CN205429570U - Electrified instrument of installing ground connection link on high voltage insulation circuit - Google Patents
Electrified instrument of installing ground connection link on high voltage insulation circuit Download PDFInfo
- Publication number
- CN205429570U CN205429570U CN201521059323.4U CN201521059323U CN205429570U CN 205429570 U CN205429570 U CN 205429570U CN 201521059323 U CN201521059323 U CN 201521059323U CN 205429570 U CN205429570 U CN 205429570U
- Authority
- CN
- China
- Prior art keywords
- ground connection
- connection link
- stay cord
- support frame
- grounding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Insulators (AREA)
Abstract
一种在高压绝缘线路上带电安装接地挂环的工具,属于电缆或电线的安装技术领域。所述带电安装接地挂环的工具包括固定座、操作臂和支撑架;所述固定座为卡箍结构,与输电线路中电杆的外径尺寸匹配,在固定座外侧壁上设置环状滑槽;所述操作臂为伸缩式结构,其下端通过滑块与环状滑槽配装,在其上端设置球头铰接座;所述支撑架一端与球头铰接座配装,通过穿入球头铰接座中的锁止销限定支撑架的空间状态,在支撑架的另一端对称设置两块用于吸附接地挂环的磁铁,所述磁铁与设置在支撑架上的磁铁滑轨配装。本实用新型解决了高压绝缘线路接地挂环的带电安装问题,保证了输电线路的安全运行,降低了高压绝缘线路的维护成本。
The utility model relates to a tool for live-installing a grounding hanging ring on a high-voltage insulated line, which belongs to the technical field of cable or electric wire installation. The tool for installing the grounding ring with electricity includes a fixed seat, an operating arm and a support frame; the fixed seat is a hoop structure, which matches the outer diameter of the pole in the power transmission line, and an annular slide is set on the outer wall of the fixed seat. Slot; the operating arm is a telescopic structure, its lower end is fitted with a slider and an annular chute, and a ball hinge seat is set at its upper end; one end of the support frame is fitted with a ball hinge seat, and the The locking pin in the head hinge seat limits the spatial state of the support frame, and two magnets for absorbing the grounding ring are arranged symmetrically at the other end of the support frame, and the magnets are assembled with the magnet slide rails arranged on the support frame. The utility model solves the live installation problem of the grounding ring of the high-voltage insulating line, ensures the safe operation of the transmission line, and reduces the maintenance cost of the high-voltage insulating line.
Description
技术领域 technical field
本实用新型涉及一种在高压绝缘导线上带电安装接地挂环的安装工具,属于电缆或电线的安装技术领域。 The utility model relates to an installation tool for live installation of a grounding hanging ring on a high-voltage insulated wire, which belongs to the technical field of installation of cables or wires.
背景技术 Background technique
在我国城镇或者农村地区,高压配电架空线路一般采用绝缘导线。但是目前一些高压绝缘导线在架设过程中没有配置接地挂环,给验电和挂接地线操作带来不便,为解决这一问题,需在输电线路的高压绝缘导线上补装接地挂环。 In my country's urban or rural areas, high-voltage distribution overhead lines generally use insulated conductors. But at present, some high-voltage insulated conductors are not equipped with grounding rings during the erection process, which brings inconvenience to the operation of electrical inspection and grounding wires. To solve this problem, it is necessary to install grounding rings on the high-voltage insulated wires of transmission lines.
如附图1、图2所示的一种适用于绝缘导线的穿刺型接地挂环1,包括线夹1-1、挂环本体1-2和压紧螺栓组件1-3,其中挂环本体1-2的接地端裸露部分用于挂接地线,在线夹1-1上设有导线卡槽和挂环卡槽,在导线卡槽的内壁上设置卡齿1-1-1,可通过旋紧压紧螺栓使卡齿1-1-1刺穿绝缘导线2的绝缘层2-1,从而使挂环卡槽中的挂环获得短路电流。目前,针对上述穿刺型接地挂环1的安装问题,大多采用断电作业或者借助电力高空带电作业车的方式,存在影响输电线路的正常运行、施工成本高的问题。 As shown in accompanying drawings 1 and 2, a puncture-type grounding link 1 suitable for insulated wires includes a wire clamp 1-1, a link body 1-2 and a compression bolt assembly 1-3, wherein the link body The exposed part of the ground terminal of 1-2 is used to hang the ground wire, and the wire clamp 1-1 is provided with a wire clamping groove and a hanging ring clamping groove, and a locking tooth 1-1-1 is set on the inner wall of the wire clamping groove, which can be Tighten the compression bolt to make the locking teeth 1-1-1 pierce the insulating layer 2-1 of the insulated wire 2, so that the hanging ring in the hanging ring slot can obtain a short-circuit current. At present, for the installation of the above-mentioned puncture-type grounding link 1 , most of them use power-off operations or use high-altitude live working vehicles, which affect the normal operation of the transmission line and cause high construction costs.
实用新型内容 Utility model content
本实用新型的目的在于针对现有技术之弊端,提供一种操作方便、性能可靠的在高压绝缘线路上带电安装接地挂环的工具,以保证输电线路的安全运行、降低高压绝缘线路的维护成本。 The purpose of this utility model is to aim at the drawbacks of the prior art, to provide a tool for installing a grounding hanging ring on a high-voltage insulated line with easy operation and reliable performance, so as to ensure the safe operation of the transmission line and reduce the maintenance cost of the high-voltage insulated line .
本实用新型上述目的是通过以下技术方案实现的: The above-mentioned purpose of the utility model is achieved through the following technical solutions:
一种在高压绝缘线路上带电安装接地挂环的工具,包括固定座、操作臂和支撑架;所述固定座为卡箍结构,与输电线路中电杆的外径尺寸匹配,在固定座外侧壁上设置环状滑槽;所述操作臂为伸缩式结构,其下端通过滑块与环状滑槽配装,在其上端设置球头铰接座;所述支撑架一端与球头铰接座配装,通过穿入球头铰接座中的锁止销限定支撑架的空间状态,在支撑架的另一端对称设置两块用于吸附接地挂环的磁铁,所述磁铁与设置在支撑架上的磁铁滑轨配装。 A tool for live-installing a grounding link on a high-voltage insulated line, including a fixing seat, an operating arm and a support frame; the fixing seat is a hoop structure, which matches the outer diameter of the pole in the power transmission line, and is outside the fixing seat An annular chute is set on the wall; the operating arm is a telescopic structure, the lower end of which is assembled with the annular chute through a slider, and a ball joint hinge seat is set at its upper end; one end of the support frame is matched with the ball joint hinge seat. The space state of the support frame is defined by the locking pin penetrating into the ball joint hinge seat, and two magnets for absorbing the grounding ring are symmetrically arranged at the other end of the support frame. Magnetic slide assembly.
上述在高压绝缘线路上带电安装接地挂环的工具,还设置一组拉绳,所述拉绳包括用于驱动两块磁铁与接地挂环分离的第一拉绳、用于旋紧压紧螺栓的第二拉绳和用于解除支撑架锁止状态的第三拉绳,在拉绳的操作端设有拉绳控制箱;所述第一拉绳数量为两根,其固定端分别与对称设置的两块磁铁连接;所述第二拉绳数量与旋紧螺栓组件数量匹配,其固定端缠绕在旋紧螺栓组件的套筒上;所述第三拉绳固定端与锁止销连接。 The above-mentioned tool for installing the grounding link on the high-voltage insulated line with electricity is also provided with a set of pull ropes, which include a first pull rope for driving two magnets to separate from the grounding link, and a set of pull ropes for tightening the compression bolts. The second stay rope and the third stay rope used to release the locked state of the support frame are provided with a stay rope control box at the operating end of the stay rope; the number of the first stay rope is two, and its fixed ends are respectively symmetrical to The two set magnets are connected; the number of the second pull rope matches the number of the tightening bolt assembly, and its fixed end is wound on the sleeve of the tightening bolt assembly; the fixed end of the third pull rope is connected with the locking pin.
上述在高压绝缘线路上带电安装接地挂环的工具,所述操作臂上端还设有滑轮支架,在所述滑轮支架上安装用于控制拉绳转向的滑轮。 In the above-mentioned tool for installing a grounding link on a high-voltage insulated line with electricity, the upper end of the operating arm is also provided with a pulley bracket, and a pulley for controlling the steering of the pull rope is installed on the pulley bracket.
上述在高压绝缘线路上带电安装接地挂环的工具,所述操作臂下端还设有空间角度调整机构,所述空间角度调整机构包括销轴和棘轮棘爪传动组件,通过棘轮棘爪传动组件限制操作臂在重力作用下顺时针方向的自由转动。 As for the above-mentioned tool for installing a grounding link with electricity on a high-voltage insulated line, the lower end of the operating arm is also provided with a space angle adjustment mechanism, and the space angle adjustment mechanism includes a pin shaft and a ratchet and pawl transmission assembly, which is limited by the ratchet and pawl transmission assembly. The operating arm rotates freely clockwise under the action of gravity.
上述在高压绝缘线路上带电安装接地挂环的工具,还设有用于限定操作臂在固定座环状滑槽中位置的锁止机构,所述锁止机构包括锁止板和卡槽;所述锁止板沿固定座周向均匀布置,与固定座铰接装配;所述卡槽位于操作臂下端的滑块固定座上。 The above-mentioned tool for live-installing the grounding link on the high-voltage insulated line is also provided with a locking mechanism for limiting the position of the operating arm in the annular chute of the fixing seat, and the locking mechanism includes a locking plate and a card slot; The locking plate is evenly arranged along the circumference of the fixing seat, and is hingedly assembled with the fixing seat; the card slot is located on the slider fixing seat at the lower end of the operating arm.
上述在高压绝缘线路上带电安装接地挂环的工具,所述支撑架上设有用于引导绝缘导线进入接地挂环导线卡槽的楔形导向元件,所述楔形导向元件对称布置在接地挂环的两侧。 As for the above-mentioned tool for installing the grounding ring with electricity on the high-voltage insulated line, the support frame is provided with a wedge-shaped guide element for guiding the insulated wire into the wire slot of the grounding ring, and the wedge-shaped guide element is symmetrically arranged on both sides of the grounding ring. side.
上述在高压绝缘线路上带电安装接地挂环的工具,还设有用于提示压紧螺栓旋紧到位的蜂鸣器,所述蜂鸣器安装在支撑架或者操作臂上,其两个触点与接地挂环的接地端裸露部分连接。 The above-mentioned tool for installing the grounding link on the high-voltage insulated line with electricity is also provided with a buzzer for prompting that the compression bolt is tightened in place. The buzzer is installed on the support frame or the operating arm, and its two contacts are connected to the The exposed part of the ground end of the ground hanging ring is connected.
本实用新型在执行高压绝缘线路接地挂环安装作业时,可将卡箍结构的固定座安装在输电线路电杆上,通过支撑架上设置的磁铁将待安装的接地挂环吸附在支撑架上,再将锁止销穿入球头铰接座中,以限定支撑架的空间状态;然后通过操作臂下端滑块与固定座外壁上环状滑槽的配合,完成操作臂在水平面360°范围内的位置调整,通过操作臂下端的空间角度调整机构调整操作臂与电杆中心轴线的夹角,还可通过对可伸缩结构操作臂长度的调整,使与操作臂上端配合的支撑架处于接地挂环安装的最佳位置,操作用于解除支撑架锁止状态的第三拉绳,使支撑架与导线随动,并在导向元件引导下使绝缘导线进入接地挂环的导线卡槽中;操作用于旋紧压紧螺栓的第二拉绳,使接地挂环导线卡槽夹紧绝缘导线,并由导线卡槽内壁上的卡齿刺穿绝缘导线的绝缘层,从而使挂环卡槽中的挂环本体获得短路电流,当蜂鸣器发出提示音后停止第二拉绳的操作;操作用于驱动两块磁铁与接地挂环分离的第一拉绳,使两块磁铁与接地挂环分离,完成接地挂环的安装。由此可见,本实用新型解决了高压绝缘线路接地挂环的带电安装问题,保证了输电线路的安全运行,降低了高压绝缘线路的维护成本。 When the utility model is performing the installation operation of the grounding ring of the high-voltage insulated line, the fixing seat of the clamp structure can be installed on the pole of the transmission line, and the grounding ring to be installed can be adsorbed on the supporting frame by the magnet provided on the supporting frame , and then insert the locking pin into the ball joint seat to limit the spatial state of the support frame; then, through the cooperation of the slider at the lower end of the operating arm and the ring-shaped chute on the outer wall of the fixing seat, the operating arm is within 360° of the horizontal plane. Adjust the position of the operating arm, adjust the angle between the operating arm and the central axis of the pole through the space angle adjustment mechanism at the lower end of the operating arm, and adjust the length of the operating arm with a telescopic structure so that the support frame matched with the upper end of the operating arm is in the grounding position The best position for ring installation, operate the third pull rope used to release the locking state of the support frame, so that the support frame and the wire follow up, and under the guidance of the guide element, the insulated wire enters the wire clamping groove of the grounding ring; operation The second pull rope used to tighten the compression bolt makes the insulated wire be clamped by the grounding ring wire slot, and the teeth on the inner wall of the wire slot pierce the insulation layer of the insulated wire, so that the hanging ring is stuck in the slot. The body of the hanging ring obtains short-circuit current, and stops the operation of the second pull rope when the buzzer sounds; operate the first pull rope used to drive the two magnets to separate from the grounding ring, so that the two magnets are connected to the grounding ring Separate to complete the installation of the grounding ring. It can be seen that the utility model solves the live installation problem of the grounding ring of the high-voltage insulated line, ensures the safe operation of the transmission line, and reduces the maintenance cost of the high-voltage insulated line.
附图说明 Description of drawings
图1是本实用新型涉及的接地挂环与导线装配关系示意图; Fig. 1 is a schematic diagram of the relationship between the grounding ring and the wire assembly involved in the utility model;
图2是图1中A-A剖面结构示意图; Fig. 2 is a schematic diagram of A-A section structure in Fig. 1;
图3是本实用新型所述在高压绝缘线路上带电安装接地挂环的工具的主视图; Fig. 3 is the front view of the tool for live installation of the grounding link on the high-voltage insulated line described in the utility model;
图4是图3中Ⅰ处结构放大图; Figure 4 is an enlarged view of the structure at I in Figure 3;
图5是图4中B-B剖面结构示意图(放大后); Fig. 5 is B-B sectional structure schematic diagram among Fig. 4 (after enlargement);
图6是图3中II处结构放大图; Fig. 6 is an enlarged view of the structure at II in Fig. 3;
图7是本实用新型所述在高压绝缘线路上带电安装接地挂环的工具的俯视图; Fig. 7 is a top view of a tool for live-installing a grounding link on a high-voltage insulated line according to the utility model;
图8是图7中C-C剖面结构示意图; Fig. 8 is a schematic diagram of the C-C section structure in Fig. 7;
图9是本实用新型所述在高压绝缘线路上带电安装接地挂环的工具工作状态示意图。 Fig. 9 is a schematic diagram of the working state of the tool for installing the grounding link on the high-voltage insulated line according to the utility model.
图中各标号清单为: The list of symbols in the figure is:
1、接地挂环,1-1、线夹,1-1-1、卡齿,1-2、挂环本体,1-3、压紧螺栓组件,2、绝缘导线,2-1、绝缘层,3、接地挂环安装工具,3-1、固定座,3-1-1、环状滑槽,3-1-2、锁止板,3-2、操作臂,3-2-1、球头铰接座,3-2-2、滑轮支架,3-2-3、滑轮,3-3、支撑架,3-3-1、楔形导向元件,3-3-2、磁铁,3-3-3、磁铁滑轨,3-4、锁止销、3-5、蜂鸣器,3-5-1、触点,3-6、滑块固定座,3-7、滑块,3-8、销轴,3-9、棘轮棘爪传动组件,3-10、拉绳控制箱,3-11、卡槽,4、电杆; 1. Grounding ring, 1-1, wire clip, 1-1-1, locking teeth, 1-2, hanging ring body, 1-3, compression bolt assembly, 2, insulated wire, 2-1, insulating layer , 3. Grounding ring installation tool, 3-1, fixed seat, 3-1-1, annular chute, 3-1-2, locking plate, 3-2, operating arm, 3-2-1, Ball joint seat, 3-2-2, pulley bracket, 3-2-3, pulley, 3-3, support frame, 3-3-1, wedge guide element, 3-3-2, magnet, 3-3 -3, magnet slide rail, 3-4, locking pin, 3-5, buzzer, 3-5-1, contact point, 3-6, slider fixing seat, 3-7, slider, 3- 8. Pin shaft, 3-9, ratchet pawl transmission assembly, 3-10, pull rope control box, 3-11, card slot, 4, electric pole;
S、拉绳,S1、第一拉绳,S2、第二拉绳,S3、第三拉绳。 S, pull rope, S1, the first pull rope, S2, the second pull rope, S3, the third pull rope.
具体实施方式 detailed description
下面结合附图和具体实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.
参看图3、图4、图5、图6、图7,本实用新型所述带电安装接地挂环的工具3包括固定座3-1、操作臂3-2和支撑架3-3;所述固定座3-1为卡箍结构,与输电线路中电杆4的外径尺寸匹配,在固定座3-1外侧壁上设置环状滑槽3-1-1;所述操作臂3-2为伸缩式结构,其下端通过滑块3-7与环状滑槽3-1-1配装,在其上端设置球头铰接座3-2-1;所述支撑架3-3一端与球头铰接座3-2-1配装,通过穿入球头铰接座3-2-1中的锁止销3-4限定支撑架3-3的空间状态,在支撑架3-3的另一端对称设置两块用于吸附接地挂环1的磁铁3-3-2,所述磁铁3-3-2与设置在支撑架3-3上的磁铁滑轨3-3-3配装。 Referring to Fig. 3, Fig. 4, Fig. 5, Fig. 6, and Fig. 7, the tool 3 for installing the grounding link with electricity according to the utility model includes a fixed seat 3-1, an operating arm 3-2 and a support frame 3-3; The fixing seat 3-1 is a hoop structure, which matches the outer diameter of the pole 4 in the power transmission line, and an annular chute 3-1-1 is arranged on the outer wall of the fixing seat 3-1; the operating arm 3-2 It is a telescopic structure, its lower end is assembled with the annular chute 3-1-1 through the slider 3-7, and a ball joint hinge seat 3-2-1 is arranged at its upper end; one end of the support frame 3-3 is connected with the ball The head hinge seat 3-2-1 is assembled, and the space state of the support frame 3-3 is limited by the locking pin 3-4 penetrating into the ball joint hinge seat 3-2-1, at the other end of the support frame 3-3 Two magnets 3-3-2 for absorbing the grounding ring 1 are arranged symmetrically, and the magnets 3-3-2 are assembled with the magnet slide rail 3-3-3 arranged on the support frame 3-3.
参看图3、图4、图5、图6,本实用新型所述带电安装接地挂环的工具3还设置一组拉绳S,所述拉绳S包括用于驱动两块磁铁3-3-2与接地挂环1分离的第一拉绳S1、用于旋紧压紧螺栓的第二拉绳S2和用于解除支撑架3-3锁止状态的第三拉绳S3,在拉绳S的操作端设有拉绳控制箱3-10;所述第一拉绳S1的数量为两根,其固定端分别与对称设置的两块磁铁3-3-2连接;所述第二拉绳S2数量与旋紧螺栓组件1-3数量匹配,其固定端缠绕在旋紧螺栓组件的套筒上;所述第三拉绳S3固定端与锁止销3-4连接。 Referring to Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the tool 3 for installing the grounding ring with electricity according to the utility model is also provided with a set of stay ropes S, and the stay rope S includes two magnets for driving 3-3- 2 The first pull rope S1 separated from the grounding ring 1, the second pull rope S2 used to tighten the compression bolt, and the third pull rope S3 used to release the locked state of the support frame 3-3, on the pull rope S The operating end is provided with a stay cord control box 3-10; the quantity of the first stay cord S1 is two, and its fixed ends are respectively connected with two symmetrically arranged magnets 3-3-2; the second stay cord The number of S2 matches the number of tightening bolt assemblies 1-3, and its fixed end is wound on the sleeve of the tightening bolt assembly; the fixed end of the third stay rope S3 is connected with the locking pin 3-4.
参看图4,本实用新型所述带电安装接地挂环的工具3在所述操作臂3-2上端还设有滑轮支架3-2-2,所述滑轮支架3-2-2上安装用于控制拉绳转向的滑轮3-2-3. Referring to Fig. 4, the tool 3 of the live installation grounding hanging ring described in the utility model is also provided with a pulley bracket 3-2-2 at the upper end of the operating arm 3-2, and the pulley bracket 3-2-2 is installed for Pulley 3-2-3 to control pulley steering.
参看图6,本实用新型所述带电安装接地挂环的工具3在所述操作臂3-2下端还设有空间角度调整机构,所述空间角度调整机构包括销轴3-8和棘轮棘爪传动组件3-9,通过棘轮棘爪传动组件3-9限制操作臂3-2在重力作用下顺时针方向的自由转动。本实用新型所述带电安装接地挂环的工具3还设有用于限定操作臂3-2在固定座3-1环状滑槽3-1-1中位置的锁止机构;所述锁止机构包括锁止板3-1-2和卡槽3-11,所述锁止板3-1-2沿固定座3-1周向均匀布置,与固定座3-1铰接装配;所述卡槽3-11位于操作臂3-2下端的滑块固定座3-6上。 Referring to Fig. 6, the tool 3 of the utility model for installing the grounding hanging ring with electricity is also provided with a space angle adjustment mechanism at the lower end of the operation arm 3-2, and the space angle adjustment mechanism includes a pin shaft 3-8 and a ratchet pawl The transmission assembly 3-9 restricts the free rotation of the operating arm 3-2 in the clockwise direction under the action of gravity through the ratchet and pawl transmission assembly 3-9. The tool 3 of the live installation grounding link described in the utility model is also provided with a locking mechanism for limiting the position of the operating arm 3-2 in the annular chute 3-1-1 of the fixed seat 3-1; the locking mechanism It includes a locking plate 3-1-2 and a card slot 3-11, the locking plate 3-1-2 is evenly arranged along the circumference of the fixing seat 3-1, and is hingedly assembled with the fixing seat 3-1; the card slot 3-11 is located on the slider holder 3-6 at the lower end of the operating arm 3-2.
参看图7、图8,本实用新型所述带电安装接地挂环的工具3在所述支撑架3-3上还设有用于引导绝缘导线2进入接地挂环导线卡槽的楔形导向元件3-3-1,所述楔形导向元件3-3-1对称布置在接地挂环2的两侧。 Referring to Fig. 7 and Fig. 8, the tool 3 for live installation of the grounding ring according to the utility model is also provided with a wedge-shaped guide element 3-3 on the support frame 3-3 for guiding the insulated wire 2 into the wire slot of the grounding ring. 3-1, the wedge-shaped guide elements 3-3-1 are symmetrically arranged on both sides of the grounding ring 2 .
参看图3、图4,本实用新型所述带电安装接地挂环的工具3还设有用于提示压紧螺栓旋紧到位的蜂鸣器3-5,所述蜂鸣器3-5安装在支撑架3-3或者操作臂3-2上,其两个触点3-5-1与接地挂环1的挂环本体1-2的接地端裸露部分以可分离方式连接。 Referring to Fig. 3 and Fig. 4, the tool 3 for live installation of the grounding ring described in the utility model is also provided with a buzzer 3-5 for prompting that the compression bolt is screwed in place, and the buzzer 3-5 is installed on the support On the frame 3-3 or the operating arm 3-2, its two contacts 3-5-1 are connected in a detachable manner with the exposed part of the grounding end of the hanging ring body 1-2 of the grounding hanging ring 1.
参看图3至图9,本实用新型所述带电安装接地挂环的工具3在执行高压绝缘线路接地挂环安装作业时,按照下列操作步骤进行: Referring to Fig. 3 to Fig. 9, the tool 3 for installing the grounding link with electricity according to the utility model performs the following operation steps when performing the installation operation of the grounding link for the high-voltage insulated line:
一、将卡箍结构的固定座3-1安装在输电线路电杆4上,由支撑架3-3上设置的磁铁3-3-2将待安装的接地挂环1吸附在支撑架3-3上,蜂鸣器3-5的两个触点3-5-1与接地挂环1的接地端裸露部分以可分离方式连接; 1. Install the fixing seat 3-1 of the clamp structure on the pole 4 of the transmission line, and the magnet 3-3-2 set on the support frame 3-3 will adsorb the grounding ring 1 to be installed on the support frame 3- 3, the two contacts 3-5-1 of the buzzer 3-5 are connected to the exposed part of the grounding end of the grounding ring 1 in a detachable manner;
二、将锁止销3-4穿入操作臂3-2上端的球头铰接座3-2-1中,以限定支撑架的空间状态; 2. Insert the locking pin 3-4 into the ball joint seat 3-2-1 at the upper end of the operating arm 3-2 to limit the spatial state of the support frame;
三、通过位于操作臂3-2下端的滑块3-7与固定座3-1外壁上环状滑槽3-1-1的配合,完成操作臂3-2在水平面内360°范围内的调整,通过操作臂3-2下端的空间角度调整机构调整操作臂3-2与电杆4中心轴线的夹角,调整可伸缩结构的操作臂3-2长度,使与操作臂3-2上端配合的支撑架3-3处于接地挂环安装的最佳位置; 3. Through the cooperation of the slider 3-7 located at the lower end of the operating arm 3-2 and the ring-shaped chute 3-1-1 on the outer wall of the fixing seat 3-1, the operating arm 3-2 can move within 360° in the horizontal plane. Adjustment, adjust the angle between the operating arm 3-2 and the central axis of the pole 4 through the space angle adjustment mechanism at the lower end of the operating arm 3-2, and adjust the length of the operating arm 3-2 of the telescopic structure so that it is aligned with the upper end of the operating arm 3-2. The matching support frame 3-3 is in the best position for the installation of the grounding ring;
四、操作用于解除支撑架3-3锁止状态的第三拉绳S3,使支撑架3-3与绝缘导线2随动,并在楔形导向元件3-3-1引导下使绝缘导线进入接地挂环1的导线卡槽中; 4. Operate the third pull rope S3 used to release the locked state of the support frame 3-3, so that the support frame 3-3 and the insulated wire 2 follow the movement, and the insulated wire enters under the guidance of the wedge-shaped guide element 3-3-1 In the wire slot of the grounding ring 1;
五、操作用于旋紧压紧螺栓的第二拉绳S2,通过第二拉绳S2固定端带动压紧螺栓组件1-3的螺母套筒旋转,通过接地挂环1的导线卡槽夹紧绝缘导线2,并由导线卡槽内壁上的卡齿1-1-1刺穿绝缘导线2的绝缘层2-1,从而使挂环卡槽中的挂环本体1-2获得短路电流,直到蜂鸣器3-5发出提示音后停止第二拉绳S2的操作; 5. Operate the second pull rope S2 for tightening the compression bolt, drive the nut sleeve of the compression bolt assembly 1-3 to rotate through the fixed end of the second pull rope S2, and clamp it through the wire slot of the grounding ring 1 Insulate the wire 2, and pierce the insulating layer 2-1 of the insulated wire 2 by the teeth 1-1-1 on the inner wall of the wire clamping groove, so that the hanging ring body 1-2 in the hanging ring clamping groove obtains a short-circuit current until Stop the operation of the second pull cord S2 after the buzzer 3-5 sends out the prompt sound;
六、操作用于驱动两块磁铁3-3-2与接地挂环1分离的第一拉绳S1,使两块磁铁3-3-2与接地挂环1分离,接地挂环1被安装在绝缘导线2上; 6. The operation is used to drive the first pull rope S1 separating the two magnets 3-3-2 from the grounding link 1, so that the two magnets 3-3-2 are separated from the grounding link 1, and the grounding link 1 is installed on the Insulated wire 2;
七、将接地挂环安装工具3从电杆4上拆除,完成接地挂环1的安装作业。 7. Remove the grounding ring installation tool 3 from the pole 4 to complete the installation of the grounding ring 1 .
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521059323.4U CN205429570U (en) | 2015-12-18 | 2015-12-18 | Electrified instrument of installing ground connection link on high voltage insulation circuit |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521059323.4U CN205429570U (en) | 2015-12-18 | 2015-12-18 | Electrified instrument of installing ground connection link on high voltage insulation circuit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205429570U true CN205429570U (en) | 2016-08-03 |
Family
ID=56538323
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521059323.4U Withdrawn - After Issue CN205429570U (en) | 2015-12-18 | 2015-12-18 | Electrified instrument of installing ground connection link on high voltage insulation circuit |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205429570U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105490207A (en) * | 2015-12-18 | 2016-04-13 | 国家电网公司 | Grounding hanging ring installation tool for high-voltage insulation line |
| CN108539694A (en) * | 2018-05-10 | 2018-09-14 | 国网山东省电力公司济南市章丘区供电公司 | A kind of power Transmission supporting rack |
| CN113764911A (en) * | 2021-08-31 | 2021-12-07 | 贵州电网有限责任公司 | Grounding hanging ring for high-voltage transmission line |
-
2015
- 2015-12-18 CN CN201521059323.4U patent/CN205429570U/en not_active Withdrawn - After Issue
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105490207A (en) * | 2015-12-18 | 2016-04-13 | 国家电网公司 | Grounding hanging ring installation tool for high-voltage insulation line |
| CN108539694A (en) * | 2018-05-10 | 2018-09-14 | 国网山东省电力公司济南市章丘区供电公司 | A kind of power Transmission supporting rack |
| CN113764911A (en) * | 2021-08-31 | 2021-12-07 | 贵州电网有限责任公司 | Grounding hanging ring for high-voltage transmission line |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101174761B (en) | Up-spinning Live Replacement Method for Tension Insulator Strings of High-Voltage Transmission Lines | |
| CN101593955B (en) | Rotary grounding wire clip | |
| KR101550852B1 (en) | Connection apparatus of underground transmission line for withstanding voltage test | |
| WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
| CN204552247U (en) | A kind of portable insulator crossarm | |
| CN208112103U (en) | A kind of drainage thread ground connection cross-arm | |
| CN205429570U (en) | Electrified instrument of installing ground connection link on high voltage insulation circuit | |
| CN204645808U (en) | Bar stepped on by cement pole cable | |
| CN105490207B (en) | A kind of high-voltage isulation circuit is grounded link installation tool | |
| CN104767050B (en) | Hook type personal security line | |
| CN202352852U (en) | Grounding device with support insulator | |
| CN203352104U (en) | Multifunctional insulating cross arm | |
| CN203690799U (en) | Device for replacing suspension angle tower insulator string in live state | |
| CN203242965U (en) | Sag adjuster | |
| CN201584691U (en) | Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field | |
| CN104810119B (en) | A kind of insulator | |
| CN110706872B (en) | Electric power insulator convenient to installation | |
| CN204068073U (en) | A kind of three-phase combined type conducting rod assembling device | |
| CN202815287U (en) | OPGW cable rack structure multidirectional insulated guide clamp | |
| CN202563987U (en) | Improved type lightning protection supporting insulator | |
| CN202905452U (en) | Transformer bushing coil out installation rack | |
| CN201877772U (en) | Bushing terminal for electrified railroad | |
| CN204011797U (en) | A kind of earthing wire clip | |
| CN206712327U (en) | A kind of powered vertical rod struts locking device with wire | |
| CN214204622U (en) | Cable installation turn-buckle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20160803 Effective date of abandoning: 20171024 |
|
| AV01 | Patent right actively abandoned |