fixed with and be set in parallel in a left side、Middle buttress brace 26 in the middle of the beam of the right,Between front fixing seat 22 and front side beam, bridge joint is fixed with and is set in parallel in a left side、Front buttress brace 25 in the middle of the beam of the right,Between rear fixing seat 24 and rear side bar, bridge joint is fixed with and is set in parallel in a left side、Rear buttress brace 27 in the middle of the beam of the right.
Load jack and have three groups and outfan is arranged the most down, three groups load jack and are divided into front jack 31, middle jack 32 and rear jack 33 along the longitudinal direction, front jack 31, middle jack 32 and rear jack 33 are all made up of the jack monomer of a pair symmetrical arrangement, the cylinder body of the most front jack 31 is fixed on seat 22 before being fixed on, the cylinder body of middle jack 32 is fixed on seat 23 in being fixed on, and the cylinder body of rear jack 33 is fixed on seat 24 after being fixed on.Connect on front jack 31, middle jack 32 and rear jack 33 and have the hydraulic means controlling the relatively independent stretching motion of three, this hydraulic means i.e. both can control front jack 31, middle jack 32 and rear jack 33 synchronization action, any one or any two action can also be controlled in front jack 31, middle jack 32 and rear jack 33, and remaining is failure to actuate.
In loading beam 1 is in loading support and front and back extend, loading beam 1 is in the lower section of rigid bar 2, the front loading unit that the front side of loading beam 1 is provided with on the side arm back timber for being pressed on filling support and the rear loading unit on the after-frame back timber being pressed on filling support, this forward and backward loading unit is all the downside of loading beam 1.Connect between front loading unit and front buttress brace 25 and have front anticreep chain 71, connect between rear loading unit and rear buttress brace 27 and have rear defence lock-off chain 72, front anticreep chain 71 and rear defence lock-off chain 72 are all the V-shaped chains being drifted apart from left and right directions from top to bottom, the middle part of chain wear or around being located at above rigid bar, two ends between left and right every be connected on loading beam.On the hinged seat that the lower end of front jack 31 is fixing on the upper side that the axis that left and right extends is hinged on front loading unit, the lower end of middle jack 32 is hinged on the upper side in the middle part of loading beam 1 on fixing hinged seat around the axis that left and right extends, on the hinged seat that the lower end of rear jack 33 is fixing on the upper side that the axis that left and right extends is hinged on rear loading unit.
In the present embodiment, the loading beam 1 of experiment porch designs longer.Because relative to conventional hydraulic support, the after-frame back timber of filling hydraulic support is also subjected to from roof pressure in real work.The most described experiment porch can adapt to the experiment of different top beam length filling hydraulic support by changing loading jack quantity, and the design of this loading beam 1 is adapted to the carrying experiment with the filling hydraulic support of before and after's back timber.Filling hydraulic support can be tested with the form that inside and outside loads, preferably select external load experiment method, by the support force situation of external roof pressure when can simulate real work more really, load mode is jack pressure, it is achieved simulation support is overall and partial pressing's situation.
The operation principle of this experiment porch is: first, filling support is placed on bearing base 5, load support setting prop to certain altitude, the manipulation valve of hydraulic means operates simultaneously, the height of loading beam 1 adjusts height with the telescopic variation loading jack and loads, and each operation valve is fine-tuning, to keep loading beam 1 level, side arm back timber and after-frame back timber to filling support pressurize, and simulate the operating mode of filling set cap entirety pressurized;Also can individually finely tune each or two jack monomers simultaneously, make filling hydraulic support top beam local compression, simulate back timber local compression situation with this, in place of being different from conventional hydraulic support experiment porch just, by local loading, can realize the simulation experiment of back timber after filling hydraulic support.This is due to filling support after-frame back timber roof pressure to be born in real work, therefore back timber after filling support is tested, this is a kind of brand-new design, it is different from conventional stent experiment porch, the stressing conditions of back timber after can simulating accurately, and carry out force analysis, be conducive to the most perfect to its mechanism.By installing various digital collection instrument on experiment porch, Pressure gauge gather each stress point stress change information.Secondly, experiment porch is applicable to the filling support in girdle work, it is applicable to the loading of long back timber, external pressurized is carried out by the loading jack pair long back timber of filling support being arranged on long loading beam 1, as a example by accompanying drawing, it is mounted with six jack monomers, length and the number of jack monomer of loading beam 1 can be designed according to the length of filling support, by handling valve events, carry out the simulation test of long bar timber.Being directed to filling hydraulic support, this experiment porch can test compacting apex distance and compacting angle, thus reinforcement mechanism is optimized improvement, designs the more preferable reinforcement mechanism of performance.
In the above-described embodiments, in hydraulic means, the oil circuit control of each jack monomer is relatively independent, to realize the control respectively to each jack monomer, in other embodiments, can also be by same oil circuit, the mode that simply each jack monomer corresponding is respectively provided with controlled valve in oil circuit exit position realizes the control respectively to each jack monomer, naturally it is also possible to the mode using other oil circuits to control realizes the control respectively to each jack monomer.It addition, the chain of anticreep chain not only can use V-shaped, it would however also be possible to employ splayed.Before, during and after and, jack all uses a pair jack monomer to be the perpendicularity in order to obtain downward pressure, it is to avoid deflection occurs in downforce, in other embodiments, it is also possible to realize vertical force by guiding mechanism between loading beam and rigid bar.

Claims (10)

1. it is directed to the experiment porch of filling hydraulic support, the loading jack for pressing downwards loading beam including the loading beam on the back timber for being pressed on filling support to be tested and upper connection thereof, loading beam extends along the longitudinal direction, it is characterized in that, the front loading unit that the front side of loading beam is provided with on the side arm back timber for being pressed on filling support and the rear loading unit on the after-frame back timber being pressed on filling support, load jack and include being in the front jack of the front loading unit position of loading beam and the rear jack of the rear loading unit position being in loading beam, before, connect on rear jack and have for controlling both relatively independent flexible hydraulic means.
The experiment porch being directed to filling hydraulic support the most according to claim 1, it is characterized in that, the lower end loading jack is connected on loading beam, the upper end connection loading jack has rigid bar, connecting on rigid bar and have vertically extending column, the bottom of column is fixed with for bracketing bearing base below filling support.
The experiment porch being directed to filling hydraulic support the most according to claim 2, it is characterized in that, column has two or more and arranges at fore-and-aft direction interval, is provided with the reinforcement diagonal brace being fixed between bearing base and rigid bar between two the most adjacent columns.
The experiment porch being directed to filling hydraulic support the most according to claim 2, it is characterized in that, rigid bar includes the back timber of framework shape, back timber is fixed on the top of column, and bridge joint has fixing seat, the upper end of described loading jack to be assemblied on fixing seat between the left and right sides side bar of back timber.
The experiment porch being directed to filling hydraulic support the most according to claim 4, it is characterized in that, fixing seat has two or more and arranges at fore-and-aft direction interval, and adjacent two fix between seat and/or bridge joint is fixed with the buttress brace being between the beam of the left and right sides between fixing seat and the front side beam of back timber and/or between fixing seat and the rear side bar of back timber.
The experiment porch being directed to filling hydraulic support the most according to claim 2, it is characterized in that, it is also equipped with two or more between rigid bar and loading beam to be connected to rigid bar upper and lower end be connected on loading beam in fore-and-aft direction spaced anticreep chain, the upper end of anticreep chain.
The experiment porch being directed to filling hydraulic support the most according to claim 6, it is characterized in that, anticreep chain includes the chain of splayed or the V-shaped being drifted apart from from top to bottom at left and right directions, the middle part of chain wear or around being located at above rigid bar, two ends between left and right every be connected on loading beam.
The experiment porch being directed to filling hydraulic support the most according to claim 6, it is characterised in that anticreep chain has two and is respectively at the two ends of loading beam.
The experiment porch being directed to filling hydraulic support the most as claimed in any of claims 1 to 8, it is characterized in that, load the middle jack that jack also includes being between forward and backward jack, jack is connected on hydraulic means, relatively independent the stretching of hydraulic means jack before, during and after controlling.
The experiment porch being directed to filling hydraulic support the most according to claim 9, it is characterised in that before, during and after the jack group that is all made up of plural jack monomer of jack, be intervally arranged with about jack each in group.
CN201620266534.3U 2016-03-31 2016-03-31 To experiment platform in filling hydraulic support Expired - Fee Related CN205538269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620266534.3U CN205538269U (en) 2016-03-31 2016-03-31 To experiment platform in filling hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620266534.3U CN205538269U (en) 2016-03-31 2016-03-31 To experiment platform in filling hydraulic support

Publications (1)

Publication Number Publication Date
CN205538269U true CN205538269U (en) 2016-08-31

Family

ID=57140475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620266534.3U Expired - Fee Related CN205538269U (en) 2016-03-31 2016-03-31 To experiment platform in filling hydraulic support

Country Status (1)

Country Link
CN (1) CN205538269U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109781369A (en) * 2019-03-05 2019-05-21 河北工程大学 A kind of four column type of front and back top beam filling set cap Strength Testing Methods

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109781369A (en) * 2019-03-05 2019-05-21 河北工程大学 A kind of four column type of front and back top beam filling set cap Strength Testing Methods

Similar Documents

Publication Publication Date Title
CN105221177B (en) Four columns are floating to shake formula hydraulic support
CN202339416U (en) Test system for simulating water inrush of mined seam floor
CN201090230Y (en) Fission top beam flexible support
CN102360087A (en) Testing system for imitating water inrush from mining coal seam floor and method thereof
CN201627597U (en) Flexible hydraulic shield support for coal mine
CN104713738B (en) Intelligent two-way multi-angle overturn model test device and test method
CN109838261A (en) A kind of novel full-mechanized roadway advance support rack
CN102251789A (en) Integrated self-shift hydraulic support for placing top coal in steeply inclined roadway
CN105043852B (en) A kind of function loading device tested suitable for mine laneway analog simulation
CN201714411U (en) Solid packed hydraulic support for working face
CN106948851A (en) A kind of alley hydraulic support
CN201486582U (en) Flexible support
CN201027543Y (en) Assembled stand for suspending upper beam
CN205538269U (en) To experiment platform in filling hydraulic support
CN201915983U (en) Hydraulic support
CN105403684A (en) Multi-scale analog simulation test platform for simulating collapse of coal covering rock
CN205101015U (en) Four posts float and shake formula hydraulic support
CN104179518B (en) Hydraulic support for roadway supporting
CN201982127U (en) Multistage plug-in connecting rod type filling hydraulic support
CN106601111A (en) Large true-triaxial simulation test stand for tunnel roof support
CN105952489A (en) Anti-side-pressure guide rail slip type advancing and end hydraulic support
CN107227966B (en) Temporary support device for tunnel excavation
CN103306697A (en) Three-column paste body filling hydraulic bracket for underground thin coal seam and four-step paste body filling process
CN210068218U (en) Multipurpose roadway advance support hydraulic support
CN107448152A (en) Combined hydraulic jumbolter workbench

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 450100 Zhengzhou City, Henan Province Road, north of the city of Xingyang Road, east of the new material industrial park

Patentee after: ZHENGZHOU SIWEI ELECTROMECHANICAL EQUIPMENT MANUFACTURING Co.,Ltd.

Address before: 450100 Zhengzhou new material industrial park, east of King Wang Road, north of science Road, Zhengzhou, Henan

Patentee before: ZHENGZHOU SIWEI MINING MACHINERY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831