CN205243708U - 一种水轮发电机组支架组焊结构 - Google Patents
一种水轮发电机组支架组焊结构 Download PDFInfo
- Publication number
- CN205243708U CN205243708U CN201520913933.XU CN201520913933U CN205243708U CN 205243708 U CN205243708 U CN 205243708U CN 201520913933 U CN201520913933 U CN 201520913933U CN 205243708 U CN205243708 U CN 205243708U
- Authority
- CN
- China
- Prior art keywords
- lug
- stud
- bolt
- hole
- support assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520913933.XU CN205243708U (zh) | 2015-11-17 | 2015-11-17 | 一种水轮发电机组支架组焊结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520913933.XU CN205243708U (zh) | 2015-11-17 | 2015-11-17 | 一种水轮发电机组支架组焊结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205243708U true CN205243708U (zh) | 2016-05-18 |
Family
ID=55942791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520913933.XU Expired - Fee Related CN205243708U (zh) | 2015-11-17 | 2015-11-17 | 一种水轮发电机组支架组焊结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205243708U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113161031A (zh) * | 2021-04-26 | 2021-07-23 | 中国核动力研究设计院 | 一种用于圆柱形运输容器的缓冲架 |
-
2015
- 2015-11-17 CN CN201520913933.XU patent/CN205243708U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113161031A (zh) * | 2021-04-26 | 2021-07-23 | 中国核动力研究设计院 | 一种用于圆柱形运输容器的缓冲架 |
CN113161031B (zh) * | 2021-04-26 | 2022-02-11 | 中国核动力研究设计院 | 一种用于圆柱形运输容器的缓冲架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204324052U (zh) | 运输工装 | |
CN102926946A (zh) | 一种风力发电机组基础环 | |
CN205243708U (zh) | 一种水轮发电机组支架组焊结构 | |
CN103953061B (zh) | 一种海上风电导管架基础结构 | |
CN203475422U (zh) | 一种混凝土管桩接桩器 | |
CN105484945B (zh) | 一种多边形风电塔架及其制造方法 | |
CN203791344U (zh) | 一种短应力线轧机接轴托架与轧机底座的连接结构 | |
CN203846403U (zh) | 一种装配式岸上临时支墩装置 | |
CN206494660U (zh) | 地铁明挖车站可调跨度梁门式起重机 | |
CN205064389U (zh) | 一种空冷风机桥架安装底座 | |
CN203161451U (zh) | 一种模块化风力发电机塔筒 | |
CN104343117A (zh) | 一种混凝土管桩接桩器 | |
CN203009138U (zh) | 一种水轮发电机机架组焊结构 | |
CN203732256U (zh) | 翻转机构测试平台 | |
CN202410262U (zh) | 大型中心传动浓缩机便载式快速组合耙架 | |
CN205356089U (zh) | 直驱永磁风力发电机定子主轴通用支撑工装 | |
CN202693110U (zh) | 一种新型的组合式钢筋混凝土秤台 | |
CN205533022U (zh) | 一种多边形风电塔架 | |
CN204727238U (zh) | 导管架、组块滚装运输的支撑框架 | |
CN205116431U (zh) | 梁柱偏心对齐的连接结构 | |
CN203834502U (zh) | 基于两个配重模块的快捷式组装基础 | |
CN202090665U (zh) | 露天开关站塔架新增横梁的连接结构 | |
CN204324053U (zh) | 运输工装 | |
CN205014326U (zh) | 大板梁叠梁安装装置 | |
CN204258696U (zh) | 一种抱扣式太阳能光伏发电组件支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Hydroelectric set support assembly welding structure Effective date of registration: 20180117 Granted publication date: 20160518 Pledgee: Chongqing mechanical and electrical Holding Group Finance Co.,Ltd. Pledgor: CHONGQING WATER TURBINE WORKS Co.,Ltd. Registration number: 2018980000007 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20190118 Granted publication date: 20160518 Pledgee: Chongqing mechanical and electrical Holding Group Finance Co.,Ltd. Pledgor: CHONGQING WATER TURBINE WORKS Co.,Ltd. Registration number: 2018980000007 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Hydroelectric set support assembly welding structure Effective date of registration: 20190320 Granted publication date: 20160518 Pledgee: Chongqing mechanical and electrical Holding Group Finance Co.,Ltd. Pledgor: CHONGQING WATER TURBINE WORKS Co.,Ltd. Registration number: 2019500000007 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160518 Termination date: 20211117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |