CN205442067U - Over -and -under type steel ore bin - Google Patents

Over -and -under type steel ore bin Download PDF

Info

Publication number
CN205442067U
CN205442067U CN201520936201.2U CN201520936201U CN205442067U CN 205442067 U CN205442067 U CN 205442067U CN 201520936201 U CN201520936201 U CN 201520936201U CN 205442067 U CN205442067 U CN 205442067U
Authority
CN
China
Prior art keywords
bracket
funnel
bin body
upper bracket
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520936201.2U
Other languages
Chinese (zh)
Inventor
王建群
李大浪
杨怀东
黄恒平
李长良
代景艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201520936201.2U priority Critical patent/CN205442067U/en
Application granted granted Critical
Publication of CN205442067U publication Critical patent/CN205442067U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

本实用新型涉及冶金矿山工程设备领域,具体是一种升降式钢矿仓;包括支架、矿仓本体、漏斗,漏斗设于矿仓本体底部出料口下方,振动给料输送设备设于漏斗底部出料口的下方,其特征是:支架包括上部支架、下部支架和漏斗支架,上部支架与下部支架套接并且上部支架可沿下部支架上升或下降,上部支架和下部支架之间通过插销的销接和螺栓的螺纹连接固定,矿仓本体固定在上部支架中央,下部支架上设有漏斗支架,漏斗与矿仓本体搭接并设于漏斗支架中。本钢矿仓采用上述设计,将传统现场制作安装的钢矿仓通过可升降的支架实现整体的模块化,从而达到降低钢矿仓自身重心、减小体积、便于运输和再安装的目的,最终为钢矿仓的安装带来便利。

The utility model relates to the field of metallurgical mine engineering equipment, in particular to an elevating steel ore bin; comprising a bracket, an ore bin body, and a funnel, the funnel is arranged below the discharge port at the bottom of the ore bin body, and vibration feeding and conveying equipment is arranged at the bottom of the funnel The bottom of the discharge port is characterized in that the bracket includes an upper bracket, a lower bracket and a funnel bracket, the upper bracket is socketed with the lower bracket and the upper bracket can rise or fall along the lower bracket, and the pin between the upper bracket and the lower bracket passes through the pin The threaded connection of the connection and the bolt is fixed, the ore bin body is fixed in the center of the upper bracket, and the lower bracket is provided with a funnel bracket, and the funnel overlaps with the mine bin body and is arranged in the funnel bracket. Benxi Iron and Steel’s ore warehouse adopts the above-mentioned design, and realizes the overall modularization of the steel ore warehouse that is traditionally fabricated and installed on site through liftable brackets, so as to achieve the purpose of lowering the center of gravity of the steel ore warehouse itself, reducing its volume, and facilitating transportation and reinstallation. It brings convenience to the installation of steel ore bins.

Description

升降式钢矿仓Lifting steel ore silo

技术领域 technical field

本实用新型涉及冶金矿山工程设备领域,具体是一种升降式钢矿仓。 The utility model relates to the field of metallurgical mine engineering equipment, in particular to a lifting type steel ore bin.

背景技术 Background technique

在冶金矿山工程建设过程中,由于钢矿仓体积大、重量大不便于整体运输,因此多是以模块运输、现场安装的方式建造的。而将经模块化运输到目的地的钢矿仓各部分重新组装时,需要运用许多的支撑加固件和捆扎件进行支撑,并且还需要花费大量时间进行重心调整使其稳固,因此现有的钢矿仓在运输、组件方面存在成本过高、安装精度不高、安装时间长的问题。 In the construction process of metallurgical mine projects, due to the large volume and weight of steel mines, it is not convenient for overall transportation, so most of them are built by means of module transportation and on-site installation. When reassembling the various parts of the steel ore warehouse that has been modularized and transported to the destination, it is necessary to use many supporting reinforcements and strapping parts for support, and it takes a lot of time to adjust the center of gravity to make it stable. Therefore, the existing steel In terms of transportation and components, there are problems of high cost, low installation accuracy and long installation time.

发明内容 Contents of the invention

本实用新型的目的在于,提供一种可升降的钢矿仓,如此,其可以缩小体积以便于整体运输,并且也方便在目的地进行复原性搭建。 The purpose of the utility model is to provide a liftable steel ore warehouse, so that the volume can be reduced to facilitate the overall transportation, and it is also convenient for restorative construction at the destination.

为了达到上述目的,本实用新型是这样实现的: In order to achieve the above object, the utility model is achieved in that:

一种升降式钢矿仓,包括支架、矿仓本体、漏斗和振动给料输送设备,其中,漏斗设于矿仓本体底部出料口下方,振动给料输送设备设于漏斗底部出料口的下方,支架包括上部支架、下部支架和漏斗支架,上部支架与下部支架套接并且上部支架可沿下部支架上升或下降,上部支架和下部支架之间通过插销的销接和螺栓的螺纹连接固定,矿仓本体固定在上部支架中央,下部支架上设有漏斗支架,漏斗与矿仓本体搭接并设于漏斗支架中。 A lift-type steel ore bin, including a bracket, a bin body, a funnel, and vibrating feeding and conveying equipment, wherein the funnel is arranged below the outlet at the bottom of the bin body, and the vibrating feeding and conveying equipment is arranged at the bottom of the outlet at the bottom of the funnel Below, the bracket includes an upper bracket, a lower bracket and a funnel bracket. The upper bracket is socketed with the lower bracket and the upper bracket can rise or fall along the lower bracket. The mine bin body is fixed in the center of the upper bracket, and the lower bracket is provided with a funnel bracket, and the funnel overlaps with the mine bin body and is arranged in the funnel bracket.

所述的升降式钢矿仓,上部支架、下部支架均包括四根立柱和用于将四根立柱合围呈矩形框架结构的横梁,上部支架的四根立柱套接在下部支架的四根立柱上。 In the lift-type steel ore bin, the upper bracket and the lower bracket both include four columns and beams for enclosing the four columns to form a rectangular frame structure, and the four columns of the upper bracket are socketed on the four columns of the lower bracket. .

所述的升降式钢矿仓,漏斗与矿仓本体搭接处通过连接螺栓实现螺纹连接。 In the lift-type steel ore bin, the joint between the funnel and the bin body is threaded through connecting bolts.

本钢矿仓采用上述设计,将传统现场制作安装的钢矿仓通过可升降的支架实现整体的模块化,从而达到降低钢矿仓自身重心、减小体积、便于运输和再安装的目的,最终为钢矿仓的安装带来便利。 Benxi Iron and Steel’s ore warehouse adopts the above-mentioned design, and realizes the overall modularization of the steel ore warehouse that is traditionally fabricated and installed on site through liftable brackets, so as to achieve the purpose of lowering the center of gravity of the steel ore warehouse itself, reducing its volume, and facilitating transportation and reinstallation. It brings convenience to the installation of steel ore bins.

附图说明 Description of drawings

图1为本钢矿仓完成状态示意图。 Figure 1 is a schematic diagram of the completed state of Benxi Iron and Steel's mine warehouse.

图2为本钢矿仓运输状态示意图。 Figure 2 is a schematic diagram of the transportation status of Benxi Iron and Steel's ore warehouse.

图3为上部支架与下部支架的连接结构示意图。 Fig. 3 is a schematic diagram of the connection structure between the upper bracket and the lower bracket.

具体实施方式 detailed description

以下通过具体实施例进一步说明本实用新型。 Below further illustrate the utility model by specific embodiment.

如图1、图2所示,一种升降式钢矿仓,包括支架4、矿仓本体1、漏斗2和振动给料输送设备5,其中,漏斗2设于矿仓本体1底部出料口下方,振动给料输送设备5设于漏斗2底部出料口的下方,支架4包括上部支架6、下部支架7和漏斗支架3,上部支架6与下部支架7套接并且上部支架可沿下部支架上升或下降,如图3所示,上部支架6和下部支架7之间通过插销8的销接和螺栓9的螺纹连接固定,矿仓本体1固定在上部支架6中央,下部支架7上设有漏斗支架3,漏斗2与矿仓本体1搭接并设于漏斗支架3中。 As shown in Figure 1 and Figure 2, a lift-type steel ore bin includes a bracket 4, a bin body 1, a funnel 2 and a vibrating feeding conveying device 5, wherein the funnel 2 is located at the bottom outlet of the bin body 1 Below, the vibrating feeding conveying equipment 5 is located below the discharge port at the bottom of the funnel 2, the support 4 includes an upper support 6, a lower support 7 and a funnel support 3, the upper support 6 is socketed with the lower support 7 and the upper support can be moved along the lower support As shown in Figure 3, the upper bracket 6 and the lower bracket 7 are fixed by the pin connection of the bolt 8 and the threaded connection of the bolt 9, the mine bin body 1 is fixed on the center of the upper bracket 6, and the lower bracket 7 is provided with The funnel support 3 and the funnel 2 overlap the mine bin body 1 and are arranged in the funnel support 3 .

所述的升降式钢矿仓,上部支架6、下部支架7均包括四根立柱和用于将四根立柱合围呈矩形框架结构的横梁,上部支架6的四根立柱套接在下部支架7的四根立柱上。 In the lift-type steel ore bin, the upper bracket 6 and the lower bracket 7 both include four columns and a crossbeam for enclosing the four columns to form a rectangular frame structure, and the four columns of the upper bracket 6 are sleeved on the lower bracket 7. on four pillars.

所述的升降式钢矿仓,漏斗2与矿仓本体1搭接处通过连接螺栓实现螺纹连接。 In the lift-type steel ore bin, the joint between the funnel 2 and the bin body 1 is threaded through connecting bolts.

所述升降式钢矿仓的拆装方法,包括下述步骤; The disassembly method of the lift-type steel ore bin includes the following steps;

步骤1、按设计图纸用钢质型材分别制作支架、矿仓本体、漏斗,并预备振动给料输送设备; Step 1. According to the design drawings, use steel profiles to make brackets, mine bin bodies, and funnels, and prepare vibration feeding and conveying equipment;

步骤2、预组装; Step 2, pre-assembly;

按下部支架、振动给料输送设备、漏斗支架、漏斗、上部支架、矿仓本体的顺序依次进行预组装; Pre-assemble in the order of the lower bracket, vibrating feeding conveying equipment, funnel bracket, funnel, upper bracket, and mine bin body;

步骤2.1、将下部支架中央将振动给料输送设备螺栓连接, Step 2.1, Bolt the vibrating feeding conveying equipment in the center of the lower bracket,

步骤2.2、将漏斗支架与下部支架螺栓连接并使漏斗支架位于振动给料输送设备上方; Step 2.2, connect the funnel support with the lower support bolts and make the funnel support above the vibrating feeding conveying equipment;

步骤2.3、将漏斗与漏斗支架螺栓连接; Step 2.3, connect the funnel with the funnel support bolt;

步骤2.4、将上部支架套接到下部支架上并用销轴和螺栓分别实现销接和螺栓连接; Step 2.4. Sleeve the upper bracket onto the lower bracket and use pins and bolts to realize pin connection and bolt connection respectively;

步骤2.5、将矿仓本体与上部支架螺栓连接并使矿仓本体位于漏斗上方; Step 2.5, connect the mine bin body with the upper bracket bolts and make the mine bin body above the funnel;

步骤3、分拆运输; Step 3, dismantling and transporting;

步骤3.1、用吊机把矿仓本体吊住,使吊绳绷紧但不吊起矿仓本体; Step 3.1, use a crane to hang the mine bin body, make the sling tight but not lift the mine bin body;

步骤3.2、松开上部支架与下部支架的销轴及螺栓连接; Step 3.2. Loosen the pin shaft and bolt connection between the upper bracket and the lower bracket;

步骤3.3、松开矿仓本体与漏斗之间的连接螺栓; Step 3.3, loosen the connecting bolts between the mine bin body and the funnel;

步骤3.4、用吊机将带有矿仓本体的上部支架沿下部支架向下滑降,使矿仓本体套落在钢漏斗上部; Step 3.4, use a crane to slide the upper bracket with the ore bin body down along the lower bracket, so that the ore bin body falls on the upper part of the steel funnel;

步骤3.5、重新将上部支架与下部支架通过销轴及螺栓实现销接和螺栓连接,形成低重心的钢矿仓整体; Step 3.5, re-connect the upper bracket and the lower bracket through pin shafts and bolts to realize pin connection and bolt connection, forming a whole steel ore warehouse with a low center of gravity;

步骤4、正式组建; Step 4. Formal formation;

步骤4.1、松开上部支架与下部支架之间的销轴和连接螺栓; Step 4.1. Loosen the pin shaft and connecting bolt between the upper bracket and the lower bracket;

步骤4.2、用吊机或顶升设备向上提升矿仓本体至设计工作位置; Step 4.2, use a crane or jacking equipment to lift up the mine bin body to the designed working position;

步骤4.3、重新将上部支架与下部支架通过销轴及螺栓实现销接和螺栓连接并在矿仓本体与支架之间设置人字支撑, Step 4.3, re-connect the upper bracket and the lower bracket through pin shafts and bolts to realize pin connection and bolt connection, and set herringbone support between the mine bin body and the bracket,

步骤4.4、连接矿仓本体与漏斗; Step 4.4, connect the mine bin body and the funnel;

步骤4.5、调整矿仓本体、漏斗的相对位置,紧固所有连接螺栓,安装完成。 Step 4.5, adjust the relative position of the mine bin body and funnel, fasten all the connecting bolts, and the installation is completed.

本钢矿仓将传统的现场制作安装的钢矿仓体及钢漏斗等组合为五个子模块,而且将其组装成为一种可升降的整体模块化钢矿仓,为钢矿仓的运输和安装带来如下优势: Benxi Iron and Steel Co., Ltd. combines the traditional on-site production and installation of the steel ore warehouse and the steel funnel into five sub-modules, and assembles them into a liftable integral modular steel ore warehouse, which is used for the transportation and installation of the steel ore warehouse. Bring the following advantages:

1、通过整体模块化并降低重心,能够保证高大的钢矿仓设备的海运安全,并大幅减少额外的支撑加固和捆扎件,降低运输、制作及安装成本和不安全因素; 1. Through the overall modularization and lowering of the center of gravity, it can ensure the safety of sea transportation of tall steel ore warehouse equipment, and greatly reduce additional support reinforcement and binding parts, reducing transportation, production and installation costs and unsafe factors;

2、完全无需现场加工和制作并最大限度的减少现场安装的工作量,进而缩短工期,提高工作效率,充分利用资源,保护环境; 2. There is no need for on-site processing and production, and the workload of on-site installation is minimized, thereby shortening the construction period, improving work efficiency, making full use of resources, and protecting the environment;

3、所有子模块的制作、安装均可以在条件较好的模块化预组装基地内完成,提高了安装精度和质量,避免因运输变形和现场施工误差所造成的设备安装困难甚至是无法安装。 3. The production and installation of all sub-modules can be completed in a modular pre-assembly base with good conditions, which improves the installation accuracy and quality, and avoids difficult or even impossible installation of equipment caused by transportation deformation and on-site construction errors.

Claims (3)

1. a lift steel ore storage bin, including support, ore storage bin body, funnel and vibrating feed conveying equipment, wherein, funnel is located at below ore storage bin body bottom portion discharging opening, the lower section of funnel bottom discharging opening is located at by vibrating feed conveying equipment, it is characterized in that: support includes upper bracket, lower bracket and funnel stand, upper bracket can rise or fall along lower bracket with lower bracket socket and upper bracket, connect by lock bolt between upper bracket and lower bracket and fix with the threaded of bolt, ore storage bin body is fixed on upper bracket central authorities, lower bracket is provided with funnel stand, funnel and ore storage bin body overlap and are located in funnel stand.
Lift steel ore storage bin the most according to claim 1, it is characterized in that: upper bracket, lower bracket all include four root posts and for four root posts surround the crossbeam of rectangular frame structure, and four root posts of upper bracket are socketed on four root posts of lower bracket.
Lift steel ore storage bin the most according to claim 1, is characterized in that: funnel realizes threadeding by connecting bolt with ore storage bin body lap-joint.
CN201520936201.2U 2015-11-23 2015-11-23 Over -and -under type steel ore bin Expired - Fee Related CN205442067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520936201.2U CN205442067U (en) 2015-11-23 2015-11-23 Over -and -under type steel ore bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520936201.2U CN205442067U (en) 2015-11-23 2015-11-23 Over -and -under type steel ore bin

Publications (1)

Publication Number Publication Date
CN205442067U true CN205442067U (en) 2016-08-10

Family

ID=57180470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520936201.2U Expired - Fee Related CN205442067U (en) 2015-11-23 2015-11-23 Over -and -under type steel ore bin

Country Status (1)

Country Link
CN (1) CN205442067U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417203A (en) * 2015-11-23 2016-03-23 中国二十冶集团有限公司 Lifting type steel ore bin and disassembly and assembly method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105417203A (en) * 2015-11-23 2016-03-23 中国二十冶集团有限公司 Lifting type steel ore bin and disassembly and assembly method thereof

Similar Documents

Publication Publication Date Title
CN205442067U (en) Over -and -under type steel ore bin
CN207774181U (en) A kind of concrete transmission device
CN205114808U (en) Subassembly hoisting accessory of large -scale ball mill
CN105417203B (en) Lift steel ore storage bin
CN201828331U (en) Device for rapid replacement of weighing sensor
CN107097062A (en) A kind of stacker-reclaimer revolution intersects the replacing options of bearing
CN214996497U (en) Assembled major diameter silo steel cone shell
CN107267165B (en) A kind of dry coke quenching furnace body is circular layout pre-embedded bolt fixed structure and installation method
CN201342733Y (en) Packaged mixing plant
CN205973064U (en) Parcel bale breaking conveyer
CN204758099U (en) Charging system of weighing
CN203779680U (en) Turnover supporting framework device
CN209721014U (en) A kind of wine brewing Liao Rujiao robot tipping bucket float positioning device
CN203127645U (en) Easily-disassembled type auger device
CN202148171U (en) Multi-purpose hoister for engineering installation
CN201671106U (en) Detachable steel structure foundation for crusher
CN207798583U (en) Based on the more dimensional structure face shear boxs of limited block combined type
CN209337920U (en) It is a kind of for drop shaft, the interim lift headframe of ore storage bin
CN203903792U (en) Gantry frame for placing equipment
CN106006361A (en) Pre-buried bolt assembly
CN219929351U (en) Sheet type combined storage bin lifting device
CN207386546U (en) A kind of flange butterfly valve body processing contains turning barrel with detachable molten iron
CN105883048B (en) A kind of electrostatic precipitator anode arranges packing device
CN203782743U (en) Steel-structure foundation frame
CN204324088U (en) Weigh batch can slippage stand

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180420

Address after: 201900 Shanghai city Baoshan District Pangu Road No. 777

Co-patentee after: CHINA NERIN ENGINEERING Co.,Ltd.

Patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Address before: 201900 Shanghai city Baoshan District Pangu Road No. 777

Patentee before: CHINA MCC20 GROUP Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810