CN205120850U - Primary equipment of transformer substation state analogue means - Google Patents

Primary equipment of transformer substation state analogue means Download PDF

Info

Publication number
CN205120850U
CN205120850U CN201520761124.1U CN201520761124U CN205120850U CN 205120850 U CN205120850 U CN 205120850U CN 201520761124 U CN201520761124 U CN 201520761124U CN 205120850 U CN205120850 U CN 205120850U
Authority
CN
China
Prior art keywords
key
phase
primary equipment
closing
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520761124.1U
Other languages
Chinese (zh)
Inventor
林中时
汪卫东
盛宏伟
占刚强
俞林广
居福豹
吴继顺
斯扬华
孙坚
唐林志
王涛涛
张盛
刘叶杰
施峰
吕坤星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
State Grid Corp of China SGCC
Original Assignee
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Zhejiang Electric Power Co Ltd, Zhejiang Electric Power Transmission and Transforming Engineering Co, State Grid Corp of China SGCC filed Critical State Grid Zhejiang Electric Power Co Ltd
Priority to CN201520761124.1U priority Critical patent/CN205120850U/en
Application granted granted Critical
Publication of CN205120850U publication Critical patent/CN205120850U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

变电站一次设备状态模拟装置,涉及变电站一次设备的模拟装置;目前,扩建(改建)变电站的扩建(改建)部分二次设备调试,需连同一次设备进行整组传动试验,停役时间长。本实用新型包括箱体、模拟断路器回路、模拟操作刀闸回路、控制电源切换电路,控制键包括手动合闸键、手动跳闸键,模拟断路器电路的组数与控制电源数量相对应;每一组模拟断路器电路均设有A相合闸键、A相分闸键、B相合闸键、B相分闸键、C相合闸键和C相分闸键、及信号灯;每组模拟遥控操作闸刀电路均设有合闸键、分闸键及信号灯。本技术方案在一次设备停役期间,只需完成保护、测控装置等带一次设备整组传动即可,大大减少了变电站一次设备停役时间。

The primary equipment state simulation device of the substation involves the simulation device of the primary equipment of the substation; at present, the secondary equipment debugging of the expansion (reconstruction) part of the expansion (reconstruction) substation needs to carry out the whole set of transmission test together with the primary equipment, and the shutdown time is long. The utility model includes a box body, a simulated circuit breaker circuit, a simulated operation knife switch circuit, and a control power switching circuit. The control keys include a manual closing key and a manual trip key. A group of analog circuit breaker circuits are equipped with A-phase closing key, A-phase opening key, B-phase closing key, B-phase opening key, C-phase closing key and C-phase opening key, and signal lights; each group of analog remote control operation The switch knife circuit is equipped with a closing key, an opening key and a signal light. During the outage period of the primary equipment, the technical solution only needs to complete the transmission of the entire set of primary equipment such as protection and measurement and control devices, which greatly reduces the outage time of the primary equipment in the substation.

Description

变电站一次设备状态模拟装置Substation Primary Equipment Status Simulator

技术领域technical field

本实用新型涉及变电站一次设备的模拟装置,尤其涉及变电站一次设备状态模拟装置。The utility model relates to a simulation device for primary equipment of a substation, in particular to a state simulation device for the primary equipment of a substation.

背景技术Background technique

扩建(改建)变电站的扩建(改建)部分二次设备调试,需连同一次设备进行整组传动试验,变电站的一次设备需要停役,停役时间长,影响供电;另外,当一次设备不具备调试条件时,无法实现二次设备的整组传动试验,影响调试进程。The secondary equipment commissioning of the expansion (reconstruction) part of the expansion (reconstruction) substation needs to carry out the whole set of transmission test together with the primary equipment. When the conditions are met, it is impossible to realize the transmission test of the whole set of secondary equipment, which affects the debugging process.

实用新型内容Utility model content

本实用新型要解决的技术问题和提出的技术任务是对现有技术方案进行完善与改进,提供变电站一次设备状态模拟装置,以达到减少变电站一次设备停役时间的目的。为此,本实用新型采取以下技术方案。The technical problem to be solved and the technical task proposed by the utility model are to perfect and improve the existing technical scheme, and provide a state simulation device for the primary equipment of the substation, so as to achieve the purpose of reducing the downtime of the primary equipment of the substation. For this reason, the utility model takes the following technical solutions.

变电站一次设备状态模拟装置,其特征在于:包括箱体、设于箱体内的至少一组模拟断路器回路、至少一组模拟操作刀闸回路、控制电源切换电路,控制键包括手动合闸键、手动跳闸键,模拟断路器电路的组数与控制电源数量相对应;每一组模拟断路器电路均设有与模拟断路器线圈相连的A相合闸键、A相分闸键、B相合闸键、B相分闸键、C相合闸键和C相分闸键、及与A相合闸键、A相分闸键、B相合闸键、B相分闸键、C相合闸键和C相分闸键对应的信号灯;每组模拟遥控操作闸刀电路均设有与刀闸合闸线圈相连的合闸键、与刀闸分闸线圈相连的分闸键及与合闸键和分闸键相对应的信号灯。本技术方案针对变电站现场调试使用而设计开发,适用于变电站现场一次设备未具备调试条件时,使用一次设备状态模拟装置,可在一次设备还未安装完成时即可有效将试验工作提前进行。同时,减少停电时间:当一次设备未具备调试条件时,采用该款一次设备状态模拟装置模拟现场一次设备,使之与智能终端或继保室内保护、测控装置连接,即可完成一次设备遥控、保护整组传动等模拟试验,完整地模拟了二次设备带一次设备试验的过程。因此,在一次设备停役期间,只需完成保护、测控装置等带一次设备整组传动即可,大大减少了变电站一次设备停役(停电)时间。A substation primary equipment state simulation device is characterized in that it includes a box body, at least one set of simulated circuit breaker circuits, at least one set of simulated operation knife switch circuits, and a control power switching circuit. The control keys include manual closing keys, Manual trip key, the number of groups of analog circuit breaker circuits corresponds to the number of control power sources; each group of analog circuit breaker circuits is equipped with a phase A closing key, A phase opening key, and B phase closing key connected to the analog circuit breaker coil , phase B opening key, phase C closing key and phase C opening key, and phase A closing key, phase A opening key, phase B closing key, phase B opening key, phase C closing key and phase C opening key The signal light corresponding to the switch key; each group of analog remote control operation knife circuit is equipped with a closing key connected to the closing coil of the knife switch, an opening key connected to the opening coil of the knife switch, and a switch corresponding to the closing key and the opening key corresponding signal lights. This technical solution is designed and developed for the on-site commissioning of substations. It is suitable for when the primary equipment on the substation site does not meet the debugging conditions. Using the primary equipment status simulation device can effectively carry out the test work in advance before the primary equipment is installed. At the same time, reduce power outage time: when the primary equipment does not meet the debugging conditions, use this primary equipment status simulation device to simulate the on-site primary equipment, and connect it with the intelligent terminal or the protection and measurement and control device in the relay protection room to complete the remote control of the primary equipment, The simulation test of protecting the whole group of transmissions completely simulates the process of secondary equipment with primary equipment test. Therefore, during the outage period of the primary equipment, it is only necessary to complete the protection, measurement and control devices, etc. to drive the entire set of primary equipment, which greatly reduces the time for the primary equipment of the substation to be out of service (power outage).

作为对上述技术方案的进一步完善和补充,本实用新型还包括以下附加技术特征。As a further improvement and supplement to the above technical solution, the utility model also includes the following additional technical features.

所述的控制电源切换电路设有电压为110V的直流电源输入端、电压为220V的直流电源输入端,控制电源切换电路设开关以切换两电压电源的输入。增加适用范围。The control power switching circuit is provided with a DC power input terminal with a voltage of 110V and a DC power input terminal with a voltage of 220V, and the control power switching circuit is provided with a switch to switch the input of the two voltage power sources. Increase the scope of application.

箱体内的两组模拟断路器回路,每组模拟断路器回路均设有一组模拟断路器的合闸线圈和一组分闸线圈、及分、合闸位置监视回路。There are two groups of analog circuit breaker circuits in the box, and each group of analog circuit breaker circuits is equipped with a group of closing coils of analog circuit breakers, a group of switching coils, and a monitoring circuit for opening and closing positions.

模拟断路器各相有辅助触点输出,每相2对辅助触点。Each phase of the analog circuit breaker has auxiliary contact output, and each phase has 2 pairs of auxiliary contacts.

箱内设有六组模拟操作刀闸回路以一次模拟6把刀闸的分、合闸操作。There are six sets of simulated operation knife switch circuits in the box to simulate the opening and closing operations of 6 knife switches at a time.

模拟操作刀闸回路设有一对辅助触点输出。The analog operation knife switch circuit has a pair of auxiliary contact outputs.

模拟操作刀闸回路中串入联闭锁接点以验证联闭锁功能。The interlocking contact is connected in series in the simulated operation knife switch circuit to verify the interlocking function.

每一模拟操作刀闸回路均设有刀闸分、合闸位置监视回路。Each analog operation knife switch circuit is equipped with a knife switch opening and closing position monitoring circuit.

分、合闸位置监视回路均设有信号灯。There are signal lamps for the monitoring circuit of opening and closing positions.

有益效果:本技术方案针对变电站现场调试使用而设计开发,适用于变电站现场一次设备未具备调试条件时,使用一次设备状态模拟装置,可在一次设备还未安装完成时即可有效将试验工作提前进行。同时,减少停电时间:当一次设备未具备调试条件时,采用该款一次设备状态模拟装置模拟现场一次设备,使之与智能终端或继保室内保护、测控装置连接,即可完成一次设备遥控、保护整组传动等模拟试验,完整地模拟了二次设备带一次设备试验的过程。因此,在一次设备停役期间,只需完成保护、测控装置等带一次设备整组传动即可,大大减少了变电站一次设备停役(停电)时间。Beneficial effects: This technical solution is designed and developed for the on-site commissioning of substations. It is suitable for when the primary equipment on the substation site does not meet the debugging conditions. Using the primary equipment status simulation device can effectively advance the test work before the primary equipment is installed. conduct. At the same time, reduce power outage time: when the primary equipment does not meet the debugging conditions, use this primary equipment status simulation device to simulate the on-site primary equipment, and connect it with the intelligent terminal or the protection and measurement and control device in the relay room to complete the remote control of the primary equipment, The simulation test of protecting the whole group of transmissions completely simulates the process of secondary equipment with primary equipment test. Therefore, during the outage period of the primary equipment, it is only necessary to complete the protection, measurement and control devices, etc. to drive the entire set of primary equipment, which greatly reduces the outage (power outage) time of the primary equipment of the substation.

附图说明Description of drawings

图1是本实用新型应用原理图。Fig. 1 is the application schematic diagram of the utility model.

图2是本实用新型模拟操作刀闸回路电气图。Fig. 2 is the electrical diagram of the analog operation knife switch circuit of the utility model.

图3是本实用新型第一组模拟断路器回路电气图。Fig. 3 is the circuit electrical diagram of the first group of analog circuit breakers of the utility model.

图4是本实用新型第二组模拟断路器回路电气图。Fig. 4 is the circuit electrical diagram of the second group of simulated circuit breakers of the utility model.

图5是本实用新型主视图。Fig. 5 is a front view of the utility model.

具体实施方式detailed description

以下结合说明书附图对本实用新型的技术方案做进一步的详细说明。The technical solution of the utility model is described in further detail below in conjunction with the accompanying drawings of the description.

如图1所示,本技术方案应用于电力系统继电保护整组试验中,它模拟高压断路器分合闸的动作行为,以完成继电保护的跳合闸试验;应用于变电站自动化调试传动试验,它模拟高压断路器、隔离开关、接地闸刀等变电站一次设备的分合闸动作行为,并实施反馈动作信号,以完成自动化调试的带设备联动试验。As shown in Figure 1, this technical solution is applied to the whole set of tests of relay protection in power systems. It simulates the opening and closing action of high-voltage circuit breakers to complete the tripping and closing tests of relay protection; it is applied to automatic debugging of transmission in substations Test, which simulates the opening and closing action behavior of primary equipment in substations such as high-voltage circuit breakers, isolating switches, and grounding switches, and implements feedback action signals to complete automatic debugging with equipment linkage tests.

在目前智能变电站中,它与智能终端装置进行配套,作为高压断路器、隔离开关及接地闸刀等设备操作回路的模拟品,模拟的一次设备操作回路行为与真实的一次设备相同。In the current intelligent substation, it is matched with the intelligent terminal device, and it is used as a simulation product of the operation circuit of equipment such as high-voltage circuit breaker, disconnector and grounding switch. The behavior of the simulated primary equipment operation circuit is the same as that of the real primary equipment.

如图3、4所示,本一次设备状态模拟装置可以模拟远方分相操作断路器,分合闸输入端子分别为适用于第一组控制电源的A相合闸107A、A相分闸137A、B相合闸107B、B相分闸137B、C相合闸107C、137CC相分闸和适用于第二组控制电源的A相合闸207A、A相分闸237A、B相合闸207B、B相分闸237B、C相合闸207C、C相分闸237C。其中:137跳开关(第1组控制电源)、107合开关(第1组控制电源)、109开关分位闭合(第1组控制电源);237跳开关(第2组控制电源)、207合开关(第2组控制电源)、209开关分位闭合(第2组控制电源)。As shown in Figures 3 and 4, this primary equipment state simulation device can simulate remote phase-splitting operation circuit breakers. The opening and closing input terminals are A-phase closing 107A, A-phase opening 137A, and B, which are suitable for the first group of control power supplies. Phase closing 107B, phase B opening 137B, phase C closing 107C, 137CC phase opening and phase A closing 207A, phase A opening 237A, phase B closing 207B, phase B opening 237B, C-phase closing 207C, C-phase opening 237C. Among them: 137 trip switches (the first group control power supply), 107 close switches (the first group control power supply), 109 switch position closing (the first group control power supply); 237 jump switches (the second group control power supply), 207 close Switch (group 2 control power supply), 209 switch position closing (group 2 control power supply).

如图2所示,本一次设备状态模拟装置可以模拟远方遥控操作闸刀,分合闸输入端子分别为合闸KNGH、分闸KNGF。其中,N代表1-6的数字,分别代表闸刀1至闸刀6。KXGH控制闸刀合,X代表1-6,分别代表闸刀1-6。As shown in Figure 2, the primary equipment state simulation device can simulate the remote control operation of the switch knife, and the opening and closing input terminals are respectively closing KNGH and opening KNGF. Wherein, N represents a number from 1 to 6, representing switch blade 1 to switch blade 6 respectively. KXGH controls switch knife closing, X stands for 1-6, respectively stands for switch knife 1-6.

如图5所示,面板上对每个操作对象均设有手动合闸和手动跳闸按钮,并设有分合闸信号灯,分别为:对于断路器为A1合、B1合、C1合、A2合、B2合、C2合六个红色信号灯和A1跳、B1跳、C1跳、A2跳、B2跳、C2跳六个绿色信号灯;对于闸刀为1G合、2G合、3G合、4G合、5G合、6G合六个红色信号灯和1G跳、2G跳、3G跳、4G跳、5G跳、6G跳六个绿色信号灯。As shown in Figure 5, there are manual closing and manual tripping buttons for each operation object on the panel, and opening and closing signal lights, respectively: for circuit breakers, A1 close, B1 close, C1 close, A2 close , B2 close, C2 close six red signal lights and A1 jump, B1 jump, C1 jump, A2 jump, B2 jump, C2 jump six green signal lights; for the switch knife, it is 1G close, 2G close, 3G close, 4G close, 5G There are six red signal lights for combination and 6G combination and six green signal lights for 1G jump, 2G jump, 3G jump, 4G jump, 5G jump, and 6G jump.

在模拟回路中设有继电器各输出一组转换触点,触点闭合或断开与操作电源完全隔离,可与微机型继电保护装置、智能测控装置、智能终端等设备进行配合试验。In the simulation circuit, there is a set of changeover contacts for each output of the relay. The closing or opening of the contacts is completely isolated from the operating power supply. It can be used for cooperating tests with microcomputer relay protection devices, intelligent measurement and control devices, intelligent terminals and other equipment.

以上图所示的变电站一次设备状态模拟装置是本实用新型的具体实施例,已经体现出本实用新型实质性特点和进步,可根据实际的使用需要,在本实用新型的启示下,对其进行形状、结构等方面的等同修改,均在本方案的保护范围之列。The substation primary equipment state simulation device shown in the above figure is a specific embodiment of the utility model, which has already reflected the substantive features and progress of the utility model, and can be implemented according to the actual use needs under the inspiration of the utility model Equivalent modifications in aspects such as shape and structure are all within the scope of protection of this proposal.

Claims (9)

1.变电站一次设备状态模拟装置,其特征在于:包括箱体、设于箱体内的至少一组模拟断路器回路、至少一组模拟操作刀闸回路、控制电源切换电路,控制键包括手动合闸键、手动跳闸键,模拟断路器电路的组数与控制电源数量相对应;每一组模拟断路器电路均设有与模拟断路器线圈相连的A相合闸键、A相分闸键、B相合闸键、B相分闸键、C相合闸键和C相分闸键、及与A相合闸键、A相分闸键、B相合闸键、B相分闸键、C相合闸键和C相分闸键对应的信号灯;每组模拟遥控操作闸刀电路均设有与刀闸合闸线圈相连的合闸键、与刀闸分闸线圈相连的分闸键及与合闸键和分闸键相对应的信号灯。1. The device for simulating the state of primary equipment in a substation is characterized in that it includes a box body, at least one set of simulated circuit breaker circuits, at least one set of simulated operation knife switch circuits, and a control power switching circuit, and the control keys include manual closing key, manual trip key, the number of groups of analog circuit breaker circuits corresponds to the number of control power sources; each group of analog circuit breaker circuits is equipped with A phase closing key, A phase opening key, and B phase closing key connected to the analog circuit breaker coil. Switch key, phase B opening key, phase C closing key and phase C opening key, and phase A closing key, phase A opening key, phase B closing key, phase B opening key, phase C closing key and C The signal light corresponding to the phase opening key; each group of analog remote control operation knife circuit is equipped with a closing key connected to the knife closing coil, an opening key connected to the knife opening coil, and a closing key and an opening key. The signal light corresponding to the key. 2.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:所述的控制电源切换电路设有电压为110V的直流电源输入端、电压为220V的直流电源输入端,控制电源切换电路设开关以切换两电压电源的输入。2. The transformer substation primary equipment state simulation device according to claim 1, characterized in that: the control power switch circuit is provided with a DC power input terminal with a voltage of 110V and a DC power input terminal with a voltage of 220V, and the control power switch The circuit is provided with a switch to switch the input of the two-voltage power supply. 3.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:箱体内的两组模拟断路器回路,每组模拟断路器回路均设有一组模拟断路器的合闸线圈和一组分闸线圈、及分、合闸位置监视回路。3. The transformer substation primary equipment state simulation device according to claim 1, characterized in that: two groups of simulated circuit breaker circuits in the cabinet, each group of simulated circuit breaker circuits are provided with a group of closing coils of the simulated circuit breaker and a set of Opening coil, and opening and closing position monitoring circuit. 4.根据权利要求3所述的变电站一次设备状态模拟装置,其特征在于:模拟断路器各相有辅助触点输出,每相2对辅助触点。4. The device for simulating the primary equipment state of a substation according to claim 3, wherein each phase of the simulated circuit breaker has an auxiliary contact output, and each phase has 2 pairs of auxiliary contacts. 5.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:箱内设有六组模拟操作刀闸回路以一次模拟6把刀闸的分、合闸操作。5. The device for simulating the primary equipment state of a substation according to claim 1, characterized in that: six groups of analog operation knife switch circuits are provided in the box to simulate the opening and closing operations of six knife switches at a time. 6.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:模拟操作刀闸回路设有一对辅助触点输出。6. The device for simulating the state of primary equipment in a substation according to claim 1, wherein a pair of auxiliary contact outputs are provided for the analog operation knife switch circuit. 7.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:模拟操作刀闸回路中串入联闭锁接点以验证联闭锁功能。7. The device for simulating the state of primary equipment in a substation according to claim 1, wherein an interlocking contact is connected in series in the simulated operation knife circuit to verify the interlocking function. 8.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:每一模拟操作刀闸回路均设有刀闸分、合闸位置监视回路。8. The device for simulating the state of primary equipment in a substation according to claim 1, wherein each circuit of a simulated operation switch is equipped with a switch opening and closing position monitoring circuit. 9.根据权利要求1所述的变电站一次设备状态模拟装置,其特征在于:分、合闸位置监视回路均设有信号灯。9. The device for simulating the state of primary equipment in a substation according to claim 1, characterized in that: the monitoring circuits for opening and closing positions are equipped with signal lamps.
CN201520761124.1U 2015-09-29 2015-09-29 Primary equipment of transformer substation state analogue means Expired - Lifetime CN205120850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520761124.1U CN205120850U (en) 2015-09-29 2015-09-29 Primary equipment of transformer substation state analogue means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520761124.1U CN205120850U (en) 2015-09-29 2015-09-29 Primary equipment of transformer substation state analogue means

Publications (1)

Publication Number Publication Date
CN205120850U true CN205120850U (en) 2016-03-30

Family

ID=55576445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520761124.1U Expired - Lifetime CN205120850U (en) 2015-09-29 2015-09-29 Primary equipment of transformer substation state analogue means

Country Status (1)

Country Link
CN (1) CN205120850U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106950449A (en) * 2017-04-07 2017-07-14 国网山东省电力公司潍坊供电公司 Intelligent substation checks and accepts breaker controller in analogue system
CN109901090A (en) * 2019-03-26 2019-06-18 国网北京市电力公司 The measuring and controlling equipment of substation
CN115830936A (en) * 2022-12-12 2023-03-21 国网江苏省电力有限公司盐城供电分公司 A circuit breaker simulation method and device based on electronic load
CN118430222A (en) * 2024-03-26 2024-08-02 国网北京市电力公司 Remote control function detection device and remote control function detection method of measurement and control device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106950449A (en) * 2017-04-07 2017-07-14 国网山东省电力公司潍坊供电公司 Intelligent substation checks and accepts breaker controller in analogue system
CN109901090A (en) * 2019-03-26 2019-06-18 国网北京市电力公司 The measuring and controlling equipment of substation
CN109901090B (en) * 2019-03-26 2020-08-04 国网北京市电力公司 Measurement and control equipment of transformer substation
CN115830936A (en) * 2022-12-12 2023-03-21 国网江苏省电力有限公司盐城供电分公司 A circuit breaker simulation method and device based on electronic load
CN118430222A (en) * 2024-03-26 2024-08-02 国网北京市电力公司 Remote control function detection device and remote control function detection method of measurement and control device

Similar Documents

Publication Publication Date Title
CN103440803B (en) The authentic training system of 10kV power distribution equipment real voltage analog current closed loop
CN110299041B (en) An integrated training system and method for intelligent power distribution terminal and communication operation and maintenance
CN205139272U (en) Join in marriage power -grid switch analog switch unit for equipment
CN202736379U (en) Transformer station comprehensive automation skill training system
CN205139322U (en) Handcart -type circuit breaker analogue test appearance
CN104900118B (en) A kind of 10kV Distribution Network Failures body-sensing Practical training equipment
CN205120850U (en) Primary equipment of transformer substation state analogue means
CN103326250B (en) Integrated ring main unit electric controller
CN104269090B (en) The analogue system of a kind of power information acquisition terminal wheel secondary control switch and method thereof
CN204287358U (en) The debugging apparatus of intelligent controller
CN106383308A (en) Charge control circuit breaker automatic breaking/closing test device
CN204257085U (en) Converting equipment electric control system failure simulation device
CN113687220A (en) A simulation device and method for a spring energy storage vacuum circuit breaker
CN203673718U (en) 10kV circuit on-load switch-closing somatosensory apparatus
CN202917090U (en) Dynamic simulation substation sand table device
CN203520719U (en) 10kV power distribution device real voltage simulation current closed-loop full-true training system
CN201230204Y (en) Logic test device for microcomputer type protection monitoring module in power supply and distribution system
CN203929925U (en) A kind of protective relaying device divide-shut brake return circuit testing device
CN204065175U (en) A kind of mimic-disconnecting switch being applicable to intelligent substation multi-voltage grade operation circuit
CN207780133U (en) Straight control type motor-operating mechanism testing inspection case
CN212646842U (en) Primary equipment state monitoring system and simulation device
CN109941314A (en) A kind of exchange goat switch operating gear
CN211505720U (en) Auxiliary test device for multi-branch circuit breaker
CN204229714U (en) A kind of experimental facilities of small electrical system
CN202049657U (en) Simulation circuit breaker