CN205449068U - Be used for TBM constructional survey total powerstation L type bracket - Google Patents

Be used for TBM constructional survey total powerstation L type bracket Download PDF

Info

Publication number
CN205449068U
CN205449068U CN201521141042.3U CN201521141042U CN205449068U CN 205449068 U CN205449068 U CN 205449068U CN 201521141042 U CN201521141042 U CN 201521141042U CN 205449068 U CN205449068 U CN 205449068U
Authority
CN
China
Prior art keywords
channel
bracket
section steel
section
tbm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521141042.3U
Other languages
Chinese (zh)
Inventor
王鹏炜
王子雷
樊德东
王凤建
孙鹤明
仇意
仇小意
马思伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201521141042.3U priority Critical patent/CN205449068U/en
Application granted granted Critical
Publication of CN205449068U publication Critical patent/CN205449068U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model provides a be used for TBM constructional survey total powerstation L type bracket which characterized in that: form by a stainless steel round dish, a channel -section steel, a square pipe and a connecting plate, the lower extreme is managed by the side and channel -section steel one end is welded, and square pipe becomes 90 degrees with the channel -section steel, the welding of stainless steel round dish is in the top of the channel -section steel other end, and a whole is constituteed by upper and lower two parts to the connecting plate, and the angle is 104 11/40 " between two parts, the lower part is divided trompil and arc wall and is arrived the upper end of square pipe through bolted connection, the hole on top is used for installing the bolt of section of jurisdiction. This bracket is compared with bracket of the same kind under the prerequisite of guaranteeing stability, lightens 43%~50% weight, has reduced about 12%~18% cost of manufacture, saves operating time, increases the output value.

Description

A kind of for TBM construction survey total powerstation L bracket
Technical field
This utility model relates to TBM when construction survey for installing total powerstation and the forward and backward L bracket regarded.
Background technology
Needing to guide with total powerstation in the construction of TBM, along with the continuous driving of TBM, total powerstation is constantly carried out turning station by needs, so needing the working environment stable to total powerstation offer during guiding.In order to reduce cost, reduce operation easier, so devising a kind of for TBM construction survey total powerstation L bracket.
Summary of the invention
Its technology contents is as follows:
It is a kind of for TBM construction survey total powerstation L bracket, it is characterised in that: it is made up of one piece of rustless steel disk, a channel-section steel, a square tube and a connecting plate;Square tube lower end and channel-section steel one end weld, and square tube becomes 90 degree with channel-section steel;Rustless steel disk is welded on the top of the channel-section steel other end, and connecting plate is formed a whole by upper and lower two parts, and between two parts, angle is 104 ° 11 ' 40 ";Lower part perforate and arcuate groove are also bolt-connected to the upper end of square tube;The hole of upper part is used for being installed to the bolt of section of jurisdiction.
L bracket is installed the easiest, and will not be changed by adjacent two endless tube sheet gap spacing and affected, this guarantees the required precision that total powerstation is in operation.
Utilize L bracket of the present utility model, have the advantage that
One, 43%~50% weight is alleviated, it is simple to operation.
Two, decrease channel-section steel, connecting plate manufacturing process is simplified.
Three, time-consuming, increase the output value.
Four, the cost of manufacture of about 12%~18% is reduced.
Accompanying drawing explanation
Fig. 1 is L bracket
Fig. 2 is connecting plate detail structure.
Detailed description of the invention
This utility model is a kind of for TBM construction survey total powerstation L bracket, it is characterised in that use the rustless steel disk (1#) of one piece of 90mm (R) * 6mm (thickness), the channel-section steel that specification is 50 (2#) of root length 380mm, the square hollow section steel that specification is 50 (3#) of root length 309mm and a 27700mm2The connecting plate (4#) of (area) * 10 (thick), gross weight is 7.224kg, and its moulding is as shown in Figure 1.
TBM interval Segment design is general endless tube sheet, is respectively arranged with one cross bolts before and after section of jurisdiction, every endless tube sheet from 0:00 direction every 36 ° have one longitudinal bolt.Being compared by the instrumented site in top left side longitudinal bolt hole, section of jurisdiction and TBM design section figure, we determine instrument bracket to be fixed on this bolt hole.Because longitudinal bolt hole is angled depression to the inside, in order to bracket can be allowed during mounting bracket parallel with section of jurisdiction section, so the angle of the angle longitudinal bolt hole depression of connecting plate design is identical, connecting plate (4#) detail structure such as Fig. 2.
Manufacture method:
(1) with two screws, connecting plate and square tube are coupled together, the most each one.After screw above tightens, it is possible to use the groove on connecting plate carries out the regulation of angle to square tube.
(2) square tube lower end and one section of channel-section steel are welded, become 90 degree.
(3) rustless steel disk is welded on the top of the channel-section steel other end, and between two parties.
Installation method:
(1) choose section of jurisdiction in advance, and find longitudinal segment bolt of 36 ° of positions on section of jurisdiction, with torque spanner, its screw dismounting is fallen;
(2) junction steel plate is put up, and tighten section of jurisdiction screw;
(3) again bracket is bolted on junction steel plate, it is noted that forced centering base whether level during installation, confirm smooth after bolt is tightened.
Bracket installation site and spacing are typically based on tunnel linear and site operation situation selects to determine, instrument bracket be mounted at least shield tail after on section of jurisdiction beyond 10 rings (after requiring this endless tube sheet is carried out slip casting in the case of execution conditions meet, just can measure work) on straightway, we install a bracket according to 50-70m, curved section installs a bracket according to sweep and condition of construction 20-40m, one survey station bracket is often installed, a upper survey station bracket just can be as rearscope bracket, push ahead bracket successively to install, the most every four brackets are one group and can recycle.

Claims (1)

1. one kind is used for TBM construction survey total powerstation L bracket, it is characterised in that: it is made up of one piece of rustless steel disk, a channel-section steel, a square tube and a connecting plate;Square tube lower end and channel-section steel one end weld, and square tube becomes 90 degree with channel-section steel;Rustless steel disk is welded on the top of the channel-section steel other end, and connecting plate is formed a whole by upper and lower two parts, and between two parts, angle is 104 ° 11 ' 40 ";Lower part perforate and arcuate groove are also bolt-connected to the upper end of square tube;The hole of upper part is used for being installed to the bolt of section of jurisdiction.
CN201521141042.3U 2015-12-31 2015-12-31 Be used for TBM constructional survey total powerstation L type bracket Expired - Fee Related CN205449068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521141042.3U CN205449068U (en) 2015-12-31 2015-12-31 Be used for TBM constructional survey total powerstation L type bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521141042.3U CN205449068U (en) 2015-12-31 2015-12-31 Be used for TBM constructional survey total powerstation L type bracket

Publications (1)

Publication Number Publication Date
CN205449068U true CN205449068U (en) 2016-08-10

Family

ID=56600276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521141042.3U Expired - Fee Related CN205449068U (en) 2015-12-31 2015-12-31 Be used for TBM constructional survey total powerstation L type bracket

Country Status (1)

Country Link
CN (1) CN205449068U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441462A (en) * 2018-12-18 2019-03-08 中铁七局集团西安铁路工程有限公司 A kind of quick station transfer formula measuring device of shield
CN110173270A (en) * 2019-06-28 2019-08-27 晏强 A kind of shield measurement total station hanging basket equipment
CN111636877A (en) * 2020-04-29 2020-09-08 中交二航局第三工程有限公司 Manufacturing method of forced centering bracket with pre-buried sliding groove and T-shaped bolt

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441462A (en) * 2018-12-18 2019-03-08 中铁七局集团西安铁路工程有限公司 A kind of quick station transfer formula measuring device of shield
CN110173270A (en) * 2019-06-28 2019-08-27 晏强 A kind of shield measurement total station hanging basket equipment
CN110173270B (en) * 2019-06-28 2024-08-09 晏强 Shield measures total powerstation hanging flower basket equipment
CN111636877A (en) * 2020-04-29 2020-09-08 中交二航局第三工程有限公司 Manufacturing method of forced centering bracket with pre-buried sliding groove and T-shaped bolt

Similar Documents

Publication Publication Date Title
CN205449068U (en) Be used for TBM constructional survey total powerstation L type bracket
CN204524692U (en) Precision controlling frock
CN203640315U (en) H-shaped steel column butt joint regulating device
CN204097882U (en) For the assembling combined steel pipe mounting system of bridge engineering
CN105604241A (en) Steel-structure reinforced beam for construction
CN202498628U (en) Multi-section connection type spring bolt rigid pipe pile steel mould
CN207362874U (en) Piping lane inner supporting structure and the compound piping lane of bamboo with the supporting structure
CN204177330U (en) A kind of thin-wall barrel circularity cubing
JP2018044309A (en) Temporary sleeper for shield tunneling work
US20160138734A1 (en) Support system providing precision stand-off adjustment for elongated structures
CN106869954B (en) Fishtail cutter assembly for shield machine
CN204024088U (en) The fast-positioning device of workshop steel column sectional lifting docking
CN210134421U (en) Hoop type connecting structure between steel pipe piles
CN102061745A (en) Manufacture and installation process for circular heavy steel hopper embedded part
CN215716584U (en) Deviation-preventing steel reinforcement cage main reinforcement positioning device for construction of constructional engineering
CN107398671B (en) Segment tower cylinder welding system and segment tower cylinder welding method
CN203892710U (en) Steel and concrete tube corrosion prevention intermediate jacking station
CN210498971U (en) Coaxial welding set of reinforcing bar extension
CN105114089B (en) Shield formula TBM originates split type reaction frame in hole
KR20010099422A (en) Reinforce with bolt for the end of steel pile
CN112388241A (en) Steel pipe segmentation interface assembly and groove gap adjusting device
CN215919469U (en) Device for accurately positioning and welding tunnel arch frame and connecting plate
CN202851013U (en) Connecting device between arch frame sections of tunnel steel arch frame
CN211286350U (en) Steel construction step of installation flexibility
CN216009157U (en) Frame for food mechanical equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20181231

CF01 Termination of patent right due to non-payment of annual fee