CN205117295U - Super large aperture well drilling follow -up wall of a well structure - Google Patents

Super large aperture well drilling follow -up wall of a well structure Download PDF

Info

Publication number
CN205117295U
CN205117295U CN201520953161.2U CN201520953161U CN205117295U CN 205117295 U CN205117295 U CN 205117295U CN 201520953161 U CN201520953161 U CN 201520953161U CN 205117295 U CN205117295 U CN 205117295U
Authority
CN
China
Prior art keywords
well wall
well
wall
drilling
follow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520953161.2U
Other languages
Chinese (zh)
Inventor
刘辰
张立文
章建
李付星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou University of Technology
Original Assignee
Xuzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou University of Technology filed Critical Xuzhou University of Technology
Priority to CN201520953161.2U priority Critical patent/CN205117295U/en
Application granted granted Critical
Publication of CN205117295U publication Critical patent/CN205117295U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

超大孔径钻井跟进井壁结构有一个圆环形的砼井壁,井壁的外部一周轴向设置有输液管;井壁的上下部圆周边沿上,设置有顺序相邻并且能够相互吻合的燕尾凸起与燕尾槽;井壁的内壁上安装有照明灯,照明灯轴向的两端顺序连接有导线与接头电源;该超大孔径钻井跟进井壁结构不仅能够调节井壁与井孔的摩擦力,便于井壁的顺利下放与跟进,同时该超大孔径钻井跟进井壁结构带有照明系统,方便井壁下放时的观察井孔内部情况,结构简单,施工简便,坚固可靠,整体性强,是超大口径钻机钻井作业的可靠井壁结构。

The follow-up well wall structure of ultra-large-aperture drilling has a circular concrete well wall, and the outer circumference of the well wall is axially provided with infusion pipes; the upper and lower peripheral edges of the well wall are provided with dovetails that are adjacent in sequence and can match each other. Protrusions and dovetail grooves; lighting lamps are installed on the inner wall of the well wall, and the two axial ends of the lighting lamps are sequentially connected with wires and joint power sources; the super-large-aperture drilling follow-up well wall structure can not only adjust the friction between the well wall and the well hole At the same time, the ultra-large-aperture drilling follow-up well wall structure is equipped with a lighting system, which is convenient for observing the internal conditions of the wellbore when the well wall is lowered. The structure is simple, the construction is simple, solid and reliable, and the integrity Strong, it is a reliable wellbore structure for ultra-large caliber drilling rig drilling operations.

Description

超大孔径钻井跟进井壁结构Super-large aperture drilling follow-up borehole structure

技术领域 technical field

本实用新型涉及一种井壁结构,尤其是一种超大孔径钻井跟进井壁结构。 The utility model relates to a well wall structure, in particular to a super large aperture drilling follow-up well wall structure.

背景技术 Background technique

由于钻井作业的钻井口径都比较小,其钻井周围的壁墙就会很好的解决,但是,对超大口径钻井的井壁来说,其施工难度就比较困难,因为超大钻井口径比较大,一般都在5米以上,有的甚至达到十几米、甚至二十几米,这样大口径的钻井,其井壁的体积和重量就特别巨大;此外,传统的井壁都是在井孔成型后逐步跟进下放到井孔内部,然而在下放和跟进的过程中,往往会使井壁下放和跟进阻力增大,使得超大孔径井壁停止不动,无法下放跟进;同时由于井孔较深,底部光线较暗,井壁没有照明设备,因此不能观察井壁下放的状态,因此会影响到超大孔径井壁的施工的进度和效率。 Since the drilling caliber of the drilling operation is relatively small, the wall around the drilling will be well resolved. However, for the well wall of the ultra-large caliber drilling, the construction difficulty is more difficult, because the ultra-large drilling caliber is relatively large, generally They are all above 5 meters, and some even reach more than ten meters or even more than twenty meters. The volume and weight of such a large-caliber drilling well are particularly huge; However, during the process of lowering and follow-up, the resistance of the well wall lowering and follow-up will often increase, making the super-large-diameter well wall stop and cannot be lowered for follow-up; at the same time, due to the deep hole , the light at the bottom is dark, and there is no lighting equipment on the shaft wall, so the state of the lowering of the shaft wall cannot be observed, which will affect the progress and efficiency of the construction of the ultra-large aperture shaft wall.

发明内容 Contents of the invention

为了解决钻井作业中超大口径钻井井壁的下放跟进困难的问题,本实用新型提供一种超大孔径钻井跟进井壁结构,该超大孔径钻井跟进井壁结构不仅能够调节井壁与井孔的摩擦力,便于井壁的顺利下放与跟进,同时该超大孔径钻井跟进井壁结构带有照明系统,方便井壁下放时的观察井孔内部情况,结构简单,施工简便,坚固可靠,整体性强,是超大口径钻机钻井作业的可靠井壁结构。 In order to solve the problem of difficult follow-up of the super-large-diameter drilling well wall during drilling operations, the utility model provides a super-large-diameter drilling follow-up well wall structure, which can not only adjust the well wall and the wellbore The frictional force facilitates the smooth lowering and follow-up of the well wall. At the same time, the ultra-large-aperture drilling follow-up well wall structure is equipped with a lighting system, which is convenient for observing the internal conditions of the well hole when the well wall is lowered. The structure is simple, the construction is simple, and it is firm and reliable. With strong integrity, it is a reliable wellbore structure for ultra-large caliber drilling rigs.

本实用新型解决其技术问题所采用的技术方案是:该超大孔径钻井跟进井壁结构,包括:输液管,井壁,导线,照明灯,燕尾槽,接头电源,燕尾凸起;该超大孔径钻井跟进井壁结构有一个圆环形的砼井壁,井壁的外部一周轴向设置有输液管;输液管内输入液体后,能够冲洗井孔内壁上砂石,减少井壁与井孔的摩擦力,便于井壁的顺利下放跟进;井壁的上下部圆周边沿上,设置有顺序相邻并且能够相互吻合的燕尾凸起与燕尾槽,燕尾凸起与燕尾槽的设置,易于上下井壁的拼接,保障了井壁的整体性与稳定性;井壁的内壁上安装有照明灯,照明灯轴向的两端顺序连接有导线与接头电源;照明灯方便井壁下放跟进时的观察井孔内部情况。 The technical solution adopted by the utility model to solve the technical problem is: the super-large aperture drilling follow-up well wall structure, including: infusion tube, well wall, wire, lighting, dovetail groove, joint power supply, dovetail protrusion; the super large aperture Drilling follow-up The well wall structure has a circular concrete well wall, and an infusion tube is arranged axially around the outside of the well wall; after the liquid is input into the infusion tube, it can wash the sand and gravel on the inner wall of the well hole, reducing the friction between the well wall and the well hole. The frictional force facilitates the smooth lowering and follow-up of the well wall; on the upper and lower circumference of the well wall, there are dovetail protrusions and dovetail grooves that are adjacent in sequence and can match each other. The setting of the dovetail protrusions and dovetail grooves makes it easy to go up and down the well The splicing of the wall ensures the integrity and stability of the well wall; lighting lamps are installed on the inner wall of the well wall, and the two axial ends of the lighting lamps are sequentially connected with wires and connector power sources; Observe the inside of the wellbore.

在钻井施工作业时,在钻井附近的地面上,先把砼井壁成型固化,然后运至已选定的井口上方,在井壁上逐步安装好超大口径钻机,然后开始钻井作业,由于该超大口径钻机把井壁下部的泥土不断排出,形成井口,促使井壁逐步下沉,直至下沉到井壁的上边缘与地面平齐为止,钻机停止作业,在井壁的上边缘面上涂抹配制好的砼粘结剂,然后把预制好的第二个井壁运至涂抹好砼粘结剂的井壁上方,让第一个井壁上部的燕尾凸起、燕尾槽和第二个井壁下部的燕尾凸起、燕尾槽吻合固定,另外使井壁的输液管、接头电源也相互吻合插接固定,再开启超大口径钻机钻井作业,把井壁下部的泥土排除后,第二个井壁靠本身重量的压力逐步跟进下落,当井壁上口边缘再次与地面平齐时,即再次使用上面的作业,周而复始,不断叠加井壁,直到钻机钻挖到需要的钻井深度为止。 During the drilling operation, on the ground near the drilling, the concrete well wall is formed and solidified first, and then transported to the top of the selected wellhead, and the super-large-caliber drilling rig is gradually installed on the well wall, and then the drilling operation is started. Due to the super-large The caliber drilling rig continuously discharges the soil from the lower part of the well wall to form a wellhead, which promotes the gradual sinking of the well wall until the upper edge of the well wall is flush with the ground. Good concrete binder, and then transport the prefabricated second well wall to the top of the well wall coated with concrete binder, so that the dovetail protrusions and dovetail grooves on the upper part of the first well wall and the second well wall The dovetail protrusions and dovetail grooves at the lower part are fitted and fixed. In addition, the infusion pipes and joint power supplies on the well wall are also fitted and fixed. Relying on the pressure of its own weight, it will gradually follow up and fall. When the upper edge of the well wall is flush with the ground again, the above operation will be used again, and the well wall will be stacked repeatedly until the drilling rig drills to the required drilling depth.

本实用新型的有益效果是:该超大孔径钻井跟进井壁结构不仅能够调节井壁与井孔的摩擦力,便于井壁的顺利下放与跟进,同时该超大孔径钻井跟进井壁结构带有照明系统,方便井壁下放时的观察井孔内部情况,结构简单,施工简便,坚固可靠,整体性强,是超大口径钻机钻井作业的可靠井壁结构。 The beneficial effects of the utility model are: the super-large-aperture drilling follow-up well wall structure can not only adjust the friction between the well wall and the well hole, and facilitate the smooth lowering and follow-up of the well wall, but at the same time, the super-large-aperture drilling follow-up well wall structure can There is a lighting system, which is convenient for observing the internal conditions of the wellbore when the wellbore is lowered. The structure is simple, the construction is convenient, solid and reliable, and the integrity is strong. It is a reliable wellbore structure for super-large-diameter drilling operations.

附图说明 Description of drawings

下面结合附图和实施例对本实用新型进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1是本实用新型的结构原理示意图。 Fig. 1 is the structural principle schematic diagram of the utility model.

图中,1.输液管,2.井壁,3.导线,4.照明灯,5.燕尾槽,6.接头电源,7.燕尾凸起。 In the figure, 1. Infusion tube, 2. Well wall, 3. Lead wire, 4. Lighting lamp, 5. Dovetail groove, 6. Connector power supply, 7. Dovetail protrusion.

具体实施方式 detailed description

图1中,该超大孔径钻井跟进井壁结构,包括:输液管1,井壁2,导线3,照明灯4,燕尾槽5,接头电源6,燕尾凸起7;该超大孔径钻井跟进井壁结构有一个圆环形的砼井壁2,井壁2的外部一周轴向设置有输液管1;输液管1内输入液体后,能够冲洗井孔内壁上砂石,减少井壁与井孔的摩擦力,便于井壁的顺利下放跟进;井壁2的上下部圆周边沿上,设置有顺序相邻并且能够相互吻合的燕尾凸起7与燕尾槽5,燕尾凸起7与燕尾槽5的设置,易于上下井壁2的拼接,保障了井壁的整体性与稳定性;井壁2的内壁上安装有照明灯4,照明灯4轴向的两端顺序连接有导线3与接头电源6;照明灯4方便井壁下放跟进时的观察井孔内部情况。 In Fig. 1, the super-large-aperture drilling follow-up well wall structure includes: infusion pipe 1, well wall 2, wire 3, lighting lamp 4, dovetail groove 5, joint power supply 6, and dovetail protrusion 7; the super-large-aperture drilling follow-up The well wall structure has a circular concrete well wall 2, and an infusion tube 1 is arranged axially around the outer circumference of the well wall 2; after the liquid is input into the infusion tube 1, it can wash the sand and gravel on the inner wall of the well hole, reducing the gap between the well wall and the well. The friction force of the hole facilitates the smooth lowering and follow-up of the well wall; on the upper and lower peripheral edges of the well wall 2, there are dovetail protrusions 7 and dovetail grooves 5 that are adjacent in sequence and can match each other, and dovetail protrusions 7 and dovetail grooves The setting of 5 facilitates the splicing of the upper and lower shaft walls 2, ensuring the integrity and stability of the shaft wall; the lighting lamp 4 is installed on the inner wall of the shaft wall 2, and the two axial ends of the lighting lamp 4 are sequentially connected with wires 3 and joints Power supply 6; lighting lamp 4 is convenient for observing the internal situation of the well hole when the well wall is lowered for follow-up.

在钻井施工作业时,在钻井附近的地面上,先把砼井壁2成型固化,然后运至已选定的井口上方,在井壁2上逐步安装好超大口径钻机,然后开始钻井作业,由于该超大口径钻机把井壁2下部的泥土不断排出,形成井口,促使井壁2逐步下沉,直至下沉到井壁2的上边缘与地面平齐为止,钻机停止作业,在井壁2的上边缘面上涂抹配制好的砼粘结剂,然后把预制好的第二个井壁2运至涂抹好砼粘结剂的井壁2上方,让第一个井壁2上部的燕尾凸起7、燕尾槽5和第二个井壁2下部的燕尾凸起7、燕尾槽5吻合固定,另外使井壁2的输液管1、接头电源6也相互吻合插接固定,再开启超大口径钻机钻井作业,把井壁2下部的泥土排除后,第二个井壁2靠本身重量的压力逐步跟进下落,当井壁2上口边缘再次与地面平齐时,即再次使用上面的作业,周而复始,不断叠加井壁2,直到钻机钻挖到需要的钻井深度为止。 During the drilling construction operation, on the ground near the drilling, the concrete well wall 2 is formed and solidified first, and then transported to the top of the selected wellhead, and the super large-caliber drilling rig is gradually installed on the well wall 2, and then the drilling operation is started. The super-large-diameter drilling rig continuously discharges the soil at the lower part of the well wall 2 to form a wellhead, which promotes the gradual sinking of the well wall 2 until the upper edge of the well wall 2 is flush with the ground, and the drilling rig stops working. Apply the prepared concrete adhesive on the upper edge surface, and then transport the prefabricated second well wall 2 to the top of the well wall 2 coated with the concrete adhesive, so that the dovetail on the upper part of the first well wall 2 protrudes 7. The dovetail groove 5 and the dovetail protrusion 7 at the lower part of the second well wall 2 are coincidently fixed, and the infusion pipe 1 and the joint power supply 6 of the well wall 2 are also coincidently plugged and fixed, and then the super large-diameter drilling rig is started In the drilling operation, after removing the soil from the lower part of the well wall 2, the second well wall 2 will gradually follow up and fall under the pressure of its own weight. When the upper edge of the well wall 2 is flush with the ground again, the above operation will be used again. Going round and round, continuously superimposing the well wall 2 until the drilling rig drills to the required drilling depth.

Claims (1)

1. ultra-large aperture drilling well follow-up shaft wall structure, comprising: woven hose (1), the borehole wall (2), wire (3), illuminating lamp (4), dovetail groove (5), joint power supply (6), dovetail tangs (7); It is characterized in that: this ultra-large aperture drilling well follow-up shaft wall structure has the concrete borehole wall (2) of an annular, the outside of the borehole wall (2) is axially provided with woven hose (1) in one week; The top and the bottom circumferential edge of the borehole wall (2), along upper, is provided with the adjacent and dovetail tangs (7) that can mutually coincide of order and dovetail groove (5); The inwall of the borehole wall (2) is provided with illuminating lamp (4), the axial two ends of illuminating lamp (4) have been linked in sequence wire (3) and joint power supply (6).
CN201520953161.2U 2015-11-26 2015-11-26 Super large aperture well drilling follow -up wall of a well structure Expired - Fee Related CN205117295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520953161.2U CN205117295U (en) 2015-11-26 2015-11-26 Super large aperture well drilling follow -up wall of a well structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520953161.2U CN205117295U (en) 2015-11-26 2015-11-26 Super large aperture well drilling follow -up wall of a well structure

Publications (1)

Publication Number Publication Date
CN205117295U true CN205117295U (en) 2016-03-30

Family

ID=55572914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520953161.2U Expired - Fee Related CN205117295U (en) 2015-11-26 2015-11-26 Super large aperture well drilling follow -up wall of a well structure

Country Status (1)

Country Link
CN (1) CN205117295U (en)

Similar Documents

Publication Publication Date Title
CN104278978B (en) Dissolvable bridge plug fracturing process string and its fracturing method
CN106640120B8 (en) Layered grouting construction method for fixed-point deep holes on earth surface
AU2013228112B2 (en) Method for removal of casings in an underground well
MY177712A (en) Method and system for plugging a well and use of explosive charges in plugging wells
MX2024010420A (en) An apparatus for verifying the inner diameter of tubulars forming a tubular string.
CN202544795U (en) Underground well opening back connecting device
CN104563126B (en) Construction method for bored pile by rotary drilling rig
CN201486494U (en) Expansion pipe suspension connection device
CN107476793B (en) Deep shale gas fracturing pipe column and fracturing process method
CN105370253A (en) Method and equipment for realizing steam assisted gravity oil drainage thermal extraction in same well
CN205117295U (en) Super large aperture well drilling follow -up wall of a well structure
CN203201486U (en) Casing pipe device for mining area coal-bed gas well on ground
CN106869846B (en) Underground casing patching method
CN108868726B (en) Assembly for fracturing horizontal section reservoir and fracturing method of infinite-stage full-drift diameter of assembly
MX2018012634A (en) Combined casing fill-up and drill pipe flowback tool and method.
CN103233694A (en) Method for descending and suspending production casing for mining area ground coal-bed gas well and casing device
CN115680497B (en) Quick well drilling device and method with separable filter tube and inner core drill rod
CN203948048U (en) A Casing Tieback Guide Centralizer
CN102296597A (en) Construction method of steel pipe piles in shallow soil layer
CN104100205B (en) Cement ring structure of ultralarge-diameter drill well and construction method
CN204386490U (en) A kind of probing follow-up casing bit
CN204649982U (en) Earth's surface aid for embedment of wave detector
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area
CN203515369U (en) Bow-spring elastic centralizer
CN203835349U (en) Sand prevention pipe column easy to fish

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160330

Termination date: 20161126

CF01 Termination of patent right due to non-payment of annual fee