CN205388371U - Heating device with vapor recovery function - Google Patents

Heating device with vapor recovery function Download PDF

Info

Publication number
CN205388371U
CN205388371U CN201620087185.9U CN201620087185U CN205388371U CN 205388371 U CN205388371 U CN 205388371U CN 201620087185 U CN201620087185 U CN 201620087185U CN 205388371 U CN205388371 U CN 205388371U
Authority
CN
China
Prior art keywords
water
heater
balanced reservoir
water tank
constant flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620087185.9U
Other languages
Chinese (zh)
Inventor
方雪勇
霍杰科
王永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Qinyuan Water Treatment Technology Co Ltd
Original Assignee
Zhejiang Qinyuan Water Treatment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Qinyuan Water Treatment Technology Co Ltd filed Critical Zhejiang Qinyuan Water Treatment Technology Co Ltd
Priority to CN201620087185.9U priority Critical patent/CN205388371U/en
Application granted granted Critical
Publication of CN205388371U publication Critical patent/CN205388371U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a heating device, the utility model discloses a heating device with vapor recovery function, it is including water tank (1) that connects gradually, balanced reservoir (4) and heater (2), water tank (1) and balanced reservoir (4) is connected through the constant flow pump, still including the controller that is used for controlling the constant flow pump function, be equipped with the level sensor who is connected and is used for surveying balanced reservoir (4) interior height of water level with the controller in balanced reservoir (4), still including fixing in inside condenser (3) of water tank (1), the upper end of condenser (3) is passed through steam conduit (31) and is connected with the upper end of heater (2), the lower extreme of condenser (3) is connected with water tank (1) through liquefaction water outlet pipe (32). The utility model discloses an installing vapor -recovery unit additional in heating device, improving on the one hand the raw water temperature of intaking, put forward the high pressure heater thermal velocity, on the other hand realizes the recycle of water resource, fully realizes energy -conserving purpose.

Description

There is the heater of Steam Recovery function
Technical field
This utility model relates to a kind of heater, has particularly related to a kind of heater with Steam Recovery function.
Background technology
On existing market, drinking equipment mode of heating mainly has two kinds, and one is to adopt stainless steel hot gallbladder, and another kind is without hot gallbladder quick-heating type.Adopting hot gallbladder mode of heating to tend to produce water, thousand boiling water, affect the healthy of people, the heating repeatedly that water is frequent, is also the performance of the waste energy.Adopt the mode leaving water temperature without hot gallbladder speed heat high, speed is fast, namely burn namely drink without waiting for, water quality is fresh, does not heat in the process not used, energy-conservation, but owing to its quick-heating type power is at more than 6000W, substantial amounts of steam can be produced in the process of heating, cause the waste of a large amount of steam energy, also have impact on attractive in appearance, equipment water yield is also had a certain impact.
Summary of the invention
This utility model is for problem for a large amount of steam energy being caused to waste without hot gallbladder quick-heating type heater in prior art, it is provided that a kind of heater with Steam Recovery function.
In order to solve above-mentioned technical problem, this utility model is addressed by following technical proposals:
There is the heater of Steam Recovery function, including the water tank being sequentially connected with by pipeline, balanced reservoir and heater, water tank and balanced reservoir are connected by the first constant flow pump, also include the controller for controlling the first constant flow pump running, it is provided with in balanced reservoir and is connected with controller and for detecting the level sensor of height of water level in balanced reservoir, also include the condenser being fixed within water tank, the upper end of condenser is connected with the upper end of heater by jet chimney, and the lower end of condenser is connected with water tank by the water outlet pipe that liquefies.
As preferably, also including the timer being connected with controller, timer is for calculating for the first constant flow pump working time and the time signal of calculating being passed to controller, and controller controls the first constant flow pump running according to the time signal received.
As preferably, also including the balanced reservoir being connected with water tank, it is connected with the bottom of heater by balanced reservoir outlet pipe bottom balanced reservoir.
As preferably, liquefaction water outlet pipe is provided with the second constant flow pump.It is stable that second constant flow pump has output flow, and the feature that will not flow backwards, so that the water that in condenser, liquefaction process produces can stably flow in water tank, it is achieved the recycling of water resource.
As preferably, water tank is provided with tank inlet pipe and radiator drain, tank inlet pipe and be respectively equipped with entering water electromagnetic valve on radiator drain and go out water solenoid valve.
This utility model, owing to have employed above technical scheme, has significant technique effect:
This utility model, by installing vapour-recovery unit in heater additional, improves former water inflow temperature on the one hand, improves firing rate, realizes the recycling of water resource on the other hand, fully realizes energy-conservation purpose.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment 1.
The toponym that in accompanying drawing, each number designation refers to is as follows: 1 water tank, 2 heaters, 3 condensers, 4 balanced reservoirs, 5 second constant flow pumps, 11 tank inlet pipes, 12 radiator drains, 13 entering water electromagnetic valves, 14 go out water solenoid valve, 31 jet chimneys, 32 liquefaction water outlet pipe, 41 balanced reservoir outlet pipes.
Detailed description of the invention
Below in conjunction with accompanying drawing and embodiment, this utility model is described in further detail.
Embodiment 1
There is the heater of Steam Recovery function, as shown in Figure 1, including the water tank 1 being sequentially connected with by pipeline, balanced reservoir 4 and heater 2, water tank 1 and balanced reservoir 4 are connected by the first constant flow pump, it is connected with the bottom of heater 2 by balanced reservoir outlet pipe 41 bottom balanced reservoir 4, water tank 1 is provided with tank inlet pipe 11 and radiator drain 12, tank inlet pipe 11 and be respectively equipped with entering water electromagnetic valve 13 on radiator drain 12 and go out water solenoid valve 14.
Also include the controller for controlling the first constant flow pump running, be provided with in balanced reservoir 4 and be connected with controller and for detecting the level sensor of height of water level in balanced reservoir 4.nullIn operation,First former water enters in water tank through tank inlet pipe 11 through entering water electromagnetic valve 13,When needs are heated,Water in water tank 1 initially enters and enters in balanced reservoir 4 through the first constant flow pump,Then enter in heater 2 through balanced reservoir 4 and heat,Duty is remained at this process first constant flow pump,When occur heater 2 can not heating state in time time,Water in balanced reservoir 4 then can increase gradually,Thus causing that in balanced reservoir 4, water level raises,In water level elevation process, the level sensor in balanced reservoir is monitored height of water level in real time and the liquid level signal detected is passed to controller,When in balanced reservoir 4, water level is increased to certain position,Controller controls the first constant flow pump reversion according to the liquid level signal received,Water in balanced reservoir 4 is back in water tank,Ensure balanced reservoir 4 water level balance,Thus the periodic duty of whole system namely can be realized,Improve whole work efficiency.
Also including the condenser 3 being fixed within water tank 1, the upper end of condenser 3 is connected with the upper end of heater 2 by jet chimney 31, and the lower end of condenser 3 is connected with water tank 1 by the water outlet pipe 32 that liquefies, and liquefaction water outlet pipe 32 is provided with the second constant flow pump 5.
Heater 2 can produce substantial amounts of steam in the process of heating, therefore the present embodiment arranges a condenser 3 connected with heater 2 upper end in water tank 1, the steam produced in heater 2 rises, under the premise closing heater outlet pipe, steam in heater 2 is on the increase, and then it is pressed in jet chimney 31, and enter in condenser 3 by jet chimney 31, steam is liquefied collection in condenser 3.Owing to condenser 3 is fabricated to by rustless steel, and soak in water, good heat dissipation effect, therefore the heat that steam discharges in liquefaction process in condenser 3 can be directly passed to the former water in water tank 1, thus improving the temperature of water tank 1 Central Plains water, and the water that post liquefaction is formed, return in water tank 1 by the second constant flow pump 5, namely Steam Recovery is utilized by such circulation, add pyrogen coolant-temperature gage, preheat so that enter the former water of heating in heater 2, fully save heat time heating time, also eliminate a large amount of steam appearance effects to equipment simultaneously, reach energy-conservation purpose.
Embodiment 2
With embodiment 1, the difference is that also including the timer that is connected with controller, timer is for calculating for the first constant flow pump working time and the time signal of calculating being passed to controller, and controller controls the first constant flow pump according to the time signal received and operates.In operating process, first former water enters in water tank through entering water electromagnetic valve 13 through tank inlet pipe 11, when needs are heated, water in water tank 1 initially enters and enters in balanced reservoir 4 through the first constant flow pump, then enter in heater through balanced reservoir 4 and heat, when the first constant flow pump works the set time, timer transmits a time signal to controller, controller controls the first constant flow pump reversion according to the time signal received, the water in balanced reservoir 4 is made to be back in water tank 1, ensure balanced reservoir water level balance, thus the periodic duty of whole system namely can be realized, improve whole work efficiency.
Embodiment 3
With embodiment 1 or 2, institute the difference is that, receive in the time signal of timer or the liquid level signal of level sensor when controller any one time, all control the first constant flow pump reversion, the water in balanced reservoir is made to be back in water tank, ensure balanced reservoir water level balance, it is achieved the periodic duty of whole system, improve whole work efficiency.
In a word, the foregoing is only preferred embodiment of the present utility model, all equalizations made according to this utility model claim change and modify, and all should belong to the covering scope of this utility model patent.

Claims (5)

1. there is the heater of Steam Recovery function, including the water tank (1) being sequentially connected with by pipeline, balanced reservoir (4) and heater (2), it is characterized in that: water tank (1) and balanced reservoir (4) are connected by the first constant flow pump, also include the controller for controlling the first constant flow pump running, the level sensor being connected and for detecting balanced reservoir (4) interior height of water level it is provided with controller in balanced reservoir (4), also include being fixed on the condenser (3) that water tank (1) is internal, the upper end of condenser (3) is connected with the upper end of heater (2) by jet chimney (31), the lower end of condenser (3) is connected with water tank (1) by the water outlet pipe (32) that liquefies.
2. the heater with Steam Recovery function according to claim 1, it is characterized in that: also include the timer being connected with controller, timer is for calculating for the first constant flow pump working time and the time signal of calculating being passed to controller, and controller controls the first constant flow pump running according to the time signal received.
3. the heater with Steam Recovery function according to claim 1, it is characterised in that: balanced reservoir (4) bottom is connected with the bottom of heater (2) by balanced reservoir outlet pipe (41).
4. the heater with Steam Recovery function according to claim 1, it is characterised in that: liquefaction water outlet pipe (32) is provided with the second constant flow pump (5).
5. the heater with Steam Recovery function according to claim 1, it is characterized in that: water tank (1) is provided with tank inlet pipe (11) and radiator drain (12), tank inlet pipe (11) and be respectively equipped with entering water electromagnetic valve (13) on radiator drain (12) and go out water solenoid valve (14).
CN201620087185.9U 2016-01-28 2016-01-28 Heating device with vapor recovery function Active CN205388371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620087185.9U CN205388371U (en) 2016-01-28 2016-01-28 Heating device with vapor recovery function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620087185.9U CN205388371U (en) 2016-01-28 2016-01-28 Heating device with vapor recovery function

Publications (1)

Publication Number Publication Date
CN205388371U true CN205388371U (en) 2016-07-20

Family

ID=56383376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620087185.9U Active CN205388371U (en) 2016-01-28 2016-01-28 Heating device with vapor recovery function

Country Status (1)

Country Link
CN (1) CN205388371U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052116A (en) * 2016-08-15 2016-10-26 昆山市曙光照明器材有限公司 Heating device
CN106108664A (en) * 2016-08-25 2016-11-16 浙江沁园水处理科技有限公司 Integrated form water tank and use the pipeline type water dispenser of this integrated form water tank
CN108742134A (en) * 2018-06-21 2018-11-06 宁波云川环保科技有限公司 A kind of control method for hot water facility

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106052116A (en) * 2016-08-15 2016-10-26 昆山市曙光照明器材有限公司 Heating device
CN106108664A (en) * 2016-08-25 2016-11-16 浙江沁园水处理科技有限公司 Integrated form water tank and use the pipeline type water dispenser of this integrated form water tank
CN108742134A (en) * 2018-06-21 2018-11-06 宁波云川环保科技有限公司 A kind of control method for hot water facility

Similar Documents

Publication Publication Date Title
CN205388371U (en) Heating device with vapor recovery function
CN203704343U (en) Energy-saving bathing waste heat recovery water heater unit
CN205825411U (en) A kind of gas heater of band heating function
CN102538186B (en) Multi-functional electric hot water boiler
CN202083020U (en) Comprehensive heating system supplied with heat from solar ground heat source heat pump and gas direct-heating heater
CN207831641U (en) A kind of zero cold water gas heater system
CN207729833U (en) A kind of circulating heat pump water heater
CN106979547A (en) A kind of integrated hot-water heating system of multiple-energy-source
CN204629435U (en) A kind of conduction oil produces the thermostatically-controlled equipment of steam
CN201289151Y (en) Hot water heating apparatus by utilizing solar
CN203810975U (en) Waste heat recovery device for heating system
CN203489495U (en) Solar energy and ground source heat pump combined hot water supplying system
CN205448402U (en) Full -automatic cooling / heat and heating water system of direct -fired machine and solar energy coupling
CN206377834U (en) A kind of high-efficiency gas water heater
CN202757258U (en) Heat-pump water heater
CN202511455U (en) Thermal storage heat pump water heater
CN204511993U (en) A kind of boiler room feed water pump cooling water circulation utilization apparatus of energy-conserving and environment-protective
CN205678874U (en) Atmospheric energy-saving liquid fuel heater
CN205560935U (en) High building earth source heat pump water supply system
CN205261923U (en) Air can positive displacement hot -water heating system
CN204438511U (en) A kind of air source heat pump drinking device
CN201218591Y (en) Instant heating type water heater
CN204388185U (en) A kind of domestic type secondary heat exchange unit
CN207975720U (en) A kind of electric boiler and solar united use heating installation
CN204786724U (en) Hot -water heating system of carrying out heat exchange again with waste water after heat cooling pumps

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model