CN205077907U - Whole bathroom - Google Patents

Whole bathroom Download PDF

Info

Publication number
CN205077907U
CN205077907U CN201520881116.0U CN201520881116U CN205077907U CN 205077907 U CN205077907 U CN 205077907U CN 201520881116 U CN201520881116 U CN 201520881116U CN 205077907 U CN205077907 U CN 205077907U
Authority
CN
China
Prior art keywords
bathroom
water
integral
pipe
sanitary ware
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520881116.0U
Other languages
Chinese (zh)
Inventor
张立秦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Gongsheng Hotel Management Co Ltd
Original Assignee
Shanghai Gongsheng Hotel Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Gongsheng Hotel Management Co Ltd filed Critical Shanghai Gongsheng Hotel Management Co Ltd
Priority to CN201520881116.0U priority Critical patent/CN205077907U/en
Application granted granted Critical
Publication of CN205077907U publication Critical patent/CN205077907U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a whole bathroom, by roof, lateral wall board, preceding wallboard, back wallboard and waterproof chassis connection formation overall framework, be equipped with the door on the preceding wallboard, wherein, preceding wallboard inwards caves in in the crossing department with the lateral wall board and is equipped with first counter top, the top of first counter top is equipped with the tap who links to each other with the inlet tube, soft blow off pipe has been arranged to the below of first counter top, be provided with on the first counter top and take filter screen drain cup, take filter screen drain cup to link to each other through soft blow off pipe and bathroom blow off pipe, the slope of leaking water on waterproof chassis is 12.5%. The utility model provides a whole bathroom through at whole bathroom outside increase and the tap that the inlet tube links to each other, can directly drain outside and heat up water, need not the bathroom water receiving, convenient health to more equitable overall arrangement bathroom space promotes whole bathroom's practicality, functional, aesthetic property.

Description

一种整体卫浴a whole bathroom

技术领域technical field

本实用新型涉及一种卫浴,尤其涉及一种整体卫浴。The utility model relates to a bathroom, in particular to an integrated bathroom.

背景技术Background technique

国内的酒店、医院、船舶、快装房已大量使用了整体卫浴。随着精装修住宅越来越普及,以及产业化、低碳环保住宅的国家政策导向相继出台,整体卫浴的应用前景越来越广。Domestic hotels, hospitals, ships, and fast-installed houses have used a large number of integrated bathrooms. With the increasing popularity of well-decorated residences, and the introduction of national policy guidance for industrialization and low-carbon environmentally friendly residences, the application prospects of integral bathrooms are becoming wider and wider.

整体卫浴的整体主要是在于它的模压底盘是整体的,具有防水防漏的功能。随着设计的发展和完善,整体卫浴有了新的诠释:即在有限空间内实现洗漱、沐浴、梳妆、如厕等多种功能的独立卫生单元。目前,酒店、医院、船舶、快装房已大量使用了整体卫浴,它用一体化防水底盘、壁板、顶板构成的整体框架,并将卫浴洁具、浴室家具、浴屏、龙头、花洒、瓷砖配件等都融入到一个的整体环境中。如何合理布局浴室空间,提升卫生间的实用性、功能性、美观性,一直是整体卫浴的研究热点。但是目前的整体卫浴在其外部没有独立的给水管,烧水的时候需要拿着茶壶去卫生间接倒水,既不方便又不卫生。The whole of the whole bathroom is mainly because its molded chassis is a whole, which has the function of waterproof and leakproof. With the development and improvement of the design, the overall bathroom has a new interpretation: that is, an independent sanitary unit that realizes multiple functions such as washing, bathing, dressing, and toileting in a limited space. At present, hotels, hospitals, ships, and fast-installed rooms have widely used integral bathrooms. It uses an integrated waterproof chassis, wall panels, and roof panels to form an overall frame, and integrates sanitary ware, bathroom furniture, bath screens, faucets, showers, Ceramic tile accessories and more are integrated into an overall environment. How to rationally arrange the bathroom space and improve the practicability, functionality and aesthetics of the bathroom has always been a research hotspot of the overall bathroom. However, the current integrated bathroom does not have an independent water supply pipe outside it. When boiling water, it is necessary to take a teapot to the bathroom to pick up and pour water, which is inconvenient and unhygienic.

实用新型内容Utility model content

本实用新型所要解决的技术问题是提供一种整体卫浴,可以在整体卫浴的外面直接接水和倒水,方便卫生。The technical problem to be solved by the utility model is to provide an integrated bathroom, which can directly receive and pour water outside the integrated bathroom, which is convenient and hygienic.

本实用新型为解决上述技术问题而采用的技术方案是提供一种整体卫浴,由顶板、侧壁板、前壁板、后壁板和防水底盘连接形成整体框架,所述前壁板上设有门,其中,所述前壁板在与侧壁板的相交处向内凹陷设有第一柜台面,所述第一柜台面的上方设有与进水管相连的水龙头,所述第一柜台面的下方布置有软质排污管。The technical scheme adopted by the utility model to solve the above-mentioned technical problems is to provide an integral bathroom, which is connected to form an integral frame by top board, side wall board, front wall board, rear wall board and waterproof chassis, and the front wall board is provided with The door, wherein, the front wall plate is recessed inwardly at the intersection with the side wall plate to provide a first counter top, and a water tap connected to the water inlet pipe is provided above the first counter top, and the first counter top A soft sewage pipe is arranged below.

上述的整体卫浴,其中,所述第一柜台面上设置有带滤网排水漏斗,所述带滤网排水漏斗通过软质排污管和浴室排污管相连。In the integral sanitary ware mentioned above, a drainage funnel with a filter is arranged on the surface of the first counter, and the drainage funnel with a filter is connected to the bathroom sewage pipe through a soft sewage pipe.

上述的整体卫浴,其中,所述防水底盘的走水坡度为12.5%。In the above integral bathroom, the water running slope of the waterproof chassis is 12.5%.

上述的整体卫浴,其中,所述顶板上设置有净水器,所述水龙头通过进水管和净水器相连。In the above integral bathroom, a water purifier is arranged on the top plate, and the faucet is connected to the water purifier through a water inlet pipe.

上述的整体卫浴,其中,所述整体卫浴的数量为2-4,每个整体卫浴第一柜台面上的水龙头均通过其进水管和同一净水器相连。The above integral bathroom, wherein, the number of said integral bathrooms is 2-4, and the faucets on the first counter of each integral bathroom are connected to the same water purifier through its water inlet pipe.

上述的整体卫浴,其中,所述侧壁板和后壁板处布置有热水管接头、冷水管接头、排风立管以及排污立管,所述进水管和排污立管大致位于整体卫浴对角线的两端。In the integral sanitary ware mentioned above, hot water pipe joints, cold water pipe joints, air exhaust standpipes and sewage discharge standpipes are arranged at the side wall panels and rear wall panels, and the water inlet pipes and sewage discharge standpipes are roughly located on the opposite side of the integral sanitary ware. both ends of the corner.

上述的整体卫浴,其中,所述排污立管和注水式马桶相连,所述注水式马桶的水箱隐藏设于后壁板后面。In the integral sanitary ware mentioned above, the sewage riser is connected to the water injection toilet, and the water tank of the water injection toilet is hidden behind the rear wall.

上述的整体卫浴,其中,所述门打开后和浴室门匹配咬合。In the above overall bathroom, wherein the door is matched and engaged with the bathroom door after being opened.

上述的整体卫浴,其中,第一柜台面上方设置有第二柜台面。In the integral bathroom mentioned above, a second counter top is arranged above the first counter top.

上述的整体卫浴,其中,所述前壁板上设有梳妆镜,所述侧壁板的数目为两块,其中一块侧壁板紧贴外饰墙或建筑墙,另一侧壁板上设置玻璃墙,所述侧壁板与前壁板、后壁板之间通过自钻钉相连。The above integral bathroom, wherein, the front wall board is provided with a vanity mirror, and the number of the side wall boards is two, one of the side wall boards is close to the exterior wall or building wall, and the other side wall board is set In the glass wall, the side wall panels are connected with the front wall panels and the rear wall panels by self-drilling nails.

本实用新型对比现有技术有如下的有益效果:本实用新型提供的整体卫浴,通过在整体卫浴外面设置第一柜台面,在柜台面上设置与进水管相连的水龙头,可以在外面直接放水烧水,无需到卫生间接水,方便卫生,从而能够更合理地布局浴室空间,提升整体卫浴的实用性、功能性、美观性,特别是在顶板上设置净水器,供水更加卫生健康。Compared with the prior art, the utility model has the following beneficial effects: the integral sanitary ware provided by the utility model can directly put water on the outside to boil water by setting the first counter top outside the integral sanitary ware, and setting a faucet connected to the water inlet pipe on the counter top. Water, no need to go to the bathroom to collect water, convenient and hygienic, so that the bathroom space can be more reasonably arranged, and the practicability, functionality, and aesthetics of the overall bathroom can be improved. In particular, a water purifier is installed on the top plate, and the water supply is more sanitary and healthy.

附图说明Description of drawings

图1为本实用新型整体卫浴的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the whole bathroom of the present utility model;

图2为本实用新型整体卫浴正面结构示意图;Figure 2 is a schematic diagram of the front structure of the utility model integral bathroom;

图3为本实用新型整体卫浴侧面结构示意图;Fig. 3 is a schematic diagram of the side structure of the utility model integral bathroom;

图4为本实用新型软质排污管连接示意图;Fig. 4 is a schematic diagram of the connection of the soft sewage pipe of the present invention;

图5为本实用新型整体卫浴壁板与防水底盘连接示意图;Fig. 5 is a schematic diagram of the connection between the integral bathroom wallboard and the waterproof chassis of the present invention;

图6为本实用新型整体卫浴壁板之间连接示意图。Fig. 6 is a schematic diagram of the connection between the integral bathroom wall panels of the present invention.

图中:In the picture:

1顶板2侧壁板3前壁板1 top panel 2 side wall panel 3 front wall panel

4第一柜台面5水龙头6带滤网排水漏斗4 first counter top 5 faucet 6 drain funnel with strainer

7软质排污管8防水底盘9进水管7 Soft sewage pipe 8 Waterproof chassis 9 Water inlet pipe

10梳妆镜11后壁板12外饰墙10 vanity mirror 11 rear wall panel 12 exterior wall

13建筑墙14玻璃墙15热水管接头13 building wall 14 glass wall 15 hot water pipe joint

16冷水管接头17排风立管18排污立管16 Cold water pipe joint 17 Exhaust riser 18 Sewage riser

19插座20底板连接件21墙角型材19 socket 20 bottom plate connector 21 corner profile

22压线23注水式马桶31门22 pressure line 23 water injection toilet 31 door

32浴室排污管41第二柜台面42茶壶32 bathroom sewage pipe 41 second counter top 42 teapot

具体实施方式detailed description

下面结合附图和实施例对本实用新型作进一步的描述。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

图1为本实用新型整体卫浴的整体结构示意图;图2为本实用新型整体卫浴正面结构示意图;图3为本实用新型整体卫浴侧面结构示意图。Figure 1 is a schematic diagram of the overall structure of the integrated bathroom of the present invention; Figure 2 is a schematic diagram of the front structure of the integrated bathroom of the present invention; Figure 3 is a schematic diagram of the side structure of the integrated bathroom of the present invention.

请参见图1、图2和图3,本实用新型提供的整体卫浴,由顶板1、侧壁板2、前壁板3、后壁板11和防水底盘8连接形成整体结构,所述前壁板3上设有门31,卫生间的房门31可以一门两用,打开后和浴室的半扇门咬合起来作为浴室的推拉门,节省空间和材料;其中,所述前壁板3在与侧壁板2的相交处向内凹陷设有第一柜台面4,所述第一柜台面4的上方设有与进水管9相连的水龙头5,所述第一柜台面4的下方布置有软质排污管7。较佳地,所述第一柜台面4上方还设置有第二柜台面41,所述第二柜台面41可放置茶杯等器具,提升用户体验。Please refer to Fig. 1, Fig. 2 and Fig. 3, the integrated sanitary ware provided by the utility model is connected to form an integral structure by top plate 1, side wall plate 2, front wall plate 3, rear wall plate 11 and waterproof chassis 8, and the front wall There is a door 31 on the board 3, and the door 31 of the bathroom can be used as a double-purpose door. After being opened, it can be occluded with the half door of the bathroom as a sliding door of the bathroom, saving space and materials; The intersection of the side wall panels 2 is recessed inwardly to provide a first counter top 4, a faucet 5 connected to the water inlet pipe 9 is provided above the first counter top 4, and a soft water heater is arranged below the first counter top 4. Quality sewage pipe 7. Preferably, a second counter surface 41 is also provided above the first counter surface 4, and the second counter surface 41 can place utensils such as teacups to improve user experience.

本实用新型提供的整体卫浴,通过在整体卫浴外面增加供水的水龙头5,可以在外面直接放水烧水,无需到卫生间接水,方便卫生,进一步地,在第一柜台面4上还可固定茶壶底座,接水时只要打开茶壶42上盖就可直接放水,使用方便安全,请继续参见图1和图3,在第一柜台面4上方的整体卫浴侧壁板或前壁板上可设置插座19,供茶壶42烧水取电使用;请参见图2和图4,第一柜台面4上还设置有带滤网排水漏斗6,所述带滤网排水漏斗6通过软质排污管7和浴室排污管32相连,最后汇总到排污立管18进行排污;通过带滤网排水漏斗6和软质排污管7的设置,可以在整体浴室外面直接进行倒水排水,也无需进入卫生间倒水,方便卫生。所述防水底盘8的走水坡度优选为12.5%。防水底盘8与前壁板3之间可设置底板连接件20,如图5所示。The integral sanitary ware provided by the utility model, by adding a water supply faucet 5 outside the integral sanitary ware, can directly discharge water and boil water outside, without going to the bathroom to receive water, which is convenient and hygienic. Further, a teapot can also be fixed on the first counter surface 4 The base, when receiving water, just open the teapot 42 upper cover and you can directly discharge the water, which is convenient and safe to use. Please continue to refer to Fig. 1 and Fig. 3, a socket can be arranged on the integral bathroom side wall or front wall above the first counter top 4 19, for the teapot 42 to boil water and get electricity; please refer to Fig. 2 and Fig. 4, the first counter top 4 is also provided with a drain funnel 6 with a filter screen, and the drain funnel 6 with a filter screen passes through a soft sewage pipe 7 and The bathroom sewage pipes 32 are connected, and finally aggregated to the sewage standpipe 18 for sewage discharge; through the setting of the drainage funnel 6 with a filter screen and the soft sewage pipe 7, water can be poured and drained directly outside the overall bathroom, and there is no need to enter the toilet to pour water. Convenient and hygienic. The water running slope of the waterproof chassis 8 is preferably 12.5%. A bottom plate connector 20 may be provided between the waterproof chassis 8 and the front wall plate 3 , as shown in FIG. 5 .

本实用新型提供的整体卫浴,较佳地,所述顶板1上设置有净水器,所述水龙头5通过净水器和纯净水进水管9相连,该净水器可以多个房间共用,如2-4个。每个整体卫浴第一柜台面4上的水龙头5均通过其进水管和同一净水器相连。In the integral bathroom provided by the utility model, preferably, the top plate 1 is provided with a water purifier, and the faucet 5 is connected to the pure water inlet pipe 9 through the water purifier, and the water purifier can be shared by multiple rooms, such as 2-4 pieces. The faucet 5 on the first counter top 4 of each integrated bathroom is connected to the same water purifier through its water inlet pipe.

本实用新型提供的整体卫浴,所述侧壁板2和后壁板11处布置有热水管接头15、冷水管接头16、排风立管17以及排污立管18,所述纯净水进水管9和排污立管18大致位于整体卫浴对角线的两端;所述排污立管18和注水式马桶23的排污管相连,所述注水式马桶23的水箱隐藏在墙板后面。In the integrated bathroom provided by the utility model, hot water pipe joints 15, cold water pipe joints 16, air exhaust standpipes 17 and sewage discharge standpipes 18 are arranged at the side wall panels 2 and rear wall panels 11, and the pure water inlet pipes 9 and sewage riser 18 are roughly positioned at the two ends of integral bathroom diagonal; Described sewage riser 18 links to each other with the sewage pipe of water-injection toilet 23, and the water tank of described water-injection toilet 23 is hidden behind the wallboard.

本实用新型提供的整体卫浴,其中,所述前壁板3上设有梳妆镜10,所述侧壁板2的数目为两块,其中一块侧壁板2紧贴外饰墙12或建筑墙13,另一侧壁板2上设置玻璃墙14,所述侧壁板2与前壁板3、后壁板11之间通过自钻钉相连。壁板之间通过墙角型材21和压线22固定,如图6所示。In the integrated bathroom provided by the utility model, a vanity mirror 10 is arranged on the front wall panel 3, and the number of the side wall panels 2 is two, and one of the side wall panels 2 is close to the exterior decoration wall 12 or the building wall 13. A glass wall 14 is set on the other side wall panel 2, and the side wall panel 2 is connected with the front wall panel 3 and the rear wall panel 11 through self-drilling nails. The wall panels are fixed by corner profiles 21 and crimping lines 22, as shown in FIG. 6 .

虽然本实用新型已以较佳实施例揭示如上,然其并非用以限定本实用新型,任何本领域技术人员,在不脱离本实用新型的精神和范围内,当可作些许的修改和完善,因此本实用新型的保护范围当以权利要求书所界定的为准。Although the present utility model has been disclosed above with preferred embodiments, it is not intended to limit the present utility model. Any person skilled in the art may make some modifications and improvements without departing from the spirit and scope of the present utility model. Therefore, the protection scope of the present utility model should be defined by the claims.

Claims (10)

1.一种整体卫浴,由顶板(1)、侧壁板(2)、前壁板(3)、后壁板(11)和防水底盘(8)连接形成整体框架,所述前壁板(3)上设有门(31),其特征在于,所述前壁板(3)在与侧壁板(2)的相交处向内凹陷设有第一柜台面(4),所述第一柜台面(4)的上方设有与进水管(9)相连的水龙头(5),所述第一柜台面(4)的下方布置有软质排污管(7)。1. A whole sanitary ware, which is connected to form an integral frame by a top board (1), a side wall board (2), a front wall board (3), a rear wall board (11) and a waterproof chassis (8), and the front wall board ( 3) A door (31) is provided on it, and it is characterized in that, the intersection of the front wall (3) and the side wall (2) is recessed inwardly to provide a first counter surface (4), and the first A water tap (5) connected to the water inlet pipe (9) is provided above the counter top (4), and a soft sewage pipe (7) is arranged under the first counter top (4). 2.如权利要求1所述的整体卫浴,其特征在于,所述第一柜台面(4)上设置有带滤网排水漏斗(6),所述带滤网排水漏斗(6)通过软质排污管(7)和浴室排污管(32)相连。2. The integral bathroom according to claim 1, characterized in that, the first counter surface (4) is provided with a drain funnel with a filter (6), and the drain funnel with a filter (6) passes through a soft Sewage pipe (7) links to each other with bathroom sewage pipe (32). 3.如权利要求1所述的整体卫浴,其特征在于,所述防水底盘(8)的走水坡度为12.5%。3. The integrated sanitary ware according to claim 1, characterized in that, the water running gradient of the waterproof chassis (8) is 12.5%. 4.如权利要求1所述的整体卫浴,其特征在于,所述顶板(1)上设置有净水器,所述水龙头(5)通过进水管(9)和净水器相连。4. The integral sanitary ware according to claim 1, characterized in that, a water purifier is arranged on the top plate (1), and the water faucet (5) is connected to the water purifier through a water inlet pipe (9). 5.如权利要求4所述的整体卫浴,其特征在于,所述整体卫浴的数量为2-4,每个整体卫浴第一柜台面(4)上的水龙头(5)均通过其进水管和同一净水器相连。5. The integral sanitary ware as claimed in claim 4, characterized in that, the number of said integral sanitary ware is 2-4, and the faucets (5) on the first counter surface (4) of each integral sanitary ware pass through its water inlet pipe and Connected to the same water purifier. 6.如权利要求4所述的整体卫浴,其特征在于,所述侧壁板(2)和后壁板(11)处布置有热水管接头(15)、冷水管接头(16)、排风立管(17)以及排污立管(18),所述进水管(9)和排污立管(18)大致位于整体卫浴对角线的两端。6. The integrated bathroom according to claim 4, characterized in that, hot water pipe joints (15), cold water pipe joints (16), drain The air riser (17) and the sewage riser (18), the water inlet pipe (9) and the sewage riser (18) are roughly located at the two ends of the diagonal line of the integral bathroom. 7.如权利要求6所述的整体卫浴,其特征在于,所述排污立管(18)和注水式马桶(23)相连,所述注水式马桶(23)的水箱隐藏设于后壁板(11)后面。7. The integrated sanitary ware as claimed in claim 6, characterized in that, the sewage riser (18) is connected to the water injection toilet (23), and the water tank of the water injection toilet (23) is hidden on the rear wall ( 11) Back. 8.如权利要求1所述的整体卫浴,其特征在于,所述门(31)打开后和浴室门匹配咬合。8. The integrated bathroom according to claim 1, characterized in that, the door (31) is matched and engaged with the bathroom door after being opened. 9.如权利要求4所述的整体卫浴,其特征在于,第一柜台面(4)上方设置有第二柜台面(41)。9. The integral bathroom according to claim 4, characterized in that, a second counter top (41) is arranged above the first counter top (4). 10.如权利要求1~9任一项所述的整体卫浴,其特征在于,所述前壁板(3)上设有梳妆镜(10),所述侧壁板(2)的数目为两块,其中一块侧壁板(2)紧贴外饰墙(12)或建筑墙(13),另一侧壁板(2)上设置玻璃墙(14),所述侧壁板(2)与前壁板(3)、后壁板(11)之间通过自钻钉相连。10. The integral bathroom according to any one of claims 1-9, characterized in that, the front wall (3) is provided with a vanity mirror (10), and the number of the side wall (2) is two block, one of the side wall panels (2) is close to the exterior wall (12) or building wall (13), and the other side wall panel (2) is provided with a glass wall (14), and the side wall panel (2) and The front wall board (3) and the rear wall board (11) are connected by self-drilling nails.
CN201520881116.0U 2015-11-06 2015-11-06 Whole bathroom Expired - Lifetime CN205077907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520881116.0U CN205077907U (en) 2015-11-06 2015-11-06 Whole bathroom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520881116.0U CN205077907U (en) 2015-11-06 2015-11-06 Whole bathroom

Publications (1)

Publication Number Publication Date
CN205077907U true CN205077907U (en) 2016-03-09

Family

ID=55430321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520881116.0U Expired - Lifetime CN205077907U (en) 2015-11-06 2015-11-06 Whole bathroom

Country Status (1)

Country Link
CN (1) CN205077907U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952191A (en) * 2016-06-08 2016-09-21 上海畅潇实业有限公司 Small intelligent movable bathroom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105952191A (en) * 2016-06-08 2016-09-21 上海畅潇实业有限公司 Small intelligent movable bathroom

Similar Documents

Publication Publication Date Title
CN201850585U (en) Bathroom cabinet with toilet, water heater, washbasin and waste water collection tank in one
CN202083090U (en) Bathroom cabinet-type water heater allowing water to get in and out from side surface
CN204555334U (en) A kind of water-saving device of water heater
CN205077907U (en) Whole bathroom
CN203029061U (en) Cabinet type electric water heater integrating fan heater
CN203036868U (en) Energy-saving bathroom cabinet electric water heater
CN201339332Y (en) Integral bathroom
CN207863533U (en) An integrated water-saving smart bathroom
CN210530414U (en) Wash and defend integral type device and bathroom thereof
CN201915654U (en) Integral kitchen and washroom device
CN102068123B (en) Integral kitchen-bathroom device
CN201245990Y (en) One-bed room
CN207545000U (en) A kind of shower device
CN201367745Y (en) Residential house structure with island type washroom
CN209528966U (en) A kind of bathroom cabinet of integrated electric heater
CN106774566A (en) Sink with bathroom smart control center
CN201239070Y (en) Multifunctional environment-protecting water-saving washing tool
CN217435719U (en) A multifunctional toilet for railway engineering vehicles
CN201968565U (en) Integrated box type shower column
TWM640861U (en) Combination structure of washstand and electric water heater
CN203169013U (en) Improved bathroom combination sideboard
CN203531423U (en) Bathroom
CN201809817U (en) Energy-saving type hand-washing device
CN209346952U (en) A kind of integrated dish washing cupboard
CN108252538A (en) An intelligent sanitary ware that recycles waste water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20160309