CN205101002U - Tunnel engineering lining cutting rebar installation support - Google Patents

Tunnel engineering lining cutting rebar installation support Download PDF

Info

Publication number
CN205101002U
CN205101002U CN201520837782.4U CN201520837782U CN205101002U CN 205101002 U CN205101002 U CN 205101002U CN 201520837782 U CN201520837782 U CN 201520837782U CN 205101002 U CN205101002 U CN 205101002U
Authority
CN
China
Prior art keywords
support column
adjustment screw
screw rod
screw mandrel
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520837782.4U
Other languages
Chinese (zh)
Inventor
黄友林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Technology and Business Institute
Original Assignee
Chongqing Technology and Business Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Technology and Business Institute filed Critical Chongqing Technology and Business Institute
Priority to CN201520837782.4U priority Critical patent/CN205101002U/en
Application granted granted Critical
Publication of CN205101002U publication Critical patent/CN205101002U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型公开了一种隧道工程衬砌钢筋安装支架,包括底座、操作台、钢筋放置架、顶模、边模、支撑柱、万向轮、驱动电机、横向调节丝杆、竖向调节丝杆、侧向调节丝杆、底脚调节丝杆和顶梁,所述底座上方设置有支撑柱,所述支撑柱上端通过竖向调节丝杆连接设置有顶梁,所述顶梁的两端通过横向调节丝杆连接设置有顶模。本实用新型支架设为与隧道相似的拱形,通过设置顶模和边模方便工作人员对隧道的顶部和侧面进行钢筋安装,通过万向轮可以进行移动,节省原材料并便于运输;工作人员通过站在操作台上操作控制器控制驱动电机工作,从而带到操作台和钢筋放置架在支撑柱上进行升降,有效降低工人的劳动强度、提高工作效率。

The utility model discloses a tunnel engineering lining steel bar installation bracket, which comprises a base, an operating table, a steel bar placement frame, a top mold, a side mold, a support column, a universal wheel, a driving motor, a horizontal adjustment screw rod, and a vertical adjustment screw rod , a lateral adjustment screw rod, a foot adjustment screw rod and a top beam, a support column is arranged above the base, the upper end of the support column is connected with a top beam through a vertical adjustment screw rod, and the two ends of the top beam pass through The horizontally adjusting screw mandrel connection is provided with a top mold. The bracket of the utility model is set in an arch shape similar to that of the tunnel. By setting the top mold and the side mold, it is convenient for the staff to install the steel bars on the top and side of the tunnel, and it can be moved through the universal wheels, which saves raw materials and facilitates transportation; Stand on the console and operate the controller to control the drive motor to work, so as to bring it to the console and place the steel bar on the support column for lifting, effectively reducing the labor intensity of workers and improving work efficiency.

Description

一种隧道工程衬砌钢筋安装支架A tunnel engineering lining reinforcement installation bracket

技术领域technical field

本实用新型涉及建筑领域,具体涉及一种隧道工程衬砌钢筋安装支架。The utility model relates to the construction field, in particular to a tunnel engineering lining steel bar installation bracket.

背景技术Background technique

衬砌指的是为防止围岩变形或坍塌,沿隧道洞身周边用钢筋混凝土等材料修建的永久性支护结构。当地质条件较差时,隧道工程衬砌需采取钢筋混凝土衬砌结构,隧道衬砌钢筋绑扎安装时,由于隧道内空间狭小,现有钢筋绑扎作业过程多采取现场加工临时钢筋安装台架,作业人员站在安装台架上绑扎安装钢筋,钢筋上下提升依靠人力,作业台架一般在高度方向分成多级台阶,以方便作业人员上下。这一安装方式需要耗费较多的人力,费工费时,工作效率低下,现场临时加工的钢筋安装台架体积较大、移动不便,难以保证钢筋的安装质量。Lining refers to a permanent support structure built with reinforced concrete and other materials along the periphery of the tunnel body in order to prevent the deformation or collapse of the surrounding rock. When the geological conditions are poor, the tunnel engineering lining needs to adopt a reinforced concrete lining structure. When the tunnel lining steel bars are bound and installed, due to the narrow space in the tunnel, the existing steel bar binding process usually adopts on-site processing of temporary steel bar installation benches. The steel bars are bound and installed on the installation platform, and the lifting of the steel bars up and down depends on manpower. The work platform is generally divided into multi-level steps in the height direction to facilitate the operators to go up and down. This installation method needs to consume more manpower, is labor-intensive and time-consuming, and the work efficiency is low. The steel bar installation stand temporarily processed on site has a large volume and is inconvenient to move, and it is difficult to ensure the installation quality of the steel bar.

因此,有必要开发一种隧道工程衬砌钢筋安装支架,其操作简便,能够有效降低工人的劳动强度,提高工作效率,保证钢筋的安装质量。Therefore, it is necessary to develop a tunnel engineering lining steel bar installation bracket, which is easy to operate, can effectively reduce the labor intensity of workers, improve work efficiency, and ensure the installation quality of the steel bars.

实用新型内容Utility model content

为解决上述问题,本实用新型提供了一种隧道工程衬砌钢筋安装支架。In order to solve the above problems, the utility model provides a tunnel engineering lining reinforcement installation bracket.

为实现上述目的,本实用新型采取的技术方案为:In order to achieve the above object, the technical scheme that the utility model takes is:

一种隧道工程衬砌钢筋安装支架,操作具体如下:包括底座、操作台、钢筋放置架、顶模、边模、支撑柱、万向轮、驱动电机、横向调节丝杆、竖向调节丝杆、侧向调节丝杆、底脚调节丝杆和顶梁,所述底座上方设置有支撑柱,所述支撑柱上端通过竖向调节丝杆连接设置有顶梁,所述顶梁的两端通过横向调节丝杆连接设置有顶模,所述底座和支撑柱侧面上通过侧向调节丝杆连接设置有边模,所述边模底端连接设置有底脚调节丝杆,所述边模顶角与顶模底角相连,所述支撑柱上设置有升降导轨,所述支撑柱通过升降导轨连接设置有操作台和钢筋放置架,所述操作台设置在钢筋放置架上方,所述支撑柱的侧面上设置有驱动电机,所述驱动电机通过驱动轴与设置在升降导轨内部的升降齿轮相连,所述升降齿轮通过绳索与操作台和钢筋放置架分别相连。A tunnel engineering lining steel bar installation bracket, the operation is as follows: including a base, an operating table, a steel bar placement frame, a top mold, a side mold, a support column, a universal wheel, a driving motor, a horizontal adjustment screw rod, a vertical adjustment screw rod, Lateral adjustment screw, foot adjustment screw and top beam, a support column is arranged above the base, the upper end of the support column is connected with a top beam through a vertical adjustment screw, and the two ends of the top beam are connected by a horizontal The adjustment screw rod is connected with a top mold, the base and the side of the support column are connected with a side mold through a lateral adjustment screw rod, and the bottom end of the side mold is connected with a foot adjustment screw rod, and the top angle of the side mold Connected with the bottom corner of the top mold, the support column is provided with a lifting guide rail, and the support column is connected with an operation table and a steel bar placement frame through the lifting guide rail, and the operation table is arranged above the steel bar placement frame. A driving motor is arranged on the side, and the driving motor is connected with the lifting gear arranged inside the lifting guide rail through the driving shaft, and the lifting gear is connected with the operating table and the steel bar placing frame respectively through ropes.

作为优选,所述操作台上设置有控制器,所述控制器通过信号线与驱动电机相连。Preferably, a controller is arranged on the console, and the controller is connected to the driving motor through a signal line.

作为优选,所述底座上设置有蓄电池。Preferably, a storage battery is arranged on the base.

作为优选,所述操作台和钢筋放置架上均设置有挡板。As a preference, baffles are provided on both the operating table and the steel bar placing frame.

本实用新型结构简单,操作方便,支架主体设为与隧道相似的拱形,通过设置顶模和边模方便工作人员对隧道的顶部和侧面进行钢筋安装,通过万向轮可以进行移动,大大减小本安装支架的体积,节省原材料并便于运输;工作人员通过站在操作台上操作控制器控制驱动电机工作,驱动升降导轨内部齿轮进行旋转从而带到操作台在支撑柱上进行升降,实现了高度自由可以可调,便于对不同位置的边墙外侧进行钢筋安装;The utility model is simple in structure and easy to operate. The main body of the bracket is set in an arch shape similar to that of the tunnel. By setting the top mold and side molds, it is convenient for the staff to install the steel bars on the top and side of the tunnel. The universal wheels can be used to move, which greatly reduces the The small size of the installation bracket saves raw materials and is convenient for transportation; the staff stands on the operating table and operates the controller to control the drive motor to work, and drives the internal gears of the lifting guide rail to rotate and bring it to the operating table for lifting on the support column, which realizes The height can be adjusted freely, which is convenient for installing reinforcement on the outside of the side wall at different positions;

同理工作人员操作控制器控制驱动电机驱动齿轮进行旋转带到钢筋放置架在支撑柱上进行升降运行,方便工作人员进行钢筋的上下传递工作,有效降低工人的劳动强度、提高工作效率,保证钢筋的安装质量;实用性强。In the same way, the staff operates the controller to control the drive motor to drive the gear to rotate and bring the steel bar placement frame to the support column for lifting operation, which is convenient for the staff to transfer the steel bar up and down, effectively reduces the labor intensity of the workers, improves work efficiency, and ensures that the steel bar Excellent installation quality; strong practicability.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图;In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work;

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

具体实施方式detailed description

下面结合附图对本实用新型的优选实施例进行详细阐述,以使本实用新型的优点和特征能更易于被本领域技术人员理解,从而对本实用新型的保护范围做出更为清楚明确的界定。The preferred embodiments of the utility model will be described in detail below in conjunction with the accompanying drawings, so that the advantages and features of the utility model can be more easily understood by those skilled in the art, so as to make a clearer definition of the protection scope of the utility model.

如图1所示,本实用新型一种隧道工程衬砌钢筋安装支架包括底座1、操作台2、钢筋放置架3、顶模4、边模5、支撑柱6、万向轮7、驱动电机8、横向调节丝杆9、竖向调节丝杆10、侧向调节丝杆11、底脚调节丝杆12和顶梁13,所述底座1上方设置有支撑柱6,所述支撑柱6上端通过竖向调节丝杆10连接设置有顶梁13,所述顶梁13的两端通过横向调节丝杆9连接设置有顶模4,所述底座1和支撑柱6侧面上通过侧向调节丝杆11连接设置有边模5,所述边模5底端连接设置有底脚调节丝杆12,所述边模5顶角与顶模4底角相连,所述支撑柱6上设置有升降导轨,所述支撑柱6通过升降导轨连接设置有操作台2和钢筋放置架3,所述操作台2设置在钢筋放置架3上方,所述支撑柱6的侧面上设置有驱动电机8,所述驱动电机8通过驱动轴与设置在升降导轨内部的升降齿轮相连,所述升降齿轮通过绳索与操作台2和钢筋放置架3分别相连。As shown in Figure 1, a tunnel engineering lining reinforcement installation bracket of the utility model includes a base 1, an operating table 2, a reinforcement placement frame 3, a top mold 4, a side mold 5, a support column 6, a universal wheel 7, and a drive motor 8 , horizontal adjustment screw rod 9, vertical adjustment screw rod 10, lateral adjustment screw rod 11, foot adjustment screw rod 12 and top beam 13, a support column 6 is arranged above the base 1, and the upper end of the support column 6 passes through The vertical adjustment screw rod 10 is connected with a top beam 13, and the two ends of the top beam 13 are connected with a top mold 4 through a horizontal adjustment screw rod 9, and the side of the base 1 and the supporting column 6 are adjusted through a lateral adjustment screw rod. 11 is connected with a side mold 5, the bottom of the side mold 5 is connected with a foot adjustment screw 12, the top corner of the side mold 5 is connected with the bottom corner of the top mold 4, and the support column 6 is provided with a lifting guide rail , the support column 6 is connected with an operation table 2 and a steel bar placement frame 3 through a lifting guide rail, the operation table 2 is arranged above the steel bar placement frame 3, and a drive motor 8 is provided on the side of the support column 6. Drive motor 8 links to each other through drive shaft and is arranged on the lifting gear inside lifting guide rail, and described lifting gear links to each other with operating table 2 and reinforcing bar placing frame 3 by rope.

值得注意的是,所述操作台2上设置有控制器,所述控制器通过信号线与驱动电机8相连。It should be noted that the console 2 is provided with a controller, and the controller is connected with the driving motor 8 through a signal line.

值得注意的是,所述底座1上设置有蓄电池。It should be noted that the base 1 is provided with a storage battery.

值得注意的是,所述操作台2和钢筋放置架3上均设置有挡板。It should be noted that both the operating table 2 and the steel bar placement frame 3 are provided with baffles.

本实用新型结构简单,操作方便,支架主体设为与隧道相似的拱形,通过设置顶模和边模方便工作人员对隧道的顶部和侧面进行钢筋安装,通过万向轮可以进行移动,大大减小本安装支架的体积,节省原材料并便于运输;工作人员通过站在操作台上操作控制器控制驱动电机工作,驱动升降导轨内部齿轮进行旋转从而带到操作台在支撑柱上进行升降,实现了高度自由可以可调,便于对不同位置的边墙外侧进行钢筋安装;The utility model is simple in structure and easy to operate. The main body of the bracket is set in an arch shape similar to that of the tunnel. By setting the top mold and side molds, it is convenient for the staff to install the steel bars on the top and side of the tunnel. The universal wheels can be used to move, which greatly reduces the The small size of the installation bracket saves raw materials and is convenient for transportation; the staff stands on the operating table and operates the controller to control the drive motor to work, and drives the internal gears of the lifting guide rail to rotate and bring it to the operating table for lifting on the support column, which realizes The height can be adjusted freely, which is convenient for installing reinforcement on the outside of the side wall at different positions;

同理工作人员操作控制器控制驱动电机驱动齿轮进行旋转带到钢筋放置架在支撑柱上进行升降运行,方便工作人员进行钢筋的上下传递工作,有效降低工人的劳动强度、提高工作效率,保证钢筋的安装质量;实用性强。In the same way, the staff operates the controller to control the drive motor to drive the gear to rotate and bring the steel bar placement frame to the support column for lifting operation, which is convenient for the staff to transfer the steel bar up and down, effectively reduces the labor intensity of the workers, improves work efficiency, and ensures that the steel bar Excellent installation quality; strong practicability.

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made. These improvements and modifications It should also be regarded as the protection scope of the present utility model.

Claims (4)

1. a construction of tunnel lining cutting reinforcement installation support, it is characterized in that: comprise base (1), operating desk (2), reinforcing bar rack (3), backform (4), limit mould (5), support column (6), universal wheel (7), drive motors (8), lateral adjustments screw mandrel (9), vertical adjustment screw mandrel (10), lateral adjustment screw mandrel (11), footing regulates screw mandrel (12) and back timber (13), described base (1) top is provided with support column (6), described support column (6) upper end is connected with back timber (13) by vertical adjustment screw mandrel (10), the two ends of described back timber (13) are connected with backform (4) by lateral adjustments screw mandrel (9), described base (1) and support column (6) side are connected with limit mould (5) by lateral adjustment screw mandrel (11), mould (5) bottom, described limit is connected with footing and regulates screw mandrel (12), described limit mould (5) drift angle is connected with backform (4) base angle, (6) are provided with riser guide to described support column, described support column (6) is connected with operating desk (2) and reinforcing bar rack (3) by riser guide, described operating desk (2) is arranged on reinforcing bar rack (3) top, the side of described support column (6) is provided with drive motors (8), described drive motors (8) is connected with the lifter wheel being arranged on riser guide inside by driving shaft, described lifter wheel is connected with reinforcing bar rack (3) with operating desk (2) respectively by rope.
2. construction of tunnel lining cutting reinforcement installation support as claimed in claim 1, it is characterized in that: (2) are provided with controller with described operating desk, described controller is connected with drive motors (8) by holding wire.
3. construction of tunnel lining cutting reinforcement installation support as claimed in claim 1, is characterized in that: (1) is provided with battery to described base.
4. construction of tunnel lining cutting reinforcement installation support as claimed in claim 1, is characterized in that: described operating desk (2) and reinforcing bar rack (3) are provided with baffle plate.
CN201520837782.4U 2015-10-20 2015-10-20 Tunnel engineering lining cutting rebar installation support Expired - Fee Related CN205101002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520837782.4U CN205101002U (en) 2015-10-20 2015-10-20 Tunnel engineering lining cutting rebar installation support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520837782.4U CN205101002U (en) 2015-10-20 2015-10-20 Tunnel engineering lining cutting rebar installation support

Publications (1)

Publication Number Publication Date
CN205101002U true CN205101002U (en) 2016-03-23

Family

ID=55516788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520837782.4U Expired - Fee Related CN205101002U (en) 2015-10-20 2015-10-20 Tunnel engineering lining cutting rebar installation support

Country Status (1)

Country Link
CN (1) CN205101002U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863682A (en) * 2016-04-26 2016-08-17 重庆工商职业学院 Tunnel lining reinforcing steel bar framework binding device
CN106050272A (en) * 2016-07-25 2016-10-26 中车建设工程有限公司 Multifunctional rack for installing lining steel bars and laying waterproof boards special for tunnels
CN108086997A (en) * 2017-11-21 2018-05-29 上海骐钛机械有限公司 A kind of multifunctional hand foot stool for tunnel maintenance
CN111980730A (en) * 2020-07-23 2020-11-24 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of steel climbing frame for tunnel waterproof and drainage board paving and hanging trolley

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863682A (en) * 2016-04-26 2016-08-17 重庆工商职业学院 Tunnel lining reinforcing steel bar framework binding device
CN106050272A (en) * 2016-07-25 2016-10-26 中车建设工程有限公司 Multifunctional rack for installing lining steel bars and laying waterproof boards special for tunnels
CN106050272B (en) * 2016-07-25 2017-12-08 中车建设工程有限公司 Multifunctional rack for installing lining steel bars and laying waterproof boards special for tunnels
CN108086997A (en) * 2017-11-21 2018-05-29 上海骐钛机械有限公司 A kind of multifunctional hand foot stool for tunnel maintenance
CN111980730A (en) * 2020-07-23 2020-11-24 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of steel climbing frame for tunnel waterproof and drainage board paving and hanging trolley

Similar Documents

Publication Publication Date Title
CN204298825U (en) Foundation ditch builds elephant trunk supporting and regulating device
CN104314305B (en) Integral mobile formwork for straight wall concrete pouring and its application
CN204163115U (en) Template construction device is hung in a kind of ater-casting
CN105220626A (en) Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled
CN204151823U (en) Along building the one-sided cantilever hydraulic template trolley of side wall under covered back-digging structural slab
CN204418701U (en) Wallboard installation car
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN208023710U (en) A kind of connection structure of assembly concrete shear wall
CN106401173A (en) Sliding reverse formwork device and construction method thereof
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN102505839A (en) Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate
CN203905488U (en) Concrete form support device for floor slab pouring
CN206128634U (en) Air conditioner shelf and window one -piece casting template support structure that wafts
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN205975530U (en) Dual formula slip form construction device of bend loss and straight section concrete
CN206503347U (en) A kind of platform for being used to repair grab bucket
CN113622328A (en) Box culvert construction assembly, application thereof and box culvert construction method
CN204419203U (en) All-hydraulic gantry type ditch, cable trench mould bases chassis
CN204126257U (en) Integral mobile formwork for straight wall concrete pouring
CN204899939U (en) Bent wall wherein partition wall formworking jumbo
CN110670873A (en) A kind of support system and construction method of steel formwork for ultra-high-section concrete column
CN205224420U (en) Anticorrosive industry factory building precast concrete stand
CN219570102U (en) Backfill concrete pouring template machine for subway station
CN202164555U (en) Bottom support of concrete box culvert template bracket post

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20161020