CN205206274U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN205206274U
CN205206274U CN201521018358.3U CN201521018358U CN205206274U CN 205206274 U CN205206274 U CN 205206274U CN 201521018358 U CN201521018358 U CN 201521018358U CN 205206274 U CN205206274 U CN 205206274U
Authority
CN
China
Prior art keywords
top shelf
pony sill
frame
scaffold
shelf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521018358.3U
Other languages
Chinese (zh)
Inventor
王志刚
于成龙
龙志勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521018358.3U priority Critical patent/CN205206274U/en
Application granted granted Critical
Publication of CN205206274U publication Critical patent/CN205206274U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for building construction belongs to civil engineering field. It includes the base frame, adjustable shelf and top frame, the base frame, adjustable shelf and top frame are by the upper plate, hypoplastron and X support frame are constituteed, the X support frame is located between upper plate and the hypoplastron, be provided with the axis of rotation on the X support frame, the base frame, put up fixing bolt and connected gradually in adjustable shelf and top, be provided with hydraulic telescopic device on the base frame, base rest base portion is provided with universal wheel and supporting leg, be provided with height -adjusting bolts on the supporting leg, be provided with the carriage on the frame of top, be provided with the pulley on the carriage and rotate the wheel, pulley and rotation take turns to to be provided with carries the rope, hydraulic telescopic device is connected with the draw -in groove of top rest base portion. The utility model provides a scaffold for building construction, can be convenient go on the material about carry, lift that can be free is dismantled, the installation is simple, it is convenient to remove, it is firm to land.

Description

A kind of building operations scaffold
Technical field
The utility model relates to technical field of civil engineering, especially relates to a kind of building operations scaffold.
Background technology
Scaffold is all the time all for building trade provides conveniently condition, roughly have small-sized, medium-sized and large-scale from scale point, low idle job coverage, Semi surrounding type coverage and full packaging type coverage is had again from coverage, its structure also emerges in an endless stream, and its object is exactly to allow workman can reach operating efficiency that is best, most convenient.
But there is following problem in existing scaffold:
1, the conveying up and down of material is inconvenient, needs people to go down to take or people serves.
2, can not be elevated freely, when needs move up and down, people needs increase or subtract scaffold, takes time and effort.
3, dismantle and install loaded down with trivial details.
Utility model content
For above problem, the utility model provides a kind of building operations scaffold, can carry up and down material easily, can be elevated freely, and simply, conveniently moving, lands firm for dismounting, installation.
Concrete technology contents is: a kind of building operations scaffold, comprise pony sill, adjustable shelf and top shelf, described pony sill, adjustable shelf and top shelf are by upper plate, lower plate and X bracing frame composition, described X bracing frame is between upper plate and lower plate, X bracing frame is provided with turning cylinder, described pony sill, adjustable shelf is connected by set bolt successively with top shelf, described pony sill is provided with hydraulic telescopic device, universal wheel and supporting leg is provided with bottom pony sill, described supporting leg is provided with height adjustment bolt, described top shelf is provided with carriage, described carriage is provided with pulley and moving runner, described pulley and moving runner are provided with hauling rope, described hydraulic telescopic device is connected with the draw-in groove bottom top shelf.
Described X bracing frame rotates along turning cylinder.
Described top shelf is provided with hydraulically extensible controller, described hydraulically extensible controller is connected with hydraulic telescopic device.
Described top shelf is provided with guardrail sleeve pipe.
Described pony sill is provided with spirit level.
Owing to taking technique scheme, compared with prior art, advantage of the present utility model:
Can carry up and down material easily, top shelf is provided with carriage, carriage is provided with pulley and moving runner, described pulley and moving runner are provided with hauling rope, conveniently easily material is transported to scaffold from ground by hauling rope and pulley.
Can be elevated freely, top shelf be provided with hydraulically extensible controller, hydraulically extensible controller can be manipulated, scaffold is elevated automatically.
Dismounting, installation are simply, conveniently moving, land firm, scaffold comprises pony sill, adjustable shelf and top shelf, pony sill, adjustable shelf are connected by set bolt successively with top shelf, can dismantle easily and install, be provided with universal wheel and supporting leg bottom pony sill simultaneously, supporting leg is provided with height adjustment bolt, need when a local construction, can put down by supporting leg, universal wheel soars, and ensure that the stability of scaffold, when needs are mobile, supporting leg is accepted, universal wheel is landed, thus can movable Scaffold.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further described.
Fig. 1 is the utility model structural representation.
In figure: 1, pony sill, 2, adjustable shelf, 3, top shelf, 4, upper plate, 5, lower plate, 6, X bracing frame, 7, turning cylinder, 8, set bolt, 9, hydraulic telescopic device, 10, universal wheel, 11, supporting leg, 12, height adjustment bolt, 13, carriage, 14, pulley, 15, moving runner, 16, hauling rope, 17, draw-in groove, 18, hydraulically extensible controller, 19, guardrail sleeve pipe, 20, spirit level.
Detailed description of the invention
Below preferred embodiment of the present utility model is described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the utility model, and be not used in restriction the utility model.
Specifically be implemented as follows: as shown in Figure 1, a kind of building operations scaffold, comprise pony sill 1, adjustable shelf 2 and top shelf 3, described pony sill 1, adjustable shelf 2 and top shelf 3 are by upper plate 4, lower plate 5 and X bracing frame 6 form, described X bracing frame 6 is between upper plate 4 and lower plate 5, X bracing frame 6 is provided with turning cylinder 7, described pony sill 1, adjustable shelf 2 is connected by set bolt 8 successively with top shelf 3, described pony sill 1 is provided with hydraulic telescopic device 9, universal wheel 10 and supporting leg 11 is provided with bottom pony sill 1, described supporting leg 11 is provided with height adjustment bolt 12, described top shelf 3 is provided with carriage 13, described carriage 13 is provided with pulley 14 and moving runner 15, described pulley 14 and moving runner 15 are provided with hauling rope 16, described hydraulic telescopic device 9 is connected with the draw-in groove 17 bottom top shelf 3.
Described X bracing frame 6 rotates along turning cylinder 7.
Described top shelf 3 is provided with hydraulically extensible controller 18, and described hydraulically extensible controller 18 is connected with hydraulic telescopic device 9.
Described top shelf 3 is provided with guardrail sleeve pipe 19.
Described pony sill 1 is provided with spirit level 20.
Realized by following steps: top shelf 3 is provided with carriage 13, described carriage 13 is provided with pulley 14 and moving runner 15, described pulley 14 and moving runner 15 are provided with hauling rope 16, conveniently easily material are transported to scaffold from ground by hauling rope 16 and pulley 14.Can be elevated freely, top shelf 3 be provided with hydraulically extensible controller 18, hydraulically extensible controller can be manipulated, scaffold is elevated automatically.Dismounting, installation are simply, conveniently moving, land firm, scaffold comprises pony sill 1, adjustable shelf 2 and top shelf 3, pony sill 1, adjustable shelf 2 are connected by set bolt 8 successively with top shelf 3, can dismantle easily and install, be provided with universal wheel 10 and supporting leg 11 bottom pony sill 1 simultaneously, supporting leg 11 is provided with height adjustment bolt 12, need when a local construction, can put down by supporting leg, universal wheel soars, and ensure that the stability of scaffold, when needs are mobile, supporting leg is accepted, universal wheel is landed, thus can movable Scaffold.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.

Claims (5)

1. a building operations scaffold, it is characterized in that: comprise pony sill (1), adjustable shelf (2) and top shelf (3), described pony sill (1), adjustable shelf (2) and top shelf (3) are by upper plate (4), lower plate (5) and X bracing frame (6) composition, described X bracing frame (6) is positioned between upper plate (4) and lower plate (5), X bracing frame (6) is provided with turning cylinder (7), described pony sill (1), adjustable shelf (2) is connected by set bolt (8) successively with top shelf (3), described pony sill (1) is provided with hydraulic telescopic device (9), pony sill (1) bottom is provided with universal wheel (10) and supporting leg (11), described supporting leg (11) is provided with height adjustment bolt (12), described top shelf (3) is provided with carriage (13), described carriage (13) is provided with pulley (14) and moving runner (15), described pulley (14) and moving runner (15) are provided with hauling rope (16), described hydraulic telescopic device (9) is connected with the draw-in groove (17) of top shelf (3) bottom.
2. a kind of building operations scaffold according to claim 1, is characterized in that: described X bracing frame (6) is rotated along turning cylinder (7).
3. a kind of building operations scaffold according to claim 1, it is characterized in that: described top shelf (3) is provided with hydraulically extensible controller (18), described hydraulically extensible controller (18) is connected with hydraulic telescopic device (9).
4. a kind of building operations scaffold according to claim 1, is characterized in that: described top shelf (3) is provided with guardrail sleeve pipe (19).
5. a kind of building operations scaffold according to claim 1, is characterized in that: described pony sill (1) is provided with spirit level (20).
CN201521018358.3U 2015-12-06 2015-12-06 Scaffold for building construction Expired - Fee Related CN205206274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521018358.3U CN205206274U (en) 2015-12-06 2015-12-06 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521018358.3U CN205206274U (en) 2015-12-06 2015-12-06 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN205206274U true CN205206274U (en) 2016-05-04

Family

ID=55844000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521018358.3U Expired - Fee Related CN205206274U (en) 2015-12-06 2015-12-06 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN205206274U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836790A (en) * 2017-03-20 2017-06-13 无锡市龙海杰机械制造有限公司 Treadle of false work buckle fixed block
CN108005371A (en) * 2017-12-25 2018-05-08 郑州靓岛建筑设计有限公司 A kind of construction assistance platform
CN109024906A (en) * 2018-07-17 2018-12-18 芜湖芬特勘测服务有限公司 A kind of assembled architecture auxiliary connecting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836790A (en) * 2017-03-20 2017-06-13 无锡市龙海杰机械制造有限公司 Treadle of false work buckle fixed block
CN108005371A (en) * 2017-12-25 2018-05-08 郑州靓岛建筑设计有限公司 A kind of construction assistance platform
CN108005371B (en) * 2017-12-25 2019-11-15 福州思琪科技有限公司 A kind of construction assistance platform
CN109024906A (en) * 2018-07-17 2018-12-18 芜湖芬特勘测服务有限公司 A kind of assembled architecture auxiliary connecting device

Similar Documents

Publication Publication Date Title
CN206088920U (en) Construction scaffold
CN205990213U (en) A kind of liftable fixed platform
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN205206274U (en) Scaffold for building construction
CN102996062A (en) Maintenance lifting platform and application method thereof
CN202175469U (en) Cable reel supporting device
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN105271011A (en) Multifunctional micro hoister
CN203097316U (en) Foldable hydraulic lifting support secure channel for high altitude construction
CN205527400U (en) Lifting mechanism
CN203976272U (en) A kind of hanging apparatus of installing for tank body coaming plate
CN204752097U (en) Load platform step by step goes up and down
CN202346636U (en) Crane
CN205077842U (en) Multi -use architecture support
CN108078479A (en) A kind of full hydraulic drive telescopic boom window cleaning equipment
CN202467170U (en) Aluminum alloy rising template system
CN213297069U (en) Scaffold for architectural decoration
CN211571448U (en) Arch ring supporting formwork
CN206122748U (en) Get hole machine
CN205713036U (en) High pier over-form construction platform
CN201212250Y (en) Mobile wheel track installation platform for large-sized network frame engineering
CN205777434U (en) Elevator shaft operating frame device
CN204848003U (en) Novel gantry crane
CN201627351U (en) Lifting operation table for construction
CN206308987U (en) A kind of convenient Liftable and movable scaffold for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160504

Termination date: 20161206