CN205170157U - Turn round king's block handling instrument - Google Patents
Turn round king's block handling instrument Download PDFInfo
- Publication number
- CN205170157U CN205170157U CN201520836349.9U CN201520836349U CN205170157U CN 205170157 U CN205170157 U CN 205170157U CN 201520836349 U CN201520836349 U CN 201520836349U CN 205170157 U CN205170157 U CN 205170157U
- Authority
- CN
- China
- Prior art keywords
- rope
- square frame
- block
- king
- day
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及扭王字块吊装技术领域,特别是一种扭王字块吊运工具。 The utility model relates to the technical field of twisting king block hoisting, in particular to a lifting tool for twisting king blocks.
背景技术 Background technique
随着水工行业的发展,工程项目对安全、质量和效率的要求越来越高。在吊运扭王字块的过程中,扭王字块需从预制区吊运至堆放场地进行存放,然后再从堆放场地吊运至施工区进行安装,转运次数多,转运环节的效率直接影响了扭王字块安装的施工效率。目前常用的扭王字块吊运工具比较简单,常用两条钢丝绳直接通过缠绕扭王字块顶上的杆件进行吊运,在吊运扭王字块的过程中存在以下问题: With the development of the hydraulic industry, engineering projects have higher and higher requirements for safety, quality and efficiency. In the process of hoisting Twisting King blocks, Twisting King blocks need to be lifted from the prefabricated area to the stacking site for storage, and then lifted from the stacking site to the construction area for installation. The number of transfers is large, and the efficiency of the transfer link directly affects Improve the construction efficiency of twisting king block installation. At present, the commonly used tools for hoisting twisted king blocks are relatively simple. Two steel wire ropes are often used to lift directly by winding the rods on the top of the twisted king block. The following problems exist in the process of lifting twisted king blocks:
1、对单根钢丝绳的抗拉强度要求高,在吊装过程中容易磨损断裂,存在安全隐患。 1. The tensile strength requirements of a single steel wire rope are high, and it is easy to be worn and broken during the hoisting process, posing a safety hazard.
2、吊绳易相互缠绕,加大解绳难度,并且在吊装过程中会出现扭王字块脱绳滑落,存在极大的安全隐患。 2. The slings are easy to be entangled with each other, which increases the difficulty of untwisting the rope, and the twisted king block will slip off the rope during the hoisting process, which poses a great safety hazard.
3、由于履带吊吊钩上装有活动闭合页,吊绳脱离扭王字块需人工将闭合页打开,取出钢丝绳,在这过程中影响了施工效率,对于较高的扭王字块堆放进而威胁施工人员的安全。 3. Since the hook of the crawler crane is equipped with a movable closing page, the closing page needs to be opened manually to take out the wire rope when the lifting rope is detached from the twisted king block. Safety of construction workers.
发明内容 Contents of the invention
本实用新型针对目前扭王字块吊运对单根钢丝绳的抗拉强度要求高,在吊装过程中容易磨损断裂,容易出现扭王字块脱绳滑落,存在极大的安全隐患,吊绳易相互缠绕,解绳难度大,人工脱绳效率低不安全安全等不足,提供一种扭王字块吊运工具。 The utility model aims at the high requirement for the tensile strength of a single steel wire rope in the hoisting of twisted king blocks at present, which is easy to be worn and broken during the hoisting process, and the twisted king blocks are prone to slipping off the rope, which has great potential safety hazards. Intertwined with each other, it is difficult to untie the rope, and the efficiency of manual detachment is low and unsafe. A lifting tool for twisting king blocks is provided.
本实用新型的技术方案为: The technical scheme of the utility model is:
一种扭王字块吊运工具,其特征在于:包括套绳、钢丝吊环和吊绳构件,所述吊绳构件包括方形边框和吊边,吊边设在方形边框中间并与方形边框组成“日”字框;套绳设置在所述方形边框上,套绳对扭王字块吊装过程中起到固定扭王字块的作用;钢丝吊环设置在吊边上。 A hoisting tool for twisted king blocks, characterized in that it includes a rope, a steel wire ring and a sling member, the sling member includes a square frame and a hanging edge, and the hanging edge is set in the middle of the square frame and forms a " "Day" character frame; the rope is arranged on the square frame, and the rope plays the role of fixing the twisted king block during the hoisting process of the twisted king block; the steel wire ring is arranged on the hanging edge.
作为本实用新型进一步说明,所述“日”字框由工字钢焊接成而成。 As a further description of the utility model, the "日" character frame is welded by I-beam.
更进一步地,所述方形边框上设置有U型卸扣,所述套绳通过所述U型卸扣连接在方形边框上。 Furthermore, a U-shaped shackle is provided on the square frame, and the rope is connected to the square frame through the U-shaped shackle.
更进一步地,所述U型卸扣数量为4个,均匀分布在方形边框距端头20cm处; Furthermore, the number of U-shaped shackles is 4, which are evenly distributed on the square frame at a distance of 20 cm from the end;
更进一步地,所述方形边框上设有孔眼,所述U型卸扣穿过孔眼连接在方形边框上。 Furthermore, the square frame is provided with holes, and the U-shaped shackle is connected to the square frame through the holes.
更进一步地,所述吊边中间设有钢板,钢板焊接在吊边上,钢板上设有圆孔,所述钢丝吊环设在所述圆孔上。 Furthermore, a steel plate is arranged in the middle of the hanging edge, the steel plate is welded on the hanging edge, a round hole is set on the steel plate, and the steel wire suspension ring is set on the round hole.
本实用新型的优点: Advantage of the utility model:
本实用新型制作以及操作非常简单,能有效保证现场扭王字块吊装施工安全和提高施工效率;通过扭王字块吊运工具作为连接扭王字块与履带吊吊钩间的构件,套绳对扭王字块吊装过程中起到固定扭王字块的作用,能够将扭王字块受力均分到每条钢丝绳上,采用卸扣连接方便拆卸更换钢丝绳;“日”字型构件防止套绳出现缠绕以及方便套绳脱离扭王字块,钢丝吊环保证构件与履带吊吊钩之间的连接;有效地进行扭王字块转运施工,安全度较高,提升了扭王字块的装卸效率,又能保证安全施工,操作简单。 The utility model is very simple to manufacture and operate, and can effectively ensure the safety of the hoisting construction of the twisted king block on site and improve the construction efficiency; the lifting tool of the twisted king block is used as a component connecting the twisted king block and the hook of the crawler crane, and the rope During the hoisting process of the torsion king block, it plays the role of fixing the torsion king block, and can equally distribute the force of the torsion king block to each steel wire rope, and adopts a shackle connection to facilitate disassembly and replacement of the wire rope; the "day"-shaped component prevents The rope is entangled and it is convenient for the rope to be separated from the torsion king block. The steel wire ring ensures the connection between the component and the crawler hook; the torsion king block is effectively transported and the safety is high, which improves the torsion king block. Loading and unloading efficiency, but also to ensure safe construction, easy to operate.
附图说明 Description of drawings
图1是本实用新型实施例装置结构主视示意图。 Fig. 1 is a schematic front view of the device structure of the embodiment of the utility model.
图2是本实用新型实施例装置结构俯视示意图。 Fig. 2 is a schematic top view of the device structure of the embodiment of the utility model.
图3是本实用新型实施例装置结构左视示意图。 Fig. 3 is a schematic left view of the device structure of the embodiment of the utility model.
图4是本实用新型实施例中工字钢结构图。 Fig. 4 is a structural diagram of the I-beam in the embodiment of the utility model.
附图标记:方形边框1、套绳2、U型卸扣3、钢板4。 Reference signs: square frame 1, noose 2, U-shaped shackle 3, steel plate 4.
具体实施方式 detailed description
实施例: Example:
下面结合附图对本实用新型的具体实施方式进行描述,以便更好的理解本实用新型。 The specific embodiment of the utility model will be described below in conjunction with the accompanying drawings, so as to better understand the utility model.
一种扭王字块吊运工具,包括套绳2、钢丝吊环和吊绳构件,吊绳构件包括方形边框1和吊边,吊边设在方形边框中间并与方形边框组成“日”字框,“日”字框由工字钢焊接成1.2m*1.1m的“日”字形状,套绳2设置在方形边框上,钢丝吊环设置在吊边上;“日”字框1.2m长边上设置有25t的U型卸扣3,U型卸扣3设置4个,均分布在距工字钢端头20cm处;“日”字框1.2m长边上设有孔眼,U型卸扣3穿过孔眼连接在“日”字框上;两条6m长的钢丝绳分别与“日”字框同一侧U型卸扣套接形成一个套绳2;吊边中间设有长30cm、宽15cm、厚度3cm的钢板4,钢板4上设有半径为4cm的圆孔,圆孔与钢板4一侧相切,相切一端焊接在吊边中间,一条2.8m长的钢丝绳穿过圆孔,通过卸扣连接形成一个圆形的钢丝吊环。 A tool for hoisting twisted king blocks, including a rope 2, a steel wire ring and a hanging rope component. The hanging rope component includes a square frame 1 and a hanging edge. The hanging edge is set in the middle of the square frame and forms a "day" frame with the square frame. , the "日" character frame is welded by I-beam into a "day" shape of 1.2m*1.1m, the rope 2 is set on the square frame, and the steel wire ring is set on the hanging edge; the "day" character frame has a 1.2m long side There are 25t U-shaped shackles 3 on the top, and there are 4 U-shaped shackles 3, which are all distributed at a distance of 20cm from the end of the I-shaped steel; 3 Pass through the holes and connect to the "日" frame; two 6m long steel wire ropes are respectively connected with the U-shaped shackle on the same side of the "日" frame to form a rope 2; there is a 30cm long and 15cm wide 1. A steel plate 4 with a thickness of 3 cm. The steel plate 4 is provided with a circular hole with a radius of 4 cm. The circular hole is tangent to one side of the steel plate 4, and the tangent end is welded in the middle of the hanging edge. A 2.8 m long steel wire rope passes through the circular hole and passes through the The shackle connection forms a round wire eye.
本实施例具体使用步骤如下: The concrete use steps of this embodiment are as follows:
(1)作业前将履带吊的吊钩钩住钢丝吊环,通过履带吊将本实施例扭王字块吊运工具移至扭王字块的上方; (1) Before the operation, the hook of the crawler crane is hooked to the steel wire suspension ring, and the lifting tool of the twisted king block of this embodiment is moved to the top of the twisted king block by the crawler crane;
(2)施工人员将两个套绳2分别与扭王字块顶部的杆件套接并确认固定; (2) The construction personnel respectively connect the two sets of ropes 2 with the rods on the top of the Twisted King block and confirm the fixation;
(3)现场施工人员离开至安全施工范围,履带吊缓缓起吊扭王字块至指定位置; (3) The on-site construction personnel leave to the safe construction area, and the crawler crane slowly lifts the twisted king block to the designated position;
(4)放下扭王字块后,履带吊操作手控制履带吊的长臂稍微向左或向右短距离移动,通过“日”字框和套绳2的惯性,将一端套绳2甩出扭王字块杆件,同理取出另一端套绳2。 (4) After putting down the twist king block, the crawler crane operator controls the long arm of the crawler crane to move a short distance to the left or right, and throws the rope 2 at one end through the "day" frame and the inertia of the rope 2 Twist the rod of the king block, and take out the other end of the rope 2 in the same way.
以上所述仅是本实用新型的优选实施方式,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本实用新型的保护范围。 The above description is only the preferred implementation of the present utility model. For those of ordinary skill in the art, without departing from the principle of the present utility model, some improvements and modifications can also be made. These improvements and modifications are also considered It is the protection scope of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520836349.9U CN205170157U (en) | 2015-10-27 | 2015-10-27 | Turn round king's block handling instrument |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520836349.9U CN205170157U (en) | 2015-10-27 | 2015-10-27 | Turn round king's block handling instrument |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205170157U true CN205170157U (en) | 2016-04-20 |
Family
ID=55734172
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520836349.9U Expired - Fee Related CN205170157U (en) | 2015-10-27 | 2015-10-27 | Turn round king's block handling instrument |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205170157U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107191016A (en) * | 2017-06-16 | 2017-09-22 | 中交四航局第二工程有限公司 | A kind of torsion-bending ratio production and construction Ground arrangement |
| CN107324204A (en) * | 2017-07-31 | 2017-11-07 | 中交天航港湾建设工程有限公司 | The Portable suspension assembling device and its manufacture method of torsion-bending ratio are lifted based on loading machine |
-
2015
- 2015-10-27 CN CN201520836349.9U patent/CN205170157U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107191016A (en) * | 2017-06-16 | 2017-09-22 | 中交四航局第二工程有限公司 | A kind of torsion-bending ratio production and construction Ground arrangement |
| CN107324204A (en) * | 2017-07-31 | 2017-11-07 | 中交天航港湾建设工程有限公司 | The Portable suspension assembling device and its manufacture method of torsion-bending ratio are lifted based on loading machine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210193173U (en) | Large-scale H shaped steel stand hoist and mount hoist that breaks off relations fast | |
| CN202080812U (en) | Dedicated sling system for large-scaled reinforcing cage | |
| CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
| CN103863937B (en) | Large aluminum alloy pole go out well suspender | |
| CN205170157U (en) | Turn round king's block handling instrument | |
| CN204342257U (en) | A kind of large-scale component turning device | |
| CN205114843U (en) | Prefabricated post hoist device with unhook function | |
| CN206665952U (en) | A kind of novel hanging tool | |
| CN108946475A (en) | A kind of overturning Lift-on/Lift-off System and hanging method for horizontal equipment | |
| CN205132903U (en) | Steel wire slings | |
| CN201254425Y (en) | Binding type I steel composite hanging fixture | |
| CN207918270U (en) | A kind of straight thread reinforced bar handling apparatus | |
| CN204355947U (en) | Large-scale without eye plate lifting beam device | |
| CN207142642U (en) | A kind of multilayer steel plates suspender | |
| CN208869199U (en) | A kind of overturning Lift-on/Lift-off System for horizontal equipment | |
| CN201280390Y (en) | Large-tonnage suspending beam | |
| CN216945864U (en) | Become prefabricated tubular pile of size self-tightening formula hoist device | |
| CN104261250A (en) | Bundled reinforcing bar lifting device | |
| CN204173765U (en) | The lifting appliance of bundled reinforcing bar | |
| CN211813005U (en) | Lifting appliance for hinge type prefabricated block | |
| CN203173677U (en) | Hoisting tool for replacing plate hook of large traveling crane | |
| CN203128003U (en) | Special hanger for cast-in-situ bored pile steel reinforcement cage | |
| CN206142656U (en) | Heavy panel hoist | |
| CN217972205U (en) | A kind of balance hanger for box girder | |
| CN207511669U (en) | A kind of color steel portable suspender |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160420 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |