CN205100401U - Modular reinforced concrete outer wall structure - Google Patents
Modular reinforced concrete outer wall structure Download PDFInfo
- Publication number
- CN205100401U CN205100401U CN201520936122.1U CN201520936122U CN205100401U CN 205100401 U CN205100401 U CN 205100401U CN 201520936122 U CN201520936122 U CN 201520936122U CN 205100401 U CN205100401 U CN 205100401U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- reinforced concrete
- exterior wall
- groove
- protrusions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Building Environments (AREA)
Abstract
本实用新型公开了一种组合式钢筋混凝土外墙结构,包括钢筋混凝土立柱、预制混泥土外墙板,预制中间层聚苯板和预制保温防火内层板,钢筋混凝土立柱两侧分别开设有上下贯通的外层凹槽、中层凹槽和内层凹槽,预制混泥土外墙板两侧分别设有凸起,预制混泥土外墙板通过两侧凸起安装在两根钢筋混凝土立柱之间的外层凹槽内,预制中间层聚苯板两侧分别设有凸起,预制中间层聚苯板通过两侧凸起安装在两根钢筋混凝土立柱之间的中层凹槽内,预制保温防火内层板两侧分别设有凸起,预制保温防火内层板通过凸起安装在两根钢筋混凝土立柱之间的内层凹槽内。
The utility model discloses a combined reinforced concrete outer wall structure, which comprises a reinforced concrete column, a prefabricated concrete outer wall panel, a prefabricated middle layer polystyrene board and a prefabricated thermal insulation and fireproof inner layer panel. Through the outer layer groove, the middle layer groove and the inner layer groove, there are protrusions on both sides of the prefabricated concrete outer wall panel, and the precast concrete outer wall panel is installed between two reinforced concrete columns through the protrusions on both sides In the outer groove of the outer layer, there are protrusions on both sides of the prefabricated middle layer polystyrene board, and the prefabricated middle layer polystyrene board is installed in the middle groove between two reinforced concrete columns through the protrusions on both sides, and the prefabricated heat preservation and fire prevention Protrusions are respectively provided on both sides of the inner layer board, and the prefabricated thermal insulation and fireproof inner layer board is installed in the inner layer groove between two reinforced concrete columns through the protrusions.
Description
技术领域 technical field
本实用新型涉及房屋建筑领域,具体地,涉及一种组合式钢筋混凝土外墙结构。 The utility model relates to the field of building construction, in particular to a combined reinforced concrete outer wall structure.
背景技术 Background technique
早在上个世纪50年代中国就开始使用装配式建筑,但是装配式建筑技术在国内一直发展缓慢,技术落后于日本、欧美的装配式技术。2009年国务院8部门联合发文宣布在中国全面启动装配式建筑的科研与示范和推广,国务院办公厅关于转发发展改革委、住房城乡建设部绿色建筑行动方案的通知,住房城乡建设等部门出台一系列政策引导加快建立促进建筑工业化的设计标准化、构件部品化、构件生产工厂化的标准体系,推广适合工业化生产的预制装配式混凝土、钢结构等建筑体系,加快发展建设工程的预制和装配技术,提高建筑工业化技术集成水平。支持集设计、生产、施工于一体的工业化基地建设,开展工业化建筑示范试点。积极推行住宅全装修,鼓励新建住宅一次装修到位或菜单式装修,促进个性化装修和产业化装修相统一。 As early as the 1950s, China began to use prefabricated buildings, but the prefabricated building technology has been developing slowly in China, and the technology lags behind the prefabricated technologies of Japan, Europe and the United States. In 2009, 8 departments of the State Council jointly issued a document announcing the comprehensive launch of scientific research, demonstration and promotion of prefabricated buildings in China. Policy guidance to accelerate the establishment of a standard system that promotes the design standardization, component parts, and component production factoryization of construction industrialization, promote prefabricated concrete, steel structures and other building systems suitable for industrial production, and accelerate the development of prefabrication and assembly technologies for construction projects. Integration level of construction industrialization technology. Support the construction of industrialized bases that integrate design, production, and construction, and carry out demonstration and pilot projects of industrialized buildings. Actively promote the full renovation of residential buildings, encourage one-time decoration or menu-style decoration of newly-built residential buildings, and promote the unification of personalized decoration and industrialized decoration.
但是现有的装配式房屋的结构不合理,构件制造工艺创新点偏少,构件安装施工工艺创新点起点低,导致施工成本高于目前的在用技术,因此需要更高层次的技术创新支持住宅产业化的快速健康发展。 However, the structure of the existing prefabricated houses is unreasonable, the innovation points of the component manufacturing process are too few, and the starting point of the innovation point of the component installation and construction process is low, resulting in higher construction costs than the current technology in use. Therefore, a higher level of technological innovation is needed to support housing. The rapid and healthy development of industrialization.
实用新型内容 Utility model content
本实用新型所要解决的技术问题是提供一种组合式钢筋混凝土外墙结构,解决了现有装配式建筑外墙结构复杂,建设周期长,强度、防火及保温效果差的问题。 The technical problem to be solved by the utility model is to provide a combined reinforced concrete exterior wall structure, which solves the problems of complex exterior wall structure, long construction period, and poor strength, fire prevention and heat preservation effects of existing prefabricated buildings.
本实用新型解决上述问题所采用的技术方案是:一种组合式钢筋混凝土外墙结构,包括钢筋混凝土立柱、预制混泥土外墙板,预制中间层聚苯板和预制保温防火内层板,所述的钢筋混凝土立柱两侧分别开设有上下贯通的外层凹槽、中层凹槽和内层凹槽,所述的预制混泥土外墙板两侧分别设有凸起,所述预制混泥土外墙板通过两侧凸起安装在两根钢筋混凝土立柱之间的外层凹槽内,所述的预制中间层聚苯板两侧分别设有凸起,所述预制中间层聚苯板通过两侧凸起安装在两根钢筋混凝土立柱之间的中层凹槽内,所述的预制保温防火内层板两侧分别设有凸起,所述预制保温防火内层板通过凸起安装在两根钢筋混凝土立柱之间的内层凹槽内。 The technical scheme adopted by the utility model to solve the above-mentioned problems is: a combined reinforced concrete outer wall structure, including reinforced concrete columns, prefabricated concrete outer wall panels, prefabricated middle layer polystyrene boards and prefabricated thermal insulation and fireproof inner layers. The two sides of the reinforced concrete column are respectively provided with an outer layer groove, a middle layer groove and an inner layer groove that penetrate up and down. The two sides of the prefabricated concrete outer wall panel are respectively provided with protrusions. The wallboard is installed in the outer groove between two reinforced concrete columns through the protrusions on both sides, and the two sides of the prefabricated middle polystyrene board are respectively provided with protrusions, and the prefabricated middle polystyrene board is passed through two The side protrusions are installed in the middle groove between the two reinforced concrete columns, and the two sides of the prefabricated thermal insulation and fireproof inner layer board are respectively provided with protrusions, and the prefabricated thermal insulation and fireproof inner layer board is installed on the two sides through the protrusions. In the inner groove between the reinforced concrete columns.
进一步的,所述的预制混泥土外墙板顶面和底面分别设置有相互配合安装的凸条和凹槽。 Further, the top surface and the bottom surface of the prefabricated concrete exterior wall panels are respectively provided with protruding lines and grooves that are installed in cooperation with each other.
进一步的,所述的预制混泥土外墙板内横向设置有通孔。 Further, through holes are arranged transversely in the prefabricated concrete exterior wall panels.
进一步的,所述的预制中间层聚苯板顶面和底面分别设置有相互配合安装的凸条和凹槽。 Further, the top surface and the bottom surface of the prefabricated interlayer polystyrene board are respectively provided with protruding lines and grooves that are installed in cooperation with each other.
进一步的,所述的预制保温防火内层板顶面和底面分别设置有相互配合安装的凸条和凹槽。 Further, the top surface and the bottom surface of the prefabricated thermal insulation and fireproof inner layer panels are respectively provided with protruding lines and grooves that are installed in cooperation with each other.
进一步的,所述的预制保温防火内层板采用发泡水泥制成。 Further, the prefabricated thermal insulation and fireproof inner layer board is made of foamed cement.
进一步的,所述的外层凹槽、中层凹槽和内层凹槽均采用槽钢结构。 Further, the outer layer groove, the middle layer groove and the inner layer groove all adopt channel steel structure.
进一步的,所述的预制混泥土外墙板和预制保温防火内层板横截面为T型结构。 Further, the cross section of the prefabricated concrete outer wall panel and the prefabricated thermal insulation and fireproof inner panel is a T-shaped structure.
综上,本实用新型的有益效果是:采用先浇筑钢筋混凝土立柱框架结构,再在两根钢筋混凝土立柱之间安装三层预制板,结构简单,在满足住房的坚固性同时,大大缩短了建房周期,在防火、保温和隔音性能方面也大大提高。 To sum up, the beneficial effect of the utility model is that the frame structure of reinforced concrete columns is poured first, and then three layers of prefabricated panels are installed between the two reinforced concrete columns. The room cycle has also been greatly improved in terms of fire prevention, heat preservation and sound insulation.
附图说明 Description of drawings
此处所说明的附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。在附图中: The drawings described here are used to provide a further understanding of the embodiments of the present invention, constitute a part of the application, and do not limit the embodiments of the present invention. In the attached picture:
图1为本实用新型一种组合式钢筋混凝土外墙结构的结构示意图; Fig. 1 is the structural representation of a kind of combined reinforced concrete exterior wall structure of the utility model;
图2为本实用新型预制混泥土外墙板的纵向截面结构示意图; Fig. 2 is a schematic diagram of the longitudinal section structure of the prefabricated concrete exterior wall panel of the present invention;
图3为本实用新型预制中间层聚苯板的纵向截面结构示意图; Fig. 3 is the longitudinal cross-sectional structure schematic diagram of the utility model prefabricated interlayer polystyrene board;
图4为本实用新型预制保温防火内层板的纵向截面结构示意图; Fig. 4 is a schematic diagram of the longitudinal section structure of the prefabricated thermal insulation and fireproof inner layer board of the present invention;
其中:1-钢筋混凝土立柱,2-预制混泥土外墙板,3-预制中间层聚苯板,4-预制保温防火内层板,5-外层凹槽,6-中层凹槽,7-内层凹槽。 Among them: 1-reinforced concrete column, 2-prefabricated concrete exterior wall panels, 3-prefabricated middle layer polystyrene board, 4-prefabricated thermal insulation and fireproof inner layer board, 5-outer layer groove, 6-middle layer groove, 7- Inner groove.
具体实施方式 detailed description
下面结合实施例,对本实用新型作进一步的详细说明,但本实用新型的实施方式不限于此。 The utility model will be further described in detail below in conjunction with the examples, but the implementation of the utility model is not limited thereto.
实施例1 Example 1
如图1-4所示的一种组合式钢筋混凝土外墙结构,包括钢筋混凝土立柱1、预制混泥土外墙板2,预制中间层聚苯板3和预制保温防火内层板4,钢筋混凝土立柱1两侧分别开设有上下贯通的外层凹槽5、中层凹槽6和内层凹槽7,预制混泥土外墙板2两侧分别设有凸起,预制混泥土外墙板2通过两侧凸起安装在两根钢筋混凝土立柱1之间的外层凹槽5内,预制中间层聚苯板3两侧分别设有凸起,预制中间层聚苯板3通过两侧凸起安装在两根钢筋混凝土立柱1之间的中层凹槽6内,预制保温防火内层板4两侧分别设有凸起,预制保温防火内层板4通过凸起安装在两根钢筋混凝土立柱1之间的内层凹槽7内。 A combined reinforced concrete exterior wall structure as shown in Figure 1-4, including reinforced concrete columns 1, prefabricated concrete exterior wall panels 2, prefabricated middle polystyrene panels 3 and prefabricated thermal insulation and fireproof inner panels 4, reinforced concrete The two sides of the column 1 are respectively provided with the outer layer groove 5, the middle layer groove 6 and the inner layer groove 7, and the two sides of the prefabricated concrete outer wall panel 2 are respectively provided with protrusions, and the prefabricated concrete outer wall panel 2 passes through the The protrusions on both sides are installed in the outer groove 5 between two reinforced concrete columns 1, and the two sides of the prefabricated middle layer polystyrene board 3 are respectively provided with protrusions, and the prefabricated middle layer polystyrene board 3 is installed through the protrusions on both sides In the middle groove 6 between the two reinforced concrete columns 1, there are protrusions on both sides of the prefabricated thermal insulation and fireproof inner layer board 4, and the prefabricated thermal insulation and fireproof inner layer board 4 is installed between the two reinforced concrete columns 1 through the protrusions In the inner layer groove 7 between.
实施例2 Example 2
如图1-4所示的一种组合式钢筋混凝土外墙结构,在实施例1的基础上,为了增加上下两层预制混泥土外墙板2的连接强度,在预制混泥土外墙板2顶面和底面分别设置有相互配合安装的凸条和凹槽。同时为了增加预制混泥土外墙板2的强度和节省材料,减少重量,在预制混泥土外墙板2内横向设置有通孔。 A combined reinforced concrete exterior wall structure as shown in Figure 1-4, on the basis of Example 1, in order to increase the connection strength of the upper and lower layers of prefabricated concrete exterior wall panels 2, in the prefabricated concrete exterior wall panels 2 The top surface and the bottom surface are respectively provided with protruding lines and grooves which are installed in cooperation with each other. At the same time, in order to increase the strength of the prefabricated concrete exterior wall panel 2 and save materials and reduce weight, through holes are arranged laterally in the prefabricated concrete exterior wall panel 2 .
实施例3 Example 3
如图1-4所示的一种组合式钢筋混凝土外墙结构,在实施例1的基础上,为了增加上下两层中间层聚苯板顶面3的连接强度,在预制中间层聚苯板3顶面和底面分别设置有相互配合安装的凸条和凹槽。 A combined reinforced concrete exterior wall structure as shown in Figure 1-4, on the basis of Example 1, in order to increase the connection strength of the top surface 3 of the upper and lower middle layer polystyrene boards, prefabricated middle layer polystyrene boards 3 The top surface and the bottom surface are respectively provided with protruding lines and grooves that are installed in cooperation with each other.
实施例4 Example 4
如图1-4所示的一种组合式钢筋混凝土外墙结构,在实施例1的基础上,为了增加上下两层预制保温防火内层板4的连接强度,在预制保温防火内层板4顶面和底面分别设置有相互配合安装的凸条和凹槽。为了提高预制保温防火内层板4耐火及保温效果,预制保温防火内层板4采用发泡水泥制成。 A combined reinforced concrete exterior wall structure as shown in Figure 1-4, on the basis of Example 1, in order to increase the connection strength of the upper and lower prefabricated thermal insulation and fireproof inner panels 4, the prefabricated thermal insulation and fireproof inner panels 4 The top surface and the bottom surface are respectively provided with protruding lines and grooves which are installed in cooperation with each other. In order to improve the fire resistance and heat preservation effect of the prefabricated thermal insulation and fireproof inner layer board 4, the prefabricated thermal insulation and fireproof inner layer board 4 is made of foamed cement.
实施例5 Example 5
如图1-4所示的一种组合式钢筋混凝土外墙结构,在实施例1的基础上,外层凹槽5、中层凹槽6和内层凹槽7均采用槽钢结构。便于提高钢筋混凝土立柱1结构强度,同时也便于安装预制混泥土外墙板2,预制中间层聚苯板3和预制保温防火内层板4。预制混泥土外墙板2和预制保温防火内层板4横截面为T型结构。 A combined reinforced concrete exterior wall structure as shown in Figures 1-4, on the basis of Example 1, the outer layer groove 5, the middle layer groove 6 and the inner layer groove 7 all adopt channel steel structure. It is convenient to improve the structural strength of the reinforced concrete column 1, and it is also convenient to install the prefabricated concrete outer wall panel 2, the prefabricated middle layer polystyrene board 3 and the prefabricated thermal insulation and fireproof inner layer board 4. The cross section of the prefabricated concrete outer wall panel 2 and the prefabricated thermal insulation and fireproof inner layer panel 4 is a T-shaped structure.
以上所述,仅是本实用新型的较佳实施例而已,并非对本实用新型作任何形式上的限制,依据本实用新型的技术实质,在本实用新型的精神和原则之内,对以上实施例所作的任何简单的修改、等同替换与改进等,均仍属于本实用新型技术方案的保护范围之内。 The above is only a preferred embodiment of the utility model, and does not limit the utility model in any form. According to the technical essence of the utility model, within the spirit and principles of the utility model, the above embodiments Any simple modifications, equivalent replacements and improvements, etc., still fall within the protection scope of the technical solutions of the present utility model.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520936122.1U CN205100401U (en) | 2015-11-23 | 2015-11-23 | Modular reinforced concrete outer wall structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520936122.1U CN205100401U (en) | 2015-11-23 | 2015-11-23 | Modular reinforced concrete outer wall structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205100401U true CN205100401U (en) | 2016-03-23 |
Family
ID=55516190
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520936122.1U Expired - Lifetime CN205100401U (en) | 2015-11-23 | 2015-11-23 | Modular reinforced concrete outer wall structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205100401U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112324001A (en) * | 2020-10-02 | 2021-02-05 | 河南省建筑设计研究院有限公司 | Polyphenyl concrete sandwich composite heat preservation batten filling outer wall |
| CN115262893A (en) * | 2022-07-21 | 2022-11-01 | 中建八局天津建设工程有限公司 | Composite heat-insulating strip plate and construction method thereof |
-
2015
- 2015-11-23 CN CN201520936122.1U patent/CN205100401U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112324001A (en) * | 2020-10-02 | 2021-02-05 | 河南省建筑设计研究院有限公司 | Polyphenyl concrete sandwich composite heat preservation batten filling outer wall |
| CN115262893A (en) * | 2022-07-21 | 2022-11-01 | 中建八局天津建设工程有限公司 | Composite heat-insulating strip plate and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105714963B (en) | Inorganic light composite heat-insulation integrated exterior wall cladding system and installation method thereof | |
| US7913469B2 (en) | Concrete load-bearing wall with compound heat-insulating layer | |
| WO2007134518A1 (en) | Structure system of concrete buliding for self-heat insulation | |
| CN205604566U (en) | Side fascia suitable for assembled concrete frame structure | |
| CN105908881A (en) | Novel bidirectional inverted-T-shaped beam combined floor | |
| CN102051912B (en) | Low-rise mixed light steel structure building | |
| CN104878860A (en) | Self-insulation superimposed slab concrete shear wall | |
| WO2013135108A1 (en) | Assembled steel structure hollow building | |
| CN103993679A (en) | Bolt connecting joint structure of low-rise fabricated composite wall house | |
| CN203008410U (en) | Modularized overall moving house | |
| CN111119406A (en) | A fire-proof, anti-corrosion, thermal insulation and decoration integrated H-shaped steel beam | |
| CN205100401U (en) | Modular reinforced concrete outer wall structure | |
| CN205475901U (en) | An inorganic lightweight composite thermal insulation integrated exterior wall hanging board system | |
| CN204491975U (en) | A kind of structure composite wallboard | |
| CN205314349U (en) | Assembly type structure composite board and adopt assembly type structure connection structure of this panel | |
| CN108118798A (en) | A kind of assembled air entrained concrete building systems | |
| CN204662725U (en) | Self-heat conserving superimposed sheet concrete shear force wall | |
| CN201254767Y (en) | Building enclosure | |
| CN104695661A (en) | Steel structure integrated system | |
| CN206646722U (en) | A kind of reinforced concrete composite structure overlaps beam slab | |
| CN205296558U (en) | A large-scale prefabricated external wall panel of lightweight aggregate microporous concrete | |
| CN205296894U (en) | Modularization house containing prefabricated component | |
| CN203640072U (en) | Composite thermal insulation board | |
| CN203878860U (en) | Building wallboard | |
| CN202899343U (en) | Composite wall body formed by foam concrete self-insulation modules with built-in cores |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160323 |
|
| CX01 | Expiry of patent term |