CN205421029U - Horizontal channel device of suspension bridge catwalk - Google Patents
Horizontal channel device of suspension bridge catwalk Download PDFInfo
- Publication number
- CN205421029U CN205421029U CN201620173951.3U CN201620173951U CN205421029U CN 205421029 U CN205421029 U CN 205421029U CN 201620173951 U CN201620173951 U CN 201620173951U CN 205421029 U CN205421029 U CN 205421029U
- Authority
- CN
- China
- Prior art keywords
- module
- rectangular bottom
- bottom beam
- bolts
- suspension bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及一种悬索桥猫道横向通道装置,至少包括一长方形底梁;长方形底梁上设有平台网面;长方形底梁的四角位置有与该长方形底梁垂直的垂直梁;该垂直梁与长方形底梁的通过设在底梁下端面的U形卡固定连接;长方形底梁长边上的垂直梁之间的中部设有中间模块,该中间模块的左右两端通过螺栓连接有尾端模块,该尾端模块与垂直梁通过螺栓连接;中间模块和尾端模块分别与长方形底梁通过螺栓连接;中间模块是由多个贝雷架通过螺栓连接起来组成的模块通道;尾端模块是由方钢焊接而成的框架通道。采用栓接、销接的方式,工序简易,安拆方便。人员行走通道设置在横向通道的内部,既安全又节省材料。
The utility model relates to a catwalk transverse channel device for a suspension bridge, which at least includes a rectangular bottom beam; a platform mesh surface is arranged on the rectangular bottom beam; vertical beams perpendicular to the rectangular bottom beam are arranged at four corners of the rectangular bottom beam; the vertical beam It is fixedly connected with the rectangular bottom beam through the U-shaped card arranged on the lower end of the bottom beam; the middle part between the vertical beams on the long side of the rectangular bottom beam is provided with an intermediate module, and the left and right ends of the intermediate module are connected with tail ends by bolts module, the end module is connected to the vertical beam by bolts; the middle module and the end module are respectively connected to the rectangular bottom beam by bolts; the middle module is a module channel composed of multiple Bailey racks connected by bolts; the end module is Frame channels welded from square steel. The method of bolt connection and pin connection is adopted, the process is simple, and the installation and disassembly are convenient. The personnel walking passage is set inside the horizontal passage, which is safe and saves materials.
Description
技术领域 technical field
本实用新型属于悬索桥领域,尤其涉及一种悬索桥猫道横向通道装置。 The utility model belongs to the field of suspension bridges, in particular to a transverse channel device for catwalks of suspension bridges.
背景技术 Background technique
索桥(Cablebridge/Suspensionbridge)。也称吊桥、绳桥、悬索桥等,是用竹索或藤索、铁索等为骨干相拼悬吊起的大桥。古书上称为絙桥、笮桥、绳桥。多建于水流急不易做桥墩的陡岸险谷,主要见于西南地区。其做法是在两岸建屋,屋内各设系绳的立柱和绞绳的转柱,然后以粗绳索若干根平铺系紧,再在绳索上横铺木板,有的在两侧还加一至两根绳索作为扶栏。 Cable bridge (Cablebridge/Suspensionbridge). Also known as suspension bridge, rope bridge, suspension bridge, etc., it is a bridge suspended by using bamboo cables, rattan cables, iron cables, etc. as the backbone. It is called Jiqiao, Ruoqiao and Rope Bridge in ancient books. Most of them are built in dangerous valleys with steep banks where the current is fast and it is not easy to make bridge piers, and they are mainly found in the southwest region. The method is to build a house on both sides of the bank, and set up a rope-tethering column and a twisted rope rotating column in the house, and then use a few thick ropes to tie them flat, and then lay wooden boards on the ropes, and some add one or two ropes on both sides. as a handrail.
在索桥施工时,猫道是悬索桥施工时架设在主缆之下、平行于主缆的线形临时施工便道。它是施工人员进行施工作业的高空脚手架,是主缆系统乃至悬索桥整个上部结构的施工平台。施工人员在其上完成诸如索股牵引、调股、整形入鞍、紧缆、索夹及吊索安装、箱梁吊装及工地连接、主缆缠丝、防护涂装等重要任务。上下游各一条,断面通常呈U型,狭长且有一些摇晃,故称“猫道”,英文为catway。它是悬索桥施工中极其重要的临时设施,大桥竣工后将被拆除。 During the construction of the cable bridge, the catwalk is a linear temporary construction access road that is erected under the main cable and parallel to the main cable during the construction of the suspension bridge. It is a high-altitude scaffold for construction workers to carry out construction work, and a construction platform for the main cable system and even the entire upper structure of the suspension bridge. On it, construction personnel complete important tasks such as cable strand traction, strand adjustment, saddle shaping, cable tightening, cable clamp and sling installation, box girder hoisting and site connection, main cable winding, protective coating and other important tasks. There is one upstream and one downstream, and the section is usually U-shaped, long and narrow with some wobbling, so it is called "catway", and the English is catway. It is an extremely important temporary facility in the construction of the suspension bridge and will be demolished after the bridge is completed.
传统猫道横向通道采用钢管或方钢管焊接式结构,由于钢管之间采用焊接方式,制造过程复杂、耗时多、自重大。施工人员行走通道在横向通道整体的的上部。 The traditional horizontal channel of catwalk adopts welded structure of steel pipe or square steel pipe. Due to the welding method between steel pipes, the manufacturing process is complicated, time-consuming and heavy. The construction personnel's walking passage is at the upper part of the transverse passage as a whole.
实用新型内容 Utility model content
为了克服上述现有技术的缺点,本实用新型的目的在于提供一种采用贝雷片式结构的方式,贝雷片之间采用栓接、销接的方式,工序简易,安拆方便。人员行走通道设置在横向通道的内部,既安全又节省材料的悬索桥猫道横向通道装置。 In order to overcome the above-mentioned shortcomings of the prior art, the purpose of this utility model is to provide a method of adopting the Bailey sheet structure. The Bailey sheets are bolted and pinned, and the process is simple and easy to install and disassemble. The personnel walking passage is set inside the transverse passage, which is a safe and material-saving suspension bridge catwalk transverse passage device.
为了达到上述目的,本实用新型采取的技术方案为:一种悬索桥猫道横向通道装置,至少包括一长方形底梁;所述的长方形底梁上设有平台网面;所述的长方形底梁的四角位置有与该长方形底梁垂直的垂直梁;所述的该垂直梁与长方形底梁的通过设在底梁下端面的U形卡固定连接; In order to achieve the above purpose, the technical solution adopted by the utility model is: a suspension bridge catwalk transverse channel device, at least including a rectangular bottom beam; the rectangular bottom beam is provided with a platform mesh surface; the rectangular bottom beam There are vertical beams perpendicular to the rectangular bottom beam at the four corners; the vertical beam is fixedly connected to the rectangular bottom beam through a U-shaped card arranged on the lower end surface of the bottom beam;
所述的长方形底梁长边上的垂直梁之间的中部设有中间模块,该中间模块的左右两端通过螺栓连接有尾端模块,该尾端模块与垂直梁通过螺栓连接;所述的中间模块和尾端模块分别与长方形底梁通过螺栓连接; The middle part between the vertical beams on the long side of the rectangular bottom beam is provided with an intermediate module, and the left and right ends of the intermediate module are connected with end modules by bolts, and the end modules are connected with the vertical beams by bolts; The middle module and the end module are respectively connected to the rectangular bottom beam through bolts;
所述的中间模块是由多个贝雷架通过螺栓连接起来组成的模块通道;所述的尾端模块是由方钢焊接而成的框架通道。 The middle module is a module channel formed by connecting multiple Bailey frames through bolts; the tail module is a frame channel welded by square steel.
所述的长方形底梁的端部与垂直梁的顶部固定连接有拉杆。 The end of the rectangular bottom beam is fixedly connected with the top of the vertical beam with a tie rod.
所述的平台网面与长方形底梁之间设有一平台垫片。 A platform spacer is provided between the platform mesh surface and the rectangular bottom beam.
所述的多个贝雷架左右之间通过工字梁进行连接,多个贝雷架的底部左右两侧通过花架连接。 The left and right sides of the plurality of Bailey racks are connected by I-beams, and the left and right sides of the bottom of the plurality of Bailey racks are connected by flower racks.
所述的贝雷架的长度为18m,高度为1.4m,宽度为1.5mm。 The length of described Bailey frame is 18m, and height is 1.4m, and width is 1.5mm.
本实用新型采用以上技术方案,具有以下优点:本实用新型采用贝雷片式结构,贝雷片之间采用栓接、销接的方式,工序简易,安拆方便。人员行走通道设置在横向通道的内部,既安全又节省材料;同时 The utility model adopts the above technical scheme, and has the following advantages: the utility model adopts the Bailey plate structure, and the Bailey pieces are bolted and pinned, the process is simple, and the installation and disassembly are convenient. The personnel walking passage is set inside the horizontal passage, which is safe and saves materials; at the same time
⑴贝雷桁片结构式横向通道,加工组装时采取栓接方式,不需要焊接,从而大幅度提高作业效率; ⑴The Bailey truss structural transverse channel adopts the bolt connection method during processing and assembly, and does not require welding, thus greatly improving the working efficiency;
⑵与常规的钢管和方钢管焊接结构相比省去了大量的焊接、拼装工序从而节约工期; ⑵Compared with the conventional steel pipe and square steel pipe welding structure, a large number of welding and assembly processes are saved to save the construction period;
⑶在满足设计要求的情况下,更轻于传统横向通道重量,其总重约为6t,传统横向通道重约为10t; (3) In the case of meeting the design requirements, it is lighter than the weight of the traditional transverse channel, its total weight is about 6t, and the weight of the traditional transverse channel is about 10t;
⑷由于其质量较轻吊装过程和拆除过程也十分方便; ⑷Because of its light weight, the hoisting and dismantling process is also very convenient;
⑸在横向通道拆除后只需要解除中间模块与尾端模块的栓接,即可回收贝雷架,周转到下一个施工使用。 ⑸ After the horizontal channel is removed, it is only necessary to unbolt the middle module and the end module to recover the Bailey frame and turn it over to the next construction.
⑹综合贝雷架结构式从其加工效率,原材料节约,工期节约,原材料回收再利用,也会大幅缩减成本。 ⑹Comprehensive Bailey frame structure from its processing efficiency, raw material saving, construction period saving, raw material recycling and reuse, will also greatly reduce costs.
附图说明 Description of drawings
图1本实用新型结构示意图; Fig. 1 structural representation of the utility model;
图2是本实用新型的侧视结构示意图 Fig. 2 is a side view structural representation of the utility model
图3是本实用新型中间模块的侧视结构示意图; Fig. 3 is a side view structural schematic diagram of the middle module of the utility model;
图4是本实用新型中间模块的俯视结构示意图; Fig. 4 is a top view structural schematic diagram of the intermediate module of the present invention;
图5是本实用新型尾端模块的结构示意图。 Fig. 5 is a structural schematic diagram of the tail end module of the present invention.
图中:1.长方形底梁;2.垂直梁;3.U形卡;4.中间模块;5.尾端模块;6.贝雷架;7.平台网面;8.拉杆;9.刹车拉杆;10.工字梁;11.花架。 In the figure: 1. Rectangular bottom beam; 2. Vertical beam; 3. U-shaped card; 4. Middle module; Tie rod; 10. I-beam; 11. Flower stand.
具体实施方式 detailed description
下面结合附图和实施例对本实用新型进行详细的描述。 Below in conjunction with accompanying drawing and embodiment the utility model is described in detail.
实施例1 Example 1
一种悬索桥猫道横向通道装置,如图2至少包括一长方形底梁1;所述的长方形底梁1上设有平台网面7;所述的长方形底梁1的四角位置有与该长方形底梁1垂直的垂直梁2;所述的该垂直梁2与长方形底梁1的通过设在底梁下端面的U形卡3固定连接; A kind of suspension bridge catwalk transverse channel device, as Fig. 2 at least comprises a rectangular bottom beam 1; Described rectangular bottom beam 1 is provided with platform mesh surface 7; The four corner positions of described rectangular bottom beam 1 have The vertical beam 2 perpendicular to the beam 1; the vertical beam 2 is fixedly connected with the rectangular bottom beam 1 through the U-shaped card 3 arranged on the lower end surface of the bottom beam;
所述的长方形底梁1长边上的垂直梁2之间的中部设有如图1所述的中间模块4,该中间模块4的左右两端通过螺栓连接有尾端模块5,该尾端模块5与垂直梁2通过螺栓连接;所述的中间模块4和尾端模块5分别与长方形底梁1通过螺栓连接; The middle part between the vertical beams 2 on the long sides of the rectangular bottom beam 1 is provided with an intermediate module 4 as shown in Figure 1, and the left and right ends of the intermediate module 4 are connected with tail end modules 5 by bolts. 5 is connected to the vertical beam 2 by bolts; the middle module 4 and the end module 5 are respectively connected to the rectangular bottom beam 1 by bolts;
所述的中间模块4是由如图3和图4所示的多个贝雷架6通过螺栓连接起来组成的模块通道;所述的尾端模块5是由如图5所示的方钢焊接而成的框架通道; The middle module 4 is a module channel composed of a plurality of Bailey frames 6 as shown in Fig. 3 and Fig. 4 connected by bolts; the tail end module 5 is welded by square steel as shown in Fig. 5 The frame channel formed;
本实施例中悬索桥猫道横向通道装置整体结构在加工厂进行预先加工拼装处理,在现场的时候只需要将中间模块和尾端模块通过采用栓接、销接的方式固定到指定的位置上,相对于目前的连接方式,不需要焊接,从而大幅度提高作业效率;与常规的钢管和方钢管焊接结构相比省去了大量的焊接、拼装工序从而节约工期;在横向通道拆除后只需要解除中间模块与尾端模块的栓接,即可回收贝雷架,周转到下一个施工使用;综合贝雷架结构式从其加工效率,原材料节约,工期节约,原材料回收再利用,也会大幅缩减成本。 In this embodiment, the overall structure of the catwalk transverse channel device of the suspension bridge is pre-processed and assembled in the processing plant, and only the middle module and the end module need to be fixed to the designated position by means of bolting and pinning at the scene. Compared with the current connection method, no welding is required, which greatly improves the working efficiency; compared with the conventional steel pipe and square steel pipe welding structure, it saves a lot of welding and assembly processes, thus saving the construction period; after the horizontal channel is removed, it only needs to be removed The bolted connection between the middle module and the end module can recycle the Bailey frame and turn it over to the next construction. The integrated Bailey frame structure will also greatly reduce the cost in terms of its processing efficiency, raw material saving, construction period saving, and raw material recycling and reuse. .
实施例2 Example 2
一种悬索桥猫道横向通道装置,如图2至少包括一长方形底梁1;所述的长方形底梁1上设有平台网面7;所述的平台网面7与长方形底梁1之间设有一平台垫片10;工作人员在猫道中工作更加的安全,提高了猫道的安全性能;所述的长方形底梁1的四角位置有与该长方形底梁1垂直的垂直梁2;所述的该垂直梁2与长方形底梁1的通过设在底梁下端面的U形卡3固定连接;长方形底梁1的端部与垂直梁2的顶部固定连接有拉杆8,增加猫道的可靠性; A suspension bridge catwalk transverse channel device, as shown in Figure 2, at least includes a rectangular bottom beam 1; the rectangular bottom beam 1 is provided with a platform mesh surface 7; between the described platform mesh surface 7 and the rectangular bottom beam 1 There is a platform gasket 10; it is safer for the staff to work in the catwalk, which improves the safety performance of the catwalk; the four corners of the rectangular bottom beam 1 have vertical beams 2 perpendicular to the rectangular bottom beam 1; The vertical beam 2 is fixedly connected with the rectangular bottom beam 1 through the U-shaped clip 3 arranged on the lower end surface of the bottom beam; the end of the rectangular bottom beam 1 is fixedly connected with the top of the vertical beam 2 with a tie rod 8 to increase the reliability of the catwalk ;
所述的长方形底梁1长边上的垂直梁2之间的中部设有如图1所述的中间模块4,该中间模块4的左右两端通过螺栓连接有尾端模块5,该尾端模块5与垂直梁2通过螺栓连接;所述的中间模块4和尾端模块5分别与长方形底梁1通过螺栓连接; The middle part between the vertical beams 2 on the long sides of the rectangular bottom beam 1 is provided with an intermediate module 4 as shown in Figure 1, and the left and right ends of the intermediate module 4 are connected with tail end modules 5 by bolts. 5 is connected to the vertical beam 2 by bolts; the middle module 4 and the end module 5 are respectively connected to the rectangular bottom beam 1 by bolts;
所述的中间模块4是由如图3和图4所示的多个贝雷架6通过螺栓连接起来组成的模块通道;猫道横向通道装置在加工厂进行加工制造。中间模块4采用贝雷架6式构造,长度为18m,宽度为1.5m,高为1.4m。由6组长度为3m的贝雷架组成;每组贝雷架由一个花架11进行栓接,每组贝雷架连接处栓接一根长度为2.6m型号为工字梁10; The middle module 4 is a modular channel formed by connecting a plurality of Bailey frames 6 as shown in Fig. 3 and Fig. 4 by bolts; the catwalk transverse channel device is processed and manufactured in a processing plant. The middle module 4 adopts a Bailey frame 6 structure with a length of 18m, a width of 1.5m and a height of 1.4m. It consists of 6 groups of 3m-long bayley frames; each group of bayley frames is bolted by a flower frame 11, and each group of bayley frames is bolted to a 2.6-m-long type I-beam 10;
所述的尾端模块5是由如图5所示的方钢焊接而成的框架通道。尾端模块5由方钢管组焊拼装,横梁的方钢管采用材质为Q235型号120×120×4mm的方钢管其余杆件均采用材质Q235型号80×80×3mm的方钢管。尾端模块5宽度为1.5m高为1.4m,杆件1长度7m,杆件6长度为6.5m。尾端模块上面需要焊接滑车装置和吊耳。尾端模块加工过程注意焊接工艺,焊缝焊脚高度均为6mm; The tail end module 5 is a frame channel welded by square steel as shown in FIG. 5 . The tail end module 5 is welded and assembled by square steel pipes. The square steel pipes of the beams are made of square steel pipes of Q235 type 120×120×4mm. The end module 5 has a width of 1.5m and a height of 1.4m, the length of the rod 1 is 7m, and the length of the rod 6 is 6.5m. The pulley device and lifting lugs need to be welded on the end module. Pay attention to the welding process during the processing of the tail module, and the height of the weld leg is 6mm;
本桥横向通道中间模块4为贝雷架3接够,由于尾端模块5需要与猫道承重绳进行连接,需要焊接移动滑车,贝雷架不能进行焊接故,尾端模块改为方钢管焊接模式,以便于与猫道承重绳连接,如图5所示;11#月24#方钢管为120×120×4mm;12#~23#采用80×80×3mm的方钢管,方钢管之间均为焊接模式。 The middle module 4 of the transverse channel of this bridge is connected to the Bailey frame 3. Since the end module 5 needs to be connected with the load-bearing rope of the catwalk, the mobile tackle needs to be welded, and the Bailey frame cannot be welded. Therefore, the tail module is changed to square steel pipe welding. 11# and 24# square steel pipes are 120×120×4mm; 12#~23# use 80×80×3mm square steel pipes, and the square steel pipes between Both are welding mode.
本实施例中悬索桥猫道横向通道装置整体结构在加工厂进行预先加工拼装处理,在现场的时候只需要将中间模块和尾端模块通过采用栓接、销接的方式固定到指定的位置上,相对于目前的连接方式,不需要焊接,从而大幅度提高作业效率;与常规的钢管和方钢管焊接结构相比省去了大量的焊接、拼装工序从而节约工期;在横向通道拆除后只需要解除中间模块与尾端模块的栓接,即可回收贝雷架,周转到下一个施工使用;综合贝雷架结构式从其加工效率,原材料节约,工期节约,原材料回收再利用,也会大幅缩减成本。 In this embodiment, the overall structure of the catwalk transverse channel device of the suspension bridge is pre-processed and assembled in the processing plant, and only the middle module and the tail end module need to be fixed to the designated position by means of bolting and pinning at the scene. Compared with the current connection method, no welding is required, which greatly improves the working efficiency; compared with the conventional steel pipe and square steel pipe welding structure, it saves a lot of welding and assembly processes, thus saving the construction period; after the horizontal channel is removed, it only needs to be removed The bolted connection between the middle module and the end module can recycle the Bailey frame and turn it over to the next construction. The integrated Bailey frame structure will also greatly reduce the cost in terms of its processing efficiency, raw material saving, construction period saving, and raw material recycling and reuse. .
以上例举仅仅是对本实用新型的举例说明,并不构成对本实用新型的保护范围的限制,凡是与本实用新型相同或相似的设计均属于本实用新型的保护范围之内。 The above examples are only illustrations of the utility model, and do not constitute a limitation to the protection scope of the utility model. All designs identical or similar to the utility model all belong to the protection scope of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620173951.3U CN205421029U (en) | 2016-03-08 | 2016-03-08 | Horizontal channel device of suspension bridge catwalk |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620173951.3U CN205421029U (en) | 2016-03-08 | 2016-03-08 | Horizontal channel device of suspension bridge catwalk |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205421029U true CN205421029U (en) | 2016-08-03 |
Family
ID=56534133
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620173951.3U Expired - Fee Related CN205421029U (en) | 2016-03-08 | 2016-03-08 | Horizontal channel device of suspension bridge catwalk |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205421029U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116770721A (en) * | 2023-06-21 | 2023-09-19 | 中铁大桥局集团有限公司 | Catwalk arrangement method for four main cable suspension bridges with different sagging degrees |
| CN117230726A (en) * | 2023-10-20 | 2023-12-15 | 中铁大桥局集团有限公司 | A catwalk transverse overpass suitable for space cable suspension bridges |
| CN117536100A (en) * | 2022-08-02 | 2024-02-09 | 中交第二公路工程局有限公司 | Suspension bridge catwalk variable-angle transverse channel bracket device and use method |
-
2016
- 2016-03-08 CN CN201620173951.3U patent/CN205421029U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117536100A (en) * | 2022-08-02 | 2024-02-09 | 中交第二公路工程局有限公司 | Suspension bridge catwalk variable-angle transverse channel bracket device and use method |
| CN116770721A (en) * | 2023-06-21 | 2023-09-19 | 中铁大桥局集团有限公司 | Catwalk arrangement method for four main cable suspension bridges with different sagging degrees |
| CN117230726A (en) * | 2023-10-20 | 2023-12-15 | 中铁大桥局集团有限公司 | A catwalk transverse overpass suitable for space cable suspension bridges |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103669832B (en) | A kind of standard type Bailey bracket assembled jacking formwork system | |
| CN202755634U (en) | Suspension type operational platform | |
| CN102433888B (en) | Assembled steel bushing box | |
| CN205421029U (en) | Horizontal channel device of suspension bridge catwalk | |
| CN105926917B (en) | Steel structure cornices exterior trim surface construction suspension platform and its building method and method for dismounting | |
| CN111648229A (en) | Assembled hoop platform for cover beam construction and installation method thereof | |
| CN209799400U (en) | A multi-functional pier column steel bar binding tire frame | |
| CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
| CN205857660U (en) | Steel structure cornices exterior finish construction suspension platform | |
| CN106758862A (en) | Lattice tubular tower and frame pacifies, tears platform open | |
| CN102913007B (en) | Steel reinforcement processing shed and construction method therefor | |
| CN210857934U (en) | Cage type scaffold | |
| CN218880592U (en) | An integrated platform for construction and protection of cover beams | |
| CN116025170B (en) | A device for tying and positioning steel bars of a horizontal beam on water in a wharf project and a construction method thereof | |
| CN102864746A (en) | Bearing frame for bridge construction | |
| CN207794690U (en) | The assembled steel reinforced machining shed that can be had enough to meet the need | |
| CN207062787U (en) | Can Fast Installation remove maintenance construction platform | |
| CN213927412U (en) | Folding support operating platform | |
| CN205840289U (en) | A kind of suspension type vertical operating platform | |
| CN214939283U (en) | A pier body formwork safety protection operation platform | |
| CN211596431U (en) | Railway bridge pad stone construction operation protector | |
| CN206220547U (en) | A kind of operating platform for steel structure column installation | |
| CN203755178U (en) | Novel ultra-wide large-span specially-shaped steel arch bridge construction device | |
| CN211285306U (en) | A bridge hanging basket front upper operating platform | |
| CN202705932U (en) | T-beam reinforced hanger frame structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160803 |