CN205116417U - Box -shaped fast -assembling house - Google Patents
Box -shaped fast -assembling house Download PDFInfo
- Publication number
- CN205116417U CN205116417U CN201520886753.7U CN201520886753U CN205116417U CN 205116417 U CN205116417 U CN 205116417U CN 201520886753 U CN201520886753 U CN 201520886753U CN 205116417 U CN205116417 U CN 205116417U
- Authority
- CN
- China
- Prior art keywords
- board
- bay
- gable
- connector body
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本实用新型提出一种盒式快装房屋,包括:开间板,包括相对设置的前开间板和后开间板;山墙板,包括第一山墙板和第二山墙板,第一山墙板设置于前开间板和后开间板一侧且与前开间板和后开间板连接,第二山墙板设置于前开间板和后开间板另一侧且与前开间板和后开间板连接;顶板,与开间板和山墙板连接;连接装置,包括第一连接件和第二连接件,第一连接件设置于开间板和/或山墙板下端,第二连接件设置于顶板顶面上。本实用新型有益效果:大量节省人工和材料,提高了连接效率,将现有盒式房屋安装时间为30分钟左右一间提高至5分钟左右一间,且稳定性和牢固性更强;提高了连接精度,将现有盒式房屋的误差±2cm提高至±0.25mm。
The utility model proposes a box-type quick-installed house, which includes: a bay panel, including a front bay panel and a rear bay panel oppositely arranged; a gable panel, including a first gable panel and a second gable panel, the first gable panel is arranged One side of the bay board and the rear bay board is connected with the front bay board and the rear bay board; the second gable board is arranged on the other side of the front bay board and the rear bay board and connected with the front bay board and the rear bay board; The board is connected to the gable board; the connecting device includes a first connecting piece and a second connecting piece, the first connecting piece is arranged at the lower end of the bay board and/or the gable board, and the second connecting piece is arranged on the top surface of the top plate. The utility model has beneficial effects: a lot of labor and materials are saved, the connection efficiency is improved, and the installation time of the existing box-type houses is increased from about 30 minutes to about 5 minutes, and the stability and firmness are stronger; The connection accuracy improves the error of the existing box house from ±2cm to ±0.25mm.
Description
技术领域technical field
本实用新型涉及建筑领域,特别是指一种盒式快装房屋。The utility model relates to the construction field, in particular to a box-type quick-pack house.
背景技术Background technique
建筑行业,传统施工方法常使用粘土制砖砌筑,或者在现场浇灌墙结构,装配大型砌块结构等,效率低,劳动强度大,而且需要较大的辅助施工场地,施工周期长,成本也比较高。而后出现了盒式房屋,其采用匚字型钢筋将前开间板、后开间板、山墙板和顶板连接后充填混凝土组成一盒子建筑结构,但该结构仍然需要较多的连接材料和人工,连接效率、连接精度、连接稳定性、连接牢固性可以进一步提高。另外,现有的盒式房屋,其建造二层或多层建筑时,除前述问题外,施工难度也较大。In the construction industry, traditional construction methods often use clay bricks for masonry, or pour wall structures on site, and assemble large block structures, etc., which are inefficient, labor-intensive, and require a large auxiliary construction site. The construction period is long and the cost is low. relatively high. Later, box-type houses appeared, which used 匚-shaped steel bars to connect the front bay panels, rear bay panels, gable panels, and roof panels, and then filled them with concrete to form a box building structure. However, this structure still requires more connecting materials and labor. Efficiency, connection accuracy, connection stability, and connection firmness can be further improved. In addition, in addition to the above-mentioned problems, the existing box-type houses are also more difficult to construct when building two-story or multi-story buildings.
实用新型内容Utility model content
本实用新型提出一种盒式快装房屋,解决了现有技术中上述问题。The utility model proposes a box-type fast-packing house, which solves the above-mentioned problems in the prior art.
本实用新型的技术方案是这样实现的:The technical scheme of the utility model is achieved in that:
一种盒式快装房屋,包括:A box-type quick-pack house, comprising:
开间板,包括相对设置的前开间板和后开间板;Bay boards, including front bay boards and rear bay boards arranged oppositely;
山墙板,包括第一山墙板和第二山墙板,所述第一山墙板设置于所述前开间板和所述后开间板一侧且与所述前开间板和所述后开间板连接,所述第二山墙板设置于所述前开间板和所述后开间板另一侧且与所述前开间板和所述后开间板连接;The gable board includes a first gable board and a second gable board, the first gable board is arranged on one side of the front bay board and the rear bay board and connected with the front bay board and the rear bay board, The second gable board is arranged on the other side of the front bay board and the rear bay board and connected with the front bay board and the rear bay board;
顶板,设置于所述开间板和所述山墙板上方,与所述开间板和所述山墙板连接;a top plate, arranged above the bay board and the gable board, and connected with the bay board and the gable board;
连接装置,包括第一连接件和第二连接件,所述第一连接件设置于所述开间板和/或所述山墙板下端,所述第二连接件设置于所述顶板顶面上。The connecting device includes a first connecting piece and a second connecting piece, the first connecting piece is arranged on the lower end of the bay plate and/or the gable plate, and the second connecting piece is arranged on the top surface of the top plate.
进一步地,本实用新型所述的盒式快装房屋,Further, the box-type quick-pack house described in the utility model,
所述第一连接件包括第一连接件本体和设置于所述第一连接件本体一端的注胶孔,所述第一连接件本体另一端设有凹槽,所述凹槽与所述注胶孔连通,所述凹槽内壁上设有卡接槽,所述卡接槽内设有卡接装置;The first connecting piece includes a first connecting piece body and a glue injection hole arranged at one end of the first connecting piece body, and the other end of the first connecting piece body is provided with a groove, and the groove is connected to the injection hole. The glue hole is connected, the inner wall of the groove is provided with a clamping groove, and the clamping groove is provided with a clamping device;
所述第二连接件包括第二连接件本体和与所述第二连接件本体连接的第二片体,所述第二连接件本体与所述第一连接件本体匹配,所述第二连接件本体上设有与所述卡接装置匹配的卡槽。The second connector includes a second connector body and a second sheet connected to the second connector body, the second connector body matches the first connector body, and the second connector The body of the piece is provided with a slot matching the snap-in device.
进一步地,所述卡接装置包括:Further, the clamping device includes:
弹簧,设置于所述卡接槽内;a spring arranged in the clamping groove;
卡簧,一端与所述弹簧连接,另一端伸出所述卡接槽。One end of the clip spring is connected to the spring, and the other end protrudes from the clip slot.
优选地,所述第一连接件本体为圆柱体,所述第二连接件本体为与所述第一连接件本体的凹槽匹配的圆台。Preferably, the first connector body is a cylinder, and the second connector body is a circular truncated that matches the groove of the first connector body.
进一步地,所述第一连接件本体还包括:Further, the first connector body also includes:
第一片体,与所述第一连接件本体连接,且与所述第二片体匹配。The first sheet is connected with the first connector body and matched with the second sheet.
进一步地,所述第二连接件本体还包括:Further, the second connector body also includes:
吊孔,设置于所述第二连接件本体上。The hanging hole is arranged on the body of the second connecting piece.
优选地,所述第一山墙板通过钢筋与所述前开间板和所述后开间板连接;所述第二山墙板通过所述钢筋与所述前开间板和所述后开间板连接;所述顶板通过所述钢筋与所述前开间板、所述后开间板、所述第一山墙板和所述第二山墙板连接。Preferably, the first gable board is connected with the front bay board and the rear bay board through steel bars; the second gable board is connected with the front bay board and the rear bay board through the steel bars; The top board is connected to the front bay board, the rear bay board, the first gable board and the second gable board through the steel bars.
优选地,所述钢筋为匚字型钢筋。Preferably, the steel bars are U-shaped steel bars.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1、本实用新型所述的盒式快装房屋,与现有的盒式房屋横竖连接时采用预埋铁件焊接相比,采用连接装置,可以大量节省人工和材料,极大地提高了连接效率,将现有盒式房屋安装时间为30分钟左右一间,提高至5分钟左右一间,并且稳定性和牢固性更强。1. Compared with the box-type fast-packing house described in the utility model, which adopts the welding of embedded iron parts when connecting horizontally and vertically in the existing box-type house, the use of connecting devices can save a lot of labor and materials, and greatly improve the connection efficiency , Increase the installation time of the existing box-type houses from about 30 minutes to about 5 minutes, and the stability and firmness are stronger.
2、本实用新型所述的盒式快装房屋,采用连接装置,提高了连接精度,将现有盒式房屋的误差±2cm提高至±0.25mm。2. The box-type fast-packing house described in the utility model adopts a connecting device, which improves the connection accuracy, and improves the error of the existing box-type house from ±2cm to ±0.25mm.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings according to these drawings without any creative effort.
图1为本实用新型一种盒式快装房屋实施例1的结构示意图;Fig. 1 is a schematic structural view of a box-type fast-packing house embodiment 1 of the present utility model;
图2为本实用新型一种盒式快装房屋实施例2的结构示意图;Fig. 2 is a schematic structural view of Embodiment 2 of a box-type fast-packing house of the present invention;
图3为本实用新型一种盒式快装房屋实施例3的结构示意图;Fig. 3 is a schematic structural view of Embodiment 3 of a box-type fast-packing house of the present invention;
图4为本实用新型一种盒式快装房屋实施例4的结构示意图;Fig. 4 is a schematic structural view of Embodiment 4 of a box-type fast-packing house of the present invention;
图5为本实用新型一种盒式快装房屋的第一连接件的结构示意图;Fig. 5 is a schematic structural view of the first connector of a box-type fast-packing house of the present invention;
图6为本实用新型一种盒式快装房屋的第二连接件的结构示意图;Fig. 6 is a structural schematic diagram of a second connector of a box-type fast-packing house of the present invention;
图7为本实用新型一种盒式快装房屋的的连接装置的使用状态参考图。Fig. 7 is a reference diagram of the use state of the connection device of a box-type quick-pack house of the present invention.
图中:In the picture:
1、第一连接件本体;2、注胶孔;3、凹槽;4、卡接槽;5、第二连接件本体;6、第二片体;7、卡槽;8、弹簧;9、卡簧;10、第一片体;11、吊孔;12、前开间板;13、后开间板;14、第一山墙板;15、第二山墙板;16、顶板;17、连接装置;18、第一连接件;19、第二连接件。1. The body of the first connector; 2. The glue injection hole; 3. The groove; 4. The clamping groove; 5. The body of the second connector; 6. The second piece; , circlip; 10, first body; 11, hanging hole; 12, front bay plate; 13, rear bay plate; 14, first gable plate; 15, second gable plate; 16, top plate; 17, connecting device ; 18, the first connector; 19, the second connector.
具体实施方式detailed description
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
如图1-7所示,本实用新型所述的一种盒式快装房屋,包括:As shown in Figure 1-7, a box-type quick-pack house described in the utility model includes:
开间板,包括相对设置的前开间板12和后开间板13;A bay plate, including a front bay plate 12 and a rear bay plate 13 oppositely arranged;
山墙板,包括第一山墙板14和第二山墙板15,第一山墙板14设置于前开间板12和后开间板13一侧且与前开间板12和后开间板13连接,第二山墙板15设置于前开间板12和后开间板13另一侧且与前开间板12和后开间板13连接;The gable board includes a first gable board 14 and a second gable board 15, the first gable board 14 is arranged on one side of the front bay board 12 and the rear bay board 13 and is connected with the front bay board 12 and the rear bay board 13, and the second gable board The board 15 is arranged on the other side of the front bay board 12 and the rear bay board 13 and connected with the front bay board 12 and the rear bay board 13;
顶板16,设置于开间板和山墙板上方,与开间板和山墙板连接;The top plate 16 is arranged above the bay board and the gable board, and is connected with the bay board and the gable board;
连接装置17,包括第一连接件18和第二连接件19,第一连接件18设置于开间板和/或山墙板下端,第二连接件19设置于顶板16顶面上。The connecting device 17 includes a first connecting piece 18 and a second connecting piece 19 , the first connecting piece 18 is set on the lower end of the bay plate and/or the gable plate, and the second connecting piece 19 is set on the top surface of the top plate 16 .
其中,第一连接件18包括第一连接件本体1和设置于第一连接件本体1一端的注胶孔2,第一连接件本体1另一端设有凹槽3,凹槽3与注胶孔2连通,凹槽3内壁上设有卡接槽4,卡接槽4内设有卡接装置;Wherein, the first connecting piece 18 includes a first connecting piece body 1 and a glue injection hole 2 arranged at one end of the first connecting piece body 1 , the other end of the first connecting piece body 1 is provided with a groove 3 , and the groove 3 is connected with the glue injection hole 2 . The hole 2 is connected, the inner wall of the groove 3 is provided with a clamping groove 4, and the clamping groove 4 is provided with a clamping device;
第二连接件19包括第二连接件本体5和与第二连接件本体5连接的第二片体6,第二连接件本体5与第一连接件本体1匹配,第二连接件本体5上设有与卡接装置匹配的卡槽7。The second connector 19 includes a second connector body 5 and a second sheet 6 connected to the second connector body 5 , the second connector body 5 matches the first connector body 1 , and the second connector body 5 A card slot 7 matching with the card connection device is provided.
其中,第一连接件18为“凹”字形,第二连接件19为“凸”字形;第二片体6与第二连接件本体5既可以为分体结构,也可以为一体成型结构。使用时,第一连接件18和第二连接件19可分别预置于需要连接的混凝土预制构件端部,即第一连接件18设置于开间板和/或山墙板下端,第二连接件19设置于顶板16顶面上,从而实现开间板和/或山墙板与顶板16的连接;当第二连接件本体5插入第一连接件本体1的凹槽3时,卡接装置可卡入卡槽7中,从而将第一连接件18和第二连接件19固定在一起,然后再通过注胶孔2向连接装置内注入胶体,可将第一连接件18和第二连接件19粘贴牢固并填充缝隙,从而使第一连接件18和第二连接件19更牢固的连接在一起,保证整个结构的牢固连接;第二片体6主要用于与第一连接件本体1和第二连接件本体5形成密闭空间,避免注胶孔2注入的胶体泄漏,同时可以与需要连接的混凝土预制构件更加方便、牢固地连接。其中,开间板和/或山墙板上可以设有与注胶孔2匹配的空洞,以便于注胶,当然,还可以在开间板和/或山墙板上预置管路,以通过管路将注胶孔2与外部连通,方便注胶。Wherein, the first connecting part 18 is in the shape of "concave", and the second connecting part 19 is in the shape of "convex"; the second piece 6 and the second connecting part body 5 can be a separate structure or an integrated structure. When in use, the first connecting piece 18 and the second connecting piece 19 can be respectively pre-placed at the ends of the concrete prefabricated components that need to be connected, that is, the first connecting piece 18 is arranged at the lower end of the bay plate and/or the gable plate, and the second connecting piece 19 It is arranged on the top surface of the top plate 16, so as to realize the connection between the bay plate and/or the gable plate and the top plate 16; when the second connector body 5 is inserted into the groove 3 of the first connector body 1, the snap-in device can snap into the card In the slot 7, the first connecting piece 18 and the second connecting piece 19 are fixed together, and then glue is injected into the connecting device through the injection hole 2, so that the first connecting piece 18 and the second connecting piece 19 can be pasted firmly And fill the gap, so that the first connector 18 and the second connector 19 are more firmly connected together to ensure the firm connection of the entire structure; the second sheet 6 is mainly used for connecting the first connector body 1 and the second connector The part body 5 forms a closed space, avoiding the leakage of the colloid injected into the glue injection hole 2, and at the same time, it can be more conveniently and firmly connected with the concrete prefabricated components that need to be connected. Wherein, the bay plate and/or the gable plate can be provided with the cavity that matches the glue injection hole 2, so that glue can be injected, of course, the pipeline can also be preset on the bay plate and/or the gable plate, to pass the pipeline The glue injection hole 2 communicates with the outside for convenient glue injection.
本实用新型所述的盒式快装房屋,采用了连接装置17,连接装置17的第一连接件18可预埋或预装于开间板和/或山墙板下端,第二连接件19可预埋或预装于顶板16顶面上,第一连接件18和第二连接件19为插拔结构,在现场施工时,可通过简单工序将开间板和/或山墙板与顶板16进行简单快速连接,简单有效,连接结构可靠。The box-type fast-packing house described in the utility model adopts a connecting device 17, the first connecting part 18 of the connecting device 17 can be pre-buried or pre-installed on the lower end of the bay board and/or gable board, and the second connecting part 19 can be pre-installed Buried or pre-installed on the top surface of the roof 16, the first connector 18 and the second connector 19 are plug-in structures. During on-site construction, the bay board and/or gable board can be easily and quickly connected to the roof 16 through a simple process. The connection is simple and effective, and the connection structure is reliable.
其中,所述卡接装置包括:Wherein, the clamping device includes:
弹簧8,设置于卡接槽4内;The spring 8 is arranged in the clamping groove 4;
卡簧9,一端与弹簧8连接,另一端伸出卡接槽4。One end of the clip spring 9 is connected to the spring 8, and the other end protrudes from the engaging groove 4.
其中,优选地,所述第一连接件本体1为圆柱体,第二连接件本体5为与第一连接件本体1的凹槽3匹配的圆台。当然,第一连接件本体1和第二连接件本体5还可以为其它形状,可以根据实际情况的需要进行确定,本实用新型对此不进行限定。Wherein, preferably, the first connector body 1 is a cylinder, and the second connector body 5 is a circular truncated that matches the groove 3 of the first connector body 1 . Of course, the first connector body 1 and the second connector body 5 can also be in other shapes, which can be determined according to actual needs, which is not limited by the present invention.
其中,所述第一连接件本体1还包括:Wherein, the first connector body 1 also includes:
第一片体10,与第一连接件本体1连接,且与第二片体6匹配。第一片体10与第一连接件本体1既可以为分体结构,也可以为一体成型结构,设有第一片体10,可以与需要连接的混凝土预制构件更加方便、牢固地连接。The first piece 10 is connected with the first connector body 1 and matched with the second piece 6 . The first sheet body 10 and the first connector body 1 can be a separate structure or an integrated structure. The first sheet body 10 can be more conveniently and firmly connected with the concrete prefabricated components that need to be connected.
其中,所述第二连接件本体5还包括:Wherein, the second connector body 5 also includes:
吊孔11,设置于第二连接件本体5上。设有吊孔11,进一步提高了使用的便利性,同时节省了原材料,减轻了总体质量。The hanging hole 11 is arranged on the second connector body 5 . The hanging hole 11 is provided, which further improves the convenience of use, saves raw materials and reduces the overall quality simultaneously.
其中,优选地,所述第一山墙板14通过钢筋与前开间板12和后开间板13连接;第二山墙板15通过钢筋与前开间板12和后开间板13连接;顶板16通过钢筋与前开间板12、后开间板13、第一山墙板14和第二山墙板15连接。Wherein, preferably, the first gable board 14 is connected with the front bay board 12 and the rear bay board 13 by a steel bar; the second gable board 15 is connected with the front bay board 12 and the rear bay board 13 by a steel bar; The front bay board 12, the rear bay board 13, the first gable board 14 and the second gable board 15 are connected.
其中,优选地,所述钢筋为匚字型钢筋。Wherein, preferably, the steel bar is a U-shaped steel bar.
关于第一山墙板14通过匚字型钢筋与前开间板12和后开间板13连接;第二山墙板15通过匚字型钢筋与前开间板12和后开间板13连接;顶板16通过匚字型钢筋与前开间板12、后开间板13、第一山墙板14和第二山墙板15连接,在申请号为94247443.0、名称为拼装式钢筋混凝土盒子结构建筑,申请号为96242406.4、名称为拼装式钢筋混凝土盒子结构建筑,以及申请号为97101408.6、名称为拼装式钢筋混凝土盒子结构和制法的中国专利申请中,已经做了详细介绍,在此不做赘述。与现有技术相比,本实用新型最主要的不同在于:使用了连接装置对开间板和/或山墙板与地面进行连接、或对开间板和/或山墙板与地面上的混凝土预制构件进行连接,以及在建造二层或多层建筑时使用了连接装置对开间板和/或山墙板与顶板16进行连接。About the first gable plate 14 is connected with the front bay plate 12 and the rear bay plate 13 through the 匚-shaped steel bar; the second gable plate 15 is connected with the front bay plate 12 and the rear bay plate 13 through the 匚-shaped steel bar; The shaped steel bar is connected with the front bay plate 12, the rear bay plate 13, the first gable plate 14 and the second gable plate 15. The application number is 94247443.0, and the name is assembled reinforced concrete box structure building. The application number is 96242406.4, and the name is assembly Type reinforced concrete box structure building, and the application number is 97101408.6, the title is called in the Chinese patent application of assembled type reinforced concrete box structure and manufacturing method, have done detailed introduction, do not repeat them here. Compared with the prior art, the main difference of the present utility model is that the connection device is used to connect the bay slab and/or the gable slab to the ground, or to connect the bay slab and/or the gable slab to the concrete prefabricated components on the ground. Connection, and when building two-story or multi-storey buildings, a connection device is used to connect the bay board and/or gable board with the top board 16.
本实用新型所述的盒式快装房屋,与现有的盒式房屋横竖连接时采用预埋铁件焊接相比,采用连接装置17,可以大量节省人工和材料,极大地提高了连接效率,将现有盒式房屋安装时间为30分钟左右一间,提高至5分钟左右一间,并且稳定性和牢固性更强,提高了连接精度,将现有盒式房屋的误差±2cm提高至±0.25mm。The box-type fast-packing house described in the utility model, compared with the existing box-type house that uses pre-embedded iron welding when connecting horizontally and vertically, adopts the connecting device 17, which can save a lot of labor and materials, and greatly improves the connection efficiency. Increase the installation time of the existing box-type houses from about 30 minutes to about 5 minutes, and the stability and firmness are stronger, the connection accuracy is improved, and the error of the existing box-type houses is increased from ± 2cm to ± 0.25mm.
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520886753.7U CN205116417U (en) | 2015-11-10 | 2015-11-10 | Box -shaped fast -assembling house |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520886753.7U CN205116417U (en) | 2015-11-10 | 2015-11-10 | Box -shaped fast -assembling house |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205116417U true CN205116417U (en) | 2016-03-30 |
Family
ID=55572037
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520886753.7U Expired - Lifetime CN205116417U (en) | 2015-11-10 | 2015-11-10 | Box -shaped fast -assembling house |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205116417U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106759853A (en) * | 2017-03-29 | 2017-05-31 | 河北建筑工程学院 | A kind of the assembled box structure system and its construction method of structural thermal insulation integration |
| WO2018101891A1 (en) * | 2016-12-02 | 2018-06-07 | Poh Qi Pin | Connection system and method for prefabricated volumetric construction modules |
| CN108678262A (en) * | 2018-05-15 | 2018-10-19 | 安徽扬子地板股份有限公司 | A kind of waterproof sound insulation fast-assembling crown wall harden structure |
| CN114263279A (en) * | 2021-12-28 | 2022-04-01 | 贺州通号装配式建筑有限公司 | Box type building and production and installation method thereof |
-
2015
- 2015-11-10 CN CN201520886753.7U patent/CN205116417U/en not_active Expired - Lifetime
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2018101891A1 (en) * | 2016-12-02 | 2018-06-07 | Poh Qi Pin | Connection system and method for prefabricated volumetric construction modules |
| CN109642424A (en) * | 2016-12-02 | 2019-04-16 | Mrcb创新私人有限公司 | Connection system and method for prefabricated volume building block |
| JP2020501051A (en) * | 2016-12-02 | 2020-01-16 | エムアールシービー イノベーションズ スンディリアン ブルハドMrcb Innovations Sdn. Bhd. | Connection system and method for prefabricated volumetric building module |
| US11525257B2 (en) | 2016-12-02 | 2022-12-13 | MRCB Innovations SDN. BHD. | Connection system and method for prefabricated volumetric construction modules |
| CN106759853A (en) * | 2017-03-29 | 2017-05-31 | 河北建筑工程学院 | A kind of the assembled box structure system and its construction method of structural thermal insulation integration |
| CN106759853B (en) * | 2017-03-29 | 2022-12-13 | 河北建筑工程学院 | An assembled box-type structural system with integrated structural insulation and its construction method |
| CN108678262A (en) * | 2018-05-15 | 2018-10-19 | 安徽扬子地板股份有限公司 | A kind of waterproof sound insulation fast-assembling crown wall harden structure |
| CN114263279A (en) * | 2021-12-28 | 2022-04-01 | 贺州通号装配式建筑有限公司 | Box type building and production and installation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205116417U (en) | Box -shaped fast -assembling house | |
| CN205024849U (en) | Wood structure building beam -column connection node structure | |
| CN104294912A (en) | Beam-column-free metal face core plate type house and manufacturing method thereof | |
| CN108824648A (en) | Space module house | |
| CN207700438U (en) | A kind of fabricated shear wall cross connected structure | |
| CN108951937A (en) | A kind of assembled wall origination end and installation method | |
| CN204475534U (en) | A kind of syndeton of column node | |
| CN209482551U (en) | Semi-unit type stone curtain wall structure | |
| CN204983248U (en) | Assembled wallboard connecting piece | |
| CN210032219U (en) | A prefabricated block and its infill wall | |
| CN207499232U (en) | A kind of tongue and groove autoclaved aerated concrete slab | |
| CN219118406U (en) | Assembled wallboard | |
| CN205171764U (en) | Stone curtain wall | |
| CN201460201U (en) | Modular connection combined energy-saving and thermal insulation wall construction formwork | |
| CN210562806U (en) | Building module splicing wall | |
| CN106193427B (en) | Corner unit of prefabricated wall and production method thereof | |
| CN206971474U (en) | A kind of integral corner structure of assembled wall | |
| CN206538961U (en) | Prefabricated assembled heat insulation decoration integrated post | |
| CN207761211U (en) | A kind of assembly section construction decorative board structure | |
| CN104328849A (en) | U-shaped rebar inserting connection method of mixed externally hung wallboard and girder | |
| CN205907880U (en) | Mounting structure of house dormer | |
| CN206070890U (en) | Partitioning slot molding external member | |
| CN205530982U (en) | Building energy conservation outer wall | |
| CN219365040U (en) | Superimposed steel plate shear wall | |
| CN220908715U (en) | Installation structure of assembled wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160330 |