CN205500302U - Various coating line of veneer is from moving buttress dolly - Google Patents

Various coating line of veneer is from moving buttress dolly Download PDF

Info

Publication number
CN205500302U
CN205500302U CN201620219292.2U CN201620219292U CN205500302U CN 205500302 U CN205500302 U CN 205500302U CN 201620219292 U CN201620219292 U CN 201620219292U CN 205500302 U CN205500302 U CN 205500302U
Authority
CN
China
Prior art keywords
yoke
coating line
veneer
gear
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620219292.2U
Other languages
Chinese (zh)
Inventor
许言午
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU DINGLONG ENVIRONMENTAL PROTECTION EQUIPMENT CO LTD
Original Assignee
CHANGZHOU DINGLONG ENVIRONMENTAL PROTECTION EQUIPMENT CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU DINGLONG ENVIRONMENTAL PROTECTION EQUIPMENT CO LTD filed Critical CHANGZHOU DINGLONG ENVIRONMENTAL PROTECTION EQUIPMENT CO LTD
Priority to CN201620219292.2U priority Critical patent/CN205500302U/en
Application granted granted Critical
Publication of CN205500302U publication Critical patent/CN205500302U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of the various coating line technique of veneer and specifically relates to a various coating line of veneer is from moving buttress dolly, including frame that has the yoke and the translation mechanism who is used for the drive chassis removal, be provided with the direction of delivery belt conveyor unanimous with yoke length direction on the yoke, be provided with in the frame and be used for driving the elevating system that the yoke rises and descends, in the course of working of veneer, change into the tray and hold by the yoke of dolly, the mounting district can thrown off and drop to to the platform, in the veneer course of working of realization on last one tray, simultaneously place the tray and place the veneer on the platform on the tray, after the veneer application on the tray of holding by the dolly yoke, the dolly withdraws from various coating line's workspace, then platform area clothing, headgear and footwear is loaded with the workspace that rises to various coating line on the tray of veneer, seamless various coating line's application flow, shorten various coating line's idle time, the efficiency of various coating line's application is greatly improved.

Description

Veneer color-coating line is from moving buttress dolly
Technical field
This utility model relates to veneer color-coating line technical field, and especially a kind of veneer color-coating line is from moving buttress dolly.
Background technology
nullVeneer color-coating line refers to the production line in veneer surface color application,Existing veneer color-coating line includes color coating device and has the lifting device of platform,As follows in the workflow of veneer color coating: the wood composite pallet carrying veneer is placed on platform,Promoted platform by lifting device and wood composite pallet is lifted the color coating device to veneer color-coating line,Color coating device carries out application and takes away one by one the veneer on wood composite pallet,Until the whole application of veneer on wood composite pallet is complete,Then platform is driven to drop to initial position by lifting device,Again a number of veneer is prevented subsequently on empty pallet,Promoted platform by lifting device again and wood composite pallet is lifted the color coating device to veneer color-coating line,Reciprocal with this,Certain color coating break time is had in whole color-coating line workflow,I.e. for being driven platform to drop to initial position by lifting device,Again a number of veneer is prevented subsequently on empty wood composite pallet,Promoted platform by lifting device again and wood composite pallet is lifted the color coating device to veneer color-coating line,Whole color coating is longer for break time,Typically requiring for 10 a few minutes could wait until that the next one has been loaded the tray lift of veneer to color coating device (working area) place of color-coating line and processed by platform,Production efficiency is low,Within color coating break time,Owing to color coating device is non-stop-machine,Therefore,Also result in the waste of the energy.
Utility model content
The technical problems to be solved in the utility model is: longer for break time in order to solve in prior art whole color coating in color-coating line, typically requiring for 10 a few minutes could wait until that the next one has been loaded the tray lift of veneer to the working area of color-coating line and processed by platform, causing the problem that production efficiency is low, a kind of veneer color-coating line of existing offer is from moving buttress dolly.
This utility model solves its technical problem and be the technical scheme is that a kind of veneer color-coating line is from moving buttress dolly, including there is the frame of yoke and for driving the translation mechanism of machine frame movement, it is provided with the belt conveyor that conveying direction is consistent with yoke length direction on described yoke, described frame is provided with the elevating mechanism for driving yoke raising and lowering.
In this utility model, translation mechanism drives machine frame movement, realize relative color-coating line working area draw close and away from, yoke is for holding pallet from below, yoke upper belt conveyer device is for being delivered to recovery area by the empty pallet on yoke, yoke, when frame moves to color-coating line working area, is fallen by elevating mechanism, is risen by yoke when yoke arrives the lower section of pallet again and supports pallet, be conducive to yoke to arrive color-coating line working area smoothly, and pallet is held firmly.
Further, described translation mechanism includes two pedestals, and one of them pedestal is provided with guider, and another pedestal is provided with driving means.
Further, described guider includes that guide post, described guide post are fixed on described pedestal, and described guide post is connected with described housing slide.
Further, described driving means includes the first motor and leading screw, described screw turns is arranged on described pedestal, described leading screw is connected with described frame screw-driven, described first motor is fixed on described pedestal, and the external part of described first motor is connected with described lead screw transmission, and the first motor-driven is to leading screw, by leading screw and frame threaded engagement, thus frame is driven to move on pedestal.
Further, described elevating mechanism includes the first power transmission shaft, crotch, drive connecting rod, some follower link and power set, described first drive axis is arranged in described frame, described crotch is arranged in described frame, one end of described drive connecting rod is connected with described first transmission shaft driven, the other end is hinged with described yoke, one end of described follower link is hinged with described crotch, the other end is hinged with described yoke, described power set are used for driving described first drive axis, the first drive axis is driven by power set, first power transmission shaft drives drive connecting rod to rotate, realize the yoke lifting relative to crotch.
Owing to yoke is shorter relative to the range of lift of crotch, therefore the rotational angle of the first power transmission shaft is less, as used motor as power source, can cause inaccuracy, further, described power set include hydraulic cylinder and connecting rod, described hydraulic cylinder is connected with described gantry rotation, one end of described connecting rod turns with the external part of described hydraulic cylinder and is connected, and the other end of described connecting rod is connected with described first drive axis, drives drive connecting rod to rotate by connecting rod when hydraulic cylinder elongation end stretches out.
Further, described belt conveyor includes belt, drivewheel, some driven pulleys, some transition wheels, second driving shaft and the second motor, described second driving shaft is rotatably installed in described frame, described drivewheel is in transmission connection with described second driving shaft, described driven pulley and transition wheel are all rotatably installed on institute's yoke, described drivewheel, connected by belt transmission between driven pulley and transition wheel, described drivewheel and driven pulley all with the interior side contacts of belt, described transition wheel and the contact outside of belt, described second motor is fixed in described frame, described second motor is in transmission connection with described second driving shaft, when second motor drives second driving shaft motion, second driving shaft drives drivewheel to rotate, the effect of transition wheel is to ensure that support arm is during rotating, belt is in tensioned state all the time.
For rational space layout, further, it is provided with actuating device between described second driving shaft and described drivewheel, described actuating device includes the first gear and the second gear, described first gear is in transmission connection with described second driving shaft, one end that described drive connecting rod is connected with described first power transmission shaft is provided with sleeve, described second pinion rotation is arranged on described sleeve, described drivewheel is fixing with described second gear to be connected, described first gear engages with described second gear, second driving shaft transmission connects to the first gear drive, first gear and the engagement of the second gear, it is ultimately transferred to drivewheel, and second gear and drivewheel when rotating on sleeve, first power transmission shaft will not rotate with it, power transitive relation is not had between first power transmission shaft and the second gear and drivewheel.
nullIn order to more smoothly pallet be held,Further,Described yoke and crotch all have two,Crotch guiding mechanism it is provided with in described frame,Described crotch guiding mechanism includes the 3rd motor and the contrary double end screw mandrel of two ends thread rotary orientation,It is equipped with gear-box on described crotch,Described first gear and the second gear are respectively positioned in described gear-box,Described first power transmission shaft and second driving shaft are splined shaft,Described double end screw mandrel is rotatably installed in described frame,Threaded with two described crotch respectively in the two ends of described double end screw mandrel,Described 3rd motor is in transmission connection with described double end screw mandrel,Crotch is connected along the axial direction of double end screw mandrel with housing slide,Size according to pallet,Double end screw mandrel is driven to drive two crotch to be located remotely from each other or draw close by the 3rd motor,Reach to be held by pallet more smoothly,Wherein gear-box plays spacing effect,By the first gear and the second gear position limiting on the support at its place.
The beneficial effects of the utility model are: veneer color-coating line of the present utility model is from moving buttress dolly in the course of processing of veneer, pallet is changed into and is held by the yoke of dolly, platform is the most disengagable and drops to load district, realize in the veneer course of processing on a upper pallet, simultaneously placement tray place veneer on pallet on platform, after the veneer application on the pallet held by dolly yoke terminates, dolly exits the working area of color-coating line, then platform rises to the working area of color-coating line with the pallet being mounted with veneer, the seamless connection coating process of color-coating line, shorten the standby time of color-coating line, substantially increase the coating efficiency of color-coating line.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is that this utility model veneer color-coating line is from the schematic front view moving buttress dolly;
Fig. 2 is that this utility model veneer color-coating line is from the schematic top plan view moving buttress dolly;
Fig. 3 is that this utility model veneer color-coating line is from the left view schematic diagram moving buttress dolly;
Fig. 4 is the close-up schematic view of A in Fig. 2;
Fig. 5 is that this utility model veneer color-coating line is from moving yoke upper belt conveyer device schematic diagram in buttress dolly;
Fig. 6 is this utility model veneer color-coating line changes buttress schematic flow sheet from move buttress dolly.
In figure: 1, yoke, 2, frame, 3, pedestal, 4, guide post, the 5, first motor, 6, leading screw, 7, the first power transmission shaft, 8, crotch, 9, drive connecting rod, 10, follower link, 11, hydraulic cylinder, 12, connecting rod, 13, belt, 14, drivewheel, 15, driven pulley, 16, transition wheel, 17, second driving shaft, the 18, second motor, 19, the first gear, the 20, second gear, 21, sleeve, 22, the 3rd motor, 23, double end screw mandrel, 24, gear-box, 25, pallet, 26, hoisting mechanism, 27, platform, 28, working area, 29, veneer.
Detailed description of the invention
Presently in connection with accompanying drawing, this utility model is described in further detail.These accompanying drawings are the schematic diagram of simplification, and basic structure of the present utility model is described the most in a schematic way, and therefore it only shows the composition relevant with this utility model.
Embodiment 1
As shown in the figure shown in 1-5, a kind of veneer color-coating line is from moving buttress dolly, including there is the frame 2 of yoke 1 and for the translation mechanism driving frame 2 to move, it is provided with the belt conveyor that conveying direction is consistent with yoke 1 length direction on described yoke 1, described frame 2 is provided with the elevating mechanism for driving yoke 1 raising and lowering.
Described translation mechanism includes two pedestals 3, and one of them pedestal 3 is provided with guider, and another pedestal 3 is provided with driving means.
Described guider includes that guide post 4, described guide post 4 are fixed on described pedestal 3, and described guide post 4 is slidably connected with described frame 2.
Described driving means includes the first motor 5 and leading screw 6, described leading screw 6 is rotatably installed on described pedestal 3, described leading screw 6 is connected with described frame 2 screw-driven, described first motor 5 is fixed on described pedestal 3, the external part of described first motor 5 is in transmission connection with described leading screw 6, first motor 5 transmission, to leading screw 6, by leading screw 6 and frame 2 threaded engagement, thus drives frame 2 to move on pedestal 3.
Described elevating mechanism includes the first power transmission shaft 7, crotch 8, drive connecting rod 9, three follower link 10 and power set, described first power transmission shaft 7 rotates and is arranged in described frame 2, described crotch 8 is arranged in described frame 2, one end of described drive connecting rod 9 is in transmission connection with described first power transmission shaft 7, the other end is hinged with described yoke 1, one end of described follower link 10 is hinged with described crotch 8, the other end is hinged with described yoke 1, described power set are used for driving described first power transmission shaft 7 to rotate, follower link 10 is parallel to each other with drive connecting rod 9, and distance between three its respective two pin joints of follower link 10 is equal, the first power transmission shaft 7 is driven to rotate by power set, first power transmission shaft 7 drives drive connecting rod 9 to rotate, realize the lifting of the relative crotch 8 of yoke 1.
Described power set include hydraulic cylinder 11 and connecting rod 12, described hydraulic cylinder 11 is rotationally connected with described frame 2, one end of described connecting rod 12 turns with the external part of described hydraulic cylinder 11 and is connected, the other end of described connecting rod 12 is rotationally connected with described first power transmission shaft 7, drives drive connecting rod 9 to rotate by connecting rod 12 when hydraulic cylinder 11 elongation end stretches out.
nullDescribed belt conveyor includes belt 13、Drivewheel 14、Five driven pulleys 15、Some transition wheels 16、Second driving shaft 17 and the second motor 18,Described second driving shaft 17 is rotatably installed in described frame 2,Described drivewheel 14 is in transmission connection with described second driving shaft 17,Described driven pulley 15 and transition wheel 16 are all rotatably installed on institute's yoke 1,Described drivewheel 14、It is in transmission connection by belt 13 between driven pulley 15 and transition wheel 16,Described drivewheel 14 and driven pulley 15 all with the interior side contacts of belt 13,Described transition wheel 16 and the contact outside of belt 13,Described second motor 18 is fixed in described frame 2,Described second motor 18 is in transmission connection with described second driving shaft 17,When second motor 18 drives second driving shaft 17 to move,Second driving shaft 17 drives drivewheel 14 to rotate,Five driven pulleys 15 are the most spaced to be distributed on support arm,It is followed successively by the first driven pulley 15 from left to right、Second driven pulley 15、3rd driven pulley 15、4th driven pulley 15 and the 5th driven pulley 15,The allocative decision of concrete transition wheel 16 is: the left side of the 5th driven pulley 15 sets a transition wheel 16,The right side of the 4th driven pulley 15 sets a transition wheel 16,Quantity and the installation site of transition wheel 16 can also be adjusted according to the actual requirements.
nullIt is provided with actuating device between described second driving shaft 17 and described drivewheel 14,Described actuating device includes the first gear 19 and the second gear 20,Described first gear 19 is in transmission connection with described second driving shaft 17,One end that described drive connecting rod 9 is connected with described first power transmission shaft 7 is provided with sleeve 21,Described second gear 20 is rotatably installed on described sleeve 21,Described drivewheel 14 is fixing with described second gear 20 to be connected,Described first gear 19 engages with described second gear 20,Sleeve 21 is to supporting spline tube with second driving shaft 17,By sleeve 21 transmission between drive connecting rod 9 and second driving shaft 17,Second driving shaft 17 transmission is in transmission connection to the first gear 19,First gear 19 engages with the second gear 20,It is ultimately transferred to drivewheel 14,And second gear 20 and drivewheel 14 when rotating on sleeve 21,First power transmission shaft 7 will not rotate with it,Power transitive relation is not had between first power transmission shaft 7 and the second gear 20 and drivewheel 14.
nullDescribed yoke 1 and crotch 8 all have two,It is provided with crotch guiding mechanism in described frame 2,Described crotch guiding mechanism includes the 3rd motor 22 and the contrary double end screw mandrel 23 of two ends thread rotary orientation,It is equipped with gear-box 24 on described crotch 8,Described first gear 19 and the second gear 20 are respectively positioned in described gear-box 24,Described first power transmission shaft 7 and second driving shaft 17 are splined shaft,Described double end screw mandrel 23 is rotatably installed in described frame 2,Threaded with two described crotch 8 respectively in the two ends of described double end screw mandrel 23,Described 3rd motor 22 is in transmission connection with described double end screw mandrel 23,Size according to pallet 25,Double end screw mandrel 23 is driven to drive two crotch 8 to be located remotely from each other or draw close by the 3rd motor,Reach to be held by pallet 25 more smoothly,Wherein gear-box 24 plays spacing effect,By spacing on the support at its place to the first gear 19 and the second gear 20.
Its rotation of above-mentioned dolly or hinged position all can choose whether to install bearing to improve its motility rotated voluntarily.
Operation principle of the present utility model:
First motor 5 transmission is to leading screw 6, by leading screw 6 and frame 2 threaded engagement, thus drive frame 2 to move on pedestal 3, realize relative color-coating line working area 28 draw close and away from, yoke 1 is for holding pallet 25 from below, yoke 1 upper belt 13 conveyer device, for the empty pallet 25 on yoke 1 is delivered to recovery area, the first power transmission shaft 7 is driven to rotate by power set, first power transmission shaft 7 drives drive connecting rod 9 to rotate, realize the lifting of the relative crotch 8 of yoke 1, when frame 2 moves to color-coating line working area 28, yoke 1 is fallen, again yoke 1 is risen when yoke 1 arrives the lower section of pallet 25 and support pallet 25, yoke 1 is conducive to arrive color-coating line working area 28 smoothly, and pallet 25 is held firmly.
As shown in Figure 6, veneer color-coating line has pallet 25 and the platform 27 driven by hoisting mechanism 26, this utility model veneer color-coating line from move buttress dolly change buttress step as follows:
1), time initially, platform 27 is positioned at load district, if being placed on platform 27 by the pallet 25 carrying dry tablet veneer 29;
2) hoisting mechanism 26 is driven to promote platform 27, the pallet 25 carrying veneer 29 is risen to the working area 28 of veneer color-coating line, platform 27 rests on working area 28 and lifts pallet 25, veneer color-coating line carries out color coating operation to the veneer 29 on pallet 25, and is taken away one by one by the veneer 29 on pallet 25;
3) translation mechanism starting dolly drives frame 2 to draw close to the working area 28 of veneer color-coating line, until yoke 1 thereon moves to the pallet 25 of working area 28, then risen to contact with pallet 25 lower surface by yoke 1 by elevating mechanism, be converted to yoke 1 and lift pallet 25;
4) when the pallet 25 of working area 28 is lifted by yoke 1, hoisting mechanism 26 drives platform 27 to drop to load district, and again places the pallet 25 carrying veneer 29 on platform 27;
5) after veneer 29 color coating on the pallet 25 lifted by yoke 1, elevating mechanism drives yoke 1 to decline, translation mechanism drives frame 2 away from the working area 28 of veneer color-coating line, and the empty pallet 25 on yoke 1 is delivered to recovery area by belt 13 conveyer device on yoke 1 subsequently;
6) after yoke 1 drives empty pallet 25 to leave the working area 28 of veneer color-coating line, hoisting mechanism 26 drive platform 27 to rise, drive the pallet 25 in step 4 to rise to the working area 28 of veneer color-coating line;
7) step 2-6 is repeated.
The superposition of described veneer 29 is placed on described pallet 25.
In step 3, time below any one value during the veneer 29 on pallet 25 also remains the interval of 1/3 to 1/2, when the veneer on such as pallet 25 also remains 5, start the translation mechanism on dolly.
The height of yoke 1 on crotch 8 can be adjusted accordingly so that it is flush with recovery area, it is simple to the empty pallet 25 on yoke 1 is delivered to recovery area according to the height of recovery area.
Above-mentioned is enlightenment according to desirable embodiment of the present utility model, and by above-mentioned description, relevant staff can carry out various change and amendment completely in the range of without departing from this utility model technological thought.The content that the technical scope of this utility model is not limited in description, it is necessary to determine its technical scope according to right.

Claims (9)

1. a veneer color-coating line is from moving buttress dolly, it is characterized in that: include having the frame (2) of yoke (1) and be used for driving the translation mechanism of frame (2) movement, it is provided with the belt conveyor that conveying direction is consistent with yoke (1) length direction on described yoke (1), described frame (2) is provided with the elevating mechanism for driving yoke (1) raising and lowering.
Veneer color-coating line the most according to claim 1 is from moving buttress dolly, it is characterized in that: described translation mechanism includes two pedestals (3), one of them pedestal is provided with guider on (3), and another pedestal is provided with driving means on (3).
Veneer color-coating line the most according to claim 2 is from moving buttress dolly, it is characterized in that: described guider includes guide post (4), described guide post (4) is fixed on described pedestal (3), and described guide post (4) is slidably connected with described frame (2).
Veneer color-coating line the most according to claim 2 is from moving buttress dolly, it is characterized in that: described driving means includes the first motor (5) and leading screw (6), described leading screw (6) is rotatably installed on described pedestal (3), described leading screw (6) is connected with described frame (2) screw-driven, described first motor (5) is fixed on described pedestal (3), and the external part of described first motor (5) is in transmission connection with described leading screw (6).
Veneer color-coating line the most according to claim 1 is from moving buttress dolly, it is characterized in that: described elevating mechanism includes the first power transmission shaft (7), crotch (8), drive connecting rod (9), some follower link (10) and power set, described first power transmission shaft (7) rotates and is arranged in described frame (2), described crotch (8) is arranged in described frame (2), one end of described drive connecting rod (9) is in transmission connection with described first power transmission shaft (7), the other end is hinged with described yoke (1), one end of described follower link (10) is hinged with described crotch (8), the other end is hinged with described yoke (1), described power set are used for driving described first power transmission shaft (7) to rotate.
Veneer color-coating line the most according to claim 5 is from moving buttress dolly, it is characterized in that: described power set include hydraulic cylinder (11) and connecting rod (12), described hydraulic cylinder (11) is rotationally connected with described frame (2), one end of described connecting rod (12) turns with the external part of described hydraulic cylinder (11) and is connected, and the other end of described connecting rod (12) is rotationally connected with described first power transmission shaft (7).
nullVeneer color-coating line the most according to claim 5 is from moving buttress dolly,It is characterized in that: described belt conveyor includes belt (13)、Drivewheel (14)、Some driven pulleys (15)、Some transition wheels (16)、Second driving shaft (17) and the second motor (18),Described second driving shaft (17) is rotatably installed in described frame (2),Described drivewheel (14) is in transmission connection with described second driving shaft (17),Described driven pulley (15) and transition wheel (16) are all rotatably installed in institute's yoke (1),Described drivewheel (14)、It is in transmission connection by belt (13) between driven pulley (15) and transition wheel (16),Described drivewheel (14) and driven pulley (15) all with the interior side contacts of belt (13),Described transition wheel (16) and the contact outside of belt (13),Described second motor (18) is fixed in described frame (2),Described second motor (18) is in transmission connection with described second driving shaft (17).
Veneer color-coating line the most according to claim 7 is from moving buttress dolly, it is characterized in that: between described second driving shaft (17) and described drivewheel (14), be provided with actuating device, described actuating device includes the first gear (19) and the second gear (20), described first gear (19) is in transmission connection with described second driving shaft (17), one end that described drive connecting rod (9) is connected with described first power transmission shaft (7) is provided with sleeve (21), described second gear (20) is rotatably installed on described sleeve (21), described drivewheel (14) is fixing with described second gear (20) to be connected, described first gear (19) is engaged with described second gear (20).
nullVeneer color-coating line the most according to claim 8 is from moving buttress dolly,It is characterized in that: described yoke (1) and crotch (8) all have two,Described frame is provided with crotch guiding mechanism on (2),Described crotch guiding mechanism includes the 3rd motor (22) and the contrary double end screw mandrel (23) of two ends thread rotary orientation,Gear-box (24) it is equipped with on described crotch (8),Described first gear (19) and the second gear (20) are respectively positioned in described gear-box (24),Described first power transmission shaft (7) and second driving shaft (17) are splined shaft,Described double end screw mandrel (23) is rotatably installed in described frame (2),Threaded with two described crotch (8) respectively in the two ends of described double end screw mandrel (23),Described 3rd motor (22) is in transmission connection with described double end screw mandrel (23).
CN201620219292.2U 2016-03-21 2016-03-21 Various coating line of veneer is from moving buttress dolly Withdrawn - After Issue CN205500302U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620219292.2U CN205500302U (en) 2016-03-21 2016-03-21 Various coating line of veneer is from moving buttress dolly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620219292.2U CN205500302U (en) 2016-03-21 2016-03-21 Various coating line of veneer is from moving buttress dolly

Publications (1)

Publication Number Publication Date
CN205500302U true CN205500302U (en) 2016-08-24

Family

ID=56731954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620219292.2U Withdrawn - After Issue CN205500302U (en) 2016-03-21 2016-03-21 Various coating line of veneer is from moving buttress dolly

Country Status (1)

Country Link
CN (1) CN205500302U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105692223A (en) * 2016-03-21 2016-06-22 常州市鼎龙环保设备有限公司 Automatic stack moving trolley for single board color coating line and stack moving method thereof
CN108674913A (en) * 2018-07-26 2018-10-19 深圳市捷佳伟创新能源装备股份有限公司 Secondary positioning adjustment carrier and transfer car(buggy)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105692223A (en) * 2016-03-21 2016-06-22 常州市鼎龙环保设备有限公司 Automatic stack moving trolley for single board color coating line and stack moving method thereof
CN105692223B (en) * 2016-03-21 2018-02-27 常州市鼎龙环保设备有限公司 Veneer color-coating line moves pile dolly and its changes stacking method certainly
CN108674913A (en) * 2018-07-26 2018-10-19 深圳市捷佳伟创新能源装备股份有限公司 Secondary positioning adjustment carrier and transfer car(buggy)
CN108674913B (en) * 2018-07-26 2023-05-30 深圳市捷佳伟创新能源装备股份有限公司 Secondary positioning adjustment carrier and transfer trolley

Similar Documents

Publication Publication Date Title
CN206278884U (en) A kind of lift electric power overhaul workbench
CN106494143A (en) A kind of artificial woodcarving workbench
CN205500302U (en) Various coating line of veneer is from moving buttress dolly
CN207014153U (en) A kind of stainless steel plate outer surface Wire Drawing device
CN209758886U (en) Energy-saving small crane
CN106493847B (en) A kind of charging crane and its storage base assembly line
CN108393630B (en) A kind of steel reinforcement cage welding equipment
CN208086695U (en) Cage guide automatic charging device
CN105752669A (en) Supporting-plate-free building block forming machine capable of automatically stacking bricks
CN219408235U (en) Material conveying device of annealing furnace
CN105692223A (en) Automatic stack moving trolley for single board color coating line and stack moving method thereof
CN204896739U (en) Burglary -resisting door packing assembly line lift conveyor
CN111412732A (en) South america white shrimp processing drying device
CN209583060U (en) A kind of corrugated board production intelligent stacking device
CN206750921U (en) Automatic sealing cover gripping machine
CN207107926U (en) Lift material-strewing device
CN208220680U (en) A kind of tubing string Automatic Conveying device
CN207158388U (en) A kind of printed circuit board production feeding device
CN206644131U (en) A kind of charging crane and its storage base streamline
CN110846487B (en) Material frame translation device of heat treatment furnace
CN110900595A (en) Material snatchs drop feed mechanism
CN206927139U (en) A kind of supervisor's transmission device of single tube circuit tower
CN218081293U (en) Rotary assembly device
CN204822910U (en) Door plant layering machine
CN205442022U (en) Automatic carton separation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160824

Effective date of abandoning: 20180227