CN205348008U - Basket is hung in construction of wave form rigid web - Google Patents

Basket is hung in construction of wave form rigid web Download PDF

Info

Publication number
CN205348008U
CN205348008U CN201620054118.7U CN201620054118U CN205348008U CN 205348008 U CN205348008 U CN 205348008U CN 201620054118 U CN201620054118 U CN 201620054118U CN 205348008 U CN205348008 U CN 205348008U
Authority
CN
China
Prior art keywords
hanging basket
corrugated
rigid web
corrugated rigid
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620054118.7U
Other languages
Chinese (zh)
Inventor
刘扬
张海萍
邓扬
江楠
黄海珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201620054118.7U priority Critical patent/CN205348008U/en
Application granted granted Critical
Publication of CN205348008U publication Critical patent/CN205348008U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种波形刚腹板施工挂篮。所述施工挂篮包括上梁组成,下梁组成,以及连接上梁组成和下梁组成的多组吊杆;所述下梁组成之上设有底板底模板和底板侧模板,所述上梁组成通过两组支撑梁支撑在两块所述的波形刚腹板顶端面上,所述支撑梁与波形刚腹板的顶端之间设有顶推装置;所述上梁组成之上设有顶板底模板;所述波形刚腹板两侧均设有水平布置的滑梁,该滑梁上装有运送所述底板底模板、底板侧模板和顶板底模板至待浇位置的输送装置。本实用新型可以有效地降低挂篮的自重、提高挂篮的安全系数和加快施工效率。

The utility model discloses a corrugated steel web construction hanging basket. The construction hanging basket includes an upper beam component, a lower beam component, and a plurality of suspension rods connecting the upper beam component and the lower beam component; a bottom plate bottom template and a bottom plate side template are arranged on the lower beam component, and the upper beam component is supported on the top surfaces of two corrugated steel webs by two groups of support beams, and a jacking device is arranged between the support beam and the top of the corrugated steel web; a top plate bottom template is arranged on the upper beam component; horizontally arranged sliding beams are arranged on both sides of the corrugated steel web, and a conveying device for conveying the bottom plate bottom template, the bottom plate side template and the top plate bottom template to the position to be poured is installed on the sliding beam. The utility model can effectively reduce the dead weight of the hanging basket, improve the safety factor of the hanging basket and accelerate the construction efficiency.

Description

一种波形刚腹板施工挂篮A corrugated rigid web construction hanging basket

技术领域 technical field

本实用新型涉及一种波形刚腹板施工挂篮,尤其涉及一种用于PC梁波形刚腹板施工的挂篮结构及其施工工艺,属于组合梁技术领域。 The utility model relates to a construction hanging basket with corrugated rigid webs, in particular to a hanging basket structure and construction technology for the construction of corrugated rigid webs of PC beams, belonging to the technical field of composite beams.

背景技术 Background technique

随着连续箱梁桥腹板开裂问题的日益增多,波形刚腹板桥开始逐步推广应用。具有结构质量轻、腹板开裂病害少和经济性能高等优点。但其施工工艺相比较普通挂篮的施工工艺而言,其浇筑工艺由底板、腹板和顶板同时浇筑分离成了安装腹板、浇筑底板和浇筑顶板三个工况。若按照常规的挂篮工艺施工则明显降低了施工速率。 With the increasing web cracking problems of continuous box girder bridges, corrugated rigid web bridges have been gradually popularized and applied. It has the advantages of light structure, less web cracking and disease, and high economic performance. However, compared with the construction technology of ordinary hanging baskets, its construction technology is separated from the simultaneous pouring of the bottom plate, web and top plate into three working conditions of installing the web, pouring the bottom plate and pouring the top plate. If the construction is carried out according to the conventional hanging basket technology, the construction speed will be significantly reduced.

实用新型内容 Utility model content

为了解决现有挂篮不能满足波形刚腹板桥梁三个工作面同时施工的问题,本实用新型旨在提供一种波形刚腹板施工挂篮,该施工挂篮可以有效地降低挂篮的自重、提高挂篮的安全系数和加快施工效率。 In order to solve the problem that the existing hanging basket cannot satisfy the simultaneous construction of the three working faces of the bridge with corrugated rigid web, the utility model aims to provide a construction hanging basket with corrugated rigid web, which can effectively reduce the weight of the hanging basket , Improve the safety factor of the hanging basket and speed up the construction efficiency.

为了实现上述目的,本实用新型所采用的技术方案是: In order to achieve the above object, the technical solution adopted in the utility model is:

一种波形刚腹板施工挂篮,其结构特点是,包括上梁组成,下梁组成,以及连接上梁组成和下梁组成的多组吊杆;所述下梁组成之上设有底板底模板和底板侧模板,所述上梁组成通过两组支撑梁支撑在两块所述的波形刚腹板顶端面上,所述支撑梁与波形刚腹板的顶端之间设有用于驱动支撑梁和上梁组成相对所述波形刚腹板滑动的顶推装置;所述上梁组成之上设有顶板底模板,所述波形刚腹板两侧均设有水平布置的滑梁,该滑梁上装有运送所述底板底模板、底板侧模板和顶板底模板至待浇位置的输送装置。 A construction hanging basket with corrugated rigid web, its structural feature is that it comprises an upper beam, a lower beam, and multiple sets of suspenders connecting the upper beam and the lower beam; the lower beam is provided with a bottom plate The formwork and the bottom plate side formwork, the upper beam is supported on the top surface of the two corrugated rigid webs by two sets of support beams, and there is a supporting beam for driving between the support beams and the top of the corrugated rigid webs and the upper beam to form a thrusting device that slides relative to the corrugated rigid web; the upper beam is composed of a roof and a bottom formwork, and both sides of the corrugated rigid web are provided with horizontally arranged sliding beams. The top is equipped with a conveying device for transporting the bottom formwork of the bottom plate, the side formwork of the bottom plate and the bottom formwork of the top plate to the position to be poured.

施工过程中,所述底板底模板和底板侧模板之间围成底板混凝土的浇筑区域,顶板底模板上形成顶板混凝土的浇筑区域,所述波形刚腹板的底端设置在底板混凝土的浇筑区域内。 During the construction process, the pouring area of the bottom slab concrete is enclosed between the bottom formwork of the bottom slab and the side formwork of the bottom slab, the pouring area of the top slab concrete is formed on the bottom slab bottom formwork, and the bottom end of the corrugated rigid web is arranged in the pouring area of the bottom slab concrete Inside.

根据本实用新型的实施例,还可以对本实用新型作进一步的优化,以下为优化后形成的技术方案: According to the embodiments of the present invention, the present invention can also be further optimized, and the following is the technical scheme formed after optimization:

所述波形刚腹板的顶端设有沿长度方向设置的凹槽,在凹槽的侧壁上开有多个贯穿孔,所述支撑梁的底端通过穿过相应贯穿孔的紧固件或销轴可拆卸地固定在波形刚腹板上。 The top of the corrugated rigid web is provided with a groove along the length direction, and a plurality of through holes are opened on the side wall of the groove, and the bottom end of the support beam is passed through the fastener or through the corresponding through hole. The pin shaft is detachably fixed on the corrugated rigid web.

所述凹槽槽底与支撑梁的底端之间设有四氟滑板。由此,支点与波形刚腹板顶板滑槽接触部位垫设四氟滑板,更优选地,挂篮行走时在行走船与轨道表面之间涂抹黄油,减少摩擦,便于挂篮行走。 A PTFE sliding plate is arranged between the bottom of the groove and the bottom end of the support beam. Thus, the fulcrum and the corrugated rigid web top plate chute are padded with PTFE slides. More preferably, when the hanging basket is walking, grease is applied between the walking boat and the surface of the track to reduce friction and facilitate hanging basket walking.

所述两块波形刚腹板之间通过支撑杆横撑相连。 The two corrugated rigid webs are connected through support rod cross braces.

所述输送装置为运输小车,所述滑梁通过可升降吊杆吊挂在已浇筑成型的顶板上。 The conveying device is a transport trolley, and the sliding beam is hung on the poured roof through a liftable suspender.

每块波形刚腹板的底部侧壁上具有向两侧延伸的凸起结构。 The bottom side wall of each corrugated rigid web has convex structures extending to both sides.

所述顶推装置为液压杆,该液压杆的安装角度相对水平面为5°-15°。 The pushing device is a hydraulic rod, and the installation angle of the hydraulic rod is 5°-15° relative to the horizontal plane.

所述吊杆包括千斤顶,千斤顶为双螺帽结构,其中上螺帽用于顶升,下螺帽用于承重。由此,挂篮使用千斤顶的地方都设计了双螺帽,上螺帽作顶升用,下螺帽作承重用。顶升后一定要将下螺帽拧紧行走方法为一头铰接锚固在挂篮后支点上,通过电动油泵供油,达到行程后利用钢销将另一头铰接锚固在波形钢腹板开孔钢板φ60贯穿孔上,电动油泵回油,液压杆牵引后支点滑动带动整个挂篮前进,达到一个行程后,将贯穿孔内钢销取下,液压站供油,达到行程后利用钢销再次锚固于贯穿孔上,重新推动液压杆,开始下一个行程动作,如此往复几次直至最后就位。 The boom includes a jack, and the jack is a double-nut structure, wherein the upper nut is used for jacking up, and the lower nut is used for load bearing. Therefore, double nuts are designed where the hanging basket uses a jack, the upper nut is used for lifting, and the lower nut is used for load bearing. After jacking up, the lower nut must be tightened. The walking method is that one end is hinged and anchored on the rear fulcrum of the hanging basket, and the oil is supplied by the electric oil pump. After reaching the stroke, the other end is hinged and anchored to the corrugated steel web with a steel pin φ60 through the hole. On the hole, the electric oil pump returns the oil, and the fulcrum slides to drive the whole hanging basket forward after being pulled by the hydraulic rod. After reaching a stroke, the steel pin in the through hole is removed, and the hydraulic station supplies oil. After reaching the stroke, the steel pin is used to anchor the through hole again On, push the hydraulic rod again to start the next stroke, and so on and forth several times until finally in place.

藉由上述结构,吊挂提升系统由不同型号的千斤顶以及40cr和精轧螺纹钢两种吊杆组成。行走系统由液压杆作,上翼缘板凹槽,滑梁和滑梁组成。模板系统包括顶板模、底板模、封端模和工作平台等,所有模板设计均按全断面一次浇注箱梁砼考虑。 With the above structure, the hanging lifting system consists of different types of jacks and two types of booms: 40cr and precision-rolled rebar. The walking system is composed of hydraulic rods, upper flange grooves, sliding beams and sliding beams. The formwork system includes top plate formwork, bottom plate formwork, end-sealing formwork and working platform, etc. All formwork designs are considered according to the one-time pouring of box girder concrete for the full section.

作为优选,挂篮利用波形钢腹板作为主纵梁,结构体系由常规挂篮的悬臂体系转变为简支体系,取消了纵梁及后锚体系,支点在波形钢腹板上翼缘钢板凹槽内滑动,取消了轨道,从而有效地减少挂篮的自重及梁体预留眼孔,又能确保挂篮前进时的安全。 As a preference, the hanging basket uses the corrugated steel web as the main longitudinal beam, and the structural system changes from the cantilever system of the conventional hanging basket to a simply supported system, canceling the longitudinal beam and the rear anchor system, and the fulcrum is on the corrugated steel web. Sliding in the groove eliminates the track, thereby effectively reducing the weight of the hanging basket and the reserved eyeholes of the beam body, and ensuring the safety of the hanging basket when it moves forward.

作为优选,波形钢腹板下沿与底板混凝土为埋入式连接,下沿受力不利的特点,在波形钢腹板下沿增加钢板,钢板与波形钢腹板采取双面贴脚焊连接,同时在左右两波形钢腹板间设置临时支架横撑,确保波形钢腹板的纵向及横向刚度。 As an optimization, the lower edge of the corrugated steel web is embedded with the concrete floor, and the lower edge is unfavorable for force. A steel plate is added to the lower edge of the corrugated steel web. The steel plate and the corrugated steel web are connected by double-sided foot welding. At the same time, temporary support cross braces are set between the left and right corrugated steel webs to ensure the longitudinal and transverse rigidity of the corrugated steel webs.

作为优选,模板两侧设置两类横向支撑,杆系类支撑确保模板安装精度,桁架类支撑提高悬臂口的抗扭转性。 As a preference, two types of lateral supports are provided on both sides of the formwork. The rod-type support ensures the installation accuracy of the formwork, and the truss-type support improves the torsion resistance of the cantilever opening.

作为优选,所有锚固用的精轧螺纹钢应进行预拉合格后方能使用,施工中应采取保护措施严防电火花触及,以及弯折,同时不得碰撞。所有的锚杆及精轧螺纹钢必须露出螺帽三丝以上。凡用连接套的地方,必须用红油漆作好标记,以保证锚固长度相等。 As a preference, all finish-rolled rebars used for anchoring should be pre-tensioned before they can be used. During construction, protective measures should be taken to prevent electric sparks from touching, bending, and collisions. All anchor rods and finish-rolled rebar must expose more than three wires of the nut. Where connecting sleeves are used, they must be marked with red paint to ensure that the anchorage lengths are equal.

作为优选,在滑梁上固定安装工字梁,在工字梁上安装顶模板,增加了施工工作断面。 Preferably, the I-beam is fixedly installed on the sliding beam, and the top formwork is installed on the I-beam, which increases the construction work section.

作为优选,在挂篮体系转换时都必须注意对称卸载,并逐级加载至能转动锁紧螺母放松吊杆即可,以避免产生偏载或过大的附加荷载。 As a preference, it is necessary to pay attention to symmetrical unloading when the hanging basket system is converted, and to load step by step until the lock nut can be turned to loosen the suspender, so as to avoid partial load or excessive additional load.

工作时,将挂篮的固定支点安置在拼装完的波形刚腹板,将销轴铰接锚固在波形钢腹板开孔钢板贯穿孔上作为顶推动力,并在波形刚腹板滑槽内设置四氟滑板。在后锚点和中锚点之间设置滑梁,并在滑梁上架设支撑和模板。在刚腹板之间设置两类临时支撑构件。 When working, the fixed fulcrum of the hanging basket is placed on the assembled corrugated rigid web, and the pin shaft is hinged and anchored on the perforated steel plate through hole of the corrugated steel web as the jacking force, and is set in the corrugated rigid web chute. PTFE skateboard. Set the sliding beam between the rear anchor point and the middle anchor point, and erect the support and formwork on the sliding beam. Two types of temporary support members are set between the rigid webs.

与现有技术相比,本实用新型的有益效果是:本实用新型的挂篮施工装置将挂篮直接架设于波形刚腹板上,相比传统挂篮施工装置删减了菱形或三角形悬臂构件,减轻了挂篮的总质量,提高了挂篮的抗倾覆安全系数。同时新型挂篮结构能够使得结构具有更大的工作空间。将悬臂施工工作面分为了m块段工作面(浇筑顶板),m+1块段工作面(浇筑底板),m+2块段工作面(悬拼挂篮)。使得施工速率提高35%以上。 Compared with the prior art, the beneficial effect of the utility model is that the hanging basket construction device of the utility model erects the hanging basket directly on the corrugated rigid web, and deletes the diamond-shaped or triangular cantilever components compared with the traditional hanging basket construction device , which reduces the total mass of the hanging basket and improves the anti-overturning safety factor of the hanging basket. At the same time, the new hanging basket structure can make the structure have a larger working space. The cantilever construction working face is divided into m block working face (pouring roof), m+1 block working face (pouring bottom plate), and m+2 block working face (hanging basket). Make the construction speed increased by more than 35%.

以下结合附图和实施例对本实用新型作进一步阐述。 Below in conjunction with accompanying drawing and embodiment the utility model is described further.

附图说明 Description of drawings

图1为本实用新型为波形刚腹板挂篮的结构立面图; Fig. 1 is the structural elevation view of the corrugated rigid web hanging basket of the utility model;

图2为本实用新型的结构原理图; Fig. 2 is the structural principle diagram of the present utility model;

图3是图2的右视图; Fig. 3 is the right view of Fig. 2;

图4为波形刚腹板顶进设备图; Figure 4 is a diagram of the corrugated rigid web jacking equipment;

图5为滑梁结构示意图; Fig. 5 is the schematic diagram of sliding beam structure;

图6为波形刚腹板结构示意图; Fig. 6 is a structural schematic diagram of a corrugated rigid web;

图7是本实用新型一种实施例的施工流程图。 Fig. 7 is a construction flowchart of an embodiment of the utility model.

在图中 In the picture

1-上横梁;2-前支点吊杆;3-波形刚腹板;4-滑梁;5-后支点吊杆;6-中支点吊杆;7-施工平台护栏;8-下纵梁;9-A类横向支撑杆;10-B类支撑杆;11-顶板混凝土;12-液压杆;13-凹槽;14-四氟滑板;15-行走小车;16-支撑梁;17-上纵梁;18-下横梁;19-贯穿孔;20顶板底模板;21-底板底模板;22-底板侧模板;23-底板混凝土;24-施工平台;25-上纵梁。 1-upper beam; 2-front pivot boom; 3-corrugated rigid web; 4-sliding beam; 5-rear pivot boom; 6-middle pivot boom; 7-construction platform guardrail; 8-lower longitudinal beam; 9-type A horizontal support rod; 10-type B support rod; 11-roof concrete; 12-hydraulic rod; 13-groove; Beam; 18-lower beam; 19-through hole; 20 roof bottom formwork; 21-bottom plate bottom formwork; 22-bottom plate side formwork; 23-bottom slab concrete; 24-construction platform;

具体实施方式 detailed description

一种波形刚腹板吊挂式施工挂篮,如图1和2所示,主要由承重系统、吊挂提升系统、行走系统、模板系统组成,其中承重系统包括上横梁1、下纵梁8和波形刚腹板3;吊挂提升系统包括后支点吊杆5、中支点吊杆6、前支点吊杆2。行走系统包括液压杆12、设置在波形刚腹板3顶端的凹槽13,四氟滑板14、滑梁4和行走小车15;模板系统包括顶模板、底模板、封端模和工作平台。 A corrugated rigid web hanging type construction hanging basket, as shown in Figures 1 and 2, is mainly composed of a load-bearing system, a hanging lifting system, a walking system, and a formwork system, wherein the load-bearing system includes an upper beam 1 and a lower longitudinal beam 8 And corrugated just web 3; The walking system includes a hydraulic rod 12, a groove 13 arranged on the top of the corrugated rigid web 3, a PTFE slide plate 14, a sliding beam 4 and a walking trolley 15; the formwork system includes a top formwork, a bottom formwork, a sealing formwork and a working platform.

支撑梁嵌入波形刚腹板凹槽13内,螺纹钢筋横穿贯穿孔与支撑梁孔,螺栓锚固。使得支撑梁16固定在凹槽13内。由此,挂篮的支撑点锚固于波形刚腹板滑槽内,用螺栓连接波形刚腹板上缘板开孔与挂篮支点。在支撑梁16与凹槽13之间垫设四氟滑板14,凹槽13内涂抹黄油。波形刚腹板滑槽13内四氟滑板大于支点宽度10cm,且滑板边缘上翘角度为45°。 The support beam is embedded in the groove 13 of the corrugated rigid web, the threaded steel bar traverses the through hole and the support beam hole, and the bolts are anchored. The supporting beam 16 is fixed in the groove 13 . Thus, the supporting point of the hanging basket is anchored in the chute of the corrugated rigid web, and the opening of the upper plate of the corrugated rigid web and the fulcrum of the hanging basket are connected with bolts. A teflon slide plate 14 is laid between the support beam 16 and the groove 13, and grease is applied in the groove 13. The teflon slide plate in the corrugated rigid web chute 13 is larger than the width of the fulcrum by 10cm, and the upturn angle of the edge of the slide plate is 45°.

支撑梁16顶端焊接上纵梁17,25。在支撑梁16上搭设上横梁1,在上横梁1上用螺栓锚固中支点吊杆6上缘。中支点吊杆6下缘用螺栓锚固下横梁18。 The upper longitudinal beams 17 and 25 are welded to the top of the support beam 16 . On the supporting beam 16, the upper crossbeam 1 is set up, and on the upper crossbeam 1, the middle fulcrum suspender 6 upper edge is anchored with bolts. Middle fulcrum suspender rod 6 lower edges are anchored lower beam 18 with bolt.

后上横梁采用2I45b工字钢组成钢箱,前上横梁采用2I40b工字钢组成钢箱,两上横梁之间用2道2I25b工字钢纵梁连接形成挂篮承重平台。各个吊杆采用40Cr吊杆和φ32精轧螺纹钢吊杆两种,为了增加挂篮的通性,40Cr吊杆为3.5m、1.75m两种规格,全部采用连接器连接。在每个吊点处根据受力大小不同分别准备不同规格千斤顶作为提升动力,以便能及时快速调整模板标高,提高生产效率,缩短施工周期。 The rear upper beam is made of 2I45b I-shaped steel to form a steel box, the front upper beam is made of 2I40b I-shaped steel to form a steel box, and the two upper beams are connected by two 2I25b I-shaped steel longitudinal beams to form a hanging basket load-bearing platform. Each suspender adopts two types of 40Cr suspender and φ32 fine-rolled rebar suspender. In order to increase the connectivity of the hanging basket, the 40Cr suspender has two specifications of 3.5m and 1.75m, and all of them are connected by connectors. Jacks of different specifications are prepared at each lifting point as the lifting power according to the force, so that the elevation of the formwork can be adjusted quickly in time, the production efficiency can be improved, and the construction period can be shortened.

滑梁4平行架设于波形刚腹板3的两侧,由后支点吊杆5和中支点吊杆6固定所述滑梁4。滑梁由后支点和中支点固定,滑梁坡度应与箱梁顶部纵坡保持一致。在滑梁上等间距搭设横向工字钢,在工字钢上搭设刚模型。 The sliding beam 4 is erected on both sides of the corrugated rigid web 3 in parallel, and the sliding beam 4 is fixed by the rear fulcrum suspender 5 and the middle fulcrum suspender 6 . The sliding beam is fixed by the rear fulcrum and the middle fulcrum, and the slope of the sliding beam should be consistent with the longitudinal slope at the top of the box girder. Set up horizontal I-beams at equal intervals on the sliding beam, and set up rigid models on the I-beams.

相邻连续三个施工块段设置横向临时支撑,上缘和下缘临时支撑为一字型钢,中间为工字型型钢。 Three consecutive adjacent construction blocks are provided with lateral temporary supports, the upper and lower edge temporary supports are I-shaped steel, and the middle is I-shaped steel.

底板侧模板22用于控制底板混凝土浇筑厚度,施工平台24用于各阶段的施工。 The bottom plate side formwork 22 is used to control the concrete pouring thickness of the bottom plate, and the construction platform 24 is used for the construction of each stage.

利用波形刚腹板施工挂篮对箱梁进行施工的方法包括以下步骤:1)挂篮的拼装顺序为:安装波形钢腹板间临时支架→铺设四氟滑板轨道→安装挂篮前、后支点(临时稳固)→连接纵梁→前、后上横梁→吊杆→前、后下横梁→底纵梁→模板。 The method of constructing the box girder using the corrugated steel web construction hanging basket includes the following steps: 1) The assembly sequence of the hanging basket is: install the temporary support between the corrugated steel webs → lay the PTFE slide track → install the front and rear fulcrums of the hanging basket (Temporary stabilization) → connecting longitudinal beams → front and rear upper beams → booms → front and rear lower beams → bottom longitudinal beams → formwork.

2)松挂篮模板:在前一段箱梁顶板混凝土达到强度后,先松开顶板模,安装滑移小车,用千斤顶同步缓慢卸除滑梁的后吊杆将吊架受力传至滑移小车上,同时降低滑梁前锚固点、将模板缓慢剥离顶板混凝土,即完成顶板内外模拆卸。千斤顶同步依次缓慢降低前、后下横梁,将模板剥离底板砼,即完成底平台的拆卸和挂篮行走准备。 2) Loose hanging basket formwork: After the concrete on the top slab of the box girder in the previous section reaches its strength, loosen the top slab formwork first, install the sliding trolley, and use a jack to slowly and synchronously remove the rear hanger of the sliding beam to transmit the force of the hanger to the sliding On the trolley, lower the front anchor point of the sliding beam at the same time, slowly peel off the formwork from the roof concrete, and complete the removal of the inner and outer formwork of the roof. The jack synchronously and slowly lowers the front and rear lower beams sequentially, and the formwork is stripped of the bottom slab concrete, that is, the disassembly of the bottom platform and the preparation for walking of the hanging basket are completed.

3)挂篮前移:通过钢销将安装在后支点处的液压杆锚固于波形钢腹板开孔钢板上,利用2根液压杆同步缓慢牵引挂篮前移。 3) The hanging basket moves forward: the hydraulic rod installed at the rear fulcrum is anchored to the perforated steel plate of the corrugated steel web through the steel pin, and the two hydraulic rods are used to synchronously and slowly pull the hanging basket forward.

施工时,m+1块段临时支架上安装波形刚腹板3,由A类支撑9和B类支撑10控制波形钢腹板的安装精度。所述液压杆12的一端与波形刚腹板3的凹槽13侧壁上的贯穿孔19用螺栓拧紧,液压杆12的另一端插入支撑梁16的槽口内。施工时,电动油泵回油,液压杆12牵引后支点吊杆5滑动带动整个挂篮前进,达到一个行程后,将贯穿孔19内的钢销取下,液压站供油,达到行程后利用钢销再次将支撑梁16锚固于贯穿孔19上,重新启动液压杆12,开始下一个行程动作,如此往复几次直至推动挂篮前移至m+1块段处。 During construction, the corrugated steel web 3 is installed on the temporary support of block m+1, and the installation accuracy of the corrugated steel web is controlled by the A-type support 9 and the B-type support 10. One end of the hydraulic rod 12 is bolted to the through hole 19 on the side wall of the groove 13 of the corrugated rigid web 3 , and the other end of the hydraulic rod 12 is inserted into the notch of the support beam 16 . During construction, the electric oil pump returns oil, and the hydraulic rod 12 pulls the rear fulcrum boom 5 to slide to drive the whole hanging basket forward. After reaching a stroke, the steel pin in the through hole 19 is removed, and the hydraulic station supplies oil. The pin anchors the support beam 16 on the through hole 19 again, restarts the hydraulic rod 12, and starts the next stroke action, so reciprocates several times until the hanging basket is pushed forward to the m+1 block section.

施工过程中,运输小车15将顶板底模板20运送至待浇筑位置。待浇筑长度的滑梁4上设置焊接横向工字梁,并在工字梁上架设顶板底模板20。通过后支点吊杆5和中支点吊杆6调节滑梁4的倾角,使得顶板底模板20前端控制点达到立模高程。浇筑m块段的顶板混凝土时,同时调节后支点吊杆5和前支点吊杆2,使底板底模板21调整至控制高程。浇筑m+1块段底板混凝土,再在m+2块段架设临时支架,在支架上安装波形刚腹板3。 During the construction process, the transport trolley 15 transports the roof and bottom formwork 20 to the position to be poured. A welded transverse I-beam is arranged on the sliding beam 4 of the length to be poured, and a roof and bottom formwork 20 is erected on the I-beam. The inclination angle of the sliding beam 4 is adjusted through the rear fulcrum suspender 5 and the middle fulcrum suspender 6, so that the control point at the front end of the roof and bottom template 20 reaches the elevation of the formwork. When pouring the top slab concrete of the m block section, adjust the rear fulcrum suspender 5 and the front fulcrum suspender 2 at the same time, so that the base plate bottom template 21 is adjusted to the control elevation. Pour m+1 section bottom slab concrete, then set up temporary support in m+2 section, and install corrugated rigid web 3 on the support.

m块段顶板混凝土浇筑、m+1块段浇筑底板混凝土浇筑和m+2块段架设波形刚腹板安装施工断面错开同步进行。完成后,再进入下个循环施工步骤。 The concrete pouring of the top slab of the m block, the concrete pouring of the bottom slab of the m+1 block, and the installation and construction of the corrugated rigid web of the m+2 block are carried out synchronously. After completion, enter the next cycle construction step.

总之,本实用新型的挂篮结构直接架设于波形刚腹板滑槽上,由波形刚腹板承担挂篮、模板系统和施工临时荷载,无需设置悬臂工字钢和行走槽钢,减轻了挂篮结构的自重,增大了抗倾覆的安全系数。在波形刚腹板滑槽内设置四氟滑板,减少挂篮滑行摩擦,加快行走效率。该挂篮结构实现了扩展工作面的功能,将悬臂施工工作面分为了m块段工作面(浇筑顶板),m+1块段工作面(浇筑底板),m+2块段工作面(悬拼挂篮)。使得施工速率提高35%以上。 In a word, the hanging basket structure of the utility model is directly erected on the chute of the corrugated rigid web, and the corrugated rigid web bears the temporary load of the hanging basket, formwork system and construction, without setting cantilever I-beam and walking channel steel, which reduces the hanging load. The self-weight of the basket structure increases the safety factor against overturning. A PTFE slide plate is installed in the chute of the corrugated rigid web to reduce the sliding friction of the hanging basket and speed up the walking efficiency. The hanging basket structure realizes the function of expanding the working surface, and divides the cantilever construction working surface into m block working face (casting roof), m+1 block working face (pouring bottom plate), m+2 block working face (cantilever spell hanging basket). Make the construction speed increased by more than 35%.

上述实施例阐明的内容应当理解为这些实施例仅用于更清楚地说明本实用新型,而不用于限制本实用新型的范围,在阅读了本实用新型之后,本领域技术人员对本实用新型的各种等价形式的修改均落入本申请所附权利要求所限定的范围。 The above-mentioned embodiments should be understood that these embodiments are only used to illustrate the utility model more clearly, and are not intended to limit the scope of the utility model. After reading the utility model, those skilled in the art will understand each aspect of the utility model Modifications in various equivalent forms all fall within the scope defined by the appended claims of this application.

Claims (8)

1.一种波形刚腹板施工挂篮,其特征在于,包括上梁组成,下梁组成,以及连接上梁组成和下梁组成的多组吊杆;所述下梁组成之上设有底板底模板(21)和底板侧模板(22),所述上梁组成通过两组支撑梁(16)支撑在两块所述的波形刚腹板顶端面上,所述支撑梁(16)与波形刚腹板(3)的顶端之间设有用于驱动支撑梁(16)和上梁组成相对所述波形刚腹板滑动的顶推装置;所述上梁组成之上设有顶板底模板(20),所述波形刚腹板两侧均设有水平布置的滑梁(4),该滑梁(4)上装有运送所述底板底模板(21)、底板侧模板(22)和顶板底模板(20)至待浇位置的输送装置。 1. A corrugated rigid web construction hanging basket is characterized in that it comprises an upper beam composition, a lower beam composition, and a plurality of groups of suspender rods connecting the upper beam composition and the lower beam composition; the lower beam composition is provided with a base plate The bottom formwork (21) and the bottom plate side formwork (22), the upper beam is supported on the top surface of the two corrugated rigid webs by two sets of support beams (16), and the support beams (16) and corrugated The top of the rigid web (3) is provided with a pushing device for driving the support beam (16) and the upper beam composition to slide relative to the corrugated rigid web; the upper beam composition is provided with a top plate bottom formwork (20 ), both sides of the corrugated rigid web are provided with sliding beams (4) arranged horizontally, and the sliding beams (4) are equipped with bottom formwork (21), side formwork (22) and bottom formwork for transporting the bottom plate (20) Conveying device to the position to be poured. 2.根据权利要求1所述的波形刚腹板施工挂篮,其特征在于,所述波形刚腹板(3)的顶端设有沿长度方向设置的凹槽(13),在凹槽(13)的侧壁上开有多个贯穿孔(19),所述支撑梁(16)的底端通过穿过相应贯穿孔(19)的紧固件或销轴可拆卸地固定在波形刚腹板(3)上。 2. The construction hanging basket with corrugated rigid web according to claim 1, characterized in that, the top of the corrugated rigid web (3) is provided with a groove (13) arranged along the length direction, and in the groove (13 ) has a plurality of through holes (19) on the side wall, and the bottom end of the support beam (16) is detachably fixed to the corrugated rigid web through fasteners or pins passing through the corresponding through holes (19) (3) on. 3.根据权利要求2所述的波形刚腹板施工挂篮,其特征在于,所述凹槽(13)槽底与支撑梁(16)的底端之间设有四氟滑板(14)。 3. The construction hanging basket with corrugated rigid web according to claim 2, characterized in that a PTFE slide (14) is provided between the bottom of the groove (13) and the bottom of the support beam (16). 4.根据权利要求1所述的波形刚腹板施工挂篮,其特征在于,所述两块波形刚腹板(3)之间通过支撑杆横撑相连。 4 . The construction hanging basket with corrugated rigid webs according to claim 1 , characterized in that, the two corrugated rigid webs ( 3 ) are connected by cross braces of support rods. 5.根据权利要求1所述的波形刚腹板施工挂篮,其特征在于,所述输送装置为运输小车(15),所述滑梁(4)通过可升降吊杆吊挂在已浇筑成型的顶板上。 5. The corrugated rigid web construction hanging basket according to claim 1, characterized in that, the conveying device is a transport trolley (15), and the sliding beam (4) is hung on the poured and formed on the top plate. 6.根据权利要求1所述的波形刚腹板施工挂篮,其特征在于,每块波形刚腹板(3)的底部侧壁上具有向两侧延伸的凸起结构。 6. The construction hanging basket with corrugated rigid web according to claim 1, characterized in that, the bottom side wall of each corrugated rigid web (3) has a raised structure extending to both sides. 7.根据权利要求1所述的波形刚腹板施工挂篮,其特征在于,所述顶推装置为液压杆(12),该液压杆(12)的安装角度相对水平面为5°-15°。 7. The construction hanging basket with corrugated rigid web according to claim 1, characterized in that the pushing device is a hydraulic rod (12), and the installation angle of the hydraulic rod (12) is 5°-15° relative to the horizontal plane . 8.根据权利要求1所述的波形刚腹板施工挂篮,其特征在于,所述吊杆包括千斤顶,千斤顶为双螺帽结构,其中上螺帽用于顶升,下螺帽用于承重。 8. The corrugated rigid web construction hanging basket according to claim 1, wherein the suspension rod includes a jack, and the jack is a double-nut structure, wherein the upper nut is used for jacking up, and the lower nut is used for bearing .
CN201620054118.7U 2016-01-20 2016-01-20 Basket is hung in construction of wave form rigid web Expired - Fee Related CN205348008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620054118.7U CN205348008U (en) 2016-01-20 2016-01-20 Basket is hung in construction of wave form rigid web

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620054118.7U CN205348008U (en) 2016-01-20 2016-01-20 Basket is hung in construction of wave form rigid web

Publications (1)

Publication Number Publication Date
CN205348008U true CN205348008U (en) 2016-06-29

Family

ID=56181719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620054118.7U Expired - Fee Related CN205348008U (en) 2016-01-20 2016-01-20 Basket is hung in construction of wave form rigid web

Country Status (1)

Country Link
CN (1) CN205348008U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507165A (en) * 2016-01-20 2016-04-20 长沙理工大学 Hanging basket for corrugated steel web construction and construction process
CN112482197A (en) * 2020-12-04 2021-03-12 中铁七局集团有限公司 Corrugated steel web mounting structure suitable for asynchronous cradle construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507165A (en) * 2016-01-20 2016-04-20 长沙理工大学 Hanging basket for corrugated steel web construction and construction process
CN105507165B (en) * 2016-01-20 2017-02-22 长沙理工大学 Hanging basket for corrugated steel web construction and construction process
CN112482197A (en) * 2020-12-04 2021-03-12 中铁七局集团有限公司 Corrugated steel web mounting structure suitable for asynchronous cradle construction

Similar Documents

Publication Publication Date Title
CN105507165A (en) Hanging basket for corrugated steel web construction and construction process
CN102261039B (en) Integral thrusting construction method of network tied arch bridge
CN201826525U (en) Climbing shuttering system device for buildings
CN105735141B (en) A kind of box beam side form slide device and its construction method
CN108004927B (en) Double-limb triangular hanging basket and construction method for cantilever beam section of large-span continuous rigid frame bridge
CN204151823U (en) Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab
CN205840047U (en) A kind of precast shear wall novel perps attachment structure
CN103774749A (en) Large-span prestressed concrete F plate frame structure system
JP7429940B2 (en) Construction method of steel concrete main girder of cable-stayed bridge
CN203903834U (en) Internal-climbing tower crane
CN207244447U (en) Movable hanging basket for steel-concrete composite bridge
CN105648924A (en) Construction method of multi-span simply-supported steel truss girder bridge
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN203174515U (en) Self-propelled dual-running track triangular hanging basket
CN107419746A (en) A kind of mobile formwork system and its construction method
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN203393639U (en) Diamond self-anchored hanging basket for road and bridge construction
CN103321155B (en) Viaduct pier operation platform system and build this system and pour into a mould the method for bridge pier
CN205348008U (en) Basket is hung in construction of wave form rigid web
CN210341675U (en) Temporary support for steel bridge pushing floating-dragging construction
CN110656570A (en) A telescopic pedestrian bridge, construction device and construction method
CN107401125B (en) Traveling device of mobile trolley and using method
CN103866699A (en) Rail-free type walking hanging basket
CN103835369B (en) Extensible high-altitude conjoined steel structure
CN106088379A (en) A kind of BRB locking detrusion nodal point connecting and installation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629

Termination date: 20170120