CN205509394U - Cable bridge convenient to lead wire - Google Patents

Cable bridge convenient to lead wire Download PDF

Info

Publication number
CN205509394U
CN205509394U CN201620186440.5U CN201620186440U CN205509394U CN 205509394 U CN205509394 U CN 205509394U CN 201620186440 U CN201620186440 U CN 201620186440U CN 205509394 U CN205509394 U CN 205509394U
Authority
CN
China
Prior art keywords
crane span
structure body
span structure
binding post
lead wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620186440.5U
Other languages
Chinese (zh)
Inventor
殷林杰
赵晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Dasen Mechanical And Electrical Co Ltd
Original Assignee
Henan Dasen Mechanical And Electrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Dasen Mechanical And Electrical Co Ltd filed Critical Henan Dasen Mechanical And Electrical Co Ltd
Priority to CN201620186440.5U priority Critical patent/CN205509394U/en
Application granted granted Critical
Publication of CN205509394U publication Critical patent/CN205509394U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a cable bridge convenient to lead wire, upper cover including crane span structure body and crane span structure body top, the crane span structure body side of being trough - shaped structure, the crane span structure body is formed by two blocks of curb plates and a bottom plate welding, just be equipped with the cavity intermediate layer in the bottom plate, it has many interconnection wiring to arrange in the cavity intermediate layer, it has a plurality of binding post to be equipped with even distribution on the curb plate of crane span structure body, and binding post is equipped with the outer joint of drawing to curb plate outside extension, and just adjacent binding post is connected through the interconnection wiring, the utility model discloses it is rational in infrastructure, at the in -process of actually installing and use, can should connect binding post through corresponding in -connection wire pair, the while rethread is drawn outward to connect and is quickmelt, and consequently wholly conveniently do multipoint cable and draw because binding post itself connects through the in -connection wire pair this moment, consequently whole in -process of drawing forth in the installation installation time that has significantly reduced has improved work efficiency.

Description

A kind of cable bridge being easy to lead wire
Technical field
This utility model relates to cable bridge, a kind of cable bridge being easy to lead wire.
Background technology
Crane span structure is generally referred to as cable testing bridge, and existing cable testing bridge is divided into slot type, pellet type and the structure such as ladder-type, grid type, is made up of support, trailing arm and installation adnexa etc..Can independently set up, can also be attached on various buildings or structures and piping lane support, embody simple in construction, handsome in appearance, flexible configuration and the feature such as easy to maintenance, all part is both needed to carry out zinc-plated process, it is arranged on the outer outdoor crane span structure of building, if in neighbouring seashore or belong to corrosion region, then must to have anticorrosion, resistance to moisture, adhesive force good for material, the physical property feature that impact strength is high.
Existing crane span structure needs to consider overall humidity resistance during design, therefore the trough type bridge frame having mostly is sealing structure, extraction at this point for cable will bring bigger trouble, it is typically all the two ends by crane span structure or reserved string holes is drawn, but this lead-out mode is not only the most inconvenient, the most also modularization management in inconvenient later stage.
Utility model content
The purpose of this utility model is to provide a kind of cable bridge being easy to lead wire, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of cable bridge being easy to lead wire, including the upper cover above crane span structure body and crane span structure body;Crane span structure body is square groove shape structure, and crane span structure body is welded by two blocks of side plates and one piece of base plate, and is provided with hollow sandwich in described base plate, and in hollow sandwich, row has many connection wires;The side plate of crane span structure body is provided with and is uniformly distributed with multiple binding post, and binding post is provided with the outer extraction joint extended outside side plate, and adjacent binding post is connected by connection wire;Therefore during actual installation uses.Can connect binding post by corresponding connection wire correspondence, do rapid abutting joint by outer extraction joint more simultaneously, now dock itself by connection wire due to binding post, therefore entirety conveniently does the extraction of multipoint cable;Therefore entirety greatly reduces the set-up time during installing extraction.
As further program of the utility model: described upper cover is spliced by polylith turnover panel, and one end of turnover panel is hinged by the side plate of bearing pin with crane span structure body, such that it is able to select suitable turnover panel to dig maintenance, personnel's work amount is little.
As this utility model further scheme: the angle, inner side of described crane span structure body is provided with oblique reinforcement, oblique reinforcement is utilized to strengthen overall intensity.
As this utility model further scheme: described turnover panel uses engineering plastics to make, overall light, intensity is high simultaneously.
Compared with prior art, the beneficial effects of the utility model are: this utility model is rational in infrastructure, during actual installation uses, binding post can be connected by corresponding connection wire correspondence, do rapid abutting joint by outer extraction joint more simultaneously, now docking itself by connection wire due to binding post, therefore entirety conveniently does the extraction of multipoint cable;Therefore entirety greatly reduces the set-up time during installing extraction, improves work efficiency.
Accompanying drawing explanation
Fig. 1 is the sectional view of a kind of cable bridge being easy to lead wire of this utility model.
Fig. 2 is the top view of a kind of cable bridge being easy to lead wire of this utility model.
In figure: draw joint, the oblique reinforcement of 7-, 8-bearing pin outside 1-crane span structure body, 2-upper cover, 21-turnover panel, 3-hollow sandwich, 4-connection wire, 5-binding post, 6-.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
Referring to Fig. 1~2, in this utility model embodiment, a kind of cable bridge being easy to lead wire, including the upper cover 2 above crane span structure body 1 and crane span structure body 1;Crane span structure body 1 is in square groove shape structure, and crane span structure body 1 is welded by two blocks of side plates and one piece of base plate, and is provided with hollow sandwich 3 in described base plate, and in hollow sandwich 3, row has many connection wires 4;The side plate of crane span structure body 1 is provided with and is uniformly distributed with multiple binding post 5, and binding post 5 is provided with the outer extraction joint 6 extended outside side plate, and adjacent binding post 5 is connected by connection wire 4;Therefore during actual installation uses.Can connect binding post 5 by corresponding connection wire 4 is corresponding, do rapid abutting joint by outer extraction joint 6 more simultaneously, now dock itself by connection wire 4 due to binding post 5, therefore entirety conveniently does the extraction of multipoint cable;Therefore entirety greatly reduces the set-up time during installing extraction.
Described upper cover 2 is spliced by polylith turnover panel 21, and one end of turnover panel 21 is hinged by the side plate of bearing pin 8 with crane span structure body 1, such that it is able to select suitable turnover panel 21 to dig maintenance, personnel's work amount is little.
The angle, inner side of described crane span structure body 1 is provided with oblique reinforcement 7, utilizes oblique reinforcement to strengthen overall intensity.
Described turnover panel 21 uses engineering plastics to make, and overall light, intensity is high simultaneously.
Operation principle of the present utility model is: therefore during actual installation uses, binding post 5 can be connected by corresponding connection wire 4 is corresponding, do rapid abutting joint by outer extraction joint 6 more simultaneously, now docking itself by connection wire 4 due to binding post 5, therefore entirety conveniently does the extraction of multipoint cable;Therefore entirety greatly reduces the set-up time during installing extraction;Upper cover 2 is spliced by polylith turnover panel 21, and one end of turnover panel 21 is hinged by the side plate of bearing pin 8 with crane span structure body 1, such that it is able to select suitable turnover panel 21 to dig maintenance, personnel's work amount is little.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to realize this utility model in other specific forms.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes fallen in the implication of equivalency and scope of claim included in this utility model.Should not be considered as limiting involved claim by any reference in claim.
In addition, it is to be understood that, although this specification is been described by according to embodiment, but the most each embodiment only comprises an independent technical scheme, this narrating mode of description is only for clarity sake, description should can also be formed, through appropriately combined, other embodiments that it will be appreciated by those skilled in the art that as an entirety, the technical scheme in each embodiment by those skilled in the art.

Claims (4)

1. the cable bridge being easy to lead wire, it is characterised in that include crane span structure body (1) and the upper cover (2) of crane span structure body (1) top;Crane span structure body (1) is in square groove shape structure, and crane span structure body (1) is welded by two blocks of side plates and one piece of base plate, and is provided with hollow sandwich (3) in described base plate, and in hollow sandwich (3), row has many connection wires (4);The side plate of crane span structure body (1) is provided with and is uniformly distributed with multiple binding post (5), and binding post (5) is provided with the outer extraction joint (6) extended outside side plate, and adjacent binding post (5) is connected by connection wire (4).
The cable bridge being easy to lead wire the most according to claim 1, it is characterised in that described upper cover (2) is spliced by polylith turnover panel (21), and one end of turnover panel (21) is hinged by the side plate of bearing pin (8) with crane span structure body (1).
The cable bridge being easy to lead wire the most according to claim 1, it is characterised in that the angle, inner side of described crane span structure body (1) is provided with oblique reinforcement (7).
The cable bridge being easy to lead wire the most according to claim 1, it is characterised in that described turnover panel (21) uses engineering plastics to make.
CN201620186440.5U 2016-03-11 2016-03-11 Cable bridge convenient to lead wire Expired - Fee Related CN205509394U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620186440.5U CN205509394U (en) 2016-03-11 2016-03-11 Cable bridge convenient to lead wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620186440.5U CN205509394U (en) 2016-03-11 2016-03-11 Cable bridge convenient to lead wire

Publications (1)

Publication Number Publication Date
CN205509394U true CN205509394U (en) 2016-08-24

Family

ID=56731320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620186440.5U Expired - Fee Related CN205509394U (en) 2016-03-11 2016-03-11 Cable bridge convenient to lead wire

Country Status (1)

Country Link
CN (1) CN205509394U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110824214A (en) * 2019-12-06 2020-02-21 林毓松 Outer wiring device that draws of electric power instrument case fixed mounting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110824214A (en) * 2019-12-06 2020-02-21 林毓松 Outer wiring device that draws of electric power instrument case fixed mounting

Similar Documents

Publication Publication Date Title
CN205509394U (en) Cable bridge convenient to lead wire
CN210117946U (en) Assembled bamboo-wood foundation and bamboo-wood low-rise residence
CN107620500A (en) A kind of H c-type assembling type nodes applied to single-layer steel structure cooling tower
CN207296508U (en) A kind of H-C type assembling type nodes applied to single-layer steel structure cooling tower
CN207638266U (en) A kind of reinforced cable bridge
CN104110072A (en) Hemispherical hollow welding sphere joint for large-span space steel structure support
CN106504674A (en) Billboard
CN208063088U (en) Roofing is without support type roof photovoltaic power station
CN207846810U (en) A kind of novel ceiling applied on steel construction ceiling framework
CN108518008B (en) Rigid roof structure on flexible inhaul cable structure and mounting method thereof
CN206575099U (en) A kind of novel self-locking cable testing bridge
CN207553565U (en) A kind of crosshead of truss
CN205509388U (en) Three cascades climbing crane span structure
CN211619808U (en) Novel wall-attached structure system of external hanging type tower crane
CN207588764U (en) Double V-shaped stent and solar energy roof system
CN208039587U (en) A kind of purlin structure in flexible cable structure
CN208202276U (en) Long-span roofing beam string
CN107834463B (en) A kind of reinforced capping adjustable cable crane span structure
CN107769120B (en) A kind of reinforced capping cable testing bridge
CN206363731U (en) Billboard
CN206697873U (en) A kind of weld mold structure for the welding of cable testing bridge support
CN205012641U (en) Connecting elements convenient to scaffold dismouting
CN211572308U (en) Assembled modularization canopy
CN104344084A (en) Layered horizontal tee joint
CN204333813U (en) Adjustable perpendicular tee joint crane span structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20180311