Modular adds power station Download PDFInfo
- Publication number
- CN205172066U CN205172066U CN201520819460.7U CN201520819460U CN205172066U CN 205172066 U CN205172066 U CN 205172066U CN 201520819460 U CN201520819460 U CN 201520819460U CN 205172066 U CN205172066 U CN 205172066U
- Authority
- CN
- China
- Prior art keywords
- room
- containers
- container
- charging
- power distribution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
本实用新型公开了一种模块式加电站,其特征在于:包括监控室、储能室、配电室和充电室,所述储能室、配电室和充电室均与监控室连接,同时,所述储能室和配电室均与充电室连接;所述监控室、储能室、配电室和充电室分别集成于与其相对应的集装箱中,各个集装箱紧密排列连接。本实用新型利用集装箱将监控室、储能室、配电室和充电室进行模块式设置,这占地面积小,结构紧凑性高,可加快加电站的建设。
The utility model discloses a modular charging station, which is characterized in that it comprises a monitoring room, an energy storage room, a power distribution room and a charging room, and the energy storage room, the power distribution room and the charging room are all connected to the monitoring room, and at the same time , the energy storage room and the power distribution room are connected to the charging room; the monitoring room, the energy storage room, the power distribution room and the charging room are respectively integrated in the corresponding containers, and the containers are closely arranged and connected. The utility model utilizes the container to set up the monitoring room, the energy storage room, the power distribution room and the charging room in a modular manner, which occupies a small area and has a high compact structure, which can speed up the construction of the power station.
Description
技术领域technical field
本实用新型涉及加电站技术,具体来说是一种模块式加电站。The utility model relates to the technology of a power station, in particular to a modular power station.
背景技术Background technique
随着电动汽车行业的不断发展和普及,换电式加电站作为电能供给,已成为重要的一环。目前的加电站主要由监控室、配电室、充电室和储能室构成,监控室、配电室、充电室和储能室均通过混凝土和钢筋在地面上建好框架,然后在框架内安装相应的设备而构成。这些加电站虽实现了就有的作用,但占地面积大,建设周期长。由于其占地面积较大,在已规划城市的中心地带加建电站,用地审批困难大,阻碍加电站的发展;同时,建设周期长也容易影响加电站的发展。目前的加电站需要在地面上现场一步一步的进行建设,这容易对加电站的周边环境造成影响。With the continuous development and popularization of the electric vehicle industry, the battery-swapping power station has become an important part of the power supply. The current power station is mainly composed of monitoring room, power distribution room, charging room and energy storage room. The monitoring room, power distribution room, charging room and energy storage room are all constructed on the ground with concrete and steel bars, and then built in the frame Install the corresponding equipment and constitute. Although these power stations have achieved their original functions, they occupy a large area and have a long construction period. Due to its large area, building additional power stations in the center of a planned city is difficult for land use approval, which hinders the development of power stations; at the same time, the long construction period also easily affects the development of power stations. The current power station needs to be built on the ground step by step, which is easy to affect the surrounding environment of the power station.
实用新型内容Utility model content
本实用新型的目的在于克服以上现有技术存在的不足,提供了一种结构简单、安装方便、生产效率高和经济性的模块式加电站。The purpose of the utility model is to overcome the disadvantages of the prior art above, and provide a modular power station with simple structure, convenient installation, high production efficiency and economy.
为了达到上述目的,本实用新型采用以下技术方案:一种模块式加电站,包括监控室、储能室、配电室和充电室,所述储能室、配电室和充电室均与监控室连接,同时,所述储能室和配电室均与充电室连接;所述监控室、储能室、配电室和充电室分别集成于与其相对应的集装箱中,各个集装箱紧密排列连接。In order to achieve the above purpose, the utility model adopts the following technical solutions: a modular charging station, including a monitoring room, an energy storage room, a power distribution room and a charging room, and the energy storage room, power distribution room and charging room are all connected with the monitoring At the same time, the energy storage room and the power distribution room are connected to the charging room; the monitoring room, energy storage room, power distribution room and charging room are respectively integrated in the corresponding containers, and the containers are closely arranged and connected. .
优选的,所述模块式加电站还包括顶棚,所述顶棚安装于监控室、储能室、配电室和充电室上方,且所述顶棚遮挡住监控室、储能室、配电室和充电室。Preferably, the modular power station further includes a ceiling, the ceiling is installed above the monitoring room, energy storage room, power distribution room and charging room, and the ceiling covers the monitoring room, energy storage room, power distribution room and charging room.
优选的,所述监控室通过1个集装箱构成,此集装箱为第一集装箱;所述配电室具有2个,所述配电室通过2个集装箱构成,此2个集装箱均为第二集装箱;所述充电室具有4个,所述充电室通过4个集装箱构成,此4个集装箱均为第三集装箱;所述储能室通过1个集装箱构成,此集装箱为第四集装箱;Preferably, the monitoring room is formed by one container, which is the first container; there are two power distribution rooms, and the power distribution room is formed by two containers, both of which are second containers; There are four charging chambers, and the charging chamber is formed by four containers, and the four containers are the third container; the energy storage chamber is formed by one container, and this container is the fourth container;
其中,4个第三集装箱以2个为一组相对设置于地面上;而第一集装箱和其中一个第二集装箱分别安装于其中一组第三集装箱的上面;而第四集装箱和另一个第二集装箱分别安装于另一组第三集装箱的上面。Among them, 4 third containers are arranged on the ground as a group of 2; and the first container and one of the second containers are respectively installed on the top of one of the third containers; and the fourth container and the other second container The containers are installed on top of another group of third containers respectively.
优选的,每组第三集装箱的两端均设有阶梯,且每组第三集装箱的上端设有廊道,所述阶梯的上端与廊道连接。Preferably, steps are provided at both ends of each group of third containers, and a gallery is provided at the upper end of each group of third containers, and the upper end of the steps is connected to the gallery.
优选的,2个所述第二集装箱相对设置。Preferably, the two second containers are arranged opposite to each other.
优选的,所述监控室通过1个集装箱构成,此集装箱为第一集装箱;所述配电室具有2个,所述配电室通过2个集装箱构成,此2个集装箱均为第二集装箱;所述充电室具有4个,所述充电室通过4个集装箱构成,此4个集装箱均为第三集装箱;所述储能室通过1个集装箱构成,此集装箱为第四集装箱;Preferably, the monitoring room is formed by one container, which is the first container; there are two power distribution rooms, and the power distribution room is formed by two containers, both of which are second containers; There are four charging chambers, and the charging chamber is formed by four containers, and the four containers are the third container; the energy storage chamber is formed by one container, and this container is the fourth container;
其中,4个第三集装箱以2个为一组相对设置于地面上;而第一集装箱和其中一个第二集装箱分别紧贴其中一组第三集装箱的两端,第四集装箱和另一个第二集装箱分别紧贴另一组第三集装箱的两端。Among them, 4 third containers are arranged on the ground in a group of 2; while the first container and one of the second containers are respectively close to the two ends of one of the third containers, and the fourth container and the other second container The containers are respectively attached to the two ends of another group of third containers.
优选的,2个所述第二集装箱相对设置。Preferably, the two second containers are arranged opposite to each other.
优选的,所述第一集装箱的大小为20英尺,所述第二集装箱的大小为20英尺,所述第三集装箱的大小为40英尺,所述第四集装箱的大小为20英尺。Preferably, the size of the first container is 20 feet, the size of the second container is 20 feet, the size of the third container is 40 feet, and the size of the fourth container is 20 feet.
优选的,所述充电室内设有电池仓和充电柜,所述电池仓安装有电池,所述电池和充电柜连接,所述充电柜与储能室连接。Preferably, the charging chamber is provided with a battery compartment and a charging cabinet, the battery compartment is equipped with a battery, the battery is connected to the charging cabinet, and the charging cabinet is connected to the energy storage room.
优选的,2组所述第三集装箱的之间设有导向槽。Preferably, a guide groove is provided between the two groups of the third containers.
本实用新型相对于现有技术,具有如下的优点及效果:Compared with the prior art, the utility model has the following advantages and effects:
1、本模块式加电站中的监控室、配电室、充电室和储能室均利用各个集装箱构成,这利用各集装箱将监控室、配电室、充电室和储能室进行模块式设置,则监控室、配电室、充电室和储能室可不需要直接在地面的现场进行逐一建设,可在加工厂将各个模块制好后,再在现场进行安装,这不令提高了建设效率,还避免建设模块式加电站时对周边环境的影响。1. The monitoring room, power distribution room, charging room and energy storage room in this modular power station are all composed of containers, which use each container to set up the monitoring room, power distribution room, charging room and energy storage room in a modular manner , then the monitoring room, power distribution room, charging room and energy storage room do not need to be built one by one directly on the ground site, and can be installed on site after each module is manufactured in the processing plant, which improves the construction efficiency , Also avoid the impact on the surrounding environment when building a modular power station.
2、本模块式加电站中的监控室、配电室、充电室和储能室均利用集装箱构成,这进行模块式设置减少了占地面积,从而降低了用地审批难度,同时,模块式设置还缩短了加电站的建设周期,故提高了加电站的发展。2. The monitoring room, power distribution room, charging room and energy storage room in this modular power station are all composed of containers. This modular setting reduces the occupied area, thereby reducing the difficulty of land use approval. At the same time, the modular setting It also shortens the construction cycle of the power station, so the development of the power station is improved.
3、本模块式加电站中的监控室、配电室、充电室和储能室利用集装箱构成,各个集装箱紧密排列连接,这紧凑性高,而且在保证充电效率的情况下,具有小型化和经济化等特点,满足电动汽车行业发展的迫切需求。3. The monitoring room, power distribution room, charging room and energy storage room in this modular power station are composed of containers, and each container is closely arranged and connected, which has high compactness, and has the advantages of miniaturization and Economization and other characteristics meet the urgent needs of the development of the electric vehicle industry.
附图说明Description of drawings
图1是实施例1的模块式加电站的整体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the modular power station of Embodiment 1.
图2是实施例1的模块式加电站去掉顶棚的结构示意图。Fig. 2 is a schematic structural view of the modular power station in Embodiment 1 without the roof.
图3是实施例1的模块式加电站侧视方向的剖视图。Fig. 3 is a cross-sectional view in the side view direction of the modular power station of the first embodiment.
图4是实施例1的模块式加电站去掉顶棚后的俯视图。其中,廊道未画出。Fig. 4 is a top view of the modular power station in Embodiment 1 with the roof removed. Among them, the corridor is not drawn.
图5是实施例2的模块式加电站的整体结构示意图。Fig. 5 is a schematic diagram of the overall structure of the modular power station of the second embodiment.
具体实施方式detailed description
为便于本领域技术人员理解,下面结合附图及实施例对本实用新型作进一步的详细说明。For the convenience of those skilled in the art to understand, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments.
实施例1:Example 1:
如图1至图4所示,本模块式加电站,包括监控室1、储能室2、配电室3和充电室4,所述储能室2、配电室3和充电室4均与监控室1连接,同时,所述储能室2和配电室3均与充电室4连接;所述监控室1、储能室2、配电室3和充电室4分别集成于与其相对应的集装箱中,各个集装箱紧密排列连接。具体的,根据公交线路的运需要求、加电站容量大小、计时电池仓的容量大小和变压器的容量,再确定集装箱的数量。As shown in Figures 1 to 4, this modular power station includes a monitoring room 1, an energy storage room 2, a power distribution room 3 and a charging room 4, and the energy storage room 2, power distribution room 3 and charging room 4 are all It is connected with the monitoring room 1, and at the same time, the energy storage room 2 and the power distribution room 3 are connected with the charging room 4; the monitoring room 1, the energy storage room 2, the power distribution room 3 and the charging room 4 are integrated in the corresponding In the corresponding containers, each container is closely arranged and connected. Specifically, the number of containers is determined according to the transportation demand of the bus line, the capacity of the refueling station, the capacity of the timing battery compartment, and the capacity of the transformer.
所述模块式加电站还包括顶棚5,所述顶棚5安装于监控室1、储能室2、配电室3和充电室4上方,且所述顶棚5遮挡住监控室1、储能室2、配电室3和充电室4。顶棚对监控室1、储能室2、配电室3和充电室4进行保护,避免雨水进入室内影响或损坏室内的设备。The modular charging station also includes a ceiling 5, which is installed above the monitoring room 1, the energy storage room 2, the power distribution room 3 and the charging room 4, and the ceiling 5 covers the monitoring room 1 and the energy storage room. 2. Power distribution room 3 and charging room 4. The ceiling protects the monitoring room 1, the energy storage room 2, the power distribution room 3 and the charging room 4 to prevent rainwater from entering the room and affecting or damaging the indoor equipment.
所述监控室1通过1个集装箱构成,此集装箱为第一集装箱6;所述配电室3具有2个,所述配电室3通过2个集装箱构成,此2个集装箱均为第二集装箱7;所述充电室4具有4个,所述充电室4通过4个集装箱构成,此4个集装箱均为第三集装箱8;所述储能室2通过1个集装箱构成,此集装箱为第四集装箱9;The monitoring room 1 is composed of one container, which is the first container 6; the power distribution room 3 has two, and the power distribution room 3 is composed of two containers, and the two containers are the second container 7. There are four charging chambers 4, and the charging chamber 4 is formed by four containers, and the four containers are the third container 8; the energy storage chamber 2 is formed by one container, and this container is the fourth container 9;
其中,4个第三集装箱8以2个为一组相对设置于地面上;而第一集装箱6和其中一个第二集装箱7分别安装于其中一组第三集装箱8的上面;而第四集装箱9和另一个第二集装箱6分别安装于另一组第三集装箱8的上面。此结构为叠加式分布,这可进一步减少占地面积,从而进一步降低用地审批的难度。Among them, 4 third containers 8 are arranged on the ground in groups of 2; and the first container 6 and one of the second containers 7 are respectively installed on the top of one of the third containers 8; and the fourth container 9 And another second container 6 are installed on the top of another group of third container 8 respectively. This structure is a superimposed distribution, which can further reduce the occupied area, thereby further reducing the difficulty of land use approval.
每组第三集装箱8的两端均设有阶梯10,且每组第三集装箱8的上端设有廊道11,所述阶梯10的上端与廊道11连接。此结构方便工作人员对加电站的操作。Steps 10 are provided at both ends of each group of third containers 8 , and corridors 11 are provided at the upper ends of each group of third containers 8 , and the upper ends of the stairs 10 are connected to the corridors 11 . This structure is convenient for the staff to operate the power station.
2个所述第二集装箱7相对设置。这对称设计,减少线路连接的长度,同时,也进一步提高了加电站的紧凑性。The two second containers 7 are arranged opposite to each other. This symmetrical design reduces the length of the line connection and at the same time further improves the compactness of the power station.
所述第一集装箱6的大小为20英尺,所述第二集装箱7的大小为20英尺,所述第三集装箱8的大小为40英尺,所述第四集装箱9的大小为20英尺。此尺寸大小为优选尺寸。即大小为20英尺的第一集装箱6、第二集装箱7和第四集装箱9的箱内的长、宽、高分别为:5898mm、2352mm、2385mm;而大小为20英尺的第一集装箱6、第二集装箱7和第四集装箱9的箱外的长、宽、高分别为:6058mm、2438mm、2591mm。大小为40英尺的第三集装箱8的箱内的长、宽、高分别为:12032mm、2352mm、2385mm;而大小为40英尺的第三集装箱8的箱外的长、宽、高分别为:12192mm、2438mm、2591mm。The size of the first container 6 is 20 feet, the size of the second container 7 is 20 feet, the size of the third container 8 is 40 feet, and the size of the fourth container 9 is 20 feet. This size is the preferred size. That is, the length, width and height of the first container 6, the second container 7 and the fourth container 9 with a size of 20 feet are respectively: 5898mm, 2352mm, and 2385mm; The outside length, width and height of the second container 7 and the fourth container 9 are respectively: 6058mm, 2438mm, 2591mm. The length, width and height inside the third container 8 with a size of 40 feet are respectively: 12032mm, 2352mm and 2385mm; while the length, width and height outside the third container 8 with a size of 40 feet are respectively: 12192mm , 2438mm, 2591mm.
所述充电室4内设有电池仓12和充电柜13,所述电池仓12安装有电池,所述电池和充电柜13连接,所述充电柜13与储能室连接。The charging chamber 4 is provided with a battery compartment 12 and a charging cabinet 13, the battery compartment 12 is equipped with a battery, the battery is connected to the charging cabinet 13, and the charging cabinet 13 is connected to the energy storage room.
2组所述第三集装箱8的之间设有导向槽14。导向槽14对驶入加电站的汽车具有指引方向的作用,提高安全性。A guide groove 14 is provided between the two groups of the third containers 8 . The guide groove 14 has the effect of guiding the direction of the automobiles driving into the power station, which improves the safety.
实施例2Example 2
本模块式加电站除以技术特征外同实施例1:如图5所示,所述监控室1通过1个集装箱构成,此集装箱为第一集装箱6;所述配电室3具有2个,所述配电室3通过2个集装箱构成,此2个集装箱均为第二集装箱7;所述充电室4具有4个,所述充电室4通过4个集装箱构成,此4个集装箱均为第三集装箱8;所述储能室2通过1个集装箱构成,此集装箱为第四集装箱9;This modular power station is the same as Embodiment 1 except for the technical features: as shown in Figure 5, the monitoring room 1 is composed of a container, which is the first container 6; the power distribution room 3 has two, The power distribution room 3 is formed by two containers, both of which are the second container 7; the charging room 4 has four, and the charging room 4 is formed by four containers, and these four containers are all the first Three containers 8; the energy storage room 2 is formed by one container, and this container is the fourth container 9;
其中,4个第三集装箱8以2个为一组相对设置于地面上;而第一集装箱6和其中一个第二集装箱7分别紧贴其中一组第三集装箱8的两端,第四集装箱9和另一个第二集装箱7分别紧贴另一组第三集装箱8的两端。此为平铺式结构,这结构紧凑性高,同时稳定性好。Among them, 4 third containers 8 are arranged on the ground in groups of 2; and the first container 6 and one of the second containers 7 are respectively close to the two ends of one of the third containers 8, and the fourth container 9 and another second container 7 respectively close to the two ends of another group of third container 8 . This is a flat structure, which has high compactness and good stability.
2个所述第二集装箱7相对设置。这对称设计,减少线路连接的长度,同时,也进一步提高了加电站的紧凑性。The two second containers 7 are arranged opposite to each other. This symmetrical design reduces the length of the line connection and at the same time further improves the compactness of the power station.
上述具体实施方式为本实用新型的优选实施例,并不能对本实用新型进行限定,其他的任何未背离本实用新型的技术方案而所做的改变或其它等效的置换方式,都包含在本实用新型的保护范围之内。The specific implementation described above is a preferred embodiment of the utility model, and does not limit the utility model. Any other changes or other equivalent replacement methods that do not deviate from the technical solution of the utility model are included in the utility model. within the scope of the new protection.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520819460.7U CN205172066U (en) | 2015-10-21 | 2015-10-21 | Modular adds power station |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520819460.7U CN205172066U (en) | 2015-10-21 | 2015-10-21 | Modular adds power station |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205172066U true CN205172066U (en) | 2016-04-20 |
Family
ID=55736069
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520819460.7U Expired - Lifetime CN205172066U (en) | 2015-10-21 | 2015-10-21 | Modular adds power station |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205172066U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107227872A (en) * | 2017-06-13 | 2017-10-03 | 云杉智慧新能源技术有限公司 | Container charging service station |
| CN108131028A (en) * | 2017-09-05 | 2018-06-08 | 上海电巴新能源科技有限公司 | Container electrical changing station |
| WO2021228251A1 (en) * | 2020-05-15 | 2021-11-18 | 奥动新能源汽车科技有限公司 | Battery replacement station |
| CN114687589A (en) * | 2020-12-31 | 2022-07-01 | 奥动新能源汽车科技有限公司 | Stacked box-shaped equipment and power conversion station or energy storage station comprising same |
-
2015
- 2015-10-21 CN CN201520819460.7U patent/CN205172066U/en not_active Expired - Lifetime
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107227872A (en) * | 2017-06-13 | 2017-10-03 | 云杉智慧新能源技术有限公司 | Container charging service station |
| CN108131028A (en) * | 2017-09-05 | 2018-06-08 | 上海电巴新能源科技有限公司 | Container electrical changing station |
| WO2021228251A1 (en) * | 2020-05-15 | 2021-11-18 | 奥动新能源汽车科技有限公司 | Battery replacement station |
| CN114687589A (en) * | 2020-12-31 | 2022-07-01 | 奥动新能源汽车科技有限公司 | Stacked box-shaped equipment and power conversion station or energy storage station comprising same |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205172066U (en) | Modular adds power station | |
| CN203907451U (en) | Solar air purification street lamp | |
| CN205944847U (en) | Protection device of prepackage type transformer substation | |
| CN204024180U (en) | A kind of communication base station | |
| CN203846839U (en) | Extensible multi-loop incoming line door type pole and tower | |
| CN205351149U (en) | Municipal engineering road warning lamp | |
| CN204299268U (en) | A kind of mixed pressure three loop steel tube tower | |
| CN203514953U (en) | Photovoltaic fence | |
| CN103259309B (en) | Ecological generating system using urban road spaces | |
| CN205475898U (en) | Thin-film solar photoelectric curtain wall | |
| CN207359319U (en) | A kind of mobile photovoltaic intelligent integration mark supports room | |
| CN105910650B (en) | Environmental monitoring system based on electric pole | |
| CN205016900U (en) | Special high voltage direct current current conversion station valve room converter transformer L type distribution structure | |
| CN202405670U (en) | Outdoor transformer substation | |
| CN206402178U (en) | Three-dimensional header box | |
| CN205861102U (en) | Environmental monitoring system based on electric pole | |
| CN204691109U (en) | A kind of energy saving and environment friendly building | |
| CN205663280U (en) | A wire pole for environmental monitoring | |
| CN104333110A (en) | Extensible support based wind and solar integrated portable power generation equipment | |
| CN103993663A (en) | Movable solar energy house | |
| CN204187501U (en) | A kind of embedded solar street light lithium battery group | |
| CN205688923U (en) | A kind of wire rounded projections arranged two circuit tower | |
| CN202855238U (en) | Outdoor solar optical fiber evacuation mark | |
| CN204304471U (en) | A kind of illumination based on photovoltaic generating system and charging equipment for mobile phone | |
| CN202074405U (en) | Solar energy light emitting diode (LED) street lamp |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee | ||
| CP03 | Change of name, title or address |
Address after: Longgang street community of Longgang District of Shenzhen City Tongde Guangdong province 518036 pit road No. 64 building two Patentee after: SHENZHEN AUTOWAY POWER TECHNOLOGY CO.,LTD. Address before: Long Wei Road in Shenzhen city Guangdong province 518036 Futian District Meilin No. 168 Building No. 1, the entire 318 Camry Patentee before: GUANGDONG ANHEWEI ELECTRIC POWER CONSTRUCTION CO.,LTD. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160420 |