CN205529779U - Kerbstone - Google Patents
Kerbstone Download PDFInfo
- Publication number
- CN205529779U CN205529779U CN201620336409.5U CN201620336409U CN205529779U CN 205529779 U CN205529779 U CN 205529779U CN 201620336409 U CN201620336409 U CN 201620336409U CN 205529779 U CN205529779 U CN 205529779U
- Authority
- CN
- China
- Prior art keywords
- water
- tank
- blasthole
- seepage hole
- water seepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kerbstone, include: the stone body, stone is internal to be equipped with the basin and the basin runs through the front and back both ends of the stone body, still be equipped with blasthole and infiltration hole on the stone body, the blasthole is linked together with infiltration kong junyu basin. When there was ponding on the road surface, water can flow into the basin through the oral siphon, the effectual production that prevents ponding, and these water both can infiltrate soil also can flow into municipal water processing system, has strengthened the throughput of city to the rainwater.
Description
Technical field
This utility model relates to municipal drainage technical field, particularly a kind of kerbstone.
Background technology
In recent years, occurring that about city the report leakage of effectiveness factors is shown in the freshest, its reason is that traditional cities draining side
The drawback of formula reveals day by day.For this situation, the theory in sponge city gradually causes the attention of society, and it is as newly
The Urban Storm Flood management concept of a generation, refers to that the aspects such as the natural disaster brought in adaptation environmental change and reply rainwater in city have
There is good " elastic ", it is possible to (international term is " low impact exploitation storm-water system structure to be referred to as " water elasticity city "
Build "), sewerage system based on " sponge city " theory has water suction, water-retention, infiltration and water purification ability when rainy, and
The water stored " can be discharged " and is used when needed.
In building the sewerage system meeting sponge the idea of the city, existing measure is mainly little by setting up in source
Type, scattered storm water man-agement engineering reduce runoff, therefore generally rain penetration and rainwater are discharged and separately consider, respectively to oozing
Facility and pumping equipment are built accordingly thoroughly.
Kerbstone refers to be located at the boundary stone of pavement edge, is called for short kerb, it be as be arranged on pavement edge and other
The rectangular slab of stone of structural belt boundary.At present, kerbstone is simply made up of concrete or the building stones of cover half, is often whole road at its place
Face lowest part, easily builds up rainwater;The most conventional anti-hydrops mode is to arrange lower well at the ground on kerbstone limit, but
It is owing to lower Water Well cap bore eye is less, narrower, the most blocked, cause the function that cannot realize the anti-hydrops in road surface.
Utility model content
For solving the problem of above-mentioned existence, this utility model provides a kind of kerbstone.
A kind of kerbstone, including: Shi Ti, it is provided with tank in stone body and tank runs through two ends before and after stone body;On stone body
Being additionally provided with blasthole and water seepage hole, blasthole is all connected with tank with water seepage hole.
Preferably, the tapered body of blasthole, blasthole towards the bore of one end of tank more than the bore of the other end.
Preferably, the tapered body of water seepage hole, water seepage hole towards the bore of one end of tank less than the bore of the other end.
Preferably, blasthole is higher than the other end towards the position of one end of tank.
Preferably, water seepage hole is less than the other end towards the position of one end of tank.
Preferably, stone body is provided with more than one blasthole;Stone body is provided with more than one water seepage hole.
Preferably, blasthole is circular port or slotted eye.
Preferably, water seepage hole is connected towards an end position of tank higher than the bottom land of tank.
Preferably, the position of one end that blasthole is connected with tank is connected with tank the position of one end higher than water seepage hole.
Compared with prior art, this utility model has the advantages that
(1) when there is hydrops on road surface, water can flow into tank by blasthole, is effectively prevented the generation of hydrops;
(2) owing to water seepage hole is less than road surface, so the water flowing into tank can slowly penetrate into soil, both can be plant
Supplying water, can penetrate again to underground, become subsoil water, utilization rate is high;When the water yield is bigger, exceed the water of water seepage hole drainability
Amount finally enters city planting ductwork or other water treatment systems via the tank water conservancy diversion being connected with each other.
(3) one end bore entering water of blasthole is less, and water outlet one end is relatively big, when there being foreign material to block, also only can block
In port, will not be blocked in the middle of blasthole, remove very convenient.
(4) one end bore entering water of water seepage hole is less, and water outlet one end is relatively big, and foreign material blocking will not be blocked in water seepage hole
Between, being blocked in port can be washed away by current, will not block water seepage hole, and even without washed away, cleaning is got up the most very convenient.
(5) tank has certain water storage function, and when summer, temperature was higher, the water rapid evaporation in tank, necessarily
The temperature of environment is reduced in degree.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model.
Fig. 2 is longitudinal sectional drawing of the present utility model (1).
Fig. 3 is longitudinal sectional drawing of the present utility model (2).
Fig. 4 is axonometric chart of the present utility model.
Wherein, the parts that in accompanying drawing, labelling is corresponding are entitled: 1-stone body, 2-tank, 3-water seepage hole, 4-blasthole.
Detailed description of the invention
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings, and embodiment of the present utility model includes
But it is not limited to the following example.
Embodiment one
A kind of kerbstone as shown in Figure 1, Figure 2, Figure 3 and Figure 4, including: stone body 1, it is provided with tank 2 and water in stone body 1
Groove 2 runs through two ends before and after stone body 1, and tank 2 serves water-retention and water is discharged the function outside stone body 1;Be additionally provided with on stone body 1 into
Water hole 4 and water seepage hole 3, blasthole 4 is all connected with tank 2 with water seepage hole 3, and rainwater can be entered tank 2 by blasthole 4, has
Effect prevents the generation of surface gathered water.Water in tank 2 can be expelled in soil by water seepage hole 3, and these water both can be planted
Thing absorbs and also is able to be precipitated as subsoil water.
In the present embodiment, the tapered body of blasthole 4, blasthole 4 towards the bore of one end of tank 2 more than the mouth of the other end
Footpath.One end bore entering water of blasthole 4 is less, and water outlet one end is bigger, it is therefore prevented that foreign material are blocked in hole, even if there being foreign material to block up
Plug, also only can be blocked in port, will not be blocked in the middle of blasthole 4, remove very convenient.
In the present embodiment, the tapered body of water seepage hole 3, water seepage hole 3 towards the bore of one end of tank 2 less than the mouth of the other end
Footpath.One end bore of the entrance of water seepage hole 3 is less, and exit end is bigger, it is therefore prevented that foreign material are blocked in hole, even if there being foreign material to block up
Plug, also only can be blocked in port, will not be blocked in the middle of blasthole 4, remove very convenient, and being blocked in port can be rushed by current
Walking, will not block water seepage hole 3, even without washed away, cleaning is got up the most very convenient.
Embodiment two
A kind of kerbstone as shown in Figure 1, Figure 2, Figure 3 and Figure 4, including: stone body 1, it is provided with tank 2 and water in stone body 1
Groove 2 runs through two ends before and after stone body 1, and tank 2 serves water-retention and water is discharged the function outside stone body 1;Be additionally provided with on stone body 1 into
Water hole 4 and water seepage hole 3, blasthole 4 is all connected with tank 2 with water seepage hole 3, and rainwater can be entered tank 2 by blasthole 4, has
Effect prevents the generation of surface gathered water.Water in tank 2 can be expelled in soil by water seepage hole 3, and these water both can be planted
Thing absorbs and also is able to be precipitated as subsoil water.
In the present embodiment, the tapered body of blasthole 4, blasthole 4 towards the bore of one end of tank 2 more than the mouth of the other end
Footpath.One end bore entering water of blasthole 4 is less, and water outlet one end is bigger, it is therefore prevented that foreign material are blocked in hole, even if there being foreign material to block up
Plug, also only can be blocked in port, will not be blocked in the middle of blasthole 4, remove very convenient.
In the present embodiment, the tapered body of water seepage hole 3, water seepage hole 3 towards the bore of one end of tank 2 less than the mouth of the other end
Footpath.One end bore of the entrance of water seepage hole 3 is less, and exit end is bigger, it is therefore prevented that foreign material are blocked in hole, even if there being foreign material to block up
Plug, also only can be blocked in port, will not be blocked in the middle of blasthole 4, remove very convenient, and being blocked in port can be rushed by current
Walking, will not block water seepage hole 3, even without washed away, cleaning is got up the most very convenient.
In the present embodiment, blasthole 4 is higher than the other end towards the position of one end of tank 2.According to mechanics law, water can
The entrance from blasthole 4 from high to low enters and flows into tank 2, accelerates the processing speed of road pavement hydrops.
In the present embodiment, water seepage hole 3 is higher than the other end towards the position of one end of tank 2.According to mechanics law, tank 2
Interior water can enter from entrance one end of water seepage hole 3 from high to low be then out stone body 1, accelerates water in tank 2
Processing speed.
Embodiment three
A kind of kerbstone as shown in Figure 1, Figure 2, Figure 3 and Figure 4, including: stone body 1, it is provided with tank 2 and water in stone body 1
Groove 2 runs through two ends before and after stone body 1, and tank 2 serves water-retention and water is discharged the function outside stone body 1;Be additionally provided with on stone body 1 into
Water hole 4 and water seepage hole 3, blasthole 4 is all connected with tank 2 with water seepage hole 3, and rainwater can be entered tank 2 by blasthole 4, has
Effect prevents the generation of surface gathered water.Water in tank 2 can be expelled in soil by water seepage hole 3, and these water both can be planted
Thing absorbs and also is able to be precipitated as subsoil water.
In the present embodiment, the tapered body of blasthole 4, blasthole 4 towards the bore of one end of tank 2 more than the mouth of the other end
Footpath.One end bore entering water of blasthole 4 is less, and water outlet one end is bigger, it is therefore prevented that foreign material are blocked in hole, even if there being foreign material to block up
Plug, also only can be blocked in port, will not be blocked in the middle of blasthole 4, remove very convenient.
In the present embodiment, the tapered body of water seepage hole 3, water seepage hole 3 towards the bore of one end of tank 2 less than the mouth of the other end
Footpath.One end bore of the entrance of water seepage hole 3 is less, and exit end is bigger, it is therefore prevented that foreign material are blocked in hole, even if there being foreign material to block up
Plug, also only can be blocked in port, will not be blocked in the middle of blasthole 4, remove very convenient, and being blocked in port can be rushed by current
Walking, will not block water seepage hole 3, even without washed away, cleaning is got up the most very convenient.
In the present embodiment, blasthole 4 is higher than the other end towards the position of one end of tank 2.According to mechanics law, water can
The entrance from blasthole 4 from high to low enters and flows into tank 2, accelerates the processing speed of road pavement hydrops.
In the present embodiment, water seepage hole 3 is higher than the other end towards the position of one end of tank 2.According to mechanics law, tank 2
Interior water can enter from entrance one end of water seepage hole 3 from high to low be then out stone body 1, accelerates water in tank 2
Processing speed.
In the present embodiment, stone body 1 is provided with more than one blasthole 4, and multiple blastholes 4 can accelerate road pavement hydrops
Processing speed;Stone body 1 is provided with more than one water seepage hole 3, and multiple water seepage holes 3 can accelerate to ooze out water in tank 2
Speed.
In the present embodiment, blasthole 4 is circular port or slotted eye.Two kinds of hole shapes can obtain bigger unit stream
Amount, is difficult to blocked simultaneously.
Embodiment four
In the present embodiment, water seepage hole 3 is connected towards an end position of tank 2 higher than the bottom land of tank 2 so that tank 2 has
There is certain water storage function.When summer, temperature was higher, the water in tank 2 can evaporate, and reduces environment to a certain extent
Temperature.
In the present embodiment, the position of one end that blasthole 4 is connected with tank 2 is connected with tank 2 one end higher than water seepage hole 3
Position, it is ensured that water seepage hole 3 is capable of the drain function of normal table.
When raining, rainwater is flowed in tank 2 by road surface by blasthole 4, the most both can penetrate into soil by water seepage hole 3
In, it is also possible to flow into municipal water treatment systems by tank 2 and be used.
Embodiment five
City can be formed by a kind of kerbstone described in embodiment one or embodiment two or embodiment three or embodiment four
Row's infiltration system.If drystone body 1 is sequentially connected and two tanks 2 of adjacent stone body 1 are connected, these tank 2 structures being connected
Become a passage, for transporting the water in tank 2;This row infiltration system is arranged at the boundary of two pavement structure bands, enters
Position, water hole 4 higher than its to the road surface of side, it is possible to the hydrops on road surface is introduced in stone body 1, water seepage hole 3 and soil phase
Corresponding so that the water in tank 2 can infiltrate in soil;This row infiltration system is connected with municipal drainage system so that water energy
Enough flow into municipal drainage system by tank 2.Native system effectively solves the problem of surface gathered water, is provided by this part water simultaneously
Source carries out sufficient secondary utilization.
Claims (9)
1. a kerbstone, it is characterised in that including: stone body (1), is provided with tank (2) in stone body (1) and tank (2) runs through
Two ends before and after stone body (1);Being additionally provided with blasthole (4) and water seepage hole (3) on stone body (1), blasthole (4) is equal with water seepage hole (3)
It is connected with tank (2).
A kind of kerbstone the most according to claim 1, it is characterised in that blasthole (4) tapered body, blasthole (4) court
Bore to one end of tank (2) is more than the bore of the other end.
A kind of kerbstone the most according to claim 1, it is characterised in that water seepage hole (3) tapered body, water seepage hole (3) court
Bore to one end of tank (2) is less than the bore of the other end.
A kind of kerbstone the most according to claim 1, it is characterised in that blasthole (4) is towards the position of one end of tank (2)
Set low in the other end.
A kind of kerbstone the most according to claim 1, it is characterised in that water seepage hole (3) is towards the position of one end of tank (2)
Set high in the other end.
A kind of kerbstone the most according to claim 1, it is characterised in that stone body (1) is provided with more than one blasthole
(4);Stone body (1) is provided with more than one water seepage hole (3).
A kind of kerbstone the most according to claim 1, it is characterised in that blasthole (4) is circular port or slotted eye.
A kind of kerbstone the most according to claim 1, it is characterised in that water seepage hole (3) is towards an end position of tank (2)
Bottom land higher than tank (2).
A kind of kerbstone the most according to claim 1, it is characterised in that one end that blasthole (4) is connected with tank (2)
Position is connected with tank (2) position of one end higher than water seepage hole (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620336409.5U CN205529779U (en) | 2016-04-20 | 2016-04-20 | Kerbstone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620336409.5U CN205529779U (en) | 2016-04-20 | 2016-04-20 | Kerbstone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205529779U true CN205529779U (en) | 2016-08-31 |
Family
ID=56796252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620336409.5U Active CN205529779U (en) | 2016-04-20 | 2016-04-20 | Kerbstone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205529779U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735085A (en) * | 2016-04-20 | 2016-07-06 | 孔文艺 | Kerb |
-
2016
- 2016-04-20 CN CN201620336409.5U patent/CN205529779U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735085A (en) * | 2016-04-20 | 2016-07-06 | 孔文艺 | Kerb |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110249844B (en) | Street tree pool with water storage and drainage device | |
CN209779370U (en) | Urban road rainwater is collected and is utilized and discharge system | |
CN103088897A (en) | Green community impact resistance rainwater ecological utilization system | |
CN203613515U (en) | LID (Low Impact Development)-type rainwater ditch | |
CN104404920B (en) | A kind of trapezoidal ecological frame irrigation canals and ditches | |
CN103603320A (en) | LID (low impact development) type rainwater ditch and design and calculation method for same | |
CN101091448A (en) | Irrigation and drainage pipes | |
CN108781576B (en) | Beach desalting method coupling water circulation | |
CN104711959A (en) | Ecological dirt removing system combining water irrigation and drainage functions in polder area | |
CN208844656U (en) | Rainwater-collecting and constant pressure seep vegetation moisturizing net certainly | |
CN107143019A (en) | A kind of rock side slope landscape drainage arrangement and its construction method | |
CN204875850U (en) | Rainwater garden | |
CN202455773U (en) | Concealed conduit device for discharging salt and reducing alkali on saline-alkali land | |
CN105735085A (en) | Kerb | |
CN205529779U (en) | Kerbstone | |
CN206635602U (en) | A kind of kerbstone with permeable filtering function | |
CN205934646U (en) | Water conservancy system | |
CN206233301U (en) | Green grassland rainwater cyclic utilization system | |
CN205530635U (en) | Ooze escape canal component | |
CN204940059U (en) | A kind of permeable urban road | |
CN109024131A (en) | Pervious environment protection type road | |
CN208733766U (en) | A kind of Rain Garden of residential area | |
CN209194665U (en) | Cell storm sewer exhaust system | |
CN207812613U (en) | A kind of sponge type rain flood ejectment system | |
CN106592687A (en) | Rainwater collection system for container-type movable house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170829 Address after: 610000 No. 51-129 Nong Temple Street, Jinniu District Township, Chengdu, Sichuan Patentee after: Chengdu Construction Technology Co., Ltd. Address before: 610000, No. 1, unit 5, Building 29, 8 Sheng Tong Road, Qingyang District, Sichuan, Chengdu Co-patentee before: Li Feng Patentee before: Kong Wenyi |