CN205535744U - Gas boiler air and moisturizing circulation system of preheating - Google Patents
Gas boiler air and moisturizing circulation system of preheating Download PDFInfo
- Publication number
- CN205535744U CN205535744U CN201620098098.3U CN201620098098U CN205535744U CN 205535744 U CN205535744 U CN 205535744U CN 201620098098 U CN201620098098 U CN 201620098098U CN 205535744 U CN205535744 U CN 205535744U
- Authority
- CN
- China
- Prior art keywords
- preheating
- air
- water tank
- water
- furnace body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Supply (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及锅炉循环预热技术领域,具体涉及一种燃气锅炉空气和补水循环预热系统。 The utility model relates to the technical field of boiler circulation preheating, in particular to a gas-fired boiler air and water supply circulation preheating system.
背景技术 Background technique
锅炉是利用燃料或其他能源的热能把水加热成为热水或蒸汽的设备。锅炉中产生的热水或蒸汽可直接为工业生产和人民生活提供所需要的热能,也可通过蒸汽动力装置转换为机械能,或再通过发电机将机械能转换为电能。提供热水的锅炉称为热水锅炉,主要用于生活,工业生产中也有少量应用。 A boiler is a device that uses the heat energy of fuel or other energy sources to heat water into hot water or steam. The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's life, and can also be converted into mechanical energy through a steam power plant, or converted into electrical energy through a generator. Boilers that provide hot water are called hot water boilers, which are mainly used in daily life, and also have a small amount of application in industrial production.
现有技术的锅炉主要由燃烧室和水腔组成,水腔设有进水口和出水口,冷水通过进水口进入锅炉水腔,通过燃烧室内燃料燃烧产生的热能将水腔内的水热,热水从出水口排出后,被应用到人们的生活和生产中。这种传统的锅炉的缺陷是耗能高、污染重、效率低。 The boiler in the prior art is mainly composed of a combustion chamber and a water chamber. The water chamber is provided with a water inlet and a water outlet. Cold water enters the boiler water chamber through the water inlet. After the water is discharged from the water outlet, it is applied to people's life and production. The disadvantages of this traditional boiler are high energy consumption, heavy pollution and low efficiency.
另外,空气预热器是利用烟气余热来加热助燃空气的设备。由于生物质锅炉的燃料含水量较大,所以空气预热对锅炉的燃料是蔗渣的糖厂锅炉和其它燃生物质锅炉尤为重要。使用锅炉空气预热器向锅炉内输入热空气,可提高炉膛温度,改善燃烧条件,使燃料的不完全燃烧损失下降,锅炉出力得到提高,从而进一步提高锅炉热效率。现有一种锅炉空气预热器,该锅炉空气预热器的技术方案是:包括装在支架上的换热器壳体,所述换热器壳体设有烟气进气口和烟气出气口,所述换热器壳体内设有换热器芯子,所述换热器芯子分别通过连接在两端的空气进气口和空气出气口与所述换热器壳体连接;所述换热器芯子具有插装在两块安装板之间的多根换热管,所述换热管为光管。这种锅炉空气预热器在使用过程中存在如下不足:该锅炉空气预热器是通过空气在换热管内流动而烟气在换热管外流动进行热交换,换热管为光管,空气在换热管内的流动为层流,管内换热系数较低,换热器的换热效果不好,造成锅炉空气预热器的总体换热效果不佳。 In addition, the air preheater is a device that uses the waste heat of the flue gas to heat the combustion air. Since the fuel of biomass boilers has a large water content, air preheating is particularly important for sugar factory boilers and other biomass-fired boilers whose fuel is bagasse. Using the boiler air preheater to input hot air into the boiler can increase the temperature of the furnace, improve the combustion conditions, reduce the incomplete combustion loss of the fuel, increase the output of the boiler, and further improve the thermal efficiency of the boiler. There is an existing boiler air preheater. The technical solution of the boiler air preheater is: it includes a heat exchanger shell mounted on a bracket, and the heat exchanger shell is provided with a flue gas inlet and a flue gas outlet. Air port, the heat exchanger housing is provided with a heat exchanger core, and the heat exchanger core is respectively connected to the heat exchanger housing through the air inlet and the air outlet connected at both ends; The heat exchanger core has a plurality of heat exchange tubes inserted between two mounting plates, and the heat exchange tubes are bare tubes. This kind of boiler air preheater has the following disadvantages during use: the boiler air preheater performs heat exchange through the flow of air in the heat exchange tube and the flue gas flows outside the heat exchange tube, the heat exchange tube is a bare tube, and the air The flow in the heat exchange tube is laminar flow, the heat transfer coefficient in the tube is low, and the heat exchange effect of the heat exchanger is not good, resulting in poor overall heat exchange effect of the boiler air preheater.
实用新型内容 Utility model content
本实用新型针对目前燃气锅炉存在余热浪费严重的问题,提供一种燃气锅炉空气和补水循环预热系统。 The utility model aims at the problem of serious waste heat waste existing in the current gas boiler, and provides an air and water supply cycle preheating system for the gas boiler.
为实现上述目的采用如下技术方案:一种燃气锅炉空气和补水循环预热系统,包括炉体,炉体底部设置炉膛,炉体中部设置加热排管和水腔,炉体上部设置烟囱;在炉体上部设置有预热水箱,预热水箱设置有进水管和循环水管,该循环水管与水腔的补水口连通;所述加热排管深入贯彻于预热水箱后汇总于烟囱;位于预热水箱内的部分或全部加热排管上,密封套固有空气预热腔,空气输入管经过空气预热腔后连通于炉膛底部。 In order to achieve the above purpose, the following technical solutions are adopted: a gas-fired boiler air and water replenishment circulation preheating system, including a furnace body, a furnace chamber is arranged at the bottom of the furnace body, a heating pipe and a water chamber are arranged in the middle of the furnace body, and a chimney is arranged at the upper part of the furnace body; The upper part of the body is provided with a preheating water tank, and the preheating water tank is provided with a water inlet pipe and a circulating water pipe. The circulating water pipe is connected with the water supply port of the water cavity; On part or all of the heating pipes inside, the sealing sleeve is inherent in the air preheating chamber, and the air input pipe is connected to the bottom of the furnace after passing through the air preheating chamber.
所述空气预热腔依次串联或者并列。 The air preheating chambers are sequentially connected in series or in parallel.
用于输送空气的管路上设置有风机。 A blower is arranged on the pipeline for transporting air.
所述预热水箱与炉体之间设置有隔热层。所述预热水箱和炉体外侧或者内侧设置有隔热层。 A heat insulation layer is arranged between the preheating water tank and the furnace body. A heat insulation layer is provided on the outside or inside of the preheating water tank and the furnace body.
所述加热排管的外壁设置有沿轴向分布的凸出导热片。 The outer wall of the heating calandria is provided with protruding heat conduction fins distributed along the axial direction.
有益效果:本实用新型中的预热水箱可装配在锅炉燃烧室上方,进烟口连接燃烧室的出烟口,从燃烧室排出的高温烟气进入烟气管道后,在运行过程中,与水仓内的冷水进行热交换,不仅充分利用了热能,也降低了烟气对环境的污染,另外,预热后水再进入燃烧室的水腔内能迅速被加热,提升了效率。 Beneficial effects: the preheating water tank in the utility model can be assembled above the combustion chamber of the boiler, and the smoke inlet is connected to the smoke outlet of the combustion chamber. The cold water in the water tank performs heat exchange, which not only makes full use of heat energy, but also reduces the pollution of the flue gas to the environment. In addition, after preheating, the water can be heated quickly when it enters the water chamber of the combustion chamber, which improves the efficiency.
采用空气换热管提高了管内外的换热系数,形成外强内强的双强化传热方式;进入预热水箱内的空气与烟气进行热交换后进入上换热管箱之前在气道内混合使之受热均匀,换热效果好,总换热系数提高了数倍。由于采用了外表面凸出的导热片,当烟气进入换热器壳体掠过换热管的翅片,换热管外的换热系数大于换热管内的换热系数,管壁温度高。 The air heat exchange tube is used to improve the heat transfer coefficient inside and outside the tube, forming a double enhanced heat transfer method with external strength and internal strength; the air entering the preheating tank undergoes heat exchange with the flue gas, and then enters the upper heat exchange tube box before entering the upper heat exchange tube box in the air passage Mixing makes it evenly heated, the heat transfer effect is good, and the total heat transfer coefficient is increased several times. Due to the use of protruding heat conduction fins on the outer surface, when the flue gas enters the heat exchanger shell and passes over the fins of the heat exchange tube, the heat transfer coefficient outside the heat exchange tube is greater than that inside the heat exchange tube, and the temperature of the tube wall is high. .
附图说明 Description of drawings
图1是本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;
图2是图1的A-A剖面结构示意图。 FIG. 2 is a schematic diagram of the A-A section structure in FIG. 1 .
图中,标号1为炉体,2为预热水箱,3为隔热层,4为炉膛,5为天然气管,6为加热排管,7为烟囱,8为水腔,9为进水管,10为循环水管,11为蒸汽排管,12为空气输入管,13为空气输出管,14为空气预热腔,15为风机。 In the figure, the number 1 is the furnace body, 2 is the preheating water tank, 3 is the heat insulation layer, 4 is the furnace, 5 is the natural gas pipe, 6 is the heating pipe, 7 is the chimney, 8 is the water cavity, and 9 is the water inlet pipe. 10 is a circulating water pipe, 11 is a steam exhaust pipe, 12 is an air input pipe, 13 is an air output pipe, 14 is an air preheating chamber, and 15 is a blower fan.
具体实施方式 detailed description
实施例1:参见图1所述的燃气锅炉空气和补水循环预热系统,在炉体1底部设置炉膛,炉体1中部设置加热排管6和水腔,炉体1上部设置烟囱7。 Embodiment 1: Referring to the gas-fired boiler air and water supply circulation preheating system described in FIG. 1 , a furnace is arranged at the bottom of the furnace body 1 , a heating pipe 6 and a water chamber are arranged in the middle of the furnace body 1 , and a chimney 7 is arranged at the upper part of the furnace body 1 .
另外,在炉体1上部设置有预热水箱2,预热水箱2设置有进水管和循环水管,该循环水管与水腔的补水口连通;所述加热排管6深入贯彻于预热水箱2后汇总于烟囱7。 In addition, a preheating water tank 2 is provided on the upper part of the furnace body 1, and the preheating water tank 2 is provided with a water inlet pipe and a circulating water pipe, and the circulating water pipe communicates with the water supply port of the water chamber; Summarize in chimney 7 afterward.
参见图2,位于预热水箱2内的部分或全部加热排管6上,密封套固有空气预热腔14,空气输入管经过空气预热腔14后连通于炉膛底部。用于输送空气的管路上设置有风机。 Referring to FIG. 2 , on part or all of the heating pipes 6 in the preheating water tank 2 , the sealing sleeve has an inherent air preheating chamber 14 , and the air input pipe passes through the air preheating chamber 14 and communicates with the bottom of the furnace. A blower is arranged on the pipeline for transporting air.
空气预热腔14依次串联或者并列。 The air preheating chambers 14 are sequentially connected in series or in parallel.
实施例2:在实施例1基础上,在预热水箱2与炉体1之间设置有隔热层3。预热水箱2和炉体1外侧或者内侧设置有隔热层。 Embodiment 2: On the basis of Embodiment 1, a heat insulating layer 3 is provided between the preheating water tank 2 and the furnace body 1 . A thermal insulation layer is arranged on the outside or inside of the preheating water tank 2 and the body of heater 1 .
实施例3:在实施例1基础上,将所述加热排管6的外壁设置有沿轴向分布的凸出导热片。 Embodiment 3: On the basis of Embodiment 1, the outer wall of the heating pipe 6 is provided with protruding heat conduction fins distributed along the axial direction.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620098098.3U CN205535744U (en) | 2016-02-01 | 2016-02-01 | Gas boiler air and moisturizing circulation system of preheating |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620098098.3U CN205535744U (en) | 2016-02-01 | 2016-02-01 | Gas boiler air and moisturizing circulation system of preheating |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205535744U true CN205535744U (en) | 2016-08-31 |
Family
ID=56774694
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620098098.3U Expired - Fee Related CN205535744U (en) | 2016-02-01 | 2016-02-01 | Gas boiler air and moisturizing circulation system of preheating |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205535744U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107384475A (en) * | 2017-08-10 | 2017-11-24 | 邵阳信多利科技发展有限公司 | A kind of Biohazard Waste gasification treatment device |
| CN107477856A (en) * | 2017-08-10 | 2017-12-15 | 邵阳信多利科技发展有限公司 | A kind of gasification of biomass hot-water boiler |
| CN110410835A (en) * | 2019-07-31 | 2019-11-05 | 安徽冠东科技有限公司 | A kind of spherical water tank heat-exchanger rig |
| CN111023069A (en) * | 2019-12-11 | 2020-04-17 | 佛山市高明区高级技工学校 | Water heating stove |
| CN113513840A (en) * | 2021-07-06 | 2021-10-19 | 贵州省永钧种植有限公司 | Energy-saving boiler |
-
2016
- 2016-02-01 CN CN201620098098.3U patent/CN205535744U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107384475A (en) * | 2017-08-10 | 2017-11-24 | 邵阳信多利科技发展有限公司 | A kind of Biohazard Waste gasification treatment device |
| CN107477856A (en) * | 2017-08-10 | 2017-12-15 | 邵阳信多利科技发展有限公司 | A kind of gasification of biomass hot-water boiler |
| CN110410835A (en) * | 2019-07-31 | 2019-11-05 | 安徽冠东科技有限公司 | A kind of spherical water tank heat-exchanger rig |
| CN110410835B (en) * | 2019-07-31 | 2020-10-16 | 宁国冠东工业技术有限公司 | A spherical water tank heat exchange device |
| CN111023069A (en) * | 2019-12-11 | 2020-04-17 | 佛山市高明区高级技工学校 | Water heating stove |
| CN113513840A (en) * | 2021-07-06 | 2021-10-19 | 贵州省永钧种植有限公司 | Energy-saving boiler |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210070225U (en) | A boiler with condensing function | |
| CN112555794B (en) | An energy-saving and environmentally friendly horizontal three-pass boiler structure | |
| CN201141587Y (en) | A special ethylene oxide heating furnace integrating waste gas incineration and heating steam | |
| CN104748367B (en) | The dustless hot air boiler of Superstrong energy-saving | |
| CN204421052U (en) | A kind of waste heat recovery furnace | |
| CN204026622U (en) | Steam boiler | |
| CN207865428U (en) | A kind of biomass boiler fume afterheat utilizes energy saver | |
| CN204513747U (en) | A kind of cornue forced circulation burning coal powder hot-water boiler | |
| CN209622916U (en) | A kind of new energy source energy-saving steam heating furnace | |
| CN204285424U (en) | A kind of air-cooled condensation steam boiler | |
| CN211823901U (en) | A condenser for a modular steam unit | |
| CN108800099B (en) | A kind of boiler feed water energy-saving preheating device and method | |
| CN200996720Y (en) | Efficient heater with multiple temperature zone under normal pressure | |
| CN208124335U (en) | A kind of energy-saving environmental-protection boiler | |
| CN207062213U (en) | A kind of gasification of biomass coupling coal fired power generation gasification gas utilizes system | |
| CN204063259U (en) | A kind of energy-saving hot blast furnace | |
| CN220017706U (en) | A straight-through water-cooled low-nitrogen combustion fire tube hot water boiler | |
| CN205351738U (en) | High energy efficiency gas heater | |
| CN206113007U (en) | High -efficient low heating stove of arranging | |
| CN219607058U (en) | Integrated superheated steam boiler | |
| CN105423550B (en) | A kind of high-efficiency heat pump couples Condensing Gas-fired Hot Water Boiler | |
| CN205351773U (en) | Phase transition heat transfer hot water unit | |
| CN221881788U (en) | High-efficiency energy-saving boiler | |
| CN205048487U (en) | Utilize top of a kitchen range flue gas to carry out circulation heating's economizer system to water | |
| CN204513812U (en) | A kind of new type solar energy straight-through vacuum pipe air collector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20180201 |