CN205537600U - Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction - Google Patents

Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction Download PDF

Info

Publication number
CN205537600U
CN205537600U CN201620078774.0U CN201620078774U CN205537600U CN 205537600 U CN205537600 U CN 205537600U CN 201620078774 U CN201620078774 U CN 201620078774U CN 205537600 U CN205537600 U CN 205537600U
Authority
CN
China
Prior art keywords
pile
concrete
height
elevation control
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620078774.0U
Other languages
Chinese (zh)
Inventor
骆洪喜
陈磊
陈彦
高瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201620078774.0U priority Critical patent/CN205537600U/en
Application granted granted Critical
Publication of CN205537600U publication Critical patent/CN205537600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction, its characterized in that adopts thin wall polyethylene plastic pipe be the main material, and according to the barodynamics characteristics, the preparation of measuring apparatu bottom is spired, and the back lid adopts threaded connection covers to be fixed with after, and hangs the nose, and striking anti -corrosive paint layer is applied paint with a brush to whole. The utility model discloses can effectively solve the difficult problem of pile bolck elevation control, it is directly perceived effective, simple accurate. Guaranteed simultaneously that the effective stake of bored concrete pile is long, reduced the meaningless waste of concrete, guaranteed the intensity and the overall stability of bored concrete pile, reached swift, the energy -conserving efficient good result of construction, had spreading value.

Description

Underwater concrete filling pile height of pile top controls construction height measurer
Technical field
The present invention relates to a kind of underwater concrete filling pile height of pile top and control construction height measurer, be applicable to Concrete Grouting Pale under bridge water.
Background technology
Concrete Grouting Pale traditional construction technique height of pile top controls main use lining rope and the side's of pouring amount estimation at present, advantage of this is that skilled operation, but lining rope controls or concreting side's amount controls all to accomplish accurately, the long too small or excessive defect of stake often occurs in work progress, and too small meeting causes the mass defect that bored concrete pile pile body effective length is not enough;Pile body superelevation causes waste of material serious and pile crown is abolished workload and increased, and the pile crown height of abolishing having even reaches 3 meters so that the height of pile top controlled when bored concrete pile pours the most succinct, effective becomes the problem that letter is to be solved.
Jinan ChengJian Group carries out research of technique for problem above, adjust construction technology, through field practice, summarize underwater grouting concrete height measurer and control bored concrete pile height engineering construction method, high process control difficulty, the long excessive or too small common quality defect of stake during solving filling pile construction.Intensity and the resistance to overturning aspect of bored concrete pile are significantly increased.
Summary of the invention
The present invention is in order to make up the deficiencies in the prior art, it is provided that a kind of shorten construction period, overcome common quality defect underwater concrete filling pile height of pile top control construction height measurer.
It is an object of the invention to realize in the following manner:
The underwater concrete filling pile height of pile top of the present invention controls construction height measurer, it is characterized in that, including bonnet above and following cylinder, bonnet and cylinder are connected with each other, and using thin-walled vinyl tube is main material, according to barodynamics feature, cylinder body bottom is fabricated to taper, bonnet uses threaded, bonnet is fixed with and hangs nose, the rust preventive coating that overall brushing is eye-catching.
Height measurer, long 30cm, diameter 8cm, wall thickness 0.2cm.
The invention has the beneficial effects as follows:
Use the construction of underwater grouting concrete height measurer method, when pouring underwater concrete, the concrete of same condition is poured in prefabricated height measurer, when concreting to design height of pile top, height measurer is put into stake holes, owing to mud is different with the proportion of concrete, height measurer can rise with underwater concreting, after height measurer rises to preset height, measuring and check, qualified rear stopping pours.Can effectively solve the difficult problem that height of pile top controls compared with traditional handicraft, so can ensure that elevation precise control, effectively, the most simple and easy to do.Can ensure that again bored concrete pile effective length, reduce concrete unnecessary waste, it is ensured that the intensity of bored concrete pile and resistance to overturning, reached the good result of quick construction, efficient energy-saving.Obtaining construction unit's abundant affirmation, social benefit is notable.
Accompanying drawing explanation
Fig. 1 is underwater grouting concrete height measurer schematic diagram.
In figure, 1 cylinder, 2 bonnets, 3 hang nose, 4 tapers.
Detailed description of the invention
With reference to Figure of description, the method for the present invention is made following detailed description of.
nullA kind of underwater concrete filling pile height of pile top controls construction method,By underwater grouting concrete height measurer,When pouring underwater concrete,The concrete of same condition is poured in prefabricated height measurer,The deadweight making height measurer is slightly below same volume weight concrete,The proportion of mud is 1.1mg/mm3,The proportion of concrete is 2.4mg/mm3,Elevation controller proportion is more than mud balance,And the proportion of slightly below concrete,Height measurer deadweight more than its in mud buoyancy be slightly less than again its buoyancy in concrete,Therefore height measurer is put into stake holes,Its position is placed exactly in mud and underwater concrete intersection,Utilize measuring instrument different with the buoyancy in concrete at mud,With underwater concreting,Height measurer rises therewith,After rising to preset height,Measure and check,Stop after qualified pouring.
Height measurer, including bonnet above and following cylinder, bonnet and cylinder are connected with each other, using special thin-walled vinyl tube is main material, according to barodynamics feature, being fabricated to taper 4 bottom measuring instrument cylinder 1, bonnet 2 uses threaded, it is fixed with on bonnet and hangs nose 3, the rust preventive coating that overall brushing is eye-catching.
Height measurer, long 30cm, diameter 8cm, wall thickness 0.2cm.

Claims (2)

1. a underwater concrete filling pile height of pile top controls construction height measurer, it is characterized in that, including bonnet above and following cylinder, bonnet and cylinder are connected with each other, bonnet uses threaded, being fixed with on bonnet and hang nose, cylinder body bottom is fabricated to taper, the rust preventive coating that overall brushing is eye-catching.
Underwater concrete filling pile height of pile top the most according to claim 1 controls construction height measurer, it is characterised in that long 30cm, diameter 8cm, wall thickness 0.2cm.
CN201620078774.0U 2016-01-27 2016-01-27 Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction Active CN205537600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620078774.0U CN205537600U (en) 2016-01-27 2016-01-27 Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620078774.0U CN205537600U (en) 2016-01-27 2016-01-27 Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction

Publications (1)

Publication Number Publication Date
CN205537600U true CN205537600U (en) 2016-08-31

Family

ID=56771059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620078774.0U Active CN205537600U (en) 2016-01-27 2016-01-27 Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction

Country Status (1)

Country Link
CN (1) CN205537600U (en)

Similar Documents

Publication Publication Date Title
CN106522288B (en) A kind of control device and its application method of underwater concrete filling pile absolute altitude
CN204788551U (en) Device of solid volume is measured to drainage
CN105887887A (en) Underwater concrete grouting pile top elevation control construction method
CN205537600U (en) Height measurement appearance is used in underwater concrete bored concrete pile pile bolck elevation control construction
CN104977201A (en) Fixed side confining rock socketed pile testing device and method thereof
CN204694592U (en) A kind of measurement repellency soil contact angle test unit
CN202433000U (en) Underwater concrete pouring lifting height tester
CN205816798U (en) Molten iron tank level control system
CN205822198U (en) Cast-in-place concrete pile perfusion controls device
CN206034925U (en) Control stopper of cast -in -place concrete floor thickness
CN206034512U (en) Bored concrete pile of driling under water construction monitoring devices
CN103267464A (en) Tool for measuring concrete pouring height
CN210982159U (en) Continuous negative pressure water replenishing metering device
CN206352316U (en) A kind of control device of underwater concrete filling pile absolute altitude
CN204491620U (en) Drilled pile is super fills with controller
CN109372036A (en) Cast-in-place concrete pile pile head elevation control device and its application method
CN205279925U (en) Accurate positioner of preformed hole is pour to concrete sample
CN209353383U (en) Sediment detection device
CN209277214U (en) Cast-in-place concrete pile pile head elevation control device
CN208329522U (en) A kind of ceramic tile mortar application device
CN206161469U (en) Measurement device for utilize law of buoyancy to measure grout density
CN202194161U (en) Detecting device for concrete at top of drilled pile
CN207376420U (en) It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude
CN111576505A (en) Device and method for testing pile top position of concrete cast-in-place pile
CN204789087U (en) Fixed side limit embedded rock pile test device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant