CN205204646U - Four bracket dollies on bank bridge - Google Patents
Four bracket dollies on bank bridge Download PDFInfo
- Publication number
- CN205204646U CN205204646U CN201521078169.5U CN201521078169U CN205204646U CN 205204646 U CN205204646 U CN 205204646U CN 201521078169 U CN201521078169 U CN 201521078169U CN 205204646 U CN205204646 U CN 205204646U
- Authority
- CN
- China
- Prior art keywords
- trolley
- wire rope
- bracket
- landside
- carriage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及岸桥托架小车,特别涉及一种岸桥四托架小车,适用于托架小车自带驱动系统能独立运行的、大梁扬起后托架小车无需或在有限范围内运行的、前后伸距超长的特大型岸桥。The utility model relates to a quay bridge bracket trolley, in particular to a quayside bridge four bracket trolley, which is suitable for the bracket trolley with its own drive system that can operate independently, and the bracket trolley does not need or can run within a limited range after the girder is raised. , Extra-large quayside crane with super long front and rear extension.
背景技术Background technique
在岸桥托架小车领域中,对于前、后伸距超长的特大型岸桥,钢丝绳的悬荡、弹跳问题通常采用常规的方式,例如,在岸桥的海、陆侧各布置一个托架小车的方法。这种方式无法解决上述现有的问题,尤其是当前伸距特别长的时候,就是采用在陆侧用两个托架小车、海侧使用一个托架小车的三托架小车缠绕方案也难以对付这一顽症。In the field of quay crane bracket trolley, for extra-large quay cranes with super long front and rear stretches, the suspension and bouncing problems of wire ropes are usually solved in a conventional way, for example, a bracket is arranged on the sea and land sides of the quay bridge The method of racking a trolley. This method cannot solve the above-mentioned existing problems, especially when the front stretch is particularly long, it is difficult to deal with the three-bracket trolley winding scheme that uses two bracket trolleys on the land side and one bracket trolley on the sea side This persistent disease.
钢丝绳的弹跳看似小问题,其实直接影响到岸桥的大、小车的运行稳定性、作业效率。其会加重岸桥的振动,影响整机性能,有时甚至会直接成为岸桥不能顺利交机的重要原因之一。进一步地,跨距大的钢丝绳还需要克服其自重作用下的挠垂所需的张紧力,张紧力的大幅提高不仅会提高张紧装置的成本,还会降低钢丝绳的寿命。The bouncing of the wire rope seems to be a small problem, but in fact it directly affects the operating stability and operating efficiency of the large and small cranes of the quay crane. It will aggravate the vibration of the quay crane, affect the performance of the whole machine, and sometimes even directly become one of the important reasons why the quay crane cannot be handed over smoothly. Furthermore, the steel wire rope with a large span also needs to overcome the tension force required to overcome the sag under its own weight. A large increase in the tension force will not only increase the cost of the tensioning device, but also reduce the life of the steel wire rope.
另外,托架小车一直沿用主小车牵引运行的方案,相互之间采用柔性的钢丝绳连接的托架小车和主小车运动没有独立性,相互干扰,导致小车实际停机位与其理论位置有错位。In addition, the carriage trolley has always been driven by the main trolley. The movement of the carriage trolley and the main trolley, which are connected by flexible wire ropes, is not independent and interferes with each other, resulting in a misalignment between the actual parking position of the trolley and its theoretical position.
因此,基于上述情况,本领域技术人员亟待从问题的源头上控制钢丝绳的悬荡,以期解决托架小车可独立运行等问题。Therefore, based on the above situation, those skilled in the art urgently need to control the suspension of the wire rope from the source of the problem, in order to solve the problem that the carriage trolley can operate independently.
实用新型内容Utility model content
本实用新型要解决的技术问题是为了克服现有技术中岸桥托架小车无法适用于特大型岸桥的缺陷,提供一种岸桥四托架小车。The technical problem to be solved by the utility model is to provide a four-bracket trolley for quayside cranes in order to overcome the defect that the quayside crane bracket trolley in the prior art cannot be applied to extra-large quayside bridges.
本实用新型是通过下述技术方案来解决上述技术问题的:一种岸桥四托架小车,其特点在于,所述岸桥四托架小车包括第一陆侧托架小车、第二陆侧托架小车、第一海测托架小车、第二海测托架小车、两套张紧油缸及两个卷筒,每一所述卷筒上设有第一钢丝绳和第二钢丝绳,所述第一钢丝绳通过头部滑轮组改向后与所述第一海测托架小车连接,所述第二钢丝绳通过尾部滑轮组改向与所述第一陆侧托架小车连接,每一所述张紧油缸与对应的所述尾部滑轮组连接;The utility model solves the above-mentioned technical problems through the following technical solutions: a four-bracket trolley for the quayside bridge, which is characterized in that the four-bracket trolley for the quayside bridge includes a first landside bracket trolley, a second landside Bracket trolley, first ocean survey bracket trolley, second ocean survey bracket trolley, two sets of tensioning oil cylinders and two reels, each of which is provided with a first steel wire rope and a second steel wire rope, said The first steel wire rope is redirected through the head pulley block and then connected to the first ocean survey bracket trolley, and the second steel wire rope is connected to the first landside bracket trolley through the tail pulley block redirection. The oil cylinder is connected with the corresponding tail block;
所述第一陆侧托架小车与所述第二陆侧托架小车之间通过第三钢丝绳连接;The first landside bracket trolley is connected to the second landside bracket trolley through a third wire rope;
所述第一海测托架小车与所述第二海测托架小车之间通过第四钢丝绳连接;The first ocean survey bracket trolley is connected to the second ocean survey bracket trolley through a fourth wire rope;
所述第二陆侧托架小车与所述第二海测托架小车之间通过第五钢丝绳连接。The second landside bracket trolley is connected to the second marine survey bracket trolley through a fifth steel wire rope.
较佳地,所述第一海侧托架小车上设有第一滑轮装配,所述第一钢丝绳的一端连接对应的所述卷筒,另一端依次穿过所述头部滑轮组和所述第一滑轮装配后固定至头部钢丝绳系固点处,所述头部钢丝绳系固点位于所述第一海测托架小车外侧的物体上。Preferably, the first sea side bracket trolley is equipped with a first pulley assembly, one end of the first steel wire rope is connected to the corresponding drum, and the other end passes through the head pulley block and the first pulley in turn. A pulley is assembled and fixed to the fastening point of the head wire rope, and the head wire rope fastening point is located on the object outside the first ocean survey bracket trolley.
较佳地,所述第一陆侧托架小车上设有第二滑轮装配,所述第二钢丝绳的一端连接对应的所述卷筒,另一端依次穿过所述尾部滑轮组和所述第二滑轮装配后固定至尾部钢丝绳系固点处,所述尾部钢丝绳系固点位于所述第一陆侧托架小车外侧的物体上。Preferably, the first landside carriage trolley is provided with a second pulley assembly, one end of the second wire rope is connected to the corresponding drum, and the other end passes through the tail pulley block and the second pulley in sequence. After the pulley is assembled, it is fixed to the fastening point of the steel wire rope at the tail, and the fastening point of the steel wire rope at the tail is located on the object outside the first landside bracket trolley.
较佳地,所述第一陆侧托架小车的两端分别设置一套第三滑轮装配,所述第三钢丝绳的一端固定至位于所述第二陆侧托架小车上的第一钢丝绳系固点处,另一端穿过所述第三滑轮装配后固定至第二钢丝绳系固点处,所述第二钢丝绳系固点位于所述第二陆侧托架小车外侧的物体上。Preferably, a set of third pulley assemblies are respectively provided at both ends of the first land side bracket trolley, and one end of the third steel wire rope is fixed to the first steel wire rope system on the second land side bracket trolley. At the fixed point, the other end is assembled through the third pulley and fixed to the second wire rope fastening point, and the second steel wire rope fastening point is located on the object outside the second landside bracket trolley.
较佳地,所述第一海测托架小车的两端分别设置一套第四滑轮装配,所述第四钢丝绳的一端固定至位于所述第二海测托架小车上的第三钢丝绳系固点处,另一端穿过所述第四滑轮装配后固定至第四钢丝绳系固点处,所述第四钢丝绳系固点位于所述第二海侧托架小车外侧的物体上。Preferably, a set of fourth pulley assemblies are respectively provided at both ends of the first ocean survey bracket trolley, and one end of the fourth steel wire rope is fixed to the third steel wire rope system on the second ocean survey bracket trolley. At the fixed point, the other end is assembled through the fourth pulley and fixed to the fourth wire rope fastening point, and the fourth steel wire rope fastening point is located on the object outside the second sea side bracket trolley.
较佳地,所述第二海测托架小车上还设有两套第五滑轮装配,所述第五钢丝绳的一端固定至位于所述第二陆侧托架小车上的第五钢丝绳系固点处,另一端穿过两套所述第五滑轮装配后固定至位于所述第二陆侧托架小车上的第六钢丝绳系固点处。Preferably, two sets of fifth pulley assemblies are also provided on the second sea surveying carriage trolley, and one end of the fifth steel wire rope is fixed to the fifth steel rope on the second landside carriage trolley. point, and the other end passes through two sets of the fifth pulley and is assembled and fixed to the sixth wire rope fastening point on the second land side bracket trolley.
较佳地,所述第一海测托架小车的速度是所述第一钢丝绳的速度的一半,所述第一陆侧托架小车的速度是所述第二钢丝绳的速度的一半。Preferably, the speed of the first ocean surveying carriage is half of the speed of the first wire rope, and the speed of the first landside carriage is half of the speed of the second wire rope.
较佳地,所述第一陆侧托架小车的速度为所述第二陆侧托架小车的一半。Preferably, the speed of the first landside carriage trolley is half that of the second landside carriage carriage.
较佳地,所述第一海测托架小车的速度为所述第二海测托架小车的一半。Preferably, the speed of the first sea surveying carriage is half of that of the second sea surveying carriage.
较佳地,所述第二陆侧托架小车的速度与所述第二海测托架小车的速度相等。Preferably, the speed of the second landside carriage trolley is equal to the speed of the second marine survey carriage trolley.
本实用新型的积极进步效果在于:The positive progressive effect of the present utility model is:
本实用新型岸桥四托架小车通过在海、陆侧各采用两个速度不等托架小车来托起岸桥的起升缠绕、小车缠绕以及自身的缠绕钢丝绳,通过增加托架小车的数量来缩短钢丝绳的跨距,从而降低钢丝绳的悬荡。同时在岸桥机房内增加一套独立的驱动系统,使得托架小车可以不需要主小车牵引而独立运行。其通过合理布置滑轮组和钢丝绳、有效地控制了托架小车的速度,增设独立的驱动系统,实现了岸桥四托架小车缠绕的创新设计,满足了大型乃至超大型岸桥的应用需求。The four bracket trolleys of the quay bridge of the utility model use two bracket trolleys with different speeds on the sea and land sides to support the lifting winding of the quay bridge, the trolley winding and its own winding steel wire rope, and increase the number of bracket trolleys. To shorten the span of the wire rope, thereby reducing the suspension of the wire rope. At the same time, an independent drive system is added in the machine room of the quay crane, so that the carriage trolley can run independently without the traction of the main trolley. By rationally arranging the pulley blocks and wire ropes, the speed of the carriage trolley is effectively controlled, and an independent drive system is added to realize the innovative design of four carriage trolley winding for the quayside crane, which meets the application requirements of large and even super large quayside cranes.
附图说明Description of drawings
本实用新型上述的以及其他的特征、性质和优势将通过下面结合附图和实施例的描述而变的更加明显,在附图中相同的附图标记始终表示相同的特征,其中:The above-mentioned and other features, properties and advantages of the present utility model will become more apparent through the following description in conjunction with the accompanying drawings and embodiments. In the accompanying drawings, the same reference numerals always represent the same features, wherein:
图1为本实用新型岸桥四托架小车的缠绕布置图。Fig. 1 is the winding arrangement diagram of the four-bracket trolley of the quay crane of the utility model.
图2为本实用新型岸桥四托架小车中头部滑轮组的工作原理图。Fig. 2 is a working principle diagram of the head pulley block in the four-bracket trolley of the quay crane of the utility model.
图3为本实用新型岸桥四托架小车中滑轮装配的工作原理图。Fig. 3 is a working principle diagram of the pulley assembly in the four-bracket trolley of the quay crane of the utility model.
具体实施方式detailed description
为让本实用新型的上述目的、特征和优点能更明显易懂,以下结合附图对本实用新型的具体实施方式作详细说明。In order to make the above-mentioned purposes, features and advantages of the present utility model more obvious and understandable, the specific implementation of the present utility model will be described in detail below in conjunction with the accompanying drawings.
在下面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是本实用新型还可以采用其它不同于在此描述的其它方式来实施,因此本实用新型不受下面公开的具体实施例的限制。In the following description, a lot of specific details have been set forth in order to fully understand the utility model, but the utility model can also be implemented in other ways different from those described here, so the utility model is not limited by the specific embodiments disclosed below limit.
图1为本实用新型岸桥四托架小车的缠绕布置图。图2为本实用新型岸桥四托架小车中头部滑轮组的工作原理图。图3为本实用新型岸桥四托架小车中滑轮装配的工作原理图。Fig. 1 is the winding arrangement diagram of the four-bracket trolley of the quay crane of the utility model. Fig. 2 is a working principle diagram of the head pulley block in the four-bracket trolley of the quay crane of the utility model. Fig. 3 is a working principle diagram of the pulley assembly in the four-bracket trolley of the quay crane of the utility model.
如图1至图3所示,本实用新型的一个实施例中公开了一种岸桥四托架小车,其包括第一陆侧托架小车10、第二陆侧托架小车20、第一海测托架小车30、第二海测托架小车40、两套张紧油缸60及两个卷筒50,卷筒50置于机器房内。其中,每一卷筒50上设有第一钢丝绳51和第二钢丝绳52,第一钢丝绳51通过头部滑轮组70改向后与第一海测托架小车30连接,第二钢丝绳52通过尾部滑轮组71改向与第一陆侧托架小车10连接,每一张紧油缸60与对应的尾部滑轮组71连接。As shown in Figures 1 to 3, one embodiment of the utility model discloses a four-carriage trolley for quayside cranes, which includes a first landside carriage trolley 10, a second landside carriage trolley 20, a first landside carriage trolley, The sea survey bracket trolley 30, the second sea survey bracket trolley 40, two sets of tensioning oil cylinders 60 and two reels 50, the reels 50 are placed in the machine room. Wherein, each reel 50 is provided with a first steel wire rope 51 and a second steel wire rope 52, the first steel wire rope 51 is connected with the first ocean survey bracket trolley 30 after being redirected by the head pulley block 70, and the second steel wire rope 52 is passed through the tail pulley block 71 is redirected to be connected with the first landside bracket trolley 10, and each tensioning oil cylinder 60 is connected with the corresponding tail pulley block 71.
此处的第一陆侧托架小车10与第二陆侧托架小车20之间通过第三钢丝绳53连接。第一海测托架小车30与第二海测托架小车40之间通过第四钢丝绳54连接。第二陆侧托架小车20与第二海测托架小车40之间通过第五钢丝绳55连接。Here, the first landside bracket trolley 10 and the second landside bracket trolley 20 are connected by a third wire rope 53 . The first ocean survey bracket trolley 30 is connected to the second ocean survey bracket trolley 40 through a fourth wire rope 54 . The second land side bracket trolley 20 is connected to the second marine survey bracket trolley 40 through a fifth wire rope 55 .
进一步优选地,第一海侧托架小车30上设有第一滑轮装配72,第一钢丝绳51的一端连接对应的卷筒50,另一端依次穿过头部滑轮组70和第一滑轮装配72后固定至头部钢丝绳系固点处80,这里所述的头部钢丝绳系固点80位于第一海测托架小车30外侧的物体上。同理,第一陆侧托架小车10上设有第二滑轮装配73,第二钢丝绳52的一端连接对应的卷筒50,另一端依次穿过尾部滑轮组71和第二滑轮装配73后固定至尾部钢丝绳系固点81处,这里所述的尾部钢丝绳系固点81位于第一陆侧托架小车10外侧的物体上。Further preferably, the first sea side bracket trolley 30 is provided with a first pulley assembly 72, one end of the first wire rope 51 is connected to the corresponding reel 50, and the other end passes through the head pulley block 70 and the first pulley assembly 72 in sequence and then fixed To the head wire rope fastening point 80 , the head wire rope fastening point 80 described here is located on the object outside the first ocean survey bracket trolley 30 . Similarly, the first land side bracket trolley 10 is provided with a second pulley assembly 73, one end of the second wire rope 52 is connected to the corresponding reel 50, and the other end passes through the tail pulley block 71 and the second pulley assembly 73 successively and is fixed to the At the tail wire rope securing point 81 , the tail wire rope securing point 81 described here is located on an object outside the first landside carriage trolley 10 .
另外,在第一陆侧托架小车10的两端分别设置一套第三滑轮装配74,第三钢丝绳53的一端固定至位于第二陆侧托架小车20上的第一钢丝绳系固点处82,另一端穿过第三滑轮装配74后固定至第二钢丝绳系固点83处,这里所述的第二钢丝绳系固点83位于第二陆侧托架小车20外侧的物体上。In addition, a set of third pulley assemblies 74 are respectively provided at both ends of the first landside carriage trolley 10, and one end of the third wire rope 53 is fixed to the first wire rope tie-down point on the second landside carriage trolley 20. 82, and the other end passes through the third pulley assembly 74 and is fixed to the second wire rope fastening point 83, the second wire rope fastening point 83 described here is located on the object outside the second landside carriage trolley 20.
同理,在第一海测托架小车30的两端分别设置一套第四滑轮装配75,第四钢丝绳54的一端固定至位于第二海测托架小车40上的第三钢丝绳系固点84处,另一端穿过第四滑轮装配75后固定至第四钢丝绳系固点85处,这里所述的第四钢丝绳系固点85位于第二海侧托架小车40外侧的物体上。In the same way, a set of fourth pulley assembly 75 is respectively arranged at both ends of the first ocean survey bracket trolley 30, and one end of the fourth wire rope 54 is fixed to the third wire rope fastening point on the second ocean survey bracket trolley 40 At 84, the other end passes through the fourth pulley assembly 75 and is fixed to the fourth wire rope fastening point 85. The fourth steel wire rope fastening point 85 described here is located on the object outside the second sea side bracket trolley 40.
进一步地,在第二海测托架小车40上还设有两套第五滑轮装配76,将第五钢丝绳55的一端固定至位于第二陆侧托架小车20上的第五钢丝绳系固点86处,另一端穿过两套第五滑轮装配76后固定至位于第二陆侧托架小车20上的第六钢丝绳系固点87处。Further, two sets of fifth pulley assembly 76 are also provided on the second ocean surveying carriage trolley 40, and one end of the fifth steel wire rope 55 is fixed to the fifth steel rope fastening point on the second land side carriage trolley 20 86, the other end passes through two sets of the fifth pulley assembly 76 and is fixed to the sixth wire rope fastening point 87 on the second landside carriage trolley 20.
如上所述本实用新型岸桥四托架小车的缠绕系统相对于大梁中心线对称布置。其利用如图2所示的双联滑轮组减速原理,使得第一海测托架小车30的速度为第一钢丝绳51的速度的一半。第一陆侧托架小车10的速度是第二钢丝绳52的速度的一半。如图3所示的单联滑轮组减速原理,使得第一陆侧托架小车10的速度为第二陆侧托架小车20的一半。第一海测托架小车30的速度为第二海测托架小车40的一半。而第二陆侧托架小车20的速度与第二海测托架小车40的速度相等。As mentioned above, the winding system of the four-bracket trolley of the quay crane of the utility model is arranged symmetrically with respect to the center line of the girder. It utilizes the deceleration principle of the double pulley block as shown in FIG. 2 , so that the speed of the first marine survey bracket trolley 30 is half of the speed of the first wire rope 51 . The speed of the first landside carriage trolley 10 is half the speed of the second wire rope 52 . The deceleration principle of the single pulley block shown in FIG. 3 makes the speed of the first landside carriage trolley 10 half that of the second landside carriage trolley 20 . The speed of the first ocean survey bracket car 30 is half of that of the second ocean survey bracket car 40 . And the speed of the second landside carriage dolly 20 is equal to the speed of the second ocean survey carriage dolly 40 .
本实用新型岸桥四托架小车的目的在于提供一种新型岸桥托架的缠绕方案,其在海、陆侧各采用两个速度不等的托架小车(即本文中提到的四托架小车)来托起岸桥的起升缠绕、小车缠绕以及自身的缠绕钢丝绳,通过增加托架小车的数量来缩短钢丝绳的跨距,从而降低钢丝绳的悬荡。同时,在岸桥机房内增加一套独立的驱动系统,使得托架小车可以不需要主小车牵引而独立运行。The purpose of the utility model four-bracket trolley for quay cranes is to provide a winding scheme for a new type of quay crane bracket, which uses two bracket trolleys with different speeds on the sea and land sides (that is, the four-trolley mentioned in this article). Trolley) to support the hoisting and winding of the quay bridge, the winding of the trolley and its own winding wire rope, and shorten the span of the wire rope by increasing the number of bracket trolleys, thereby reducing the suspension of the wire rope. At the same time, an independent drive system is added in the machine room of the quay crane, so that the carriage trolley can run independently without the traction of the main trolley.
本实用新型岸桥四托架小车的特点在于:The characteristics of the four-bracket trolley for the quayside bridge of the utility model are:
一、不同于一般的主小车牵引的缠绕形式,该四托架小车缠绕自带独立的驱动系统,使得托架小车在运行速度的调节方面更具有灵活性。如附图所示的四托架小车缠绕,与驱动系统的卷筒50连接的第一钢丝绳51和第二钢丝绳52的速度就可以直接通过卷筒50的驱动电机转速来设定。1. Different from the general winding form of the main trolley, the four-trolley winding has its own independent drive system, which makes the adjustment of the running speed of the carriage trolley more flexible. As shown in the accompanying drawings, the speed of the first wire rope 51 and the second wire rope 52 connected to the reel 50 of the drive system can be directly set by the speed of the drive motor of the reel 50 .
二、巧妙地运用了滑轮组倍率变化来达到增、减钢丝绳速度的目的,使得钢丝的绳速度可控,托架小车与小车之间也就能有序地运行。在设定好从驱动系统引出的第一钢丝绳51和第二钢丝绳52的速度V后,其它钢丝绳速度可以通过滑轮组倍率的改变来控制。如附图中的缠绕方案中第一陆侧托架小车10、第一海侧托架小车30的速度就被减为1/2V,第二海侧托架小车40和第二陆侧托架小车20与相应的第一海测托架小车30、第一陆侧托架小车10之间则通过动滑轮实现速度翻倍到V。2. Cleverly use the change of pulley block multiplier to achieve the purpose of increasing and decreasing the speed of the steel wire rope, so that the speed of the steel wire rope can be controlled, and the carriage trolley and trolley can also run in an orderly manner. After setting the speed V of the first wire rope 51 and the second wire rope 52 drawn from the drive system, other wire rope speeds can be controlled by changing the ratio of the pulley block. As in the winding scheme in the accompanying drawings, the speeds of the first landside carriage dolly 10 and the first seaside carriage 30 are reduced to 1/2V, and the second seaside carriage 40 and the second landside carriage Between the trolley 20 and the corresponding first sea-survey bracket trolley 30 and the first land-side bracket trolley 10, the speed is doubled to V through movable pulleys.
三、四托架小车缠绕自身钢丝绳数目就很多,如附图中共计有9根钢丝绳,加上外侧有岸桥的起升缠绕钢丝绳、内侧有主小车缠绕钢丝绳,其采取了空间纵向分层、横向分档等方式排布,以避免钢丝绳之间相互纠缠、干涉、和钩挂。Three or four-bracket trolleys have a lot of steel wire ropes wrapped around them. For example, there are 9 steel wire ropes in the attached drawing, plus the lifting winding steel wire ropes of the quay bridge on the outside and the winding steel wire ropes of the main trolley on the inside. Arranged in horizontal grading and other ways to avoid entanglement, interference and hooking between wire ropes.
综上所述,本实用新型岸桥四托架小车以上通过合理的布置滑轮组和钢丝绳、有效地控制了托架小车的速度,增设独立的驱动系统,实现了岸桥四托架小车缠绕的创新设计,满足了大型乃至超大型岸桥的应用需求。To sum up, the four-bracket trolley of the quayside crane of the utility model effectively controls the speed of the bracket trolley by rationally arranging the pulley block and the wire rope, and adds an independent drive system to realize the winding innovation of the four-bracket trolley of the quayside bridge. Designed to meet the application requirements of large and even super large quayside cranes.
虽然以上描述了本实用新型的具体实施方式,但是本领域的技术人员应当理解,这些仅是举例说明,本实用新型的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本实用新型的原理和实质的前提下,可以对这些实施方式作出多种变更或修改,但这些变更和修改均落入本实用新型的保护范围。Although the specific embodiments of the present invention have been described above, those skilled in the art should understand that these are only examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present utility model, but these changes and modifications all fall within the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521078169.5U CN205204646U (en) | 2015-12-22 | 2015-12-22 | Four bracket dollies on bank bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521078169.5U CN205204646U (en) | 2015-12-22 | 2015-12-22 | Four bracket dollies on bank bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205204646U true CN205204646U (en) | 2016-05-04 |
Family
ID=55842376
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521078169.5U Expired - Lifetime CN205204646U (en) | 2015-12-22 | 2015-12-22 | Four bracket dollies on bank bridge |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205204646U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105384068A (en) * | 2015-12-22 | 2016-03-09 | 上海振华重工(集团)股份有限公司 | Four-bracket trolley for quayside container crane |
| CN114348867A (en) * | 2020-10-12 | 2022-04-15 | 株式会社大福 | Article lifting device and article carrier with same |
| CN116332053A (en) * | 2023-04-14 | 2023-06-27 | 上海振华重工(集团)股份有限公司 | A bracket trolley winding system for single-box girder quay bridge |
| CN119160770A (en) * | 2024-09-29 | 2024-12-20 | 三一海洋重工有限公司 | Trolley traction device and quay crane |
-
2015
- 2015-12-22 CN CN201521078169.5U patent/CN205204646U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105384068A (en) * | 2015-12-22 | 2016-03-09 | 上海振华重工(集团)股份有限公司 | Four-bracket trolley for quayside container crane |
| CN114348867A (en) * | 2020-10-12 | 2022-04-15 | 株式会社大福 | Article lifting device and article carrier with same |
| CN116332053A (en) * | 2023-04-14 | 2023-06-27 | 上海振华重工(集团)股份有限公司 | A bracket trolley winding system for single-box girder quay bridge |
| CN119160770A (en) * | 2024-09-29 | 2024-12-20 | 三一海洋重工有限公司 | Trolley traction device and quay crane |
| CN119160770B (en) * | 2024-09-29 | 2025-10-10 | 三一海洋重工有限公司 | Trolley traction device and quay crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202848895U (en) | Crane hoisting mechanism | |
| CN205204646U (en) | Four bracket dollies on bank bridge | |
| CN104961043B (en) | A kind of crane barge and its Multifunctional hanging hook, Multifunctional hanging hook group | |
| CN201809059U (en) | Crane pulley block mechanism and crane comprising same | |
| CN105129612A (en) | Double-trolley drive mechanism used for traversing type double-trolley quay crane | |
| CN108439210B (en) | A drop-down crane anti-sway device | |
| CN204958233U (en) | Tower crane hoisting wire rope rope support device | |
| CN108002229B (en) | A kind of low clearance box culvert part loop wheel machine with turn over function | |
| CN203946815U (en) | Crane Super Lifting Device and Crane | |
| CN205011258U (en) | A double small car actuating mechanism for passing through formula double small car bank bridge | |
| CN104627885A (en) | Guiding device for optimizing steel wire rope elevation angle | |
| CN203529798U (en) | Lifting devices and cranes | |
| CN205204647U (en) | Three bracket dollies on bank bridge | |
| CN108249317A (en) | A kind of cable crane full circle swinging trailer system and construction method | |
| CN202379623U (en) | Hoisting mechanism and reach stacker | |
| CN202542765U (en) | Steel wire rope pulley assembly and crane | |
| CN203767902U (en) | Hoisting crane structure of folding block of steel box girder of cable-stayed bridge | |
| CN105384069B (en) | The trolley of bank bridge three | |
| CN204802900U (en) | Amplitude changing device of swing arm formula tower machine | |
| CN103803432B (en) | A kind of carriage amplitude varying formula tower crane two multiplying power luffing device | |
| CN105384068A (en) | Four-bracket trolley for quayside container crane | |
| CN106006434B (en) | A kind of single drum four-point lifting lifting mechanism | |
| JP5781797B2 (en) | Catenary support trolley rope hanging method | |
| CN202415043U (en) | Double-winding-drum hoisting mechanism | |
| CN202785391U (en) | Three-hanging-point hoisting mechanism of overweight-type seaborne crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160504 |