CN205212199U - Prefabricated cabin formula combination secondary equipment wiring structure - Google Patents
Prefabricated cabin formula combination secondary equipment wiring structure Download PDFInfo
- Publication number
- CN205212199U CN205212199U CN201521078045.7U CN201521078045U CN205212199U CN 205212199 U CN205212199 U CN 205212199U CN 201521078045 U CN201521078045 U CN 201521078045U CN 205212199 U CN205212199 U CN 205212199U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- electrical interface
- prefabricated cabin
- interface cabinet
- cabin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
本实用新型公开了一种预制舱式组合二次设备接线结构,包括:预制舱、电气接口柜、进线口、操作门,所述电气接口柜靠舱壁放置,电气接口柜不设置背板,电气接口柜正面和背面均设置有安装板,正面安装板上设置有光缆插座,背面安装板上设置有电缆插座;所述电气接口柜背面舱壁上开设有操作门;所述电气接口柜底部设置有进线口。本实用新型提供的一种预制舱式组合二次设备接线结构,减少工程现场的接线工作量,并预制线缆插座,使预制舱到达工程现场后实现"即插即用";可以使工人不进入预制舱内即完成外部线缆的接入,不再需要对预制舱内的陶瓷面防静电地板进行拆装工作,节约工时、提高效率,且完全避免损坏地板、破坏舱内已完成线路的风险。
The utility model discloses a prefabricated cabin type combined secondary equipment wiring structure, comprising: a prefabricated cabin, an electrical interface cabinet, a line inlet, and an operation door, the electrical interface cabinet is placed against the bulkhead, and the electrical interface cabinet is not provided with a backboard , the front and back of the electrical interface cabinet are provided with mounting panels, the front mounting panel is provided with optical cable sockets, and the rear mounting panel is provided with cable sockets; an operation door is provided on the bulkhead at the back of the electrical interface cabinet; the electrical interface cabinet There is an inlet at the bottom. The utility model provides a prefabricated cabin type combined secondary equipment wiring structure, which reduces the wiring workload on the engineering site, and prefabricated cable sockets, so that the prefabricated cabin can realize "plug and play" after arriving at the engineering site; workers can not After entering the prefabricated cabin, the access of external cables is completed, and it is no longer necessary to disassemble and assemble the ceramic surface anti-static floor in the prefabricated cabin, which saves man-hours, improves efficiency, and completely avoids damaging the floor and destroying the completed lines in the cabin. risk.
Description
技术领域 technical field
本实用新型涉及一种预制舱式组合二次设备接线结构,属于预制舱式组合二次设备技术领域。 The utility model relates to a wiring structure of prefabricated cabin type combined secondary equipment, which belongs to the technical field of prefabricated cabin type combined secondary equipment.
背景技术 Background technique
随着标准配送式变电站的建设的推广,预制舱式二次组合设备的应用,对在变电站中实现模块化建设起到了重要的作用。预制舱式二次组合设备,后文简称预制舱,由预制舱体、二次设备屏柜或机架、舱体辅助设施等组成,在工厂内完成制作、组装、配线、调试等工作,以箱房形式整体运输至工程现场,就位安装与基础上。但预制舱到达工程现场后,与外部设备连接仍然需要在现场进行较多的接线工作,在现场需要通过预制舱舱底预留的进线孔将外部电缆接入预制舱内部。在此过程中需要对预制舱内的陶瓷面防静电地板以及舱底进线孔挡板进行拆装,经常会损坏陶瓷面防静电地板,且可能对预制舱内已完成连接的线缆产生难以预计的不利影响。既延长了现场接线时间,又增加了现场接线的故障率,未能实现真正意义上的“装配式建设”。 With the promotion of the construction of standard distribution substations, the application of prefabricated cabin-type secondary combination equipment has played an important role in realizing modular construction in substations. Prefabricated cabin-type secondary combination equipment, hereinafter referred to as prefabricated cabin, is composed of prefabricated cabin, secondary equipment screen cabinet or rack, cabin auxiliary facilities, etc., and the production, assembly, wiring, debugging and other work are completed in the factory. It is transported to the project site as a whole in the form of a box room, and installed in place and on the foundation. However, after the prefabricated cabin arrives at the project site, it is still necessary to carry out more wiring work on site to connect with external equipment. On site, it is necessary to connect the external cables to the interior of the prefabricated cabin through the reserved wire hole at the bottom of the prefabricated cabin. During this process, it is necessary to disassemble and assemble the anti-static floor on the ceramic surface in the prefabricated cabin and the baffle plate of the inlet hole in the bilge, which will often damage the anti-static floor on the ceramic surface and may cause difficulties to the cables that have been connected in the prefabricated cabin. expected adverse effects. It not only prolongs the on-site wiring time, but also increases the failure rate of on-site wiring, failing to realize the real "fabricated construction".
现有接线技术包括两种,一种在工厂制造生产仅能预先连接部分屏柜间的线缆,所有需要跟外部设备连接的电缆或光纤都需要在工程现场进行接线。这样的方式完全不能体现出预制舱室二次组合设备的优势,不符合“预制”和“组合”的模块化理念。将绝大部分的接线工作留到工程现场,增加了现场接线的时间和人力成本;而现场施工时从舱外引进的每一根电缆都要接到对应的设备或接口上,线缆数量庞大大,接口多,不利于行线和整理,也容易造成线缆的混淆;接线时,现场施工人员还需要先拆除预制舱内的陶瓷面防静电地板,接线完成后再复原,容易损坏防静电地板的陶瓷贴面,且复原后舱内地板平面的平整度也会受到很大影响。 There are two types of existing wiring technologies. One is to manufacture and produce cables in the factory that can only pre-connect some of the screen cabinets. All cables or optical fibers that need to be connected to external equipment need to be wired at the engineering site. This method cannot reflect the advantages of the secondary combination equipment of the prefabricated cabin at all, and does not conform to the modular concept of "prefabrication" and "combination". Leaving most of the wiring work to the engineering site increases the time and labor cost of on-site wiring; and every cable introduced from outside the cabin during on-site construction must be connected to the corresponding equipment or interface, and the number of cables is huge It is large and has many interfaces, which is not conducive to wiring and arrangement, and it is easy to cause confusion of cables; when wiring, the on-site construction personnel also need to remove the ceramic surface anti-static floor in the prefabricated cabin, and restore it after the wiring is completed, which is easy to damage the anti-static The ceramic veneer of the floor, and the flatness of the floor plane in the cabin after restoration will also be greatly affected.
另一种在预制舱内设置了集中配线柜,对第一种方案是一个改进。但在工程现场,外部线缆从舱底进线孔进线并连接到集中配线柜,仍需要进入预制舱,拆除部分防静电地板,从而进行接线。且由于预制舱外部进线和舱内屏柜间接线都要连接到集中配线柜上,使得集中配线柜处的线缆十分密集,增加接线难度,难以实现内外线缆、光纤和电缆的分离。 The other one has a centralized wiring cabinet in the prefabricated cabin, which is an improvement on the first scheme. However, at the project site, the external cables enter the cable through the bilge hole and are connected to the centralized distribution cabinet. They still need to enter the prefabricated cabin and remove part of the anti-static floor for wiring. In addition, because the external incoming lines of the prefabricated cabin and the wiring between the screen cabinets in the cabin must be connected to the centralized distribution cabinet, the cables at the centralized distribution cabinet are very dense, which increases the difficulty of wiring and the separation of internal and external cables, optical fibers and cables. .
本设计在预置舱内设置专用的电气接口柜,柜体靠舱壁放置,舱壁上开一操作门,当门打开时,可直接对电气接口柜内的航空插头进行接插,不必进入舱内、拆卸地板即可完成接线,弥补现有技术的不足。 In this design, a special electrical interface cabinet is installed in the preset cabin. The cabinet body is placed against the bulkhead, and an operation door is opened on the bulkhead. When the door is opened, the aviation plugs in the electrical interface cabinet can be connected directly without entering Wiring can be completed in the cabin and by dismantling the floor, which makes up for the deficiencies in the prior art.
实用新型内容 Utility model content
目的:为了克服现有技术中存在的不足,本实用新型提供一种预制舱式组合二次设备接线结构。 Purpose: In order to overcome the deficiencies in the prior art, the utility model provides a prefabricated cabin type combined secondary equipment wiring structure.
技术方案:为解决上述技术问题,本实用新型采用的技术方案为: Technical solution: In order to solve the above-mentioned technical problems, the technical solution adopted in the utility model is:
一种预制舱式组合二次设备接线结构,包括:预制舱、电气接口柜、进线口、操作门,所述电气接口柜靠舱壁放置,电气接口柜不设置背板,电气接口柜正面和背面均设置有安装板,正面安装板上设置有光缆插座,背面安装板上设置有电缆插座;所述电气接口柜背面舱壁上开设有操作门;所述电气接口柜底部设置有进线口。 A prefabricated cabin-type combined secondary equipment wiring structure, including: a prefabricated cabin, an electrical interface cabinet, a wire inlet, and an operating door. and the back are provided with mounting plates, the front mounting plate is provided with optical cable sockets, and the rear mounting plate is provided with cable sockets; the rear bulkhead of the electrical interface cabinet is provided with an operation door; the bottom of the electrical interface cabinet is provided with an incoming line mouth.
还包括预制光缆、预制电缆,所述预制舱地板下设置有走线槽盒,所述走线槽盒分为上下两层,所述预制光缆、预制电缆分别设置在上下两层内。 It also includes prefabricated optical cables and prefabricated cables. There is a wiring trough box under the floor of the prefabricated cabin. The wiring trough box is divided into upper and lower layers.
还包括航空插头,所述预制光缆、预制电缆末端均设置有航空插头。 It also includes aviation plugs, and the ends of the prefabricated optical cables and the prefabricated cables are all provided with aviation plugs.
作为优选方案,所述电气接口柜背面正对着操作门。 As a preferred solution, the back of the electrical interface cabinet faces the operation door.
有益效果:本实用新型提供的一种预制舱式组合二次设备接线结构,在于改进现有两种方案中的不足,首先是减少工程现场的接线工作量,将大部分的接线工作,预制舱内屏柜间的接线放在工厂内完成,并预制线缆插座,使预制舱到达工程现场后实现"即插即用";其次,本实用新型可以使工人不进入预制舱内即完成外部线缆的接入,不再需要对预制舱内的陶瓷面防静电地板进行拆装工作,节约工时、提高效率,且完全避免损坏地板、破坏舱内已完成线路的风险。 Beneficial effects: the utility model provides a prefabricated cabin-type combined secondary equipment wiring structure, which aims to improve the deficiencies in the two existing schemes. The wiring between the inner screen cabinets is completed in the factory, and the cable sockets are prefabricated, so that "plug and play" can be realized after the prefabricated cabin arrives at the engineering site; secondly, the utility model can enable workers to complete the external wiring without entering the prefabricated cabin. Cable access eliminates the need to disassemble and assemble the ceramic anti-static floor in the prefabricated cabin, saving man-hours, improving efficiency, and completely avoiding the risk of damaging the floor and destroying the completed lines in the cabin.
附图说明 Description of drawings
图1为本实用新型的结构俯视图; Fig. 1 is a structural top view of the utility model;
图2为电气接口柜正面结构示意图; Figure 2 is a schematic diagram of the front structure of the electrical interface cabinet;
图3为电气接口柜背面结构示意图。 Figure 3 is a schematic diagram of the rear structure of the electrical interface cabinet.
具体实施方式 detailed description
下面结合附图对本实用新型作更进一步的说明。 Below in conjunction with accompanying drawing, the utility model is described further.
如图1所示,一种预制舱式组合二次设备接线结构,包括:预制舱1、电气接口柜2、进线口3、操作门4,所述电气接口柜2靠预制舱1舱壁放置,电气接口柜2不设置背板,电气接口柜2正面和背面均设置有安装板5,正面安装板5上设置有光缆插座6,背面安装板5上设置有电缆插座7;所述电气接口柜2背面舱壁上开设有操作门4;所述电气接口柜2底部设置有进线口3。所述预制舱1地板下设置有走线槽盒8,所述走线槽盒8分为上下两层,预制光缆、预制电缆分别设置在上下两层内。所述预制光缆、预制电缆末端均设置有航空插头。 As shown in Figure 1, a prefabricated cabin-type combined secondary equipment wiring structure includes: a prefabricated cabin 1, an electrical interface cabinet 2, a wire inlet 3, and an operation door 4, and the electrical interface cabinet 2 leans against the bulkhead of the prefabricated cabin 1 Placement, the electrical interface cabinet 2 is not provided with a backboard, the front and back of the electrical interface cabinet 2 are provided with a mounting plate 5, the front mounting plate 5 is provided with an optical cable socket 6, and the rear mounting plate 5 is provided with a cable socket 7; An operation door 4 is provided on the back bulkhead of the interface cabinet 2; a wire inlet 3 is provided at the bottom of the electrical interface cabinet 2. A wiring trough box 8 is arranged under the floor of the prefabricated cabin 1, and the wiring trough box 8 is divided into upper and lower layers, and prefabricated optical cables and prefabricated cables are arranged in the upper and lower layers respectively. Both the prefabricated optical cable and the end of the prefabricated cable are provided with aviation plugs.
具体安装方法如下:预制舱到达工程现场后,外部线缆从进线孔进入舱体,打开操作门,对航空插头进行接插,即可完成外部线缆接线工作,真正实现预制舱的“即插即用”。 The specific installation method is as follows: After the prefabricated cabin arrives at the project site, the external cables enter the cabin through the cable inlet, the operation door is opened, and the aviation plug is connected to complete the wiring of the external cables. Plug and Play".
以上所述仅是本实用新型的优选实施方式,应当指出:对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。 The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made. Retouching should also be regarded as the scope of protection of the present utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521078045.7U CN205212199U (en) | 2015-12-21 | 2015-12-21 | Prefabricated cabin formula combination secondary equipment wiring structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521078045.7U CN205212199U (en) | 2015-12-21 | 2015-12-21 | Prefabricated cabin formula combination secondary equipment wiring structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205212199U true CN205212199U (en) | 2016-05-04 |
Family
ID=55849893
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521078045.7U Expired - Lifetime CN205212199U (en) | 2015-12-21 | 2015-12-21 | Prefabricated cabin formula combination secondary equipment wiring structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205212199U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107994497A (en) * | 2017-12-23 | 2018-05-04 | 中国西电电气股份有限公司 | A kind of distributed generation resource is quickly accessed with one or two unit equipment prefabricated cabins |
| CN109149429A (en) * | 2017-06-15 | 2019-01-04 | 平高集团有限公司 | Movable transformer pack and its equipment compartment, module transition cabinet |
| CN110247311A (en) * | 2019-05-20 | 2019-09-17 | 许继电气股份有限公司 | A kind of prefabricated cabin |
| CN110729636A (en) * | 2019-09-25 | 2020-01-24 | 许继电气股份有限公司 | Prefabricated cabin and its base |
| CN116365372A (en) * | 2023-03-17 | 2023-06-30 | 广东电网有限责任公司惠州供电局 | Switch board convenient to optical cable is pegged graft |
-
2015
- 2015-12-21 CN CN201521078045.7U patent/CN205212199U/en not_active Expired - Lifetime
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109149429A (en) * | 2017-06-15 | 2019-01-04 | 平高集团有限公司 | Movable transformer pack and its equipment compartment, module transition cabinet |
| CN107994497A (en) * | 2017-12-23 | 2018-05-04 | 中国西电电气股份有限公司 | A kind of distributed generation resource is quickly accessed with one or two unit equipment prefabricated cabins |
| CN110247311A (en) * | 2019-05-20 | 2019-09-17 | 许继电气股份有限公司 | A kind of prefabricated cabin |
| CN110247311B (en) * | 2019-05-20 | 2020-09-15 | 许继电气股份有限公司 | a prefabricated cabin |
| CN110729636A (en) * | 2019-09-25 | 2020-01-24 | 许继电气股份有限公司 | Prefabricated cabin and its base |
| CN116365372A (en) * | 2023-03-17 | 2023-06-30 | 广东电网有限责任公司惠州供电局 | Switch board convenient to optical cable is pegged graft |
| CN116365372B (en) * | 2023-03-17 | 2024-01-09 | 广东电网有限责任公司惠州供电局 | Switch board convenient to optical cable is pegged graft |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204680910U (en) | A kind of cable fast joint structure for modularization secondary unit equipment | |
| CN108666884A (en) | Secondary device rack in a kind of prefabricated cabin | |
| CN204810749U (en) | Wall -hanging network rack | |
| CN204243477U (en) | A kind of cable laying structure of secondary screen cabinet | |
| CN204497850U (en) | Secondary equipment of intelligent converting station composite module and interconnecting module standardized interface arrangement | |
| CN206057397U (en) | A kind of multifunction power ammeter box | |
| CN201600799U (en) | A teaching and training device for building integrated wiring with a planar structure | |
| CN203761060U (en) | Distributed access system | |
| CN203983936U (en) | Prefabricated cabin fiber optic cable transfer box | |
| CN205829092U (en) | Ladder busbar formula joint-box | |
| CN209267047U (en) | A kind of cable gantry | |
| CN205809126U (en) | A kind of combined modular ammeter box | |
| CN204464759U (en) | A cabin-mounted screen for displaying prefabricated cabins before wiring | |
| CN205935226U (en) | Modularization building connecting piece | |
| CN207150143U (en) | A kind of preassembled transformer station secondary cable transfer box and mounting structure | |
| CN206640247U (en) | outdoor cable branch box | |
| CN205231537U (en) | Single busbar segmented system high voltage distribution cabinet | |
| CN216930482U (en) | Wire drawing-free threading blind plate for cabinet | |
| CN204732776U (en) | The microcomputer protecting device that cabinet panel is separated | |
| CN207234231U (en) | A kind of buried electricity box of overhead type | |
| CN207459632U (en) | A kind of cable of power distribution cabinet inlet wire improves device | |
| CN206947893U (en) | It is a kind of for skyscraper index bed can Fast Installation distribution box device | |
| CN218549100U (en) | Electric power inlet cabinet convenient for wire arrangement | |
| CN209145230U (en) | A kind of pre-buried template of well electricity well | |
| CN205049682U (en) | A cable check -up mechanism for ammeter incasement |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160504 |