CN205252513U - Erect and put log bridge - Google Patents
Erect and put log bridge Download PDFInfo
- Publication number
- CN205252513U CN205252513U CN201520922665.8U CN201520922665U CN205252513U CN 205252513 U CN205252513 U CN 205252513U CN 201520922665 U CN201520922665 U CN 201520922665U CN 205252513 U CN205252513 U CN 205252513U
- Authority
- CN
- China
- Prior art keywords
- log
- pile
- column
- utility
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses an erect and put log bridge, including the stand, and be fixed in the platform on the stand, and set up the security steel rope cable between the stand, still be fixed with two parallel ropes between the stand, the interval is provided with the log pile between the parallel rope, every movable lock latch is installed to the log pile both sides. The utility model discloses an erect and put log bridge, the project organization is reasonable, and the log pile interval is adjustable, the optional security of diameter is good, and interesting high, the challenge is strong, and can temper participant's four limbs, tests participant's health balancing capability.
Description
Technical field
The utility model relates to a kind of erecting and puts log bridge, belongs to the entertainment selection field of expanding.
Background technology
Current expansion entertainment selection is using amusement as main purpose, general be all arranged on ground or a little more than the position on ground, its challenge is not high, less for participant's psychological pressure, mainly test participant's stability of standing, cannot reach the object of whole body exercise; Due to the restriction in place, it is in the majority that existing expansion entertainment selection equipment is fixedly installed in addition, and total degree of difficulty is lower.
Utility model content
(1) technical problem that will solve
For addressing the above problem, the utility model proposes a kind of erecting and put log bridge, security is good, and interesting high, challenge is strong, and can temper participant's four limbs, test participant's balance ability.
(2) technical scheme
Of the present utility model erecting put log bridge, comprises column, and is fixed on the platform on column, and be arranged at the safety lanyard rope between column, and participant is played a protective role; Between described column, be also fixed with two parallel ropes; Between described parallel rope, be arranged at intervals with log pile; Each described log pile both sides are provided with movable snap close.
As preferred embodiment, the diameter of section 0.1 ~ 0.5m of each described log pile; By regulating movable snap close, regulating the spacing between adjacent described log pile is 0.5 ~ 1m.
(3) beneficial effect
Compared with prior art, of the present utility model erecting put log bridge, and project organization is reasonable, and log pile spacing is adjustable, and its diameter also can be selected as required; Security is good, and interesting high, challenge is strong, and can temper participant's four limbs, test participant's balance ability.
Brief description of the drawings
Fig. 1 is overall structure schematic diagram of the present utility model.
Parts in accompanying drawing are labeled as: 1-column, 2-platform, 3-safety lanyard rope, 4-parallel rope, 5-log pile, the movable snap close of 6-.
Detailed description of the invention
Embodiment 1:
The perpendicular log bridge of putting as shown in Figure 1, comprises column 1, and is fixed on the platform 2 on column 1, and is arranged at the safety lanyard rope 3 between column 1, and participant is played a protective role; Between described column 1, be also fixed with two parallel ropes 4; Between described parallel rope 4, be arranged at intervals with log pile 5; Each described log pile 5 both sides are provided with movable snap close 6.
Wherein, the diameter of section 0.2m of each described log pile 5; By regulating movable snap close 6, regulating the spacing between adjacent described log pile 5 is 0.5m.
Embodiment 2:
Of the present utility model erecting put log bridge, comprises column 1, and is fixed on the platform 2 on column 1, and be arranged at the safety lanyard rope 3 between column 1, and participant is played a protective role; Between described column 1, be also fixed with two parallel ropes 4; Between described parallel rope 4, be arranged at intervals with log pile 5; Each described log pile 5 both sides are provided with movable snap close 6.
Wherein, the diameter of section 0.5m of each described log pile 5; By regulating movable snap close 6, regulating the spacing between adjacent described log pile 5 is 1m.
Participant's pin is trampled on log pile, passes by from log pile, completes whole expansion entertainment selection; Thereby whole equipment can regulate the distance between adjacent log pile by the movable snap close on the horizontal steel wire cable of adjusting, in addition, can also regulate log pile diameter, thereby adjust the complexity of expanding entertainment selection, and by highly participant being produced to psychological pressure.
Embodiment recited above is described preferred embodiment of the present utility model, not design of the present utility model and scope is limited. Do not departing under the prerequisite of the utility model design concept; various modification and improvement that this area ordinary person makes the technical solution of the utility model; all should drop into protection domain of the present utility model; the technology contents of the utility model request protection, has all been documented in claims.
Claims (2)
1. erect and put a log bridge, comprise column, and be fixed on the platform on column, and be arranged at the safety lanyard rope between column; It is characterized in that: between described column, be also fixed with two parallel ropes; Between described parallel rope, be arranged at intervals with log pile; Each described log pile both sides are provided with movable snap close.
2. according to claim 1 erecting put log bridge, it is characterized in that: the diameter of section 0.1 ~ 0.5m of each described log pile; Spacing between adjacent described log pile is 0.5 ~ 1m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520922665.8U CN205252513U (en) | 2015-11-18 | 2015-11-18 | Erect and put log bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520922665.8U CN205252513U (en) | 2015-11-18 | 2015-11-18 | Erect and put log bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205252513U true CN205252513U (en) | 2016-05-25 |
Family
ID=55994064
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520922665.8U Expired - Fee Related CN205252513U (en) | 2015-11-18 | 2015-11-18 | Erect and put log bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205252513U (en) |
-
2015
- 2015-11-18 CN CN201520922665.8U patent/CN205252513U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207115792U (en) | A kind of safe construction experiences equipment | |
CN205252513U (en) | Erect and put log bridge | |
CN206815163U (en) | A kind of suspension cable construction bridge | |
CN205235253U (en) | High altitude rings bridge | |
CN206388436U (en) | A kind of transmission tower high-altitude trainer | |
CN205323082U (en) | Monospar sky bridge type high ladder with safety belt | |
CN203971275U (en) | Outward bound facility unit, four-way self protection type high-altitude | |
CN205252389U (en) | Stake bridge is suspended in midair in high altitude | |
CN205252388U (en) | Rectangular wood of cross that falls suspends bridge in midair | |
CN203494151U (en) | Amusement park equipment for rope adventure | |
CN205252390U (en) | High altitude triangle rings bridge | |
CN206621673U (en) | Regularization escape device for temporary building | |
CN205252512U (en) | Cake suspends bridge in midair | |
CN203280963U (en) | High-altitude psychological behavior training facility | |
CN205252402U (en) | Single foot of lurch suspends bridge in midair | |
CN205460566U (en) | Transformer that stability is high overhauls uses safety belt lift kits | |
CN204103309U (en) | A kind of composite type inspection platform | |
CN206267512U (en) | A kind of movable operating platform | |
CN203213951U (en) | Parallel three-upright post climb-proof device | |
CN205252434U (en) | Side direction rock climbing wall | |
CN206282466U (en) | A kind of work high above the ground body-sensing system | |
CN205307777U (en) | Thick bolt bridge of drop shot rope | |
CN103638630B (en) | Multiple altitude combination formula high ladders | |
CN205252514U (en) | Single track skidding steel wire bridge with lumps of wood | |
CN104064984A (en) | Double split wire line maintenance pulley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160525 Termination date: 20171118 |
|
CF01 | Termination of patent right due to non-payment of annual fee |