CN205475157U - Power station ditch rubbish clearance system - Google Patents

Power station ditch rubbish clearance system Download PDF

Info

Publication number
CN205475157U
CN205475157U CN201620143507.7U CN201620143507U CN205475157U CN 205475157 U CN205475157 U CN 205475157U CN 201620143507 U CN201620143507 U CN 201620143507U CN 205475157 U CN205475157 U CN 205475157U
Authority
CN
China
Prior art keywords
garbage
water channel
collection roller
sides
garbage collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620143507.7U
Other languages
Chinese (zh)
Inventor
周子恒
周宝龙
周佳
方超
唐欣
王昌纬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Tianhan Xingkong Technology Co ltd
Original Assignee
Yangxian Zhuhuan Organic Industry Technology Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangxian Zhuhuan Organic Industry Technology Consulting Co Ltd filed Critical Yangxian Zhuhuan Organic Industry Technology Consulting Co Ltd
Priority to CN201620143507.7U priority Critical patent/CN205475157U/en
Application granted granted Critical
Publication of CN205475157U publication Critical patent/CN205475157U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

本实用新型属于环境卫生机械制造技术领域,涉及一种水电站水渠垃圾清理系统,在水渠上安装有垃圾导向板、垃圾收集滚轮、支撑架及机电传动系统;垃圾收集滚轮上安装垃圾拦污栅、传动轴、垃圾排污闸板滑槽、垃圾出口;垃圾收集滚轮通过传动轴安装在水渠两侧轴承座中,轴承座安装在水渠两侧的支撑架上,支撑架预埋固定在水渠两侧的地面中;传动轴的旋转、锁定由机电传动系统控制;当垃圾拦污栅收集够垃圾时,在垃圾排污闸板滑槽中插入排污闸板,垃圾收集滚轮向上旋转进行垃圾清除。本实用新型提供了一种水渠垃圾收集、清理系统,结构简单紧促,省时省力。

The utility model belongs to the technical field of environmental sanitation machinery manufacturing, and relates to a garbage cleaning system for a water channel of a hydropower station. A garbage guide plate, a garbage collection roller, a support frame and an electromechanical transmission system are installed on the water channel; a garbage rack is installed on the garbage collection roller. Drive shaft, garbage discharge ram chute, garbage outlet; the garbage collection roller is installed in the bearing seats on both sides of the water channel through the drive shaft, the bearing seats are installed on the support frames on both sides of the water channel, and the support frames are pre-buried and fixed on both sides of the water channel. On the ground; the rotation and locking of the transmission shaft are controlled by the electromechanical transmission system; when the garbage rack collects enough garbage, the sewage gate is inserted into the waste gate chute, and the garbage collection roller rotates upward to remove the waste. The utility model provides a water canal garbage collection and cleaning system, which has a simple and compact structure and saves time and effort.

Description

一种水电站水渠垃圾清理系统A waste cleaning system for hydropower station canals

技术领域technical field

本实用新型属于环境卫生机械制造技术领域,涉及一种用于水电站水渠垃圾清理,同时也适用于河流或水库引水水渠、工厂污水渠等地方的垃圾清理。The utility model belongs to the technical field of environmental sanitation machinery manufacturing, and relates to a garbage cleaning device for hydroelectric power station ditches, and is also suitable for garbage cleaning in rivers or reservoir diversion canals, factory sewage canals and other places.

背景技术Background technique

水电站水渠、河流或水库引水水渠,常常有很多树叶、草等垃圾以及少量的树枝和生活垃圾落在水渠内。这些垃圾不清掉,就会堵塞渠道影响输水工作。目前采用人工清垃圾的方式:在水渠进入水电站的前池处加装拦污栅,每天定时靠人工在拦污栅处打捞垃圾,这样人工清理垃圾的方式要求工人劳动强度和责任心极高,同时用工安全系数也低。Hydropower station canals, rivers or reservoir diversion canals often have a lot of leaves, grass and other garbage, as well as a small amount of branches and domestic garbage falling in the canals. If these rubbish are not removed, they will block the channels and affect the water delivery work. At present, the method of manual garbage removal is adopted: a trash rack is installed at the forebay where the canal enters the hydropower station, and garbage is salvaged from the trash rack by hand at regular intervals every day. This method of manual garbage cleaning requires workers to be extremely labor-intensive and responsible. At the same time, the labor safety factor is also low.

实用新型内容Utility model content

本实用新型的目的是解决以上问题,提供一种水渠垃圾收集、清理为一体的新型高效垃圾清理系统,造价及运营成本低,结构紧奏,使用和维护方便,可大大降低工人劳动强度。The purpose of this utility model is to solve the above problems and provide a new type of high-efficiency garbage cleaning system that integrates garbage collection and cleaning in canals. It has low construction and operating costs, compact structure, convenient use and maintenance, and can greatly reduce labor intensity of workers.

本实用新型的技术方案如下:一种水电站水渠垃圾清理系统,包括在水渠上沿水流方向前段安装有垃圾导向板,沿水流方向后段安装有垃圾收集滚轮、支撑架及机电传动系统;垃圾收集滚轮上安装垃圾拦污栅、传动轴、垃圾排污闸板滑槽、垃圾出口;垃圾收集滚轮通过传动轴安装在水渠两侧轴承座中,轴承座安装在水渠两侧的支撑架上,支撑架预埋固定在水渠两侧的地面中;传动轴上连接有机电传动系统,传动轴的旋转、锁定由机电传动系统控制;垃圾导向板上安装有滤水孔;清除垃圾时,在垃圾排污闸板滑槽中插入垃圾排污闸板,垃圾排污闸板安装有垃圾排污闸板拉手和滤水孔。The technical scheme of the utility model is as follows: a waste cleaning system for a water channel of a hydropower station, including a garbage guide plate installed on the water channel along the front section of the water flow direction, and a garbage collection roller, a support frame and an electromechanical transmission system installed on the rear section of the water flow direction; Garbage racks, transmission shafts, garbage discharge gate chute, and garbage outlets are installed on the rollers; the garbage collection rollers are installed in the bearing housings on both sides of the water channel through the transmission shaft, and the bearing housings are installed on the support frames on both sides of the water channel. It is pre-buried and fixed in the ground on both sides of the water channel; the transmission shaft is connected with an electromechanical transmission system, and the rotation and locking of the transmission shaft are controlled by the electromechanical transmission system; there are water filter holes installed on the garbage guide plate; The garbage discharge ram is inserted into the plate chute, and the garbage discharge ram is equipped with a garbage discharge ram handle and a water filter hole.

所述进水口的最高边缘低于垃圾收集滚轮中的传动轴。The highest edge of the water inlet is lower than the transmission shaft in the refuse collection roller.

本实用新型的工作原理和过程为:机电传动系统带动垃圾收集滚轮旋转,使垃圾收集滚轮上的垃圾拦污栅与进水口水流方向垂直定位,然后停止旋转并锁定垃圾收集滚轮;水面漂浮垃圾经过垃圾导向板导入到垃圾收集滚轮中的垃圾拦污栅处,垃圾被拦污栅拦截;当垃圾拦污栅收集够垃圾时,在垃圾排污闸板滑槽中插入垃圾排污闸板,通过机电传动系统带动垃圾收集滚轮向上旋转90°后锁定垃圾收集滚轮,使垃圾拦污栅上的垃圾下落到垃圾排污闸板上,然后人工从垃圾出口将垃圾耙出;当垃圾清理完毕,将垃圾排污闸板从垃圾排污闸板滑槽中拔出,机电传动系统带动垃圾收集滚轮旋转定位,继续收集垃圾。The working principle and process of the utility model are as follows: the electromechanical transmission system drives the garbage collection roller to rotate, so that the garbage rack on the garbage collection roller is vertically positioned with the water flow direction of the water inlet, and then stops rotating and locks the garbage collection roller; the garbage is floating on the water surface After the garbage guide plate is introduced to the garbage rack in the garbage collection roller, the garbage is intercepted by the trash rack; when the garbage rack collects enough garbage, the garbage discharge gate is inserted into the garbage discharge gate chute, and the waste discharge gate is passed through the electromechanical The transmission system drives the garbage collection roller to rotate upwards by 90° and then locks the garbage collection roller, so that the garbage on the garbage rack falls to the garbage discharge ram, and then the garbage is manually raked out from the garbage outlet; when the garbage is cleaned, the garbage is discharged The ram is pulled out from the chute of the garbage discharge ram, and the electromechanical transmission system drives the garbage collection roller to rotate and position, and continue to collect garbage.

本实用新型具有如下优点:The utility model has the following advantages:

1、解决了水渠垃圾收集、清理问题,系统造价及运营成本低,结构紧奏,使用和维护方便。1. It solves the problem of garbage collection and cleaning in the canal, the system cost and operating cost are low, the structure is compact, and it is easy to use and maintain.

2、本实用新型在垃圾清理时,拦污栅拦截的垃圾利用自身重力下落到排污闸板上,垃圾清理省时省力,降低工人劳动强度。2. When the utility model is cleaning the garbage, the garbage intercepted by the trash rack will fall to the sewage discharge gate by its own gravity, which saves time and labor for garbage cleaning and reduces the labor intensity of workers.

附图说明Description of drawings

下面结合附图和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是本实用新型未安装垃圾闸板的的主视结构示意图。Fig. 1 is a schematic diagram of the front view of the utility model without a garbage gate installed.

图2是本实用新型安装垃圾闸板的主视结构示意图。Fig. 2 is a schematic diagram of the front view of the installation of the garbage gate of the utility model.

图3是本实用新型的俯视结构示意图。Fig. 3 is a top view structural diagram of the utility model.

图4是本实用新型的左视结构示意图。Fig. 4 is a left view structural diagram of the utility model.

图5是本实用新型的垃圾排除时左视结构示意图。Fig. 5 is a left view structural diagram of the utility model when removing garbage.

图6是本实用新型的垃圾排污闸板结构示意图。Fig. 6 is a structural schematic diagram of the garbage discharge ram of the present invention.

图中:1、地面,2、传动轴,3、轴承座,4、垃圾收集滚轮,5、垃圾拦污栅,6、机电传动系统,7、支撑架,8、垃圾排污闸板滑槽,9、垃圾导向板,10、水渠,11、垃圾排污闸板,12、垃圾出口,13、垃圾排污闸板拉手,14、垃圾排污闸板滤水孔,15、垃圾导向板滤水孔,16、进水口。In the figure: 1. Ground, 2. Transmission shaft, 3. Bearing seat, 4. Garbage collection roller, 5. Garbage rack, 6. Electromechanical transmission system, 7. Support frame, 8. Garbage discharge gate chute, 9. Garbage guide plate, 10, water channel, 11, garbage discharge ram, 12, garbage outlet, 13, garbage discharge ram handle, 14, garbage discharge ram filter hole, 15, garbage guide plate water filter hole, 16 ,water intake.

具体实施方式detailed description

下面通过实施例对本实用新型进行具体的描述,有必要在此指出的是本实施例只用于对本实用新型进行进一步说明,但不能理解为对本实用新型保护范围的限制,可以根据上述本实用新型的内容作出一些非本质的改进和调整,均属于本实用新型范围。The utility model is specifically described below through the embodiments, it is necessary to point out that the present embodiment is only used to further illustrate the utility model, but can not be interpreted as the limitation of the utility model protection scope, can according to above-mentioned utility model Some non-essential improvements and adjustments to the content are within the scope of the present utility model.

本实用新型如图1、图3、图4、图5所示的实施例如下:包括在水渠10上沿水流方向前段安装有垃圾导向板9,沿水流方向后段安装有垃圾收集滚轮4、支撑架7及机电传动系统6;垃圾收集滚轮4上安装垃圾拦污栅5、传动轴2、垃圾排污闸板滑槽8、垃圾出口12;垃圾收集滚轮4通过传动轴2安装在水渠10两侧轴承座3中,轴承座3安装在水渠10两侧的支撑架7上,支撑架7预埋固定在水渠10两侧地面1中;传动轴2上安装有机电传动系统6,传动轴2的旋转、锁定由机电传动系统6控制;垃圾导向板9上安装有滤水孔15;所述进水口16的最高边缘低于垃圾收集滚轮4中的传动轴2。清除垃圾时,如图2所示,在垃圾排污闸板滑槽8中插入垃圾排污闸板11,如图6所示,垃圾排污闸板11安装有拉手13和滤水孔14。The embodiment shown in Fig. 1, Fig. 3, Fig. 4, and Fig. 5 of the present utility model is as follows: a garbage guide plate 9 is installed along the front section of the water flow direction on the water channel 10, and a garbage collection roller 4 is installed along the back section of the water flow direction. The support frame 7 and the electromechanical transmission system 6; the garbage rack 5, the transmission shaft 2, the garbage discharge gate chute 8, and the garbage outlet 12 are installed on the garbage collection roller 4; the garbage collection roller 4 is installed on the water channel 10 through the transmission shaft 2 In the side bearing housing 3, the bearing housing 3 is installed on the support frame 7 on both sides of the water channel 10, and the support frame 7 is embedded and fixed in the ground 1 on both sides of the water channel 10; the electromechanical transmission system 6 is installed on the transmission shaft 2, and the transmission shaft 2 Rotation and locking are controlled by the electromechanical transmission system 6; water filter holes 15 are installed on the garbage guide plate 9; the highest edge of the water inlet 16 is lower than the transmission shaft 2 in the garbage collection roller 4. When removing the rubbish, as shown in Figure 2, insert the garbage discharge gate 11 in the garbage discharge gate chute 8, as shown in Figure 6, the garbage discharge gate 11 is equipped with a handle 13 and a water filter hole 14.

使用方式如下:水渠垃圾清理的工作,机电传动系统6带动垃圾收集滚轮4旋转,使垃圾收集滚轮4上的垃圾拦污栅5与进水口16水流方向垂直定位,然后停止旋转并锁定垃圾收集滚轮4;水面漂浮垃圾经过垃圾导向板9导入到垃圾收集滚轮4中的垃圾拦污栅5处,垃圾被拦污栅5拦截;当垃圾拦污栅5收集够垃圾时,在垃圾排污闸板滑槽8中插入垃圾排污闸板11,通过机电传动系统6带动垃圾收集滚轮4向上旋转90°后锁定垃圾收集滚轮,使垃圾拦污栅5上的垃圾下落到垃圾排污闸板11上,然后人工从垃圾出口12将垃圾耙出;当垃圾清理完毕,将垃圾排污闸板11从垃圾排污闸板滑槽8中拔出,机电传动系统6带动垃圾收集滚轮4旋转定位,继续收集垃圾。The way of use is as follows: for the cleaning of canal garbage, the electromechanical transmission system 6 drives the garbage collection roller 4 to rotate, so that the garbage rack 5 on the garbage collection roller 4 is positioned perpendicular to the water flow direction of the water inlet 16, and then stops the rotation and locks the garbage collection roller 4. Floating garbage on the water surface is introduced into the garbage rack 5 in the garbage collection roller 4 through the garbage guide plate 9, and the garbage is intercepted by the trash rack 5; Insert the garbage discharge ram 11 in the groove 8, drive the garbage collection roller 4 to rotate upwards by 90° through the electromechanical transmission system 6, and then lock the garbage collection roller, so that the garbage on the garbage rack 5 falls to the garbage discharge ram 11, and then manually The garbage is raked out from the garbage outlet 12; when the garbage is cleaned up, the garbage discharge gate 11 is pulled out from the garbage discharge gate chute 8, and the electromechanical transmission system 6 drives the garbage collection roller 4 to rotate and position, and continue to collect garbage.

通过上述方式,本实用新型的一种水电站水渠垃圾清理系统,实现了水渠垃圾收集、清理为一体的机械化,提高了水渠垃圾收集清理效率,造价及运营成本低,结构紧奏,使用和维护方便,可大大降低工人劳动强度。不但适用于水电站水渠垃圾清理,同时也适用于河流或水库引水水渠、工厂污水渠等地方的垃圾清理,应用范围广。Through the above method, a waste cleaning system for water canals of hydropower stations of the present utility model realizes the mechanization of the collection and cleaning of canal garbage, improves the efficiency of canal garbage collection and cleaning, has low construction and operation costs, compact structure, and is easy to use and maintain , can greatly reduce the labor intensity of workers. It is not only suitable for garbage cleaning in hydropower canals, but also for garbage cleaning in rivers or reservoir diversion canals, factory sewage canals and other places, with a wide range of applications.

Claims (3)

1.一种水电站水渠垃圾清理系统,其特征在于:包括在水渠(10)上安装有垃圾导向板(9)、垃圾收集滚轮(4)、支撑架(7)及机电传动系统(6);垃圾收集滚轮(4)上安装垃圾拦污栅(5)、传动轴(2)、垃圾排污闸板滑槽(8)、垃圾出口(12);垃圾收集滚轮(4)通过传动轴传动轴(2)安装在水渠(10)两侧轴承座(3)中,轴承座(3)安装在水渠(10)两侧的支撑架(7)上,支撑架(7)预埋固定在水渠(10)两侧的地面(1)中;传动轴(2)上安装有机电传动系统(6),传动轴(2)的旋转、锁定由机电传动系统(6)控制;排除垃圾时,在垃圾排污闸板滑槽(8)中插入垃圾排污闸板(11)。 1. A hydropower station canal rubbish cleaning system, characterized in that: comprise a rubbish guide plate (9), rubbish collection rollers (4), support frame (7) and electromechanical transmission system (6) installed on the canal (10); Garbage rack (5), power transmission shaft (2), garbage discharge flashboard chute (8), garbage outlet (12) are installed on the garbage collection roller (4); the garbage collection roller (4) passes through the transmission shaft transmission shaft ( 2) Installed in the bearing housings (3) on both sides of the water channel (10), the bearing housings (3) are installed on the support frames (7) on both sides of the water channel (10), and the support frames (7) are pre-buried and fixed in the water channel (10 ) in the ground (1) on both sides; an electromechanical transmission system (6) is installed on the transmission shaft (2), and the rotation and locking of the transmission shaft (2) are controlled by the electromechanical transmission system (6); Insert the waste discharge ram (11) in the ram chute (8). 2.根据权利要求1所述的一种水电站水渠垃圾清理系统,其特征是:所述垃圾导向板(9)安装在水渠(10)两侧,垃圾导向板(9)上安装有滤水孔(15)。 2. The waste cleaning system of a hydroelectric power station canal according to claim 1, characterized in that: the waste guide plate (9) is installed on both sides of the water canal (10), and a water filter hole is installed on the waste guide plate (9) (15). 3.根据权利要求1所述的一种水电站水渠垃圾清理系统,其特征是:所述的垃圾排污闸板(11)上安装有拉手(13)、滤水孔(14)。 3. A waste cleaning system for hydropower station canals according to claim 1, characterized in that: a handle (13) and a water filter hole (14) are installed on the waste discharge ram (11).
CN201620143507.7U 2016-02-20 2016-02-20 Power station ditch rubbish clearance system Expired - Fee Related CN205475157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620143507.7U CN205475157U (en) 2016-02-20 2016-02-20 Power station ditch rubbish clearance system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620143507.7U CN205475157U (en) 2016-02-20 2016-02-20 Power station ditch rubbish clearance system

Publications (1)

Publication Number Publication Date
CN205475157U true CN205475157U (en) 2016-08-17

Family

ID=56678116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620143507.7U Expired - Fee Related CN205475157U (en) 2016-02-20 2016-02-20 Power station ditch rubbish clearance system

Country Status (1)

Country Link
CN (1) CN205475157U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044117A (en) * 2017-05-26 2017-08-15 刘思辰 Water body garbage collector
CN110777748A (en) * 2019-11-05 2020-02-11 吴远光 River channel treatment garbage interception treatment method
CN111395290A (en) * 2020-04-17 2020-07-10 王忠成 Channel floating garbage collection device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107044117A (en) * 2017-05-26 2017-08-15 刘思辰 Water body garbage collector
CN110777748A (en) * 2019-11-05 2020-02-11 吴远光 River channel treatment garbage interception treatment method
CN110777748B (en) * 2019-11-05 2021-04-27 苏州市水利设计研究院有限公司 River channel treatment garbage interception treatment method
CN111395290A (en) * 2020-04-17 2020-07-10 王忠成 Channel floating garbage collection device
CN111395290B (en) * 2020-04-17 2021-07-27 山东同其数字技术有限公司 Channel floating garbage collection device

Similar Documents

Publication Publication Date Title
CN205475157U (en) Power station ditch rubbish clearance system
CN113529907A (en) Rainwater recovery device with anti-blocking function
CN210216692U (en) A drainage pipe device for municipal works
CN213486173U (en) Irrigation device for hydraulic engineering
CN107100148B (en) A kind of power station water channel rubbish continuously clears up system automatically
CN210845427U (en) Filter equipment that waste water treatment used
CN113550414A (en) Cutting and crushing device of pipeline dredging robot
CN206706710U (en) Hydrodynamic force auto purification type trash rack system
CN118954664B (en) Multistage separation and filtration device for river treatment of sludge and sundries and application method
CN213803186U (en) High-efficient sewage stage filter equipment
CN205023885U (en) Orifice plate formula grating de -dirt machine
CN205444142U (en) Continuous automatic clearance system of power station ditch rubbish
CN112316519A (en) A kind of purification device for sewage treatment based on environmental protection using its own potential energy to prevent blockage
CN219033456U (en) Prevent municipal drainage pipe who prevents stifled type
CN215594312U (en) Self-cleaning type channel sewage intercepting well
CN206245293U (en) A kind of new medium or smallsized river trash rack device
CN213653682U (en) Anti-blocking type drainage equipment for municipal road
CN204098162U (en) A kind of kitchen waster water processing apparatus
CN211447186U (en) Road drainage device for civil engineering
CN202380570U (en) Slab culvert sewage intercepting well
CN222412924U (en) A device for automatically removing suspended matter from the water surface using water flow power
CN112502230A (en) Spiral rotating device for cleaning water outlet of hydropower station and implementation method
CN215801432U (en) Power station dam ecological flow hole trash device
CN220620278U (en) A kind of eaves-type rainwater storage and collection
CN220598554U (en) Anti-blocking device for foundation pit dewatering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230906

Address after: No. 522, 5th Floor, Organic Building, Dongjie Community, Yangzhou Sub district Office, Yangxian County, Hanzhong City, Shaanxi Province, 723300

Patentee after: Shaanxi Tianhan Xingkong Technology Co.,Ltd.

Address before: 723300 organic food industrial park, Yangxian County, Hanzhong City, Shaanxi Province

Patentee before: YANG COUNTY ZHUHUAN ORGANIC INDUSTRY TECHNOLOGY CONSULTING CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817