CN205495893U - Steel constructs painting system - Google Patents

Steel constructs painting system Download PDF

Info

Publication number
CN205495893U
CN205495893U CN201521047139.8U CN201521047139U CN205495893U CN 205495893 U CN205495893 U CN 205495893U CN 201521047139 U CN201521047139 U CN 201521047139U CN 205495893 U CN205495893 U CN 205495893U
Authority
CN
China
Prior art keywords
air
steel
spraying
plate
paint spraying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521047139.8U
Other languages
Chinese (zh)
Inventor
吴会超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Duowei Union Group Co Ltd
Original Assignee
Duowei Union Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Duowei Union Group Co Ltd filed Critical Duowei Union Group Co Ltd
Priority to CN201521047139.8U priority Critical patent/CN205495893U/en
Application granted granted Critical
Publication of CN205495893U publication Critical patent/CN205495893U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The embodiment of the utility model provides a steel constructs painting system, it includes: the spraying cabin, the spraying cabin includes the cabin body, be provided with a plurality of air intake and air outlet on the body of cabin, air supply unit, air supply unit's supply -air outlet passes through the air is sent to the air intake the spraying cabin, the unit of airing exhaust, air exhaust the inlet scoop of unit and pass through the air is followed to the air outlet the spraying under -deck is discharged, and spraying station, the spraying station set up in the spraying under -deck, it highly is suitable for spraying work height, wherein, air supply unit with the unit of airing exhaust is guaranteed the spraying under -deck has required working pressure of compressed air. Steel constructs painting system still includes, walking unit, walking unit include the slide rail and with the pulley that the slide rail cooperation was used, two the slide rail symmetry is fixed treating spraying ground border department, and is a plurality of the pulley respectively with the bottom of first curb plate with the bottom fixed connection of second curb plate.

Description

A kind of steel structure paint spraying system
Technical field
This utility model embodiment relates to spraying equipment field, particularly relates to a kind of steel structure paint spraying system.
Background technology
Spraying refers to, by spray gun or dish-style nebulizer, by means of pressure or centrifugal force, coating be dispersed into uniform and fine droplet, is applied over the application on coated article surface.The applied range of spraying mainly has the fields such as five metals, plastic cement, family property, military project, boats and ships, is to apply most common a kind of application mode now.Such as, steel beam column is generally coated with coating, for antiseptic and rustproof, to increase the use time of steel beam column.
Subject matter present in spraying: due to compressed air, becomes coating high degree of dispersion coating cloud, paint grain, flies upward and be diffused in ambient atmosphere, and the solvent evaporated in coating, both pollute environment, be unfavorable for health, waste again coating, cause economic loss.
And, in open spraying area, every ambient parameter is not easily controlled and regulates, it is easy to affect spraying effect, such as: the on-the-spot cleaning not of spraying operation, dust is mixed in paint, can cause coating seediness;Or spraying operation scene temperature, high humidity, paint film reaction acutely, may combine with moisture content in air and produce whiting;Or operation field temperature is high, air humidity is big, causes bubble.
Accordingly, it would be desirable to a kind of steel structure paint spraying system, solve the problems referred to above.
Utility model content
The problem existed for prior art, the embodiment of the present application provides a kind of steel structure paint spraying system, which solves pollutant diffusion, the problem causing air pollution in spraying process.
The embodiment of the present application provides a kind of steel structure paint spraying system, comprising: spray booth, described spray booth includes nacelle, described nacelle is provided with several air inlets and air outlet;Blowing unit, air is sent into described spray booth by described air inlet by the air outlet of described blowing unit;Air exhaust units, air is discharged in described spray booth by the inlet scoop of described air exhaust units by described air outlet;And spray station, described spray station is arranged in described spray booth, and it is highly suitable for spray coating operations height;Wherein, described blowing unit has required operating air pressure in ensureing described spray booth with described air exhaust units.
Preferably, described nacelle includes the rolling screen door that the first side plate fixed in top board, two ends relative with described top board respectively and the second side plate, respectively opposite end other with described top board are fixed.
Preferably, described first side plate is provided with multiple described air inlet, and described second side plate is provided with multiple described air outlet, and described top board is provided with multiple described air outlet.
Preferably, described blowing unit includes multiple axial flow blower.
Preferably, multiple described axial flow blowers are distributed in the outside of described first side plate, and the air outlet of each described axial flow blower connects with the air inlet of described first side plate.
Preferably, described air exhaust units includes the most a set of air draft supervisor, air exhaust branch pipe and air draft suction nozzle, described air draft supervisor is positioned at described spray booth top, one end of described air draft supervisor is provided with extractor fan, the other end and the described air draft main tube body of described air draft supervisor are provided with many described air exhaust branch pipes, and described air draft suction nozzle is positioned at described spray booth and is connected with described air exhaust branch pipe.
Preferably, described air draft supervisor includes that at least pipeline, the caliber of the entrance point of described air draft supervisor to the port of export are gradually increased.
Preferably, being gradually increased near the caliber of described air draft main tube end away from described air draft main tube end of described air exhaust branch pipe.
Preferably, described air draft suction nozzle is multiple, is provided with a described air draft suction nozzle at the air outlet of each described top board and the air outlet of described second side plate.
Furthermore it is preferred that also include, walking unit, described walking unit include slide rail and with described slide rail with the use of pulley, two described slide rail symmetries are fixed on ground to be sprayed boundary, and multiple described pulleys are fixing with the bottom of the bottom of described first side plate and described second side plate respectively to be connected.
Knowable to the description above and practice, a kind of steel structure paint spraying system that the embodiment of the present application provides, compared with prior art, it provides the benefit that: one, workpiece to be sprayed is placed in spray station, spray booth cover is buckled in above spray station, then carries out spraying operation, space can be polluted with closed spray, it is easy to follow-up focusing on, reduce the discharge capacity of VOC, reduce coating cloud and the pollution of VOC, environmental pollution indexes can be reduced;Its two, spray booth carries out side-blown equipped with blowing unit and air exhaust units, blowing unit, and air exhaust units is inhaled by side and collects waste gas by the way of upper suction, with ensure spray booth gas sampling efficiency maximize;Its three, multiple spray station is set, spray booth can move to each spray station and be provided above closing space, facilitates spraying operation, saves spray time.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present application or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is some embodiments of the application, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Accompanying drawing described herein is used for providing further understanding of the present application, constitutes the part of the application, and the schematic description and description of the application is used for explaining the application, is not intended that the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the steel structure paint spraying system side view described in the embodiment of the present application;
Fig. 2 is the steel structure paint spraying system top view shown in Fig. 1.
Reference:
10: spray booth;11: air inlet;12: air outlet;13: top board;14: the first side plates;
15: the second side plates;16: spray station;20: blowing unit;30: air exhaust units;
31: air draft is responsible for;32: air exhaust branch pipe;33: air draft suction nozzle.
Detailed description of the invention
For making the purpose of the embodiment of the present application, technical scheme and advantage clearer, below in conjunction with the accompanying drawing in the embodiment of the present application, technical scheme in the embodiment of the present application is clearly and completely described, obviously, described embodiment is some embodiments of the present application rather than whole embodiments.Based on the embodiment in the application, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of the application protection.
For making the purpose of the application, technical scheme and advantage clearer, below in conjunction with drawings and the specific embodiments, the application is described in further detail.
Fig. 1 is the steel structure paint spraying system side view described in the embodiment of the present application.Fig. 2 is the steel structure paint spraying system top view shown in Fig. 1.As depicted in figs. 1 and 2: steel structure paint spraying system includes: spray booth 10, spray station 16, blowing unit 20 and air exhaust units 30.
Spray booth 10 includes nacelle, and nacelle is provided with several air inlet 11 and several air outlets 12, and the number of air inlet 11 and air outlet 12 depends primarily on the space size in spraying storehouse 10;Spray station 16 can be the component that stirrup etc. can raise the height of steel structure to be sprayed, but it is not limited thereto, spray station 16 is arranged in spray booth 10, the height of spray station 16 is suitable for spray coating operations height, as sprayed the working depth etc. of work, to ensure the integrity of steel structure spraying, it is to avoid invar structure height is improper and causes spraying dead angle, affects coating quality;Air is sent into spray booth 10 by air inlet 11 by the air outlet of blowing unit 20;Air is discharged in spray booth 10 by the inlet scoop of air exhaust units 30 by air outlet 12, blowing unit 20 and air exhaust units 30 have required operating air pressure in ensureing spray booth 10, operating air pressure can ensure that spraying and the Spray painting tool smoothly of steel structure have safe working environment in spray booth 10, increase the safety of steel structure spray coating operations.
Preferably, nacelle cover is buckled in spray station 16, and nacelle includes top board the 13, first side plate the 14, second side plate 15 and rolling screen door.The relative two ends of top board 13 fixed first side plate 13 and the second side plate 14 respectively, top board 13 additionally relative to two ends fix rolling screen door respectively.When carrying out spraying operation, rolling screen door is put down, and nacelle forms confined space above spray station 16;After spraying completes, rolling screen door is rolled, convenient ventilation.
Be provided with multiple air inlet 11 in the first side plate 14 bottom, air inlet 11 is equidistant on the first side plate, homalographic, etc. the distribution of relative altitude, convenient uniform gas distribution in nacelle.
Second side plate 15 is provided with multiple air outlet 12 at top, air outlet 12 is equidistant on the second side plate 15, homalographic, etc. the distribution of relative altitude;Top board 13 is provided with multiple row air outlet 12, and air outlet 12 is equidistant on top board 13, the distribution of homalographic, air outlet 12 on top board 13 in array distribution.
The air inlet 11 of corresponding first side plate 14 bottom of the air outlet of blowing unit 20, the air outlet of blowing unit 20 is docked to air inlet 11, is sent in spray booth 10 by air by air inlet 11.
Preferably, blowing unit 20 includes multiple axial flow blower, and each axial flow blower provides an air outlet, and each axial flow blower is located at the outside of the first side plate 14, and the air outlet of each axial flow blower and the air inlet 11 of the first side plate 14 connect.
The air outlet 12 on corresponding second side plate 15 top, the inlet scoop of air exhaust units 30 or the air outlet 12 of top board 13, discharged air by air outlet 12 in spray booth 10.
By adjusting blowing unit 20 and the air inflow of air exhaust units 30 and gas output so that blowing unit 20 and air exhaust units 30 have required operating air pressure in can ensure that spray booth 10.
Preferably, air exhaust units 30 includes the most a set of air draft supervisor 31, air exhaust branch pipe 32 and air draft suction nozzle 33.
Top board 13 tops that air draft supervisor 31 is positioned at spray booth 10, and extend to air outlet 12 along the second side plate 15, one end of air draft supervisor 31 is connected with extractor fan, extractor fan will go into air draft be responsible for 31 air and pollutant take away.
Preferably, air draft supervisor 31 includes that at least pipeline, the caliber of the entrance point of air draft supervisor 31 to the port of export are gradually increased.How air draft supervisor 31 can also be by forming with pipeline connects, wherein, and the caliber of the conduit entrance that the caliber of front-end pipelines outlet connects less than its rear, and, the caliber of each pipeline caliber from entrance point to the port of export is gradually increased.
The reason that the entrance point of air draft supervisor 31 is gradually increased to the caliber of the port of export is: the air capacity from entrance point to the port of export is gradually increased along with the quantity increase of the arm of connection, when starting to ventilate, the air exhaust branch pipe 32 connected from entrance point to the port of export and air outlet more than 12, there is provided air capacity the biggest to air draft supervisor, if it is constant that 31 calibers are responsible in air draft, the resistance of air circulation will be increased, by the way of increasing air draft and being responsible for 31 calibers, the covert resistance reducing air circulation.
Connecting many air exhaust branch pipes 32 on air draft supervisor 31,31 relative both sides, multiple row air exhaust branch pipe 32 spaced apart are responsible in air draft, and the air exhaust branch pipe 32 of every string is positioned at above the string air outlet 12 of top board 13 or the second side plate 15.
Preferably, being responsible for 31 ends away from air draft and be gradually increased to being responsible for the caliber of 31 ends near air draft of air exhaust branch pipe 32.This is because, it is sequentially communicated multiple air exhaust branch pipe 32 on air draft supervisor 31, when starting to ventilate, the distalmost end away from air draft supervisor 31 only has the ventilation in air draft supervisor 31 of an air exhaust branch pipe 32, is responsible for 31 the closer to air draft, the air exhaust branch pipe 32 of connection and the number of air outlet 12 are the most, the flow of air is the biggest, if air exhaust branch pipe 32 caliber is constant, will increase the resistance of air circulation, by the way of increasing air exhaust branch pipe 32 caliber, the covert resistance reducing air circulation.
It is provided with an air draft suction nozzle 33 in each air outlet 12 of top board 13 or the second side plate 15, by air draft suction nozzle 33, the air in spray booth 10 and pollutant are discharged, suction nozzle one end of each air draft suction nozzle 33 is positioned at spray booth 10, and the pipe section of the top of air draft suction nozzle 33 is connected with air exhaust branch pipe 32.The flow of each air draft suction nozzle 33 is identical, it is to avoid cause local pressure excessive or too small.
Spray station 16 is the position that part to be sprayed is placed in when spraying, a spray station 16 can be set in spray booth 10, multiple spray station 16 can also be arranged at intervals in the path that spray booth 10 is walked, spray booth 10 can be covered and is buckled in the spray station 16 wherein used, after having sprayed, spray booth 10 is moved at next spray station 16.The height of spray station 16 is suitable for the height that spray coating operations launches.
In the present embodiment, spray station 16 includes transverse strands and vertical frame, and transverse strands is spaced apart, and many vertical framves are distributed in above transverse strands side by side, the transverse strands of lower section fix.The height of transverse strands determines the height of spray station 16, and the entire area of vertical frame determines the usable floor area of spray station.
Preferably, spray booth 10 also includes unit of walking, and walking unit is arranged on below the first side plate 14 and second side plate 15 of spray booth 10, and spray booth 10 can be helped to walk on default track.Walking unit include slide rail and with slide rail with the use of pulley, two slide rail symmetries are fixed on to be sprayed ground boundary, the multiple pulleys of the fixing connection in the first side plate 14 position corresponding with the bottom of the second side plate 15 or lower section.Such as slide rail is arranged on the outside of multiple spray station 16, and walking unit can drive spray booth 10 to move above spray station 16.
In sum, according to the technical scheme of the embodiment of the present application, according to a kind of steel structure paint spraying system of the embodiment of the present application offer, it provides the benefit that: one, workpiece to be sprayed is placed in spray station, spray booth cover is buckled in above spray station, then carries out spraying operation, space can be polluted with closed spray, it is easy to follow-up focusing on, reduce the discharge capacity of VOC, reduce coating cloud and the pollution of VOC, environmental pollution indexes can be reduced;Its two, spray booth carries out side-blown equipped with blowing unit and air exhaust units, blowing unit, and air exhaust units is inhaled by side and collects waste gas by the way of upper suction, with ensure spray booth gas sampling efficiency maximize;Its three, multiple spray station is set, spray booth can move to each spray station and be provided above closing space, facilitates spraying operation, saves spray time.
Last it is noted that above example is only in order to illustrate the technical scheme of the application, it is not intended to limit;Although the application being described in detail with reference to previous embodiment, it will be understood by those within the art that: the technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature is carried out equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of the application each embodiment technical scheme.

Claims (10)

1. a steel structure paint spraying system, it is characterised in that including:
Spray booth, described spray booth includes nacelle, described nacelle is provided with several air inlets and air outlet;
Blowing unit, air is sent into described spray booth by described air inlet by the air outlet of described blowing unit;
Air exhaust units, air is discharged in described spray booth by the inlet scoop of described air exhaust units by described air outlet;And
Spray station, described spray station is arranged in described spray booth, and it is highly suitable for spray coating operations height;
Wherein, described blowing unit has required operating air pressure in ensureing described spray booth with described air exhaust units.
2. steel structure paint spraying system as claimed in claim 1, it is characterised in that described nacelle includes the rolling screen door that the first side plate fixed in top board, two ends relative with described top board respectively and the second side plate, respectively opposite end other with described top board are fixed.
3. steel structure paint spraying system as claimed in claim 2, it is characterised in that described first side plate is provided with multiple described air inlet, and described second side plate is provided with multiple described air outlet, and described top board is provided with multiple described air outlet.
4. steel structure paint spraying system as claimed in claim 2, it is characterised in that described blowing unit includes multiple axial flow blower.
5. steel structure paint spraying system as claimed in claim 4, it is characterised in that multiple described axial flow blowers are distributed in the outside of described first side plate, and the air outlet of each described axial flow blower connects with the air inlet of described first side plate.
6. steel structure paint spraying system as claimed in claim 2, it is characterized in that, described air exhaust units includes the most a set of air draft supervisor, air exhaust branch pipe and air draft suction nozzle, described air draft supervisor is positioned at described spray booth top, one end of described air draft supervisor is provided with extractor fan, the other end and the described air draft main tube body of described air draft supervisor are provided with many described air exhaust branch pipes, and described air draft suction nozzle is positioned at described spray booth and is connected with described air exhaust branch pipe.
7. steel structure paint spraying system as claimed in claim 6, it is characterised in that described air draft supervisor includes that at least pipeline, the caliber of the entrance point of described air draft supervisor to the port of export are gradually increased.
8. steel structure paint spraying system as claimed in claim 6, it is characterised in that being gradually increased to the caliber near described air draft main tube end away from described air draft main tube end of described air exhaust branch pipe.
9. steel structure paint spraying system as claimed in claim 6, it is characterised in that described air draft suction nozzle is multiple, is provided with a described air draft suction nozzle at the air outlet of each described top board and the air outlet of described second side plate.
10. steel structure paint spraying system as claimed in claim 2, it is characterized in that, also include, walking unit, described walking unit include slide rail and with described slide rail with the use of pulley, article two, described slide rail symmetry is fixed on ground to be sprayed boundary, and multiple described pulleys are fixing with the bottom of the bottom of described first side plate and described second side plate respectively to be connected.
CN201521047139.8U 2015-12-15 2015-12-15 Steel constructs painting system Active CN205495893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521047139.8U CN205495893U (en) 2015-12-15 2015-12-15 Steel constructs painting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521047139.8U CN205495893U (en) 2015-12-15 2015-12-15 Steel constructs painting system

Publications (1)

Publication Number Publication Date
CN205495893U true CN205495893U (en) 2016-08-24

Family

ID=56721137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521047139.8U Active CN205495893U (en) 2015-12-15 2015-12-15 Steel constructs painting system

Country Status (1)

Country Link
CN (1) CN205495893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106824642A (en) * 2016-12-22 2017-06-13 安徽伟宏钢结构集团股份有限公司 Paint spraying box in steel member surface

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106824642A (en) * 2016-12-22 2017-06-13 安徽伟宏钢结构集团股份有限公司 Paint spraying box in steel member surface

Similar Documents

Publication Publication Date Title
CN102658251B (en) Side convulsion vent uri spraying chamber
US7666077B1 (en) Paint booth arrangement and method for directing airflow
US20110275300A1 (en) Method for supplying air into a spray booth (embodiments) and a ventilation unit for implementing the method (embodiments)
CN204448395U (en) A kind of continous way paint line
CN202621383U (en) Dust-free paint spray room
CN104014458A (en) Automatic paint-spraying assembly line device
CN202316213U (en) Mobile passing-type polishing and painting device
CN205495893U (en) Steel constructs painting system
CN104492643A (en) Continuous type coating production line
US6478859B1 (en) Airborne particulate removal apparatus
CN105903625B (en) Oily leaching formula multifunction surface processing equipment
CN203816842U (en) Water-rotating paint spraying chamber
CN105562272A (en) Steel structure spraying system with purifying function
CN205146556U (en) Formula of spraying paint cascade cabinet
CN105436007A (en) Steel structure spraying system
CN205413472U (en) Steel constructs paint finishing with purification performance
CN106040465A (en) Spraying device with automatic cleaning function
CN203803286U (en) Water-cyclone type paint mist treatment device
CN105709968A (en) Layered shelf type paint mist separating device and method for separating over-spray objects
CN207546859U (en) A kind of environmental-friendly dust-free paint spray booth
CN104209220A (en) Paint spraying chamber
CN203917010U (en) Painting Shop rework equipments
CN203525932U (en) Local recirculating air utilizing device used on coating production line
CN203304112U (en) Spraying production line
CN205731789U (en) A kind of Novel plastic spraying paint-spraying production line

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model