CN205331121U - Hydraulic pressure pump test load valves - Google Patents

Hydraulic pressure pump test load valves Download PDF

Info

Publication number
CN205331121U
CN205331121U CN201521040239.8U CN201521040239U CN205331121U CN 205331121 U CN205331121 U CN 205331121U CN 201521040239 U CN201521040239 U CN 201521040239U CN 205331121 U CN205331121 U CN 205331121U
Authority
CN
China
Prior art keywords
valve
plug
pump
test
way plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521040239.8U
Other languages
Chinese (zh)
Inventor
李太杰
付江华
张虎
岑娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Dagang Road Machinery Co Ltd
Original Assignee
Xian Dagang Road Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Dagang Road Machinery Co Ltd filed Critical Xian Dagang Road Machinery Co Ltd
Priority to CN201521040239.8U priority Critical patent/CN205331121U/en
Application granted granted Critical
Publication of CN205331121U publication Critical patent/CN205331121U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reciprocating Pumps (AREA)

Abstract

The utility model provides a hydraulic pressure pump test load valves has mainly solved current test bench hydraulic system and only can test a hydraulic pump, simultaneously compatible open hydraulic pump and closed hydraulic pump's problem. Adopt the technical scheme of the utility model, having simplified test bench hydraulic system, having improved the measuring accuracy, the load test to open hydraulic pump and closed hydraulic pump can be realized to the hydraulic fluid port of connecting the load valves different, has solved former hydraulic pressure pump test bed load valves and can only make open pump test and can not make closed pump test, and closed pump test must have another set loading system's problem.

Description

Test-bed for pump charge valve group
Technical field
This utility model relates to a kind of hydraulic pump test charge valve group。
Background technology
At present, the measuring accuracy of testing stand hydraulic system is relatively low, and a kind of testing stand hydraulic system is only capable of a kind of hydraulic pump is tested, and carries out load test to opposite opened hydraulic pump respectively and closed type hydraulic pump, then needing two set testing stand hydraulic systems, the scope of application is narrow。
Summary of the invention
This utility model provides a kind of test-bed for pump charge valve group, mainly solves existing testing stand hydraulic system and is only capable of a kind of hydraulic pump is tested, it is impossible to the problem of compatible open hydraulic pump and closed type hydraulic pump simultaneously。
Concrete technical solution of the present utility model is as follows:
This test-bed for pump charge valve group includes plug-in mounting overflow valve and four two-way plug-in valves, described plug-in mounting overflow valve is connected with the control system controlling plug-in mounting overflow valve oil pressure relief, the outlet of plug-in mounting overflow valve is Leakage Energy hydraulic fluid port, the outlet of plug-in mounting overflow valve entrance and the 3rd two-way plug-in valve, the 4th two-way plug-in valve;The entrance of the 3rd two-way plug-in valve and the outlet of the first two-way plug-in valve;The entrance of the 4th two-way plug-in valve and the outlet of the second two-way plug-in valve;The entrance of the 3rd two-way plug-in valve and the entrance of the 4th two-way plug-in valve all as pump pressure oil inlet to be tested, can access again the entrance of the first two-way plug-in valve and the entrance of the second two-way plug-in valve after the leakage under high temperature oil cooling of plug-in mounting overflow valve。Four two-way plug-in valves define bridge shape oil return。
Described control system is made up of Solenoid ball valve, electricity proportional pressure control valve and relief valve。
The beneficial effects of the utility model are in that:
1, owing to have employed this technical scheme, simplify testing stand hydraulic system, improve measuring accuracy, connect the different hydraulic fluid port of charge valve group and can realize the load test of opposite opened hydraulic pump and closed type hydraulic pump, solve former hydraulic pump test stand charge valve group and can only make open type pump testing and can not make enclosed pump testing;Enclosed pump testing must have another set of loading system。
Detaching pipelines is not needed when testing pump difference outlet pressure and flow when 2, carrying out enclosed pump testing。
3, reduce the maloperation of operator, improve work efficiency。Decrease leakage and the waste of hydraulic oil。
Accompanying drawing explanation
Fig. 1 is open type pump testing schematic diagram;
Fig. 2 is enclosed pump testing schematic diagram;
Accompanying drawing is detailed as follows:
1, Solenoid ball valve;2, electricity proportional pressure control valve;3, relief valve;4, plug-in mounting overflow valve;5-1, the first two-way plug-in valve;5-2, the second two-way plug-in valve;5-3, the 3rd two-way plug-in valve;5-4, the 4th two-way plug-in valve;6, tested pump testing;7, radiator。
Detailed description of the invention
Below in conjunction with specific embodiment, this utility model is described in detail:
This test-bed for pump charge valve group is by four two-way plug-in valves, 2, relief valve of an electric proportional pressure control valve, 1, plug-in mounting overflow valve 4 integrated hydraulic loop of 3, Solenoid ball valve。
Wherein plug-in mounting overflow valve 4 is connected with the control system controlling plug-in mounting overflow valve oil pressure relief, and control system is made up of Solenoid ball valve 1, electricity proportional pressure control valve 2 and relief valve 3。
The outlet of plug-in mounting overflow valve is for revealing oil hydraulic fluid port, the outlet of plug-in mounting overflow valve entrance and the 3rd two-way plug-in valve 5-3, the 4th two-way plug-in valve 5-4;The entrance of the 3rd two-way plug-in valve 5-3 and the outlet of the first two-way plug-in valve 5-1;The entrance of the 4th two-way plug-in valve 5-4 and the outlet of the second two-way plug-in valve 5-1;The entrance of the 3rd two-way plug-in valve 5-3 and the entrance of the 4th two-way plug-in valve 5-4 are pump pressure oil inlet to be tested。
When utilizing the test-bed for pump charge valve group that this utility model provides to test, carry out in such a way respectively:
A. open type pump testing
During open type pump testing, the pressure oil of pump enters the A mouth of load-on module by the 4th two-way plug-in valve 5-4 entrance plug-in mounting overflow valve 4, constantly change the size of current of electricity proportional pressure control valve 2 thus changing the oil pressure relief of overflow valve, realize loading to hydraulic pump, direct oil sump tank after load-on module T1 mouth leakage under high temperature oil cooling out。
B. enclosed pump testing
During enclosed pump testing when the A mouth of pump is pressure oil side, hydraulic oil enters the A mouth of load-on module and enters plug-in mounting overflow valve 4 by the 4th two-way plug-in valve 5-4, constantly change the size of current of electricity proportional pressure control valve 2 thus changing the oil pressure relief of overflow valve, it is achieved the loading to hydraulic pump。
After load-on module T1 mouth leakage under high temperature oil cooling out, enter the first two-way plug-in valve 5-1 entrance by the T2 mouth of load-on module, enter low-pressure side B interruption-forming one circulation of enclosed pump from the outlet of the first two-way plug-in valve 5-1。
When the B mouth of pump is force feed side, hydraulic oil enters the B mouth of load-on module and enters plug-in mounting overflow valve 4 by the 3rd two-way plug-in valve 5-3, constantly changes the size of current of electricity proportional pressure control valve 2 thus changing the oil pressure relief of overflow valve, it is achieved the loading to hydraulic pump。
After load-on module T1 mouth leakage under high temperature oil cooling out, enter the second two-way plug-in valve 5-2 entrance by the T2 mouth of load-on module, enter low-pressure side A interruption-forming one circulation of enclosed pump from the outlet of the second two-way plug-in valve 5-2。

Claims (2)

1. a test-bed for pump charge valve group, it is characterized in that: include a plug-in mounting overflow valve and four two-way plug-in valves, described plug-in mounting overflow valve is connected with the control system controlling plug-in mounting overflow valve oil pressure relief, the outlet of plug-in mounting overflow valve is Leakage Energy hydraulic fluid port, the outlet of plug-in mounting overflow valve entrance and the 3rd two-way plug-in valve, the 4th two-way plug-in valve;The entrance of the 3rd two-way plug-in valve and the outlet of the first two-way plug-in valve;The entrance of the 4th two-way plug-in valve and the outlet of the second two-way plug-in valve;The entrance of the 3rd two-way plug-in valve and the entrance of the 4th two-way plug-in valve all can as pump pressure oil inlets to be tested;The entrance of the first two-way plug-in valve and the entrance of the second two-way plug-in valve is accessed after the leakage under high temperature oil cooling of described plug-in mounting overflow valve。
2. test-bed for pump charge valve group according to claim 1, it is characterised in that: described control system is made up of Solenoid ball valve, electricity proportional pressure control valve and relief valve。
CN201521040239.8U 2015-12-12 2015-12-12 Hydraulic pressure pump test load valves Expired - Fee Related CN205331121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521040239.8U CN205331121U (en) 2015-12-12 2015-12-12 Hydraulic pressure pump test load valves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521040239.8U CN205331121U (en) 2015-12-12 2015-12-12 Hydraulic pressure pump test load valves

Publications (1)

Publication Number Publication Date
CN205331121U true CN205331121U (en) 2016-06-22

Family

ID=56212675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521040239.8U Expired - Fee Related CN205331121U (en) 2015-12-12 2015-12-12 Hydraulic pressure pump test load valves

Country Status (1)

Country Link
CN (1) CN205331121U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194456A (en) * 2018-01-05 2018-06-22 宁波程锐液压科技有限公司 A kind of test valve group of Load sensing pump

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194456A (en) * 2018-01-05 2018-06-22 宁波程锐液压科技有限公司 A kind of test valve group of Load sensing pump
CN108194456B (en) * 2018-01-05 2020-08-28 宁波程锐液压科技有限公司 Test valve group of load sensing pump

Similar Documents

Publication Publication Date Title
CN102128717B (en) Valve test system
CN204286771U (en) A kind of engine piston cooling nozzle endurance quality simulated testing system
CN205331121U (en) Hydraulic pressure pump test load valves
CN105156403A (en) Automatic power recycling testing platform for hydraulic pump and hydraulic motor
CN201955224U (en) Valve test system
CN107605837A (en) Hydraulic system for loading test
CN202545211U (en) Hydraulic pump testing system capable of controlling oil liquid temperature
CN207297498U (en) Hydraulic system for loading test
CN203615081U (en) Pipeline pressure test device
CN202955068U (en) Pump control switching device of multi-way valve test-bed
CN202646237U (en) Oil source device for hydraulic system
CN202149102U (en) Novel test bed device of hydraulic valve
CN105545878A (en) Transient-pressure oil supply system for multi-way valve test stand
CN102213635B (en) Testing system for main valve leakage of hydraulic excavator
CN205190392U (en) Support cylinder hydraulic system of super large jumbo
CN103982489A (en) Modularized control device for testing hydraulic pump and hydraulic motor
CN205605542U (en) A pump test unit for multiple unit valve test bench
CN205190389U (en) Bolt hydro -cylinder system with self -locking function
CN203069333U (en) Cooler water leakage on-line detection device
CN208568170U (en) A kind of shared multichannel leakage tester of gas/liquid
CN209557385U (en) Hydraulic pump test platform
CN203362671U (en) Double-way priority valve group
CN203051313U (en) Hydraulic pressure station
CN206891865U (en) A kind of anchoring tester control system
CN206095614U (en) Solenoid valve single valve test fixture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20201212