CN205189876U - Shield structure machine bracket that misses stop - Google Patents
Shield structure machine bracket that misses stop Download PDFInfo
- Publication number
- CN205189876U CN205189876U CN201521037178.XU CN201521037178U CN205189876U CN 205189876 U CN205189876 U CN 205189876U CN 201521037178 U CN201521037178 U CN 201521037178U CN 205189876 U CN205189876 U CN 205189876U
- Authority
- CN
- China
- Prior art keywords
- panel
- plate
- guide rail
- web
- shield machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
技术领域technical field
本实用新型属于盾构机技术领域,具体涉及一种盾构机过站托架。The utility model belongs to the technical field of shield tunneling machines, and in particular relates to a shield tunneling machine passing bracket.
背景技术Background technique
随着我国城市轨道交通设施的快速发展,盾构机已成为现代城市轨道交通和隧道工程施工中不可或缺的主流施工设备,而在盾构施工过程中经常出现盾构机过站的环节,盾构机托架则是盾构机在始发、到达及过站施工过程中必须使用的重要构件。现有的盾构机过站方式如下:With the rapid development of my country's urban rail transit facilities, the shield machine has become an indispensable mainstream construction equipment in the construction of modern urban rail transit and tunnel engineering, and in the process of shield tunneling construction, there are often links where the shield machine passes the station. The shield machine bracket is an important component that the shield machine must use in the process of starting, arriving and passing. The existing shield machine passing methods are as follows:
一种盾构机过站方式是采用钢筋砼弧形导台过站,该方法是在车站主体结构底板上预先浇筑钢筋砼弧形导台,在导台内安置钢轨,盾构机到达后,顶推至弧形导台钢导轨上,用两台千斤顶顶推盾构机向前移动过站。该方法在前期施工钢筋弧形导台时,精度要求高,后期还需破除导台,材料浪费大,施工成本相对较高。A way for the shield machine to pass the station is to use a reinforced concrete arc-shaped guide platform to pass the station. This method is to pre-cast a reinforced concrete arc-shaped guide platform on the main structure floor of the station, and place steel rails in the guide platform. After the shield machine arrives, Push it onto the steel guide rail of the arc-shaped guide table, and use two jacks to push the shield machine forward to pass the station. This method requires high precision in the construction of the arc-shaped guide platform for steel bars in the early stage, and the guide platform needs to be removed in the later stage, resulting in a large waste of materials and relatively high construction costs.
另一种盾构机过站方式是采用过站小车加满铺钢板的过站方式,该方法是采用传统型钢托架作为盾构机过站小车,型钢托架下满焊钢板,盾构机过站前,在车站主体结构底板上铺设3cm厚的钢板,钢板下部用砂子找平并用水泥砂浆抹平固定,而后采用两台千斤顶顶推过站小车,完成盾构机过站作业。该方法由于作为过站小车的型钢托架高度较高,因此在盾构机到达后进行过站施工前以及过站作业完成后二次始发前,均需对盾构机盾体进行顶升置换托架作业,而盾构机重量、体积均较大,顶升过程安全隐患较大。型钢托架的体积大,较笨重,拼装过程中无吊车配合时难度较大。Another shield machine passing method is to use the passing trolley to fill the station with steel plates. This method uses the traditional shaped steel bracket as the shield machine passing trolley, and the steel plate is fully welded under the shaped steel bracket. Before passing the station, a 3cm thick steel plate is laid on the main structure floor of the station, the lower part of the steel plate is leveled with sand and fixed with cement mortar, and then two jacks are used to push the trolley through the station to complete the station passing operation of the shield machine. Due to the high height of the section steel bracket used as the passing trolley in this method, it is necessary to lift the shield body of the shield machine before the station passing construction after the shield machine arrives and before the second departure after the passing operation is completed. The bracket replacement operation, but the weight and volume of the shield machine are relatively large, and the safety hazards during the jacking process are relatively large. The section steel bracket is bulky and heavy, and it is difficult to cooperate without a crane during the assembly process.
上述两种盾构机过站方式均存在明显缺点,安全、工期、成本均不理想。Both of the above two shield machine passing methods have obvious shortcomings, and the safety, construction period and cost are not ideal.
实用新型内容Utility model content
本实用新型的目的在于克服上述现有技术中的不足,提供一种盾构机过站托架,其结构简单、设计合理新颖合理且组装方便,可避免置换托架过程中盾构机顶升环节存在较大的安全隐患,方便盾构机过站,使用安全、可靠,操作便捷。The purpose of the utility model is to overcome the deficiencies in the above-mentioned prior art, and provide a shield machine passing bracket, which has a simple structure, reasonable design, novel and reasonable and convenient assembly, which can avoid the shield machine jacking up in the process of replacing the bracket There is a big potential safety hazard in the link, which is convenient for the shield machine to pass through, safe, reliable and convenient to operate.
为实现上述目的,本实用新型采用的技术方案是:一种盾构机过站托架,其特征在于:包括中间连接板和对称连接在中间连接板左右两侧的支承底架,所述支承底架包括底板、主支撑架和导轨,所述主支撑架安装在底板上,所述导轨安装在所述主支撑架上,所述主支撑架的左右两侧均设置有肋板,所述主支撑架为T字形结构,所述主支撑架包括腹板和面板,所述腹板的上端与面板的底部固定连接,所述腹板的下端与底板固定连接,所述腹板和面板均沿底板的长度方向设置,所述肋板与底板、腹板和面板均固定连接,所述导轨安装在面板上,所述导轨沿面板的长度方向设置,所述导轨的两侧均设置有用于将导轨压紧在面板上的压板,所述压板固定安装在面板上,所述底板与中间连接板固定连接。In order to achieve the above purpose, the technical solution adopted by the utility model is: a shield machine passing bracket, which is characterized in that it includes an intermediate connecting plate and a supporting chassis symmetrically connected to the left and right sides of the intermediate connecting plate, and the supporting The chassis includes a bottom plate, a main support frame and guide rails, the main support frame is installed on the bottom plate, the guide rail is installed on the main support frame, ribs are arranged on the left and right sides of the main support frame, and the The main support frame is a T-shaped structure, the main support frame includes a web and a panel, the upper end of the web is fixedly connected to the bottom of the panel, the lower end of the web is fixedly connected to the bottom plate, and the web and the panel are both It is arranged along the length direction of the bottom plate, the ribs are fixedly connected with the bottom plate, the web and the panel, the guide rail is installed on the panel, the guide rail is arranged along the length direction of the panel, and both sides of the guide rail are provided with The guide rail is pressed against the pressure plate on the panel, the pressure plate is fixedly installed on the panel, and the bottom plate is fixedly connected with the middle connecting plate.
上述的一种盾构机过站托架,其特征在于:所述主支撑架的外侧设置有加强肋,所述加强肋的形状为T字形,所述加强肋的下端与底板焊接,所述加强肋的上部与位于外侧的所述肋板焊接,所述加强肋沿底板的长度方向设置。The above-mentioned shield machine passing bracket is characterized in that: the outer side of the main support frame is provided with a reinforcing rib, the shape of the reinforcing rib is T-shaped, the lower end of the reinforcing rib is welded to the bottom plate, the The upper part of the reinforcing rib is welded to the rib plate located on the outside, and the reinforcing rib is arranged along the length direction of the bottom plate.
上述的一种盾构机过站托架,其特征在于:所述底板的内侧焊接有第一连接板,所述中间连接板上焊接有第二连接板,所述第一连接板和第二连接板相对设置,所述第一连接板和第二连接板通过螺栓固定连接。The above-mentioned shield machine passing bracket is characterized in that: a first connecting plate is welded on the inner side of the bottom plate, a second connecting plate is welded on the middle connecting plate, and the first connecting plate and the second connecting plate are welded. The connecting plates are arranged oppositely, and the first connecting plate and the second connecting plate are fixedly connected by bolts.
上述的一种盾构机过站托架,其特征在于:所述肋板的数量为多个,多个所述肋板均匀布设。The above-mentioned shield machine passing bracket is characterized in that: there are multiple ribs, and the multiple ribs are evenly arranged.
上述的一种盾构机过站托架,其特征在于:所述压板的数量为多个,多个所述压板均匀布设。The above-mentioned shield machine passing bracket is characterized in that: the number of the pressing plates is multiple, and the plurality of pressing plates are evenly arranged.
上述的一种盾构机过站托架,其特征在于:所述腹板的上端与面板的底部的连接方式为焊接,所述腹板的下端与底板的连接方式为焊接。The above-mentioned shield machine passing bracket is characterized in that: the upper end of the web is connected to the bottom of the panel by welding, and the lower end of the web is connected to the bottom plate by welding.
上述的一种盾构机过站托架,其特征在于:所述肋板与底板的连接方式为焊接,所述肋板与腹板的连接方式为焊接,所述肋板与面板的连接方式为焊接。The above-mentioned shield machine passing bracket is characterized in that: the connection mode between the rib plate and the bottom plate is welding, the connection mode between the rib plate and the web plate is welding, and the connection mode between the rib plate and the panel is for soldering.
上述的一种盾构机过站托架,其特征在于:所述导轨焊接在面板上,所述压板焊接在面板上。The above-mentioned shield machine passing bracket is characterized in that: the guide rail is welded on the panel, and the pressure plate is welded on the panel.
上述的一种盾构机过站托架,其特征在于:所述中间连接板的形状为长方形。The above-mentioned transit bracket of a shield machine is characterized in that: the shape of the intermediate connecting plate is rectangular.
上述的一种盾构机过站托架,其特征在于:所述中间连接板为钢板。The above-mentioned shield machine passing bracket is characterized in that: the intermediate connecting plate is a steel plate.
本实用新型与现有技术相比具有以下优点:Compared with the prior art, the utility model has the following advantages:
1、本实用新型结构简单、设计合理新颖合理且组装方便。1. The utility model is simple in structure, reasonable in design, novel and reasonable, and convenient in assembly.
2、本实用新型过站托架与传统型钢托架相比,重量轻、安装简便、快捷,盾构机接收平移后,可直接顶推至过站托架上,无需顶升盾构机置换过站托架环节,安全和工期都可以得到保障。2. Compared with the traditional section steel bracket, the passing bracket of the utility model is light in weight, easy and quick to install. After the shield machine receives translation, it can be directly pushed onto the passing bracket without jacking up the shield machine for replacement The safety and construction period can be guaranteed in the transit bracket link.
3、本实用新型可避免置换托架过程中盾构机顶升环节存在较大的安全隐患,方便盾构机过站,使用安全、可靠。3. The utility model can avoid the big potential safety hazard in the jacking link of the shield machine in the process of replacing the bracket, facilitates the shield machine to pass through the station, and is safe and reliable to use.
下面通过附图和实施例,对本实用新型做进一步的详细描述。Below by accompanying drawing and embodiment, the utility model is described in further detail.
附图说明Description of drawings
图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图2为本实用新型上放置盾构机时的结构示意图。Fig. 2 is a structural schematic diagram of the utility model when a shield machine is placed on it.
图3为本实用新型的使用状态图。Fig. 3 is the usage state diagram of the utility model.
附图标记说明:Explanation of reference signs:
1—底板;2—腹板;3—面板;1—bottom plate; 2—web plate; 3—face plate;
4—肋板;5—第二连接板;6—加强肋;4—rib plate; 5—second connecting plate; 6—reinforcing rib;
7—第一连接板;8—导轨;9—压板;7—the first connecting plate; 8—the guide rail; 9—the pressure plate;
10—中间连接板;11—盾构机;12—过站托架;10—intermediate connecting plate; 11—shield machine; 12—passing bracket;
13—钢板;14—接收托架;15—型钢垫板;13—steel plate; 14—receiving bracket; 15—steel backing plate;
16—车站结构底板。16—the bottom plate of the station structure.
具体实施方式detailed description
如图1和图2所示,本实用新型包括中间连接板10和对称连接在中间连接板10左右两侧的支承底架,所述支承底架包括底板1、主支撑架和导轨8,所述主支撑架安装在底板1上,所述导轨8安装在所述主支撑架上,所述主支撑架的左右两侧均设置有肋板4,所述主支撑架为T字形结构,所述主支撑架包括腹板2和面板3,所述腹板2的上端与面板3的底部固定连接,所述腹板2的下端与底板1固定连接,所述腹板2和面板3均沿底板1的长度方向设置,所述肋板4与底板1、腹板2和面板3均固定连接,所述导轨8安装在面板3上,所述导轨8沿面板3的长度方向设置,所述导轨8的两侧均设置有用于将导轨8压紧在面板3上的压板9,所述压板9固定安装在面板3上,所述底板1与中间连接板10固定连接。As shown in Figures 1 and 2, the utility model includes an intermediate connecting plate 10 and a support chassis symmetrically connected to the left and right sides of the intermediate connecting plate 10, and the supporting chassis includes a base plate 1, a main support frame and a guide rail 8, so that The main support frame is installed on the base plate 1, the guide rail 8 is installed on the main support frame, the left and right sides of the main support frame are provided with ribs 4, and the main support frame is a T-shaped structure, so The main support frame includes a web 2 and a panel 3, the upper end of the web 2 is fixedly connected to the bottom of the panel 3, the lower end of the web 2 is fixedly connected to the bottom plate 1, and the web 2 and the panel 3 are all along The length direction of the bottom plate 1 is set, the rib plate 4 is fixedly connected with the bottom plate 1, the web plate 2 and the panel 3, the guide rail 8 is installed on the panel 3, and the guide rail 8 is arranged along the length direction of the panel 3. Both sides of the guide rail 8 are provided with a pressing plate 9 for pressing the guide rail 8 on the panel 3 , the pressing plate 9 is fixedly installed on the panel 3 , and the bottom plate 1 is fixedly connected with the intermediate connecting plate 10 .
如图1和图2所示,所述主支撑架的外侧设置有加强肋6,所述加强肋6的形状为T字形,所述加强肋6的下端与底板1焊接,所述加强肋6的上部与位于外侧的所述肋板焊接,所述加强肋6沿底板1的长度方向设置;加强肋6对主支撑架起加强作用。As shown in Figure 1 and Figure 2, the outer side of the main support frame is provided with a reinforcing rib 6, the shape of the reinforcing rib 6 is T-shaped, the lower end of the reinforcing rib 6 is welded to the bottom plate 1, and the reinforcing rib 6 The upper part of the upper part is welded with the ribs located on the outside, and the reinforcing ribs 6 are arranged along the length direction of the bottom plate 1; the reinforcing ribs 6 strengthen the main support frame.
如图1和图2所示,所述底板1的内侧焊接有第一连接板7,所述中间连接板10上焊接有第二连接板5,所述第一连接板7和第二连接板5相对设置,所述第一连接板7和第二连接板5通过螺栓固定连接。As shown in Figures 1 and 2, a first connecting plate 7 is welded on the inner side of the bottom plate 1, a second connecting plate 5 is welded on the intermediate connecting plate 10, and the first connecting plate 7 and the second connecting plate 5 are arranged oppositely, and the first connecting plate 7 and the second connecting plate 5 are fixedly connected by bolts.
本实施例中,所述肋板4的数量为多个,多个所述肋板4均匀布设。In this embodiment, the number of the ribs 4 is multiple, and the plurality of ribs 4 are uniformly arranged.
本实施例中,所述压板9的数量为多个,多个所述压板9均匀布设。In this embodiment, the number of the pressing plates 9 is multiple, and the plurality of pressing plates 9 are evenly arranged.
本实施例中,所述腹板2的上端与面板3的底部的连接方式为焊接,所述腹板2的下端与底板1的连接方式为焊接。In this embodiment, the upper end of the web 2 is connected to the bottom of the panel 3 by welding, and the lower end of the web 2 is connected to the bottom plate 1 by welding.
本实施例中,所述肋板4与底板1的连接方式为焊接,所述肋板4与腹板2的连接方式为焊接,所述肋板4与面板3的连接方式为焊接。In this embodiment, the ribs 4 are connected to the bottom plate 1 by welding, the ribs 4 and the web 2 are connected by welding, and the ribs 4 and the panel 3 are connected by welding.
本实施例中,所述导轨8焊接在面板3上,所述压板9焊接在面板3上。In this embodiment, the guide rail 8 is welded on the panel 3 , and the pressing plate 9 is welded on the panel 3 .
本实施例中,所述中间连接板10的形状为长方形。In this embodiment, the shape of the intermediate connecting plate 10 is a rectangle.
本实施例中,所述中间连接板10为钢板。In this embodiment, the intermediate connecting plate 10 is a steel plate.
结合图3,本实用新型的工作原理为:盾构机11接收后,在盾构机11的过站线路上铺设钢板13并将钢板13固定牢靠,钢板13上满涂黄油。将本实用新型过站托架12组装完成后固定在钢板13上,确保过站托架12的顶面标高和接收托架14的顶面标高一致,接收托架14置于型钢垫板15上。然后,利用千斤顶组将盾构机11顶推至过站托架12上,最后采用固定在车站结构底板16上的具有一定额定功率的卷扬机作为盾构机11过站平移的动力设备,将卷扬机的钢丝绳固定在过站托架12上,拖动盾构机11过站。3, the working principle of the utility model is: after the shield machine 11 is received, the steel plate 13 is laid on the passing line of the shield machine 11 and the steel plate 13 is fixed firmly, and the steel plate 13 is covered with butter. Fix the passing bracket 12 of the utility model on the steel plate 13 after assembling, ensure that the top surface elevation of the passing bracket 12 is consistent with the top surface elevation of the receiving bracket 14, and the receiving bracket 14 is placed on the shaped steel backing plate 15 . Then, use the jack group to push the shield machine 11 onto the station passing bracket 12, and finally use a winch with a certain rated power fixed on the station structure floor 16 as the power equipment for the shield machine 11 to move over the station. The steel wire rope is fixed on the transit bracket 12, and the shield machine 11 is dragged to transit.
以上所述,仅是本实用新型的较佳实施例,并非对本实用新型作任何限制,凡是根据本实用新型技术实质对以上实施例所作的任何简单修改、变更以及等效结构变换,均仍属于本实用新型技术方案的保护范围内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any simple modifications, changes and equivalent structural transformations made to the above embodiments according to the technical essence of the present utility model still belong to Within the scope of protection of the technical solution of the utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521037178.XU CN205189876U (en) | 2015-12-11 | 2015-12-11 | Shield structure machine bracket that misses stop |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521037178.XU CN205189876U (en) | 2015-12-11 | 2015-12-11 | Shield structure machine bracket that misses stop |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205189876U true CN205189876U (en) | 2016-04-27 |
Family
ID=55782876
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521037178.XU Expired - Fee Related CN205189876U (en) | 2015-12-11 | 2015-12-11 | Shield structure machine bracket that misses stop |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205189876U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105923265A (en) * | 2016-06-16 | 2016-09-07 | 北京城建集团有限责任公司 | Concrete duct piece bracket and use method thereof |
| CN107152290A (en) * | 2017-06-16 | 2017-09-12 | 中铁隧道集团有限公司 | Big shield launching extensible track combination fixed structure and its construction method |
| CN108442933A (en) * | 2018-03-02 | 2018-08-24 | 中铁十二局集团有限公司 | Shield launching pedestal and shield launching method |
| CN109505613A (en) * | 2018-12-30 | 2019-03-22 | 中铁五局集团电务工程有限责任公司 | Originating method in the hole of earth pressure balanced shield, EPBS in small space |
-
2015
- 2015-12-11 CN CN201521037178.XU patent/CN205189876U/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105923265A (en) * | 2016-06-16 | 2016-09-07 | 北京城建集团有限责任公司 | Concrete duct piece bracket and use method thereof |
| CN105923265B (en) * | 2016-06-16 | 2018-08-17 | 北京城建集团有限责任公司 | A kind of concrete pipe sheet bracket and its application method |
| CN107152290A (en) * | 2017-06-16 | 2017-09-12 | 中铁隧道集团有限公司 | Big shield launching extensible track combination fixed structure and its construction method |
| CN108442933A (en) * | 2018-03-02 | 2018-08-24 | 中铁十二局集团有限公司 | Shield launching pedestal and shield launching method |
| CN109505613A (en) * | 2018-12-30 | 2019-03-22 | 中铁五局集团电务工程有限责任公司 | Originating method in the hole of earth pressure balanced shield, EPBS in small space |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102230381B (en) | Hollow needle beam lining trolley | |
| CN207685833U (en) | A kind of quick inner support bracing means | |
| CN204024676U (en) | A kind of novel tunnel concrete steel form carrier | |
| CN207484512U (en) | A kind of integrated reinforcement trolley for the construction of pipe gallery tunneling boring | |
| CN205314542U (en) | Construction liquid die plate device that climbs | |
| CN204386615U (en) | A self-propelled tunnel inverted arch construction trolley | |
| CN104453951B (en) | Combined type subway station lining template trolley for baffle | |
| CN204956486U (en) | Shield method tunnel construction shield constructs horizontal translation device of board car | |
| CN205348147U (en) | A tamping unit for building site | |
| CN203795311U (en) | Multi-leg high pier and slip form construction device | |
| CN204386608U (en) | A kind of tunnel invert construction tool | |
| CN203684113U (en) | Automatic beam placement platform device | |
| CN206954226U (en) | Hydraulic platform movement system | |
| CN107642089B (en) | Narrow space concrete pouring method | |
| CN104405417A (en) | Inverted arch construction trolley for self-propelled tunnel | |
| CN217761022U (en) | Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station | |
| CN101775990B (en) | Three-dimensional space curved surface steel mould trolley | |
| CN103434967B (en) | Storage station's trash rack maintenance lifting appliance | |
| CN203649748U (en) | Device for aligning head ends of flange plates and webs for H-shaped section steel assembly apparatus | |
| CN204080642U (en) | A kind of for installing small bridge precast beam device | |
| CN207244364U (en) | One kind be used for underground cable lay a railway track construct service channel at transition apparatus | |
| CN208036267U (en) | Diversion system of hydropower station penstock and telescopic joint transport dedicated trolley | |
| CN205950246U (en) | A splicing apparatus for equipment of chain hopper | |
| CN209288563U (en) | A kind of assembly tooling for bucket assembly | |
| CN206721683U (en) | A kind of concrete Simple T-Girders tensioning jack hanger |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160427 |