CN205281245U - Three -dimensional hydropower construction uses management system based on visualization technology - Google Patents
Three -dimensional hydropower construction uses management system based on visualization technology Download PDFInfo
- Publication number
- CN205281245U CN205281245U CN201620031394.1U CN201620031394U CN205281245U CN 205281245 U CN205281245 U CN 205281245U CN 201620031394 U CN201620031394 U CN 201620031394U CN 205281245 U CN205281245 U CN 205281245U
- Authority
- CN
- China
- Prior art keywords
- construction
- visual
- management system
- dimensional
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 238000005516 engineering process Methods 0.000 title abstract description 7
- 238000012800 visualization Methods 0.000 title abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 15
- 238000007794 visualization technique Methods 0.000 claims description 7
- 230000000007 visual effect Effects 0.000 abstract description 11
- 238000000034 method Methods 0.000 abstract description 9
- 238000013461 design Methods 0.000 abstract description 6
- 238000012545 processing Methods 0.000 abstract description 4
- 238000004088 simulation Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000004870 electrical engineering Methods 0.000 abstract 2
- 238000006243 chemical reaction Methods 0.000 abstract 1
- 238000004891 communication Methods 0.000 abstract 1
- 238000011161 development Methods 0.000 description 3
- 238000005096 rolling process Methods 0.000 description 3
- 238000009430 construction management Methods 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a three -dimensional hydropower construction uses management system based on visualization technology utilizes computer graphics and image processing techniques, and become the figure or the image shows on the screen with data conversion, water electrical engineering is the characteristic through visual, parameterization, can carry out the simulation of building before realizing to carry out the virtual construction of design goal's check -up, the in -depth design of construction, virtual construction, great special engineering. Set up the BIM model through a minute bleed electrical engineering drawing, and the business datum that produces during related hydropower construction, can embody the construction progress in visual scene, construction quality, effects such as construction safety precaution, rethread and vehicle transportation monitored control system, the concrete rolls monitored control system, personnel positioning system realizes communication, can effectively show the vehicle, personnel's locating information, and pay close attention to the grinding quality condition in real time, provide decision support for construction dispatching, provide effective solution for visual construction.
Description
Technical field
The utility model relates to a kind of three-dimensional water power construction application management system, is specifically a kind of three-dimensional water power construction application management system based on visualization technique.
Background technology
Along with socioeconomic development, water resources is difficult to meet actual needs, and in order to obtain more water resources, we will rely on Hydraulic and Hydro-Power Engineering construction to meet our growing needs. Water conservancy and hydropower is cleaning renewable energy source, and its utilization is the product of social progress to present stage. Furtherly, along with the high speed development of China's economic society directly facilitates innovation and the development of Hydraulic and Hydro-Power Engineering, in Hydraulic and Hydro-Power Engineering process of construction, very crucial, extremely important effect is played in the innovation of the operating technique of water conservancy and hydropower. In Construction of Hydropower Engineering process of construction, it is bigger that the engineering construction period is longer, construction specialty is more, personnel change frequency so that the management of engineering construction is more difficult. The execution of construction management standard specifications, it is possible to promote project management level, reduces site construction management difficulty, but standard implementation application difficulty is bigger, it is difficult to implement.
Practical novel content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of three-dimensional water power construction application management system based on visualization technique at this; Utilize computer graphics and image processing techniques, data are converted figure to or image shows on screen, again by rolling supervisory system, personnel location system data corresponding with vehicle transport supervisory system, concrete, can effectively show vehicle and personnel positioning information, and pay close attention in real time and roll quality situation, for construction dispatching provides decision support, for visual construction provides effective solution.
The utility model realizes like this, it is to construct a kind of three-dimensional water power construction application management system based on visualization technique, it is characterised in that: comprise the computer that data are converted to figure or image and it is used for carrying out the display screen of information displaying; Computer is connected with display screen; Also comprise vehicle transport supervisory system, concrete rolls supervisory system, personnel location system; Vehicle transport supervisory system, concrete roll supervisory system, personnel location system and realize data corresponding with computer respectively.
The utility model has the advantage of: the utility model provides a kind of three-dimensional water power construction application management system based on visualization technique by improving, utilize computer graphics and image processing techniques, data are converted figure to or image shows on screen, and carry out theory, the Method and Technology of interaction process; Turn to feature by visual, parameter, it is possible to before hydroelectric project realizes, carry out the simulation built, thus carry out the Virtual Construction of the verification of design objective, the in-depth design of construction, virtual construction, key special subjects engineering. BIM model is set up by analyzing hydroelectric project drawing, and associate the business datum produced when water power is constructed, construction speed, construction quality, construction safety early warning etc. can be embodied in visual scene, again by rolling supervisory system, personnel location system data corresponding with vehicle transport supervisory system, concrete, can effectively show vehicle, personnel positioning information, and pay close attention in real time and roll quality situation, for construction dispatching provides decision support, for visual construction provides effective solution.
Accompanying drawing explanation
Fig. 1 is the enforcement structure block diagram that the utility model is corresponding.
Embodiment
Below in conjunction with accompanying drawing 1, the utility model is described in detail, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only the present invention's part embodiment, instead of whole embodiments. Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The utility model provides a kind of three-dimensional water power construction application management system based on visualization technique by improving, as shown in Figure 1, it is possible to implemented in the following manner; Comprise the computer 1 that data are converted to figure or image and it is used for carrying out the display screen 2 of information displaying; Computer 1 is connected with display screen 2; Also comprise vehicle transport supervisory system 3, concrete rolls supervisory system 4, personnel location system 5; Vehicle transport supervisory system 3, concrete roll supervisory system 4, personnel location system 5 and realize data corresponding with computer 1 respectively. Visual (Visualization) utilizes computer graphics and image processing techniques, data converts figure or image shows on screen to, and carries out theory, the Method and Technology of interaction process. Turn to feature by visual, parameter, it is possible to before hydroelectric project realizes, carry out the simulation built, thus carry out the Virtual Construction of the verification of design objective, the in-depth design of construction, virtual construction, key special subjects engineering. BIM model is set up by analyzing hydroelectric project drawing, and associate the business datum produced when water power is constructed, construction speed, construction quality, construction safety early warning etc. can be embodied in visual scene, again by rolling supervisory system, personnel location system data corresponding with vehicle transport supervisory system, concrete, can effectively show vehicle, personnel positioning information, and pay close attention in real time and roll quality situation, for construction dispatching provides decision support, for visual construction provides effective solution.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are enable to realize or use the utility model. To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein when not departing from spirit or scope of the present utility model, can realize in other embodiments. Therefore, the utility model can not be limited in these embodiments shown in this article, but be met the widest scope consistent with principle disclosed herein and features of novelty.
Claims (1)
1. the three-dimensional water power construction application management system based on visualization technique, it is characterised in that: comprise the computer (1) that data are converted to figure or image and the display screen (2) for carrying out information displaying; Computer (1) is connected with display screen (2); Also comprise vehicle transport supervisory system (3), concrete rolls supervisory system (4), personnel location system (5); Vehicle transport supervisory system (3), concrete roll supervisory system (4), personnel location system (5) and realize data corresponding with computer (1) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620031394.1U CN205281245U (en) | 2016-01-14 | 2016-01-14 | Three -dimensional hydropower construction uses management system based on visualization technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620031394.1U CN205281245U (en) | 2016-01-14 | 2016-01-14 | Three -dimensional hydropower construction uses management system based on visualization technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205281245U true CN205281245U (en) | 2016-06-01 |
Family
ID=56065803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620031394.1U Expired - Fee Related CN205281245U (en) | 2016-01-14 | 2016-01-14 | Three -dimensional hydropower construction uses management system based on visualization technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205281245U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107330212A (en) * | 2017-07-11 | 2017-11-07 | 四川电力设计咨询有限责任公司 | The careful method and system in the intelligent school of power plant Design of digital |
CN110488782A (en) * | 2019-08-26 | 2019-11-22 | 中电建路桥集团有限公司 | Cement concrete batching plant back court intelligent monitor system based on BIM platform |
-
2016
- 2016-01-14 CN CN201620031394.1U patent/CN205281245U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107330212A (en) * | 2017-07-11 | 2017-11-07 | 四川电力设计咨询有限责任公司 | The careful method and system in the intelligent school of power plant Design of digital |
CN107330212B (en) * | 2017-07-11 | 2020-10-16 | 四川电力设计咨询有限责任公司 | Method and system for digital design intelligent check of power plant |
CN110488782A (en) * | 2019-08-26 | 2019-11-22 | 中电建路桥集团有限公司 | Cement concrete batching plant back court intelligent monitor system based on BIM platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105373852A (en) | BIM-based personnel evacuation prompting system and method | |
CN107944284B (en) | Method and system for internal security control of enterprise data | |
CN205281245U (en) | Three -dimensional hydropower construction uses management system based on visualization technology | |
CN109636154A (en) | A kind of power grid operation monitoring precision management system based on operation map | |
CN109920036A (en) | A kind of arc steel structure construction method based on BIM technology | |
CN207660763U (en) | A kind of bouyant wheel hydroelectric generator | |
CN108959824B (en) | BIM design section layer layering generation method for Ying Yi planning pipeline | |
Peng et al. | Design and development of intelligent operation and maintenance training system for substation based on augmented reality | |
Dong et al. | Research on intelligent construction intensive management based on building information modeling technology | |
CN204495566U (en) | Based on the dynamic load simulator stand of cae analysis | |
Liu | Research and application of information technology in construction enterprise | |
Qi | Discussion on Issues and Solutions in Enterprise Information Construction from the Perspective of Engineering Economics | |
CN206574402U (en) | A kind of bus billboard | |
CN204073700U (en) | Inovulant granulation production line plant floor | |
Fengjiang | Research on Problems and Countermeasures in Informatization Management of Construction Projects | |
Zhai et al. | Application and Realization of BIM in Construction Engineering Management | |
Wang | Construction and Research of Digital Product Design Platform | |
CN111062001B (en) | Power generation load loss statistical display method and system | |
CN107622340A (en) | A kind of motivational techniques and device based on user power utilization data analysis | |
Wang et al. | Research on Urban Architecture Design under the Concept of Smart City | |
Han et al. | The role of digital economy in promoting high-quality development | |
Li | RETRACTED: The Application of Innovation Mode in Building Engineering Management Based on Computer Technology | |
Zhang et al. | The application of BIM technology in project management of construction engineering from 3D to 6D | |
CN203164949U (en) | Electric transmission and transformation equipment status information real-time display system | |
CN107633335A (en) | Steel rolling cost statistical method based on MES system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160601 Termination date: 20170114 |