CN205521975U - Underground precast concrete field - Google Patents

Underground precast concrete field Download PDF

Info

Publication number
CN205521975U
CN205521975U CN201620185844.2U CN201620185844U CN205521975U CN 205521975 U CN205521975 U CN 205521975U CN 201620185844 U CN201620185844 U CN 201620185844U CN 205521975 U CN205521975 U CN 205521975U
Authority
CN
China
Prior art keywords
silo
valve
conveying
concrete
stirring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620185844.2U
Other languages
Chinese (zh)
Inventor
叶伟然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Krystic Building Materials Co ltd
Original Assignee
Guangzhou Haite Electromechanical Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Haite Electromechanical Technology Co ltd filed Critical Guangzhou Haite Electromechanical Technology Co ltd
Priority to CN201620185844.2U priority Critical patent/CN205521975U/en
Application granted granted Critical
Publication of CN205521975U publication Critical patent/CN205521975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型公开了一种地下混凝土预制场,包括原材料送料系统、混凝土预制池、称量系统、输送系统以及控制系统。该地下混凝土预制场为建在地下的封闭式混凝土预制场,不仅节约了地上空间,还会避免混凝土生产过程中的粉尘污染和噪音污染。

The utility model discloses an underground concrete prefabrication field, which comprises a raw material feeding system, a concrete prefabrication pool, a weighing system, a conveying system and a control system. The underground concrete prefabrication field is a closed concrete prefabrication field built underground, which not only saves the space on the ground, but also avoids dust pollution and noise pollution during the concrete production process.

Description

一种地下混凝土预制场An underground concrete precast yard

技术领域: Technical field:

本实用新型涉及混凝土生产技术领域,具体涉及一种地下混凝土预制场。 The utility model relates to the technical field of concrete production, in particular to an underground concrete precast yard.

背景技术: Background technique:

混凝土预制场即混凝土搅拌站,是用来集中搅拌混凝土的联合装置。由于它的机械化、自动化程度较高,所以生产率也很高,并能保证混凝土的质量和节省水泥,常用于混凝土工程量大、工期长、工地集中的大、中型水利、电力、桥梁等工程。随着市政建设的发展,采用集中搅拌、提供商品混凝土的搅拌站具有很大的优越性,因而得到迅速发展,并为推广混凝土泵送施工,实现搅拌、输送、浇筑机械联合作业创造条件。 The concrete prefabrication site is the concrete mixing station, which is a joint device used to centrally mix concrete. Due to its high degree of mechanization and automation, its productivity is also high, and it can ensure the quality of concrete and save cement. It is often used in large and medium-sized water conservancy, electric power, bridges and other projects with large concrete engineering volume, long construction period, and concentrated construction sites. With the development of municipal construction, it is of great advantage to use centralized mixing to provide commercial concrete mixing plants, so it has been developed rapidly, and it has created conditions for the promotion of concrete pumping construction and the realization of combined operations of mixing, conveying, and pouring machinery.

目前,在混凝土生产行业中,混凝土预制场通常是建在地上,不仅会占用较大的地上面积,开放式的混凝土预制场还会造成粉尘污染和噪音污染,影响施工人员的身心健康。 At present, in the concrete production industry, concrete precast yards are usually built on the ground, which not only occupies a large area above the ground, but also causes dust pollution and noise pollution, which affects the physical and mental health of construction workers.

实用新型内容: Utility model content:

本实用新型的目的就是针对现有技术之不足,而提供一种地下混凝土预制场,该地下混凝土预制场为建在地下的封闭式混凝土预制场,不仅节约了地上空间,还会避免混凝土生产过程中的粉尘污染和噪音污染。 The purpose of this utility model is to provide an underground concrete prefabrication field for the deficiencies of the prior art. The underground concrete prefabrication field is a closed concrete prefabrication field built underground, which not only saves the space on the ground, but also avoids the concrete production process. dust pollution and noise pollution.

本实用新型的技术解决措施如下: The technical solutions of the present utility model are as follows:

一种地下混凝土预制场,包括原材料送料系统、混凝土预制池、称量系统、输送系统以及控制系统,原材料送料系统包括并排设置的第一筒仓、第二筒仓以及第三筒仓,第一筒仓、第二筒仓以及第三筒仓分别装有砂石、水泥和黄沙,三个筒仓的上部均设置有高位料位计,下部均设置有低位料位计,高位料位计和低位料位计均与控制系统电连接,三个筒仓的下部开口处均设置有电动阀门,三个电动阀门的下部设置有各自的称量系统,称量系统上砂石、水泥和黄沙均被输送系统送入混凝土预制池侧面设置的输送溜槽内,继而进入混凝土预制池,混凝土预制池包括土建基础,土建基础上固定有支撑立柱,支撑立柱上密封安装有密封盖,密封盖上安装有通气阀,支撑立柱的侧面还设置有加水漏斗,混凝土预制池内设置有输出装置,输送装置包括横移输送机构和纵移输送机构,纵移输送机构包括纵移轨道、纵移架体和皮带输送机,纵移架体在纵移电机的驱动下沿着纵移轨道在沼气发酵池内纵向移动,皮带输送机安装在纵移架体上,横移输送机构包括横移小车和螺旋输送机,横移小车能够在纵移架体上横向移动,螺旋输送机安装在横移小车上,并由螺旋电机驱动,螺旋输送机的出料口与皮带输送机正对,制成的混凝土经螺旋输送机提升至皮带输送机上,并由皮带输送机运送至输送车辆。 An underground concrete prefabrication field, including a raw material feeding system, a concrete precasting pool, a weighing system, a conveying system and a control system, the raw material feeding system includes a first silo, a second silo and a third silo arranged side by side, the first The silo, the second silo and the third silo are respectively filled with gravel, cement and yellow sand. The upper part of the three silos is equipped with a high-level material level gauge, and the lower part is equipped with a low-level material level gauge. The three silos are equipped with electric valves at the lower openings of the three silos, and the lower parts of the three electric valves are equipped with their respective weighing systems. The sand is sent by the conveying system into the conveying chute set on the side of the concrete precast pool, and then enters the concrete precast pool. The concrete precast pool includes a civil foundation, on which a supporting column is fixed, and a sealing cover is installed on the supporting column, and the sealing cover is sealed. A ventilation valve is installed, and a water-filling funnel is provided on the side of the support column. An output device is provided in the concrete prefabricated pool. The conveying device includes a lateral transfer mechanism and a vertical transfer mechanism. Belt conveyor, the vertical moving frame moves longitudinally along the vertical moving track in the biogas fermentation tank driven by the vertical moving motor, the belt conveyor is installed on the vertical moving frame, and the horizontal moving conveying mechanism includes a horizontal moving trolley and a screw conveyor , the traversing trolley can move laterally on the longitudinal moving frame. The screw conveyor is installed on the traversing trolley and driven by a screw motor. The discharge port of the screw conveyor is directly opposite to the belt conveyor. The conveyor is lifted onto the belt conveyor and transported to the delivery vehicle by the belt conveyor.

作为上述技术方案的优选,密封盖为透明盖体,通气阀外部连接有袋式除尘器,输送系统为带式输送机,带式输送机的输送距离为2-3千米。 As a preferred technical solution, the sealing cover is a transparent cover, the vent valve is connected with a bag filter, and the conveying system is a belt conveyor with a conveying distance of 2-3 kilometers.

作为上述技术方案的优选,纵移架体上还设置有两个搅拌器,搅拌器由搅拌电机驱动,搅拌器包括搅拌框和搅拌轴,搅拌框固定在搅拌轴上,搅拌轴与搅拌电机的输出轴通过联轴器连接。 As the preference of the above-mentioned technical scheme, two stirrers are also arranged on the longitudinal moving frame body, the stirrers are driven by a stirring motor, the stirrers include a stirring frame and a stirring shaft, the stirring frame is fixed on the stirring shaft, the stirring shaft and the stirring motor The output shaft is connected by a coupling.

作为上述技术方案的优选,输送溜槽上覆盖有耐磨材料,第一筒仓、第二筒仓以及第三筒仓的结构和尺寸相同,均包括筒状主体和下部锥形斗,筒状主体的高度为4-5米,筒状主体的直径为1.2米,三个筒仓通过筒仓支架支撑在地面之上,地面上具有固定筒仓支架的建筑基础。 As a preferred technical solution, the conveying chute is covered with wear-resistant materials, and the first silo, the second silo, and the third silo have the same structure and size, and all include a cylindrical main body and a lower conical bucket. The height of the silo is 4-5 meters, and the diameter of the cylindrical body is 1.2 meters. The three silos are supported above the ground by silo brackets, and the ground has a building foundation for fixing the silo brackets.

作为上述技术方案的优选,电动阀门包括阀门主体和阀瓣,阀门主体两端焊接有连接法兰,连接法兰上开设有螺栓孔,阀瓣中间开设有容纳旋转轴的空腔,阀瓣与旋转轴焊接成一体。 As a preferred technical solution, the electric valve includes a valve main body and a valve disc. Both ends of the valve main body are welded with connecting flanges, and bolt holes are opened on the connecting flanges. A cavity for accommodating the rotating shaft is opened in the middle of the valve disc. The rotating shaft is welded into one piece.

作为上述技术方案的优选,旋转轴与外部齿轮通过键连接,旋转轴露出的部分套设有套筒,外部齿轮通过连接皮带与主动齿轮连接,主动齿轮由阀门电机驱动,阀门电机的输出轴通过联轴器与主动轴连接,主动轴通过连接键与主动齿轮连接。 As a preferred technical solution, the rotating shaft is connected to the external gear through a key, the exposed part of the rotating shaft is covered with a sleeve, the external gear is connected to the driving gear through a connecting belt, the driving gear is driven by a valve motor, and the output shaft of the valve motor passes through The shaft coupling is connected with the driving shaft, and the driving shaft is connected with the driving gear through the connecting key.

本实用新型的有益效果在于:该地下混凝土预制场为建在地下的封闭式混凝土预制场,不仅节约了地上空间,还会避免混凝土生产过程中的粉尘污染和噪音污染。 The beneficial effect of the utility model is that: the underground concrete prefabrication yard is a closed concrete precast yard built underground, which not only saves the ground space, but also avoids dust pollution and noise pollution in the concrete production process.

附图说明: Description of drawings:

以下附图仅旨在于对本实用新型做示意性说明和解释,并不限定本实用新型的范围。其中: The following drawings are only intended to illustrate and explain the utility model schematically, and do not limit the scope of the utility model. in:

图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2为电动阀门立体结构示意图; Figure 2 is a schematic diagram of the three-dimensional structure of the electric valve;

图3为电动阀门的俯视图; Figure 3 is a top view of the electric valve;

图4为皮带秤的结构示意图; Fig. 4 is the structural representation of belt scale;

图5为称量支架的结构示意图。 Fig. 5 is a structural schematic diagram of a weighing bracket.

具体实施方式: detailed description:

如图1所示,地下混凝土预制场包括原材料送料系统、混凝土预制池、称量系统2、输送系统以及控制系统20,原材料送料系统包括并排设置的第一筒仓11、第二筒仓12以及第三筒仓13,第一筒仓11、第二筒仓12以及第三筒仓13分别装有砂石、水泥和黄沙,三个筒仓的上部均设置有高位料位计16,下部均设置有低位料位计,高位料位计16和低位料位计均与控制系统电连接,三个筒仓的下部开口处均设置有电动阀门15,三个电动阀门15的下部设置有各自的称量系统2,称量系统2上砂石、水泥和黄沙均被输送系统30送入混凝土预制池侧面设置的输送溜槽31内,继而进入混凝土预制池,混凝土预制池包括土建基础43,土建基础43上固定有支撑立柱44,支撑立柱44上密封安装有密封盖45,密封盖45上安装有通气阀46,支撑立柱44的侧面还设置有加水漏斗32,混凝土预制池内设置有输出装置,输送装置包括横移输送机构和纵移输送机构,纵移输送机构包括纵移轨道41、纵移架体42和皮带输送机6,纵移架体42在纵移电机的驱动下沿着纵移轨道41在沼气发酵池内纵向移动,皮带输送机6安装在纵移架体42上,横移输送机构包括横移小车51和螺旋输送机53,横移小车51能够在纵移架体42上横向移动,螺旋输送机 53安装在横移小车51上,并由螺旋电机52驱动,螺旋输送机53的出料口与皮带输送机6正对,制成的混凝土经螺旋输送机53提升至皮带输送机6上,并由皮带输送机6运送至输送车辆7。 As shown in Figure 1, the underground concrete prefabrication field comprises a raw material feeding system, a concrete prefabricating pool, a weighing system 2, a delivery system and a control system 20, and the raw material feeding system includes a first silo 11, a second silo 12, and a side-by-side arrangement. The third silo 13, the first silo 11, the second silo 12 and the third silo 13 are respectively equipped with gravel, cement and yellow sand. Both are equipped with low-level material level gauges, and the high-level material level gauge 16 and the low-level material level gauge are both electrically connected to the control system. The lower openings of the three silos are all equipped with electric valves 15, and the lower parts of the three electric valves 15 are provided with respective Gravel, cement and yellow sand on the weighing system 2 are all sent into the delivery chute 31 provided on the side of the concrete precast pool by the delivery system 30, and then enter the concrete precast pool. The concrete precast pool includes the civil foundation 43, A supporting column 44 is fixed on the civil foundation 43, a sealing cover 45 is installed on the supporting column 44, a vent valve 46 is installed on the sealing cover 45, a water adding funnel 32 is arranged on the side of the supporting column 44, and an output device is arranged in the concrete prefabricated pool , the conveying device includes a traverse conveying mechanism and a longitudinal conveying mechanism, and the longitudinal conveying mechanism includes a longitudinal movement track 41, a longitudinal movement frame body 42 and a belt conveyor 6, and the longitudinal movement frame body 42 is driven along the vertical movement direction by the longitudinal movement motor. The moving track 41 moves longitudinally in the biogas fermentation tank, and the belt conveyor 6 is installed on the vertical moving frame body 42. The lateral moving conveying mechanism includes a horizontal moving trolley 51 and a screw conveyor 53. Horizontal movement, the screw conveyor 53 is installed on the traversing trolley 51 and driven by the screw motor 52. The discharge port of the screw conveyor 53 is directly opposite to the belt conveyor 6, and the concrete made is lifted to the belt conveyor 53 by the screw conveyor 53. Conveyor 6, and transported to transport vehicle 7 by belt conveyor 6.

密封盖45为透明盖体,通气阀46外部连接有袋式除尘器,输送系统30为带式输送机,带式输送机的输送距离为2-3千米。 The sealing cover 45 is a transparent cover body, the vent valve 46 is externally connected with a bag filter, and the conveying system 30 is a belt conveyor whose conveying distance is 2-3 kilometers.

纵移架体42上还设置有两个搅拌器55,搅拌器55由搅拌电机54驱动,搅拌器55包括搅拌框和搅拌轴,搅拌框固定在搅拌轴上,搅拌轴与搅拌电机54的输出轴通过联轴器连接。 Two agitators 55 are also arranged on the vertically moving frame body 42, and the agitator 55 is driven by a stirring motor 54. The agitator 55 includes a stirring frame and a stirring shaft, and the stirring frame is fixed on the stirring shaft, and the output of the stirring shaft and the stirring motor 54 The shafts are connected by couplings.

输送溜槽31上覆盖有耐磨材料,第一筒仓11、第二筒仓12以及第三筒仓13的结构和尺寸相同,均包括筒状主体和下部锥形斗,筒状主体的高度为4-5米,筒状主体的直径为1.2米,三个筒仓通过筒仓支架支撑在地面之上,地面上具有固定筒仓支架的建筑基础。 The conveying chute 31 is covered with wear-resistant materials. The first silo 11, the second silo 12 and the third silo 13 have the same structure and size, and all include a cylindrical main body and a lower conical bucket. The height of the cylindrical main body is 4-5 meters, the diameter of the cylindrical main body is 1.2 meters, and the three silos are supported above the ground by silo brackets, and the ground has a building foundation to fix the silo brackets.

如图2-3所示,电动阀门15包括阀门主体155和阀瓣153,阀门主体155两端焊接有连接法兰151,连接法兰151上开设有螺栓孔154,阀瓣153中间开设有容纳旋转轴158的空腔152,阀瓣153与旋转轴158焊接成一体,旋转轴158与外部齿轮141通过键143连接,旋转轴158露出的部分套设有套筒159,外部齿轮141通过连接皮带145与主动齿轮142连接,主动齿轮由阀门电机150驱动,阀门电机150的输出轴通过联轴器156与主动轴157连接,主动轴157通过连接键144与主动齿轮142连接。 As shown in Figure 2-3, the electric valve 15 includes a valve main body 155 and a valve disc 153. A connecting flange 151 is welded at both ends of the valve main body 155. A bolt hole 154 is opened on the connecting flange 151, and a housing is opened in the middle of the valve disc 153. The cavity 152 of the rotating shaft 158, the valve disc 153 and the rotating shaft 158 are welded into one body, the rotating shaft 158 is connected with the external gear 141 through a key 143, the exposed part of the rotating shaft 158 is covered with a sleeve 159, and the external gear 141 is connected by a belt 145 is connected with driving gear 142, and driving gear is driven by valve motor 150, and the output shaft of valve motor 150 is connected with driving shaft 157 by coupling 156, and driving shaft 157 is connected with driving gear 142 by connecting key 144.

如图4-5所示,称量系统2为与控制系统20电连接的皮带秤,皮带秤包括称量支架23、皮带24和带轮22,皮带24缠绕带轮22, 皮带24为带有挡边的橡胶皮带,两个带轮22之间还设置有张紧轮21,称量支架23支撑皮带24位于上部的部分,称量支架23包括U型座235,U型座235上设置有第一肋板231、第二肋板232、第三肋板233以及第四肋板234,第一肋板231和第三肋板233之间形成第一侧部安装部,第二肋板232和第四肋板234之间形成第二侧部安装部,第三肋板233和第四肋板234之间形成水平安装部,第一侧部安装部和第二侧部安装部上均安装有侧向支撑辊238,水平安装部上通过转轴236安装有水平支撑辊237,侧向支撑辊238和水平支撑辊237上设置有重量传感器。 As shown in Fig. 4-5, weighing system 2 is the belt scale that is electrically connected with control system 20, and belt scale comprises weighing bracket 23, belt 24 and pulley 22, and belt 24 is wrapped around pulley 22, and belt 24 is belt with The rubber belt of the sidewall is also provided with a tension pulley 21 between the two pulleys 22, and the weighing bracket 23 supports the part of the belt 24 at the top. The weighing bracket 23 includes a U-shaped seat 235, and the U-shaped seat 235 is provided with The first rib 231, the second rib 232, the third rib 233 and the fourth rib 234, the first side mounting part is formed between the first rib 231 and the third rib 233, the second rib 232 The second side mounting part is formed between the fourth rib plate 234 and the third rib plate 233 and the fourth rib plate 234. The horizontal mounting part is formed between the first side mounting part and the second side mounting part. There are lateral support rollers 238, and horizontal support rollers 237 are installed on the horizontal installation part through rotating shafts 236, and weight sensors are arranged on the lateral support rollers 238 and the horizontal support rollers 237.

所述实施例用以例示性说明本实用新型,而非用于限制本实用新型。任何本领域技术人员均可在不违背本实用新型的精神及范畴下,对所述实施例进行修改,因此本实用新型的权利保护范围,应如本实用新型的权利要求所列。 The embodiments are used to illustrate the utility model, but not to limit the utility model. Any person skilled in the art can modify the embodiments without violating the spirit and scope of the utility model, so the protection scope of the utility model should be as listed in the claims of the utility model.

Claims (6)

1.一种地下混凝土预制场,其特征在于,包括原材料送料系统、混凝土预制池、称量系统(2)、输送系统以及控制系统(20),原材料送料系统包括并排设置的第一筒仓(11)、第二筒仓(12)以及第三筒仓(13),第一筒仓(11)、第二筒仓(12)以及第三筒仓(13)分别装有砂石、水泥和黄沙,三个筒仓的上部均设置有高位料位计(16),下部均设置有低位料位计,高位料位计(16)和低位料位计均与控制系统电连接,三个筒仓的下部开口处均设置有电动阀门(15),三个电动阀门(15)的下部设置有各自的称量系统(2),称量系统(2)上砂石、水泥和黄沙均被输送系统(30)送入混凝土预制池侧面设置的输送溜槽(31)内,继而进入混凝土预制池,混凝土预制池包括土建基础(43),土建基础(43)上固定有支撑立柱(44),支撑立柱(44)上密封安装有密封盖(45),密封盖(45)上安装有通气阀(46),支撑立柱(44)的侧面还设置有加水漏斗(32),混凝土预制池内设置有输出装置,输送装置包括横移输送机构和纵移输送机构,纵移输送机构包括纵移轨道(41)、纵移架体(42)和皮带输送机(6),纵移架体(42)在纵移电机的驱动下沿着纵移轨道(41)在沼气发酵池内纵向移动,皮带输送机(6)安装在纵移架体(42)上,横移输送机构包括横移小车(51)和螺旋输送机(53),横移小车(51)能够在纵移架体(42)上横向移动,螺旋输送机(53)安装在横移小车(51)上,并由螺旋电机(52)驱动,螺旋输送机(53)的出料口与皮带输送机(6)正对,制成的混凝土经螺旋输送机(53)提升至皮带输送机(6)上,并由皮带输送机(6)运送至输送车辆(7)。1. an underground concrete prefabrication field, is characterized in that, comprises raw material feeding system, concrete precast pool, weighing system (2), delivery system and control system (20), and raw material feeding system comprises the first silo ( 11), the second silo (12) and the third silo (13), the first silo (11), the second silo (12) and the third silo (13) are equipped with gravel, cement and Yellow sand, the upper part of the three silos is equipped with a high-level material level gauge (16), and the lower part is equipped with a low-level material level gauge. Both the high-level material level gauge (16) and the low-level material level gauge are electrically connected to the control system. Electric valves (15) are provided at the lower openings of the silos, and the lower parts of the three electric valves (15) are provided with respective weighing systems (2). It is sent into the conveying chute (31) provided on the side of the concrete precast pool by the conveying system (30), and then enters the concrete precast pool. The concrete precast pool includes a civil foundation (43), and a support column (44) is fixed on the civil foundation (43) , the support column (44) is sealed with a sealing cover (45), and the air valve (46) is installed on the sealing cover (45). There is an output device, and the conveying device includes a lateral movement conveying mechanism and a longitudinal movement conveying mechanism, and the longitudinal movement conveying mechanism includes a longitudinal movement track (41), a longitudinal movement frame body (42) and a belt conveyor (6), and the longitudinal movement frame body (42 ) moves vertically in the biogas fermentation tank along the vertical moving track (41) driven by the vertical moving motor, the belt conveyor (6) is installed on the vertical moving frame (42), and the horizontal moving conveying mechanism includes a horizontal moving trolley (51 ) and screw conveyor (53), the traversing trolley (51) can move laterally on the vertical movement frame (42), the screw conveyor (53) is installed on the traversing trolley (51), and is driven by the screw motor (52 ) drive, the outlet of the screw conveyor (53) is opposite to the belt conveyor (6), and the concrete made is lifted to the belt conveyor (6) through the screw conveyor (53), and is passed by the belt conveyor ( 6) Delivery to the delivery vehicle (7). 2.根据权利要求1所述的地下混凝土预制场,其特征在于:密封盖(45)为透明盖体,通气阀(46)外部连接有袋式除尘器,输送系统(30)为带式输送机,带式输送机的输送距离为2-3千米。2. The underground concrete precast field according to claim 1, characterized in that: the sealing cover (45) is a transparent cover, the air valve (46) is externally connected with a bag filter, and the conveying system (30) is a belt conveying machine, the conveying distance of the belt conveyor is 2-3 kilometers. 3.根据权利要求1所述的地下混凝土预制场,其特征在于:纵移架体(42)上还设置有两个搅拌器(55),搅拌器(55)由搅拌电机(54)驱动,搅拌器(55)包括搅拌框和搅拌轴,搅拌框固定在搅拌轴上,搅拌轴与搅拌电机(54)的输出轴通过联轴器连接。3. underground concrete prefabrication field according to claim 1, is characterized in that: two stirrers (55) are also arranged on the vertically moving support body (42), and stirrer (55) is driven by stirring motor (54), The stirrer (55) comprises a stirring frame and a stirring shaft, the stirring frame is fixed on the stirring shaft, and the stirring shaft is connected with the output shaft of the stirring motor (54) through a coupling. 4.根据权利要求1所述的地下混凝土预制场,其特征在于:输送溜槽(31)上覆盖有耐磨材料,第一筒仓(11)、第二筒仓(12)以及第三筒仓(13)的结构和尺寸相同,均包括筒状主体和下部锥形斗,筒状主体的高度为4-5米,筒状主体的直径为1.2米,三个筒仓通过筒仓支架支撑在地面之上,地面上具有固定筒仓支架的建筑基础。4. The underground concrete precast field according to claim 1, characterized in that: the delivery chute (31) is covered with wear-resistant materials, the first silo (11), the second silo (12) and the third silo (13) have the same structure and size, including a cylindrical main body and a lower conical bucket. The height of the cylindrical main body is 4-5 meters, and the diameter of the cylindrical main body is 1.2 meters. The three silos are supported by silo brackets. Above ground, a building foundation with fixed silo supports on the ground. 5.根据权利要求1所述的地下混凝土预制场,其特征在于:电动阀门(15)包括阀门主体(155)和阀瓣(153),阀门主体(155)两端焊接有连接法兰(151),连接法兰(151)上开设有螺栓孔(154),阀瓣(153)中间开设有容纳旋转轴(158)的空腔(152),阀瓣(153)与旋转轴(158)焊接成一体。5. The underground concrete prefabrication field according to claim 1, characterized in that: the electric valve (15) includes a valve body (155) and a valve disc (153), and the two ends of the valve body (155) are welded with connecting flanges (151 ), a bolt hole (154) is opened on the connecting flange (151), a cavity (152) for accommodating the rotating shaft (158) is opened in the middle of the valve disc (153), and the valve disc (153) is welded to the rotating shaft (158) into one. 6.根据权利要求5所述的地下混凝土预制场,其特征在于:旋转轴(158)与外部齿轮(141)通过键(143)连接,旋转轴(158)露出的部分套设有套筒(159),外部齿轮(141)通过连接皮带(145)与主动齿轮(142)连接,主动齿轮由阀门电机(150)驱动,阀门电机(150)的输出轴通过联轴器(156)与主动轴157连接,主动轴(157)通过连接键(144)与主动齿轮(142)连接。6. The underground concrete precast field according to claim 5, characterized in that: the rotating shaft (158) is connected with the external gear (141) through a key (143), and the exposed part of the rotating shaft (158) is sleeved with a sleeve ( 159), the external gear (141) is connected with the driving gear (142) through the connecting belt (145), the driving gear is driven by the valve motor (150), and the output shaft of the valve motor (150) is connected to the driving shaft through the coupling (156) 157 is connected, and driving shaft (157) is connected with driving gear (142) by connection key (144).
CN201620185844.2U 2016-03-10 2016-03-10 Underground precast concrete field Active CN205521975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620185844.2U CN205521975U (en) 2016-03-10 2016-03-10 Underground precast concrete field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620185844.2U CN205521975U (en) 2016-03-10 2016-03-10 Underground precast concrete field

Publications (1)

Publication Number Publication Date
CN205521975U true CN205521975U (en) 2016-08-31

Family

ID=56781441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620185844.2U Active CN205521975U (en) 2016-03-10 2016-03-10 Underground precast concrete field

Country Status (1)

Country Link
CN (1) CN205521975U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105690572A (en) * 2016-03-10 2016-06-22 湖州中辰建设有限公司 Underground concrete precast yard
CN108356989A (en) * 2017-01-26 2018-08-03 北京鑫源诺美环保科技有限责任公司 Sunk type concrete mixing plant
CN108356988A (en) * 2017-01-26 2018-08-03 北京鑫源诺美环保科技有限责任公司 Sunk type sandstone blending station
CN108793786A (en) * 2017-04-28 2018-11-13 北京鑫源诺美环保科技有限责任公司 A kind of enclosed cement production system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105690572A (en) * 2016-03-10 2016-06-22 湖州中辰建设有限公司 Underground concrete precast yard
CN107283644A (en) * 2016-03-10 2017-10-24 甘丽霞 A kind of buried concrete precasting yard
CN105690572B (en) * 2016-03-10 2017-11-14 重庆妙坤生物科技有限责任公司 An underground concrete precast yard
CN108356989A (en) * 2017-01-26 2018-08-03 北京鑫源诺美环保科技有限责任公司 Sunk type concrete mixing plant
CN108356988A (en) * 2017-01-26 2018-08-03 北京鑫源诺美环保科技有限责任公司 Sunk type sandstone blending station
CN108793786A (en) * 2017-04-28 2018-11-13 北京鑫源诺美环保科技有限责任公司 A kind of enclosed cement production system

Similar Documents

Publication Publication Date Title
CN105690572A (en) Underground concrete precast yard
CN105690568B (en) An automatic batching system for a concrete mixing station
CN105922452B (en) Automatic mixing plant of foam concrete
CN205521975U (en) Underground precast concrete field
CN102029650B (en) Movable type concrete mixer
CN205704733U (en) A kind of foam concrete automatic mixing plant
CN106182437A (en) A kind of cement sand and gravel mixing apparatus and method
CN106192623A (en) CRTS III template self-compacting concrete pouring construction equipment and workflow
CN201841607U (en) Movable concrete stirring machine
CN211842584U (en) A concrete mixing device for urban construction
CN206426276U (en) Buried concrete mixing plant
CN202656319U (en) Full-automatic material mixing and proportioning machine
CN204398156U (en) A kind of construction site cement mixing equipment
CN205521961U (en) Concrete mixing plant's automatic blending system
CN205416002U (en) Concrete mixing device
CN205713133U (en) A kind of concrete-agitating pours device
CN204195995U (en) A kind of green building moves mortar mixing plant
CN206765104U (en) Sunk type sandstone blending station
CN101629403A (en) Universal stirring pumping perfusion vehicle for high-low elastic modulus cement emulsified asphalt mortar
CN205704666U (en) A kind of concrete integrated production system
CN201755869U (en) Tire-type online walking cement emulsified asphalt mortar mixing and pouring vehicle
CN211566463U (en) Portable multi-use architecture material production facility
CN207736516U (en) Siliceous material grouting stirring and conveying device
CN207143957U (en) A kind of efficient water conservancy construction feeding device
CN115648427B (en) Dry mortar storage and mixing equipment for shield construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Fan Zhifeng

Inventor before: Ye Weiran

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170607

Address after: West Lake Ao Town Village in Conghua District of Guangzhou City, Guangdong Province, 510940 State Road 106 (by 3) the first floor

Patentee after: GUANGZHOU KRYSTIC BUILDING MATERIALS Co.,Ltd.

Address before: Wuxing District of Zhejiang city in Huzhou province 313000 eight Li Dian Zhen Zhang Jia Dai Cun Dong Shi Road No. 111-112

Patentee before: HUZHOU ZHONGCHEN CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Underground concrete precast yard

Effective date of registration: 20190327

Granted publication date: 20160831

Pledgee: Bank of China Limited by Share Ltd. Guangzhou Panyu branch

Pledgor: GUANGZHOU KRYSTIC BUILDING MATERIALS Co.,Ltd.

Registration number: 2019440000123

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20160831

Pledgee: Bank of China Limited by Share Ltd. Guangzhou Panyu branch

Pledgor: GUANGZHOU KRYSTIC BUILDING MATERIALS Co.,Ltd.

Registration number: 2019440000123

PC01 Cancellation of the registration of the contract for pledge of patent right
PP01 Preservation of patent right

Effective date of registration: 20251128

Granted publication date: 20160831

PP01 Preservation of patent right