CN205100652U - Hurdle system is enclosed in transformer substation's light weight base construction - Google Patents

Hurdle system is enclosed in transformer substation's light weight base construction Download PDF

Info

Publication number
CN205100652U
CN205100652U CN201520876161.7U CN201520876161U CN205100652U CN 205100652 U CN205100652 U CN 205100652U CN 201520876161 U CN201520876161 U CN 201520876161U CN 205100652 U CN205100652 U CN 205100652U
Authority
CN
China
Prior art keywords
base
face
diameter end
buried pile
light weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520876161.7U
Other languages
Chinese (zh)
Inventor
耿星
周亮
郭敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jichuan Information Technology Co Ltd
State Grid Corp of China SGCC
Liangshan Power Supply Co of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Chengdu Jichuan Information Technology Co Ltd
State Grid Corp of China SGCC
Liangshan Power Supply Co of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jichuan Information Technology Co Ltd, State Grid Corp of China SGCC, Liangshan Power Supply Co of State Grid Sichuan Electric Power Co Ltd filed Critical Chengdu Jichuan Information Technology Co Ltd
Priority to CN201520876161.7U priority Critical patent/CN205100652U/en
Application granted granted Critical
Publication of CN205100652U publication Critical patent/CN205100652U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Foundations (AREA)

Abstract

本实用新型公开了变电站轻量底座施工围栏架系统,包括预先与地面固定的预埋地桩,所述预埋地桩呈圆台体,预埋地桩的小直径端面在上,预埋地桩的大直径端面在下,还包括底座,底座呈圆台体,底座的大直径端面开口,底座的小直径端面封闭,在底座的小直径端面连接有立柱,底座的小直径端面还固定有第一铁块,预埋地桩从底座的大直径端面的开口插入、使得底座套设在预埋地桩上,其中,在预埋地桩的小直径端面向下开有凹槽、并在该凹槽内嵌入有顶部磁铁;所述底座为轻质高强度塑料底座。本实用新型与现有技术相比,结构简单,成本低,施工方便,极大降低底座的质量,提高施工效率,减少施工周期,同时也能保证其稳定性。

The utility model discloses a construction fence frame system for a light-weight base of a substation, which comprises a pre-buried ground pile fixed to the ground in advance. The large-diameter end face of the base is below, and also includes the base, the base is a circular platform, the large-diameter end face of the base is open, the small-diameter end face of the base is closed, the small-diameter end face of the base is connected with a column, and the small-diameter end face of the base is also fixed with a first iron The pre-embedded pile is inserted from the opening of the large-diameter end face of the base so that the base is sleeved on the pre-embedded pile, wherein a groove is opened downward on the small-diameter end face of the pre-embedded pile, and the groove Embedded with top magnets; said base is a lightweight, high-strength plastic base. Compared with the prior art, the utility model has the advantages of simple structure, low cost, convenient construction, greatly reduces the quality of the base, improves the construction efficiency, reduces the construction period, and can also ensure its stability.

Description

变电站轻量底座施工围栏架系统Substation Lightweight Base Construction Fence Frame System

技术领域 technical field

本发明涉及一种电力安装工具,具体涉及变电站轻量底座施工围栏架系统。 The invention relates to a power installation tool, in particular to a construction fence frame system for a light-weight base of a substation.

背景技术 Background technique

变电站施工围栏架系统是变电站在检修期间必须设置的一种安全防护设备,起到隔离周围区域的目的,在检修事件发生时,需要先行设置施工围栏架系统,而传统的施工围栏架系统采用金属的底盘和金属的杆体以及围护栅共同组成,在整个施工围栏架系统的架设过程中,属于底盘和杆体的质量较重,由于变电站内部不易采用机械车辆运输,因此这种施工围栏架系统的架设大多数采用人工方式进行架设,由于底盘和金属杆的重量大,施工人员一次性携带的底盘和金属杆的数量有限,因此整个搬运过程占用了大量的人力和时间,造成恢复供电的时间加长,不利用提高供电效率。 Substation construction fence frame system is a kind of safety protection equipment that must be installed in substation during maintenance. It serves the purpose of isolating the surrounding area. The chassis, the metal rod body and the fence are composed together. During the erection process of the whole construction fence system, the quality of the chassis and the rod body is relatively heavy. Since the inside of the substation is not easy to be transported by mechanical vehicles, the construction fence system Most of the erection is erected manually. Due to the heavy weight of the chassis and metal poles, the number of chassis and metal poles carried by the construction personnel at one time is limited. Therefore, the entire handling process takes up a lot of manpower and time, resulting in longer power restoration time. , does not take advantage of improving power supply efficiency.

对于上述现状,本行业的技术人员为了解决该问题,因此设计有一种预埋法,其结构是在地面设置管道,在管道的顶部设置有盖子,在需要时,将盖子打开,然后插入杆件,这样就省去了搬运底盘的时间和人力,可以大大提高施工效率,但是有这种结构需要设置盖子和管道,当施工人员忘记盖上盖子时,会造成管道内部填充泥沙等杂物,时间一长需要更换管道,会增加施工成本,另外,这种方式的施工围栏架系统结构不稳定,当杆件的直径小于管道的直径时,杆件的位置会导致晃动,结构不稳定,当杆件的直径刚好等于管道直径时,由于杂物的嵌入,常常会导致杆件很难从管道内拔出或者插入;因此,上述这种预埋法的施工效果并不理想。 For the above-mentioned current situation, in order to solve this problem, technicians in this industry have designed a pre-embedded method, the structure of which is to set the pipeline on the ground, and set a cover on the top of the pipeline. When necessary, open the cover, and then insert the rod , which saves the time and manpower for moving the chassis, which can greatly improve the construction efficiency, but with this structure, it is necessary to set up the cover and the pipe. When the construction personnel forget to cover the cover, it will cause the inside of the pipe to be filled with silt and other debris. Over time, the pipe needs to be replaced, which will increase the construction cost. In addition, the structure of the construction fence frame system in this way is unstable. When the diameter of the rod is smaller than the diameter of the pipe, the position of the rod will cause shaking and the structure is unstable. When the diameter of the rod is just equal to the diameter of the pipe, it is often difficult to pull out or insert the rod from the pipe due to the embedding of debris; therefore, the construction effect of the above-mentioned pre-embedded method is not ideal.

发明内容 Contents of the invention

本发明所的目的在于提供变电站轻量底座施工围栏架系统,解决费力和费时搬运施工围栏架系统中底盘的问题。 The purpose of the invention is to provide a light-weight base construction fence frame system for substations, which solves the problem of laborious and time-consuming handling of the chassis in the construction fence frame system.

本发明的通过下述技术方案实现: The present invention is realized through the following technical solutions:

变电站轻量底座施工围栏架系统,包括预先与地面固定的预埋地桩,所述预埋地桩呈圆台体,预埋地桩的小直径端面在上,预埋地桩的大直径端面在下,还包括底座,底座呈圆台体,底座的大直径端面开口,底座的小直径端面封闭,在底座的小直径端面连接有立柱,底座的小直径端面还固定有第一铁块,预埋地桩从底座的大直径端面的开口插入、使得底座套设在预埋地桩上,其中,在预埋地桩的小直径端面向下开有凹槽、并在该凹槽内嵌入有顶部磁铁;所述底座为轻质高强度塑料底座。 The construction fence frame system of the lightweight base of the substation includes pre-embedded ground piles fixed to the ground in advance. , also includes a base, the base is a circular platform, the large-diameter end face of the base is open, the small-diameter end face of the base is closed, a column is connected to the small-diameter end face of the base, the first iron block is fixed on the small-diameter end face of the base, and the ground is pre-buried The pile is inserted from the opening of the large-diameter end face of the base so that the base is sleeved on the pre-embedded pile, wherein a groove is opened downward on the small-diameter end face of the pre-embedded pile, and a top magnet is embedded in the groove ; The base is a lightweight high-strength plastic base.

本发明的设计原理为:本发明采用预先固定的预埋地桩作为基座,然后采用轻质高强度的塑料底座与预埋地桩套接,同时利用第一铁块和顶部磁铁的吸附力使得二者能稳定的结合在一起,同时本发明采用圆台体的底座和圆台体的预埋地桩进行套接,利用圆台体的稳定性提高二者的连接稳定,该系统中,由于采用套接的方式和磁体吸附的方式进行连接,因此,只需要将底座设置成轻质高强度的材料制成,也可以保证整个结构的稳定性能,这样在运输时,可以一次人力运输多个底座,并且能快速的进行组合安装,整个结构简单,安装方便,整个底座和立柱的质量大大减轻,相比传统的底座式的结构,本发明的底座和立柱的质量可以控制在500克的范围以内,而传统的底座式结构的质量往往在6000克以上,因此,本发明极大的减少结构的重量,但由于存在圆台套接方式和磁体吸附力,因此整个结构的稳定性依旧良好,不会发生侧翻事件。 The design principle of the present invention is: the present invention uses pre-fixed pre-buried ground piles as the base, and then uses a light-weight and high-strength plastic base to socket the pre-buried ground piles, and at the same time utilizes the adsorption force of the first iron block and the top magnet The two can be stably combined together. At the same time, the present invention uses the base of the frustum of the cone and the pre-embedded piles of the cone of the cone to be socketed, and the stability of the cone of the cone is used to improve the stability of the connection between the two. In this system, due to the use of sleeves Therefore, it is only necessary to set the base to be made of light and high-strength materials, which can also ensure the stability of the entire structure, so that during transportation, multiple bases can be transported manually at one time. And it can be combined and installed quickly, the whole structure is simple, easy to install, and the quality of the whole base and column is greatly reduced. Compared with the traditional base structure, the quality of the base and column of the present invention can be controlled within the range of 500 grams. The mass of the traditional base structure is often more than 6000 grams. Therefore, the present invention greatly reduces the weight of the structure. However, due to the existence of the circular table socket method and the magnetic adsorption force, the stability of the entire structure is still good and will not occur. rollover event.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,在预埋地桩的侧壁开有侧壁凹槽、并在该侧壁凹槽内嵌入有侧部磁铁,在底座设置有一圈环形铁皮。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded ground pile, a side wall groove is opened on the side wall of the pre-buried ground pile, and a side magnet is embedded in the side wall groove. A ring-shaped iron sheet is provided.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,底座的小直径端面的直径为D1,预埋地桩的小直径端面的直径为D2,D1小于D2,底座与预埋地桩形成过盈配合。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded pile, the diameter of the small-diameter end face of the base is D1, the diameter of the small-diameter end face of the pre-embedded pile is D2, and D1 is less than D2. The piles form an interference fit.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,底座的大直径端面的直径为D3,预埋地桩的大直径端面的直径为D4,D3小于D4,底座与预埋地桩形成过盈配合。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded ground pile, the diameter of the large-diameter end face of the base is D3, the diameter of the large-diameter end face of the pre-embedded ground pile is D4, and D3 is less than D4. The piles form an interference fit.

第一铁块位于顶部磁铁的正上方。 The first iron block is located directly above the top magnet.

所述立柱通过连接件与围护栅连接。 The column is connected with the enclosure grid through the connecting piece.

所述预埋地桩为混凝土地桩。 The pre-embedded piles are concrete piles.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,所述底座为的大端面的端口还连接有弹性橡胶圈,可以通过弹性橡胶圈再次提高二者的连接稳定性能。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded ground pile, the port on the large end surface of the base is also connected with an elastic rubber ring, and the connection stability between the two can be improved again through the elastic rubber ring.

基于变电站轻量底座施工围栏架系统的安装方法,包括以下步骤: The installation method of the construction fence frame system based on the lightweight base of the substation includes the following steps:

S1:制备底座,采用弹性橡胶或轻质高强度塑料制备一个大端面开口的圆台体的底座,并在底座的小端面设置第一铁块; S1: Preparing the base, using elastic rubber or light high-strength plastic to prepare a base of a conical frustum with a large end face opening, and setting a first iron block on the small end face of the base;

S2:制备预埋地桩,采用混凝土在底面浇筑形成圆台体的预埋地桩,并使得预埋地桩的小端面向上,并在预埋地桩的小端面开凹槽后嵌入顶部磁铁。 S2: Pre-embedded ground piles are prepared. Concrete is poured on the bottom surface to form a pre-embedded ground pile with a conical body, and the small end of the pre-embedded ground pile is turned upward, and the top magnet is embedded after a groove is made on the small end surface of the pre-embedded ground pile.

S3:套装,将底座的大端面面向预埋地桩的小端面,并使得预埋地桩从底座的大端面的开口插入到底座内,利用顶部磁铁吸附第一铁块。 S3: Assembled, the large end of the base faces the small end of the pre-embedded ground pile, and the pre-embedded ground pile is inserted into the base from the opening of the large end of the base, and the first iron block is absorbed by the top magnet.

S4:装配立柱,在底座的小端面连接好立柱,然后通过连接件连接围护栅。 S4: Assemble the column, connect the column on the small end of the base, and then connect the enclosure grid through the connector.

本发明与现有技术相比,具有如下的优点和有益效果:结构简单,成本低,施工方便,极大降低底座的质量,提高施工效率,减少施工周期,同时也能保证其稳定性。 Compared with the prior art, the present invention has the following advantages and beneficial effects: the structure is simple, the cost is low, the construction is convenient, the quality of the base is greatly reduced, the construction efficiency is improved, the construction period is shortened, and its stability can be guaranteed at the same time.

附图说明 Description of drawings

附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。 The accompanying drawings are used to provide further understanding of the embodiments of the present invention, constitute a part of the application, and do not limit the embodiments of the present invention.

图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.

图中的附图标记分别表示为:1、立柱;2、连接件;3、围护栅;11、底座;12、第一铁块;13、环形铁皮;14、顶部磁铁;15、侧部磁铁;16、预埋地桩。 The reference signs in the figure are respectively represented as: 1. Upright column; 2. Connecting piece; 3. Enclosure grid; 11. Base; 12. First iron block; 13. Ring iron sheet; 14. Top magnet; 15. Side part Magnets; 16, pre-buried piles.

具体实施方式 detailed description

为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。 In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples and accompanying drawings. As a limitation of the present invention.

实施例1: Example 1:

如图1所示, As shown in Figure 1,

变电站轻量底座施工围栏架系统,包括预先与地面固定的预埋地桩16,所述预埋地桩呈圆台体,预埋地桩的小直径端面在上,预埋地桩的大直径端面在下,还包括底座11,底座11呈圆台体,底座11的大直径端面开口,底座的小直径端面封闭,在底座的小直径端面连接有立柱1,底座的小直径端面还固定有第一铁块12,预埋地桩从底座11的大直径端面的开口插入、使得底座11套设在预埋地桩16上,其中,在预埋地桩的小直径端面向下开有凹槽、并在该凹槽内嵌入有顶部磁铁14;所述底座为轻质高强度塑料底座。 The construction fence frame system for the lightweight base of the substation includes pre-embedded ground piles 16 fixed to the ground in advance. Below, it also includes a base 11, the base 11 is a circular frustum, the large-diameter end face of the base 11 is open, the small-diameter end face of the base is closed, the small-diameter end face of the base is connected with a column 1, and the small-diameter end face of the base is also fixed with a first iron Block 12, the pre-embedded ground pile is inserted from the opening of the large-diameter end face of the base 11, so that the base 11 is sleeved on the pre-buried ground pile 16, wherein a groove is provided downward on the small-diameter end face of the pre-buried ground pile, and A top magnet 14 is embedded in the groove; the base is a lightweight high-strength plastic base.

本发明的设计原理为:本发明采用预先固定的预埋地桩作为基座,然后采用轻质高强度的塑料底座与预埋地桩套接,同时利用第一铁块和顶部磁铁的吸附力使得二者能稳定的结合在一起,同时本发明采用圆台体的底座和圆台体的预埋地桩进行套接,利用圆台体的稳定性提高二者的连接稳定,该系统中,由于采用套接的方式和磁体吸附的方式进行连接,因此,只需要将底座设置成轻质高强度的材料制成,也可以保证整个结构的稳定性能,这样在运输时,可以一次人力运输多个底座,并且能快速的进行组合安装,整个结构简单,安装方便,整个底座和立柱的质量大大减轻,相比传统的底座式的结构,本发明的底座和立柱的质量可以控制在500克的范围以内,而传统的底座式结构的质量往往在6000克以上,因此,本发明极大的减少结构的重量,但由于存在圆台套接方式和磁体吸附力,因此整个结构的稳定性依旧良好,不会发生侧翻事件。 The design principle of the present invention is: the present invention uses pre-fixed pre-buried ground piles as the base, and then uses a light-weight and high-strength plastic base to socket the pre-buried ground piles, and at the same time utilizes the adsorption force of the first iron block and the top magnet The two can be stably combined together. At the same time, the present invention uses the base of the frustum of the cone and the pre-embedded piles of the cone of the cone to be socketed, and the stability of the cone of the cone is used to improve the stability of the connection between the two. In this system, due to the use of sleeves Therefore, it is only necessary to set the base to be made of light and high-strength materials, which can also ensure the stability of the entire structure, so that during transportation, multiple bases can be transported manually at one time. And it can be combined and installed quickly, the whole structure is simple, easy to install, and the quality of the whole base and column is greatly reduced. Compared with the traditional base structure, the quality of the base and column of the present invention can be controlled within the range of 500 grams. The mass of the traditional base structure is often more than 6000 grams. Therefore, the present invention greatly reduces the weight of the structure. However, due to the existence of the circular platform socket method and the magnetic adsorption force, the stability of the entire structure is still good and will not occur. rollover event.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,在预埋地桩的侧壁开有侧壁凹槽、并在该侧壁凹槽内嵌入有侧部磁铁15,在底座设置有一圈环形铁皮13。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded ground pile, a side wall groove is opened on the side wall of the pre-buried ground pile, and a side magnet 15 is embedded in the side wall groove. The base is provided with a ring of iron sheet 13 .

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,底座的小直径端面的直径为D1,预埋地桩的小直径端面的直径为D2,D1小于D2,底座与预埋地桩形成过盈配合。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded pile, the diameter of the small-diameter end face of the base is D1, the diameter of the small-diameter end face of the pre-embedded pile is D2, and D1 is smaller than D2. The piles form an interference fit.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,底座的大直径端面的直径为D3,预埋地桩的大直径端面的直径为D4,D3小于D4,底座与预埋地桩形成过盈配合。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded ground pile, the diameter of the large-diameter end face of the base is D3, the diameter of the large-diameter end face of the pre-embedded ground pile is D4, and D3 is less than D4. The piles form an interference fit.

第一铁块12位于顶部磁铁14的正上方。 The first iron block 12 is located directly above the top magnet 14 .

所述立柱1通过连接件2与围护栅3连接。 The column 1 is connected to the enclosure grid 3 through the connecting piece 2 .

所述预埋地桩为混凝土地桩。 The pre-embedded piles are concrete piles.

优选的,为了增加稳定性,提高底座与预埋地桩的连接力,所述底座为的大端面的端口还连接有弹性橡胶圈,可以通过弹性橡胶圈再次提高二者的连接稳定性能。 Preferably, in order to increase the stability and improve the connection force between the base and the pre-embedded ground pile, the port on the large end surface of the base is also connected with an elastic rubber ring, and the connection stability between the two can be improved again through the elastic rubber ring.

基于变电站轻量底座施工围栏架系统的安装方法,包括以下步骤: The installation method of the construction fence frame system based on the lightweight base of the substation includes the following steps:

S1:制备底座,采用弹性橡胶或轻质高强度塑料制备一个大端面开口的圆台体的底座,并在底座的小端面设置第一铁块12; S1: preparing the base, using elastic rubber or lightweight high-strength plastic to prepare a base of a conical frustum with a large end face opening, and setting a first iron block 12 on the small end face of the base;

S2:制备预埋地桩,采用混凝土在底面浇筑形成圆台体的预埋地桩,并使得预埋地桩的小端面向上,并在预埋地桩的小端面开凹槽后嵌入顶部磁铁14。 S2: Prepare pre-embedded ground piles, use concrete to pour concrete on the bottom surface to form pre-embedded ground piles with a circular frustum, and make the small end of the pre-embedded piles face upward, and insert a top magnet after opening a groove on the small end of the pre-embedded piles 14 .

S3:套装,将底座的大端面面向预埋地桩的小端面,并使得预埋地桩从底座的大端面的开口插入到底座内,利用顶部磁铁14吸附第一铁块12。 S3: Assembling, facing the large end surface of the base to the small end surface of the pre-embedded ground pile, inserting the pre-embedded ground pile into the base from the opening of the large end surface of the base, and using the top magnet 14 to attract the first iron block 12 .

S4:装配立柱,在底座的小端面连接好立柱,然后通过连接件连接围护栅。 S4: Assemble the column, connect the column on the small end of the base, and then connect the enclosure grid through the connector.

以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本发明的专利保护范围内。 The above descriptions are only examples of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the content of the description of the present invention, or directly or indirectly used in other related technical fields, shall be The same reasoning is included in the patent protection scope of the present invention.

Claims (8)

1. transformer station's light weight base construction fence frame system, it is characterized in that: comprise pre-buried pile (16) fixing with ground in advance, described pre-buried pile is Rotary-table, the minor diameter end face of pre-buried pile is upper, the major diameter end face of pre-buried pile under, also comprise base (11), base (11) is in Rotary-table, the major diameter end face opening of base (11), the smaller diameter end face closure of base, column (1) is connected with at the minor diameter end face of base, the minor diameter end face of base is also fixed with the first iron block (12), pre-buried pile inserts from the opening of the major diameter end face of base (11), base (11) is made to be set on pre-buried pile (16), wherein, face down in the smaller diameter end of pre-buried pile and have groove, and be embedded in top magnet (14) at this groove, described base is light-high-strength plastic feet.
2. transformer station according to claim 1 light weight base construction fence frame system, it is characterized in that: have sidewall notches at the sidewall of pre-buried pile and be embedded in sidepiece magnet (15) in this sidewall notches, base is provided with a ring shape iron sheet (13).
3. transformer station according to claim 1 light weight base construction fence frame system, is characterized in that: the diameter of the minor diameter end face of base is D1, and the diameter of the minor diameter end face of pre-buried pile is that D2, D1 are less than D2, and base and pre-buried pile form interference fit.
4. transformer station according to claim 1 light weight base construction fence frame system, is characterized in that: the diameter of the major diameter end face of base is D3, and the diameter of the major diameter end face of pre-buried pile is that D4, D3 are less than D4, and base and pre-buried pile form interference fit.
5. transformer station according to claim 1 light weight base construction fence frame system, is characterized in that: the first iron block (12) is positioned at directly over top magnet (14).
6. transformer station according to claim 1 light weight base construction fence frame system, is characterized in that: described column (1) by connector (2) with go along with sb. to guard him grid (3) and be connected.
7. transformer station according to claim 1 light weight base construction fence frame system, is characterized in that: described pre-buried pile is concrete pile.
8. transformer station according to claim 1 light weight base construction fence frame system, is characterized in that: the port of the large end face that described base is also is connected with elastic rubber ring.
CN201520876161.7U 2015-11-06 2015-11-06 Hurdle system is enclosed in transformer substation's light weight base construction Expired - Lifetime CN205100652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520876161.7U CN205100652U (en) 2015-11-06 2015-11-06 Hurdle system is enclosed in transformer substation's light weight base construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520876161.7U CN205100652U (en) 2015-11-06 2015-11-06 Hurdle system is enclosed in transformer substation's light weight base construction

Publications (1)

Publication Number Publication Date
CN205100652U true CN205100652U (en) 2016-03-23

Family

ID=55516439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520876161.7U Expired - Lifetime CN205100652U (en) 2015-11-06 2015-11-06 Hurdle system is enclosed in transformer substation's light weight base construction

Country Status (1)

Country Link
CN (1) CN205100652U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257082A (en) * 2015-11-06 2016-01-20 国网四川省电力公司凉山供电公司 Transformer substation light-weight base construction fence frame system and installation method thereof
CN107989471A (en) * 2017-11-24 2018-05-04 安徽恒杰保安服务有限公司 A kind of security column net vertical columns being easily installed

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257082A (en) * 2015-11-06 2016-01-20 国网四川省电力公司凉山供电公司 Transformer substation light-weight base construction fence frame system and installation method thereof
CN105257082B (en) * 2015-11-06 2017-11-17 国网四川省电力公司凉山供电公司 Transformer station's light weight base construction fence frame system and its installation method
CN107989471A (en) * 2017-11-24 2018-05-04 安徽恒杰保安服务有限公司 A kind of security column net vertical columns being easily installed

Similar Documents

Publication Publication Date Title
CN101985861B (en) Quickly detached temporary telegraph pole
CN205100652U (en) Hurdle system is enclosed in transformer substation's light weight base construction
CN105839947A (en) Hoisting room based on rectangular steel structure base and hoisting method
CN105257082B (en) Transformer station's light weight base construction fence frame system and its installation method
CN203865934U (en) Temporary suspension device of pulley lifting mechanism for electric pole
CN108173161B (en) A cable trench cover opening and carrying device
CN203289011U (en) Tension cross arm hoisting device
CN203278042U (en) Hoisting apparatus for electric power equipment for substation
CN106245986A (en) The method for assembling of power network line steel tower and device
CN207910357U (en) A kind of blind flange unlatching handling device
CN204009336U (en) A kind of hard ball curtain
CN206541707U (en) A kind of phase-shifting transformer connects box
CN207097608U (en) Fuel tank positioner for transformer
CN204835412U (en) Wire and cable of transformer substation assembled hoist and mount laying device
CN203666706U (en) Simple two-wheel lever transportation tool
CN202353043U (en) Transfer device for high-tension switch board
CN204940878U (en) Electrical installation erecting device in a kind of prepackage type electrical house
CN206957334U (en) A kind of electric flagpole
CN205476470U (en) Pre -buried mould of housing construction construction blank bolt hole for platform installation
CN204059584U (en) A kind of light house
CN204476247U (en) A kind of cat ladder
CN206616923U (en) A kind of concurrent
CN106710813B (en) A kind of phase-shifting transformer connection box
CN206204830U (en) A kind of anticollision lifting column
CN206164003U (en) A erect instrument for 10kV overhead line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20160323