CN205057414U - Double -deck large -diameter steel pipe transports device that is geared to needs of job in tunnel - Google Patents
Double -deck large -diameter steel pipe transports device that is geared to needs of job in tunnel Download PDFInfo
- Publication number
- CN205057414U CN205057414U CN201520807105.8U CN201520807105U CN205057414U CN 205057414 U CN205057414 U CN 205057414U CN 201520807105 U CN201520807105 U CN 201520807105U CN 205057414 U CN205057414 U CN 205057414U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- car body
- adjustable
- detachable
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
技术领域technical field
本发明涉及到安装叉举外伸装置的车体及配套的可拆可调式临时管道支架,通过车体将两个支架与上下双层管道组成的管道组运送到位,通过临时管道支架实现管道对口。具体而言是一种可以实现隧道内双层大口径管道运送就位并分别实现各层管道单独调节对口功能的组合装置。The invention relates to a car body with a fork lift extension device and a matching detachable and adjustable temporary pipe support. The pipe group composed of the two supports and the upper and lower double-layer pipes is transported in place through the car body, and the pipe alignment is realized through the temporary pipe support. . Specifically, it is a combination device that can realize the delivery of double-layer large-diameter pipelines in the tunnel and realize the function of independently adjusting the counterparts of each layer of pipelines.
背景技术Background technique
在北方供热城市,大型热电联产集中供热已经非常普及,目前最大的集中供热管道直径为DN1400,采用聚氨酯预制保温后,保温管外径已经达到将近1.7m。近年随着环保压力的增大、国家治理雾霾的决心,大力发展清洁能源供热已成为治理雾霾、改善环境的重要手段。燃气作为一种清洁能源价格昂贵且气量不足,我国以燃煤为主的能源结构造就了燃煤热电联产作为一种主要供热方式还将长期存在。随着城市环境改善要求及市容市貌的需要,燃煤热电联产正在远离市区并向着大规模集中化发展,因此远距离长输大型集中供热成为一种发展的方向,受管径限制双趟管线共同敷设也将多次出现。在中西部地区,长距离敷设供热管道时难免穿越山岭地带,供热工程的属性决定了供热管线无法通过较高的驼峰地形,为了使供热管线敷设趋近平缓,避免供热管线局部高点的出现,穿越山岭地区时供热隧道成为唯一的选择。In heating cities in the north, large-scale combined heat and power central heating has become very popular. At present, the largest central heating pipe has a diameter of DN1400. After using polyurethane prefabricated insulation, the outer diameter of the insulation pipe has reached nearly 1.7m. In recent years, with the increasing pressure of environmental protection and the determination of the country to control smog, vigorously developing clean energy heating has become an important means to control smog and improve the environment. As a clean energy source, gas is expensive and the amount of gas is insufficient. my country's coal-based energy structure has created a long-term existence of coal-fired heat and power cogeneration as a major heating method. With the improvement of the urban environment and the needs of the city appearance, coal-fired cogeneration is moving away from the urban area and is developing towards large-scale centralization. Therefore, long-distance long-distance large-scale central heating has become a development direction, limited by pipe diameters. The joint laying of double pipelines will also occur many times. In the central and western regions, when laying long-distance heating pipelines, it is inevitable to cross mountainous areas. The nature of the heating project determines that the heating pipelines cannot pass through the high hump terrain. With the emergence of high points, heating tunnels become the only option when crossing mountainous areas.
在供热隧道内,双趟4根供热管线一般采用架空方式敷设,为利用空间,一般管道左右两排、上下叠落,中间为检修安装通道,通道一般较为紧凑。当隧道很长且存在弯度时,轨道在提高双向快速通行安全性的同时,又可以方便施工与检修,另外轨道又有较高的承载力,可实现快速起吊,节约普通起重设备需要额外伸出支撑腿的时间,提高作业效率。In the heating tunnel, the 4 heating pipelines in double trips are generally laid in an overhead manner. In order to make use of space, the pipelines are generally arranged in two rows on the left and right, stacked up and down, and the maintenance and installation channel is in the middle, and the channel is generally relatively compact. When the tunnel is very long and has curvature, the track can not only improve the safety of two-way rapid passage, but also facilitate construction and maintenance. In addition, the track has a high bearing capacity, which can realize rapid lifting and save the extra extension required by ordinary lifting equipment. It saves the time for supporting legs and improves work efficiency.
管道上下双层布置,无论先安装哪根管道都存在相互影响的问题,且隧道内检修通行的空间较为狭小,车辆停在某一处进行吊装,会影响其他管道的通行就位,因此初步运送就位及对口安装必须分别进行,以便提高管道安装的效率。采用可调可拆式支架,将上下双层组成一体,利用具有叉举外伸装置的车体,将该组管道及支架初步就位,车体即可返回运送第二个管道组,而管道单独对口可采用已经初步就位的两个可调可拆式支架进行。The upper and lower layers of pipelines are arranged in two layers. No matter which pipeline is installed first, there will be problems of mutual influence, and the space for maintenance and passage in the tunnel is relatively narrow. If the vehicle stops at a certain place for hoisting, it will affect the passage of other pipelines. Therefore, the preliminary transportation In-place and counterpart installation must be carried out separately in order to improve the efficiency of pipeline installation. Adjustable and detachable brackets are used to integrate the upper and lower layers. Using the car body with a fork lift extension device, the group of pipes and brackets are initially in place, and the car body can return to transport the second pipe group, and the pipes Individual alignment can be performed with two adjustable and detachable brackets already in place.
目前参考专利文献中有一“隧道运输车”,专利号200420061303.6及“隧道大口径钢管运送装置”,专利号20081016652.9。其主要特点都是运输单管管道,且不能实现运输就位及管道对口的独立操作功能,只适用于隧道内单层大口径管道的安装,无法适合大口径双层管道快速安装的需要。There is a "tunnel transport vehicle" in the current reference patent literature, patent number 200420061303.6 and "tunnel large-diameter steel pipe transport device", patent number 20081016652.9. Its main feature is the transportation of single-pipe pipes, and it cannot realize the independent operation functions of transportation and pipe alignment. It is only suitable for the installation of single-layer large-diameter pipes in tunnels, and cannot meet the needs of rapid installation of large-diameter double-layer pipes.
发明内容Contents of the invention
本发明的目的在于自主创新,目前此类型供热隧道工程是前所未有的工程,隧道内双层大口径管道安装也没有经验,研制一种与众不同运输上下双层大口径管道的有轨车辆及配套的可调可拆式支架,克服已有类似运输工具的不足,满足上下双层大口径管道施工快速就位,独立对口的要求。The purpose of the present invention is to innovate independently. At present, this type of heating tunnel project is an unprecedented project, and there is no experience in the installation of double-layer large-diameter pipes in the tunnel. A rail vehicle and The matching adjustable and detachable support overcomes the shortcomings of existing similar transportation tools and meets the requirements of fast positioning of the upper and lower double-layer large-diameter pipelines and independent counterparts.
上述目的是由下述技术方案实现的:Above-mentioned purpose is realized by following technical scheme:
隧道内双层大口径钢管运送对口装置,包括第一车体,第二车体,车体连接装置,钢轨行走轮,车体举升装置,车体外伸装置,地面上辅助行走轮胎,驱动电机,操作部件,液压动力装置,柴油发电机,油箱,配套的可调可拆式临时钢管支架,可调可拆式支架上半部分,可调可拆式支架下半部分,敷设在地面上的钢轨,上层大口径钢管,下层大口径钢管,对口器,自动焊机;第一车体及第二车体组合成一个整车后沿敷设在地面上的钢轨将钢管组初步运送到位;配套的可调可拆式支架两个一组,与上层大口径钢管及下层大口径钢管共同成组,每个支架上有层可调可拆式管托及下层可调可拆式管托,两处管托均可以独立调节,实现上下、左右、轴向前后三个方向的限量位移,实现钢管的微调对口,且可调可拆式支架下方均配有独立轮子,可以在钢管初步就位后进一步对该钢管及支架进行调整;当两组钢管就位后采用对口器,配合钢管微调实现钢管的对口,对口完毕后对利用自动焊机对钢管进行自动焊接。Double-layer large-diameter steel pipe transportation counterpart device in the tunnel, including the first car body, the second car body, car body connection device, rail travel wheels, car body lifting device, car body extension device, auxiliary walking tires on the ground, and drive motor , operating parts, hydraulic power unit, diesel generator, fuel tank, matching adjustable and detachable temporary steel pipe support, the upper part of the adjustable and detachable support, the lower part of the adjustable and detachable support, laying on the ground Steel rails, large-diameter steel pipes on the upper layer, large-diameter steel pipes on the lower layer, counterparts, and automatic welding machines; the first car body and the second car body are combined into a whole car and the steel pipe group is initially transported to place along the steel rails laid on the ground; the matching Two sets of adjustable and detachable brackets form a group with the upper large-diameter steel pipe and the lower large-diameter steel pipe. Each bracket has an adjustable and detachable pipe support on the upper layer and a lower adjustable and detachable pipe support. The pipe supports can be adjusted independently to achieve limited displacement in three directions: up and down, left and right, and axially front and back, and realize the fine-tuning of the steel pipe, and the adjustable and detachable brackets are equipped with independent wheels below, which can be further adjusted after the steel pipe is initially in place. Adjust the steel pipe and the bracket; when the two sets of steel pipes are in place, use a matching device to cooperate with the fine adjustment of the steel pipes to realize the matching of the steel pipes. After the matching is completed, use an automatic welding machine to automatically weld the steel pipes.
其中,车辆行走基于隧道内敷设的钢轨,可以实现快速双向行驶,提高在长隧道内运行的安全性、快速性及起吊效率。Among them, the vehicle running is based on the steel rails laid in the tunnel, which can realize fast two-way driving and improve the safety, speed and lifting efficiency of running in long tunnels.
上述隧道内双层大口径钢管运送装置由第一车体,第二车体及两组可调可拆式钢管支架及上两层大口径钢管、下两层大口径钢管的组合件共同工作。The above-mentioned double-layer large-diameter steel pipe conveying device in the tunnel is composed of the first car body, the second car body, two groups of adjustable and detachable steel pipe supports, and the assembly of the upper two layers of large-diameter steel pipes and the lower two layers of large-diameter steel pipes.
上述隧道内双层大口径钢管运送装置,其第一车体和第二车体由两部分长方形框架结构,用方钢、角钢、槽钢焊接而成。The above-mentioned double-layer large-caliber steel pipe conveying device in the tunnel has a first car body and a second car body made of two rectangular frame structures welded with square steel, angle steel and channel steel.
当第一车体,第二车体在轨道上工作时可以通过连接装置连接为一个整体,通过钢轮行走轮,通过自身的动力装置驱动电机及柴油发电机行走;在轨道外可分解为当第一车体,第二车体,通过底部伸出的地面上辅助行走轮胎通过外力拖动行走。When the first car body and the second car body work on the track, they can be connected as a whole through the connecting device, and the steel wheel travel wheel can be used to drive the motor and diesel generator to walk through its own power device; The first car body and the second car body are dragged by external force to walk through the auxiliary walking tires on the ground protruding from the bottom.
上述隧道内双层大口径钢管运送装置,车体上配套车体叉举装置车体外伸装置,可以将一组钢管及支架运输就位上抬后举高外伸,将该钢管就位。The above-mentioned double-layer large-caliber steel pipe conveying device in the tunnel is equipped with a car body forklift device and a car body extension device, which can transport a group of steel pipes and brackets in place, lift them up, lift them up and extend them, and put the steel pipes in place.
与车体配套的可调可拆式支架两个一组,共同运输上下双根钢管,钢管在隧道外采用普通起重设备按照指定位置安放在两个可调可拆式支架上,上下双层安装完毕后共同摆放在车体指定位置,由当第一车体,第二车体共同工作沿敷设在地面的钢轨运送到指定安装位置。Two sets of adjustable and detachable brackets matched with the car body are used to transport the upper and lower steel pipes together. After the installation is completed, they are placed at the designated position of the car body, and the first car body and the second car body work together to be transported to the designated installation position along the rails laid on the ground.
可调可拆式支架分为上下两层,两层支架可以独立安装,也可以共同安装,在需要时可以单独承载上方钢管或者下方钢管;上下两层支架可以前后、左右、上下三个自由度移动和微调钢管。The adjustable and detachable bracket is divided into upper and lower layers. The two layers of brackets can be installed independently or together. When necessary, the upper steel pipe or the lower steel pipe can be carried separately; the upper and lower layers of brackets can have three degrees of freedom: front and rear, left and right, and up and down. Move and fine-tune the steel pipe.
当两组钢管就位后,通过钢管对口器配合可调可拆式支架的微调对口功能实现精确对口。When the two sets of steel pipes are in place, precise alignment is achieved through the fine-tuning alignment function of the steel pipe alignment device and the adjustable and detachable bracket.
附图说明Description of drawings
图1是本发明车体的整体结构主视示意图。Fig. 1 is a schematic front view of the overall structure of the vehicle body of the present invention.
图2是本发明车体的整体结构俯视示意图。Fig. 2 is a schematic plan view of the overall structure of the vehicle body of the present invention.
图3是本发明车体的整体结构侧视图。Fig. 3 is a side view of the overall structure of the vehicle body of the present invention.
图4是本发明可调可拆式支架侧视图。Fig. 4 is a side view of the adjustable and detachable bracket of the present invention.
图5是本发明两组可调可拆式支架与上下双层管道组主视图。Fig. 5 is a front view of two groups of adjustable and detachable brackets and the upper and lower double-layer pipeline groups of the present invention.
图中标记为:Labeled in the figure:
1.第一车体;2.第二车体;3.车体连接装置;4.钢轨行走轮;5.车体叉举装置;6.车体外伸装置;7.地面上辅助行走轮胎;8.驱动电机;9.操作系统;10.液压动力系统;11.柴油发电机;12.油箱;13.可调可拆式支架,13A.可调可拆式支架上半部分,13B.可调可拆式支架下半部分,14.敷设在地面上的钢轨;GU.上层大口径管道;GD.下层大口径管道;15.管道对口器;16.自动焊机。1. The first car body; 2. The second car body; 3. Car body connection device; 4. Rail travel wheels; 5. Car body forklift device; 6. Car body extension device; 8. Drive motor; 9. Operating system; 10. Hydraulic power system; 11. Diesel generator; 12. Fuel tank; 13. Adjustable and detachable bracket, 13A. Adjust the lower half of the detachable bracket, 14. The steel rail laid on the ground; GU. The upper large-diameter pipe; GD. The lower large-diameter pipe; 15. Pipe counterpart; 16. Automatic welding machine.
具体实施方式detailed description
隧道内双层大口径钢管运送对口装置主要包括第一车体(1),第二车体(2),车体连接装置(3),钢轨行走轮(4),车体举升装置(5),车体外伸装置(6),地面上辅助行走轮胎(7),驱动电机(8),操作部件(9),液压动力装置(10),柴油发电机(11),油箱(12),车体沿敷设在地面上的钢轨(14)将钢管初步运送到位;配套的可调可拆式支架(13)两个一组,共同承载上层大口径管道(GU)及下层大口径管道(GD),每个支架有上层可调可拆式管托(13A)及下层可调可拆式管托(13B),(13A)及(13B)两处管托均可以独立调节,实现上下、左右、轴向前后三个方向的限量位移,实现管子的微调对口。且可调可拆式支架(13)下方均配有独立轮子(13C),可以在管道初步就位后进一步对该组管道及支架进行调整。当两组管道基本就位后采用对口器(15),配合管道微调实现钢管的对口,对口完毕后对利用自动焊机(16)对钢管进行自动焊接。The counterpart device for double-layer large-diameter steel pipe transportation in the tunnel mainly includes the first car body (1), the second car body (2), the car body connecting device (3), the rail travel wheel (4), the car body lifting device (5 ), vehicle body extension device (6), auxiliary walking tires (7) on the ground, drive motor (8), operating components (9), hydraulic power unit (10), diesel generator (11), fuel tank (12), The car body initially transports the steel pipes in place along the steel rails (14) laid on the ground; the matching adjustable and detachable brackets (13) are in groups of two, and jointly carry the upper large-diameter pipe (GU) and the lower large-diameter pipe (GD ), each bracket has an upper adjustable and detachable tube support (13A) and a lower adjustable and detachable tube support (13B), (13A) and (13B) two tube supports can be adjusted independently to achieve up and down, , Axial limited displacement in three directions, forward and backward, to realize the fine-tuning of the pipe. And the bottom of the adjustable and detachable support (13) is equipped with independent wheels (13C), which can further adjust the group of pipelines and supports after the pipelines are initially in place. Adopt counterpart (15) after two groups of pipelines are basically in place, cooperate pipeline fine-tuning to realize the counterpart of steel pipe, utilize automatic welding machine (16) to carry out automatic welding to steel pipe after counterpart completes.
车辆行走基于隧道内敷设的钢轨(14),可以实现快速双向行驶,提高在长隧道内运行的安全性及快速性。The running of the vehicle is based on the steel rails (14) laid in the tunnel, which can realize fast two-way running and improve the safety and speed of running in the long tunnel.
上述隧道内双层大口径钢管运送装置由运输第一车体(1)、第二车体(2)及两组可调可拆式管道支架(13)及上下两层大口径钢管(GU)、(GD)的组合件共同工作。The above-mentioned double-layer large-diameter steel pipe transportation device in the tunnel consists of transporting the first car body (1), the second car body (2), two sets of adjustable and detachable pipe supports (13) and the upper and lower layers of large-diameter steel pipes (GU). , (GD) assemblies work together.
上述隧道内双层大口径钢管运送装置,其中(1)、(2)两部分长方形框架结构,用方钢、角钢、槽钢等焊接而成,可以实现解体运输及连体工作。The above-mentioned double-layer large-caliber steel pipe conveying device in the tunnel, wherein (1) and (2) are two rectangular frame structures, are welded with square steel, angle steel, channel steel, etc., which can realize disassembly transportation and connected work.
当(1)车体1及(2)车体2在(14)轨道上工作时可以通过(3)连接装置连接为一个整体,通过(4)钢轮行走轮,通过自身的动力装置(8)驱动电机及(11)柴油发电机行走;在轨道外可分解为(1)车体1、(2)车体2,通过底部伸出的(7)地面上辅助行走轮胎通过外力拖动行走。When (1) car body 1 and (2) car body 2 work on (14) track, can be connected as a whole by (3) connection device, by (4) steel wheel traveling wheel, by self power unit (8) ) drives the motor and (11) diesel generator to walk; it can be decomposed into (1) car body 1, (2) car body 2 outside the track, and (7) auxiliary walking tires on the ground protruding from the bottom are dragged by external force to walk .
上述隧道内双层大口径钢管运送装置,车体上配套(5)车体叉举装置(6)车体外伸装置,可以将一组管道及支架运输就位后抬后高外伸,将该组管道基本就位。The above-mentioned double-layer large-diameter steel pipe transportation device in the tunnel is equipped with (5) car body fork lifting device (6) car body extension device on the car body, which can transport a group of pipes and supports in place, lift them up, and extend them out. The group piping is basically in place.
与车体配套的可调可拆式支架(13)两个一组,共同运输上下两根管道(GU)及(GD),在隧道外采用普通起重设备将管道按照指定位置安放在两个(13)管道可调可拆式支架上,双层安放完毕后将其摆放在车体指定位置。第一车体(1)及第二车体(2)共同工作,沿敷设在地面的钢轨(14)将管道组运送到指定安装位置。Two sets of adjustable and detachable supports (13) matched with the car body are used to transport the upper and lower pipelines (GU) and (GD). (13) On the adjustable and detachable bracket of the pipeline, place it on the designated position of the car body after the double layer is installed. The first vehicle body (1) and the second vehicle body (2) work together to transport the pipeline group to a designated installation position along the steel rail (14) laid on the ground.
可调可拆式支架(13)分为上下两层(13A)及(13B),两层支架可以独立安装,也可以共同安装,在需要时可以单独承载上方管道(GU)或者下方管道(GD)。上下两层支架可以前后、左右、上下三个自由度移动和微调钢管。The adjustable and detachable bracket (13) is divided into upper and lower layers (13A) and (13B). The two layers of brackets can be installed independently or together. When necessary, the upper pipeline (GU) or the lower pipeline (GD ). The upper and lower two-layer brackets can move and fine-tune the steel pipes in three degrees of freedom, front and rear, left and right, and up and down.
当两组管道(GU)和(GD)基本就位后,通过管道对口器(15)配合(13A)及(13B)的微调对口功能实现精确对口。After the two groups of pipelines (GU) and (GD) are basically in place, the fine-tuning matching functions of (13A) and (13B) through the pipeline matching device (15) are used to realize accurate matching.
对口完毕且检验合格后,通过自动焊机(16)实现管道的自动焊接。After the matching is completed and the inspection is qualified, the automatic welding of the pipeline is realized by the automatic welding machine (16).
以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in the present utility model. within the scope of the new protection.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520807105.8U CN205057414U (en) | 2015-10-20 | 2015-10-20 | Double -deck large -diameter steel pipe transports device that is geared to needs of job in tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520807105.8U CN205057414U (en) | 2015-10-20 | 2015-10-20 | Double -deck large -diameter steel pipe transports device that is geared to needs of job in tunnel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205057414U true CN205057414U (en) | 2016-03-02 |
Family
ID=55384017
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520807105.8U Expired - Lifetime CN205057414U (en) | 2015-10-20 | 2015-10-20 | Double -deck large -diameter steel pipe transports device that is geared to needs of job in tunnel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205057414U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105834035A (en) * | 2016-05-13 | 2016-08-10 | 中船黄埔文冲船舶有限公司 | Double-layer coating bracket for main chords and diagonal pipes |
| CN107639383A (en) * | 2017-09-20 | 2018-01-30 | 中石化河南油建工程有限公司 | A kind of slope pipeline butt method and its contra-aperture device |
-
2015
- 2015-10-20 CN CN201520807105.8U patent/CN205057414U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105834035A (en) * | 2016-05-13 | 2016-08-10 | 中船黄埔文冲船舶有限公司 | Double-layer coating bracket for main chords and diagonal pipes |
| CN105834035B (en) * | 2016-05-13 | 2018-09-25 | 中船黄埔文冲船舶有限公司 | Main chord tube and down tube bilayer application bracket |
| CN107639383A (en) * | 2017-09-20 | 2018-01-30 | 中石化河南油建工程有限公司 | A kind of slope pipeline butt method and its contra-aperture device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103422866B (en) | Underground folding start method for assorted trolleys after shielding | |
| CN103711499A (en) | Shield tunneling machine split starting construction method | |
| CN108756934B (en) | Operation disease tunnel assembly type treatment structure construction operation trolley | |
| CN107100642B (en) | The pipe sheet assembling system and assembling method for shield of being healed up applied to rectangle | |
| CN103277110A (en) | Construction method of overlapped shield tunnel | |
| CN107503333A (en) | A kind of super large caliber penstock installation method | |
| CN210483756U (en) | Trackless major diameter steel pipe transportation installation platform truck in tunnel | |
| CN109779655A (en) | A kind of construction method of shield duct piece staggered joint erection | |
| CN205057414U (en) | Double -deck large -diameter steel pipe transports device that is geared to needs of job in tunnel | |
| CN110374614A (en) | Shield machine quickly receives translation construction method in a kind of cavern | |
| CN103953790A (en) | Movable welding vehicle for continuously welding and laying plastic pipelines | |
| CN107059629A (en) | Sightseeing trajectory bridge lifting bridging equipment | |
| CN204136067U (en) | A kind of rail mounted robot ambulation route changing apparatus | |
| CN205101674U (en) | Be used for large -scale steel pipe to pass through road bed sheathed tube mobile device | |
| CN101712323B (en) | Movable wheel type trolley supporting system for long-distance overlapping shield tunnel of small clear distance | |
| CN204960941U (en) | Storage battery car connecting device for shield tunnel construction | |
| CN206811296U (en) | A kind of steel pipe plasma cutter | |
| CN107762552A (en) | The rapid translation chassis and method of supporting trailer after TBM | |
| CN100588570C (en) | Tunnel large-diameter steel pipe conveying device | |
| CN201009058Y (en) | Mobile Pipeline Automatic Welding Workstation | |
| CN211395205U (en) | Light rail car for transporting shield tunneling machine trolley track | |
| CN205114537U (en) | Pipe fitting loading and unloading delivery wagon | |
| JP3867088B2 (en) | Pipe transport cart | |
| CN109505251A (en) | A kind of arch steel structure truss bridge erection method | |
| CN116085032A (en) | Intelligent transportation and installation method for shield tunnel steel pipes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 030012 Kangle street, Yingze District, Taiyuan, Shanxi 48 Patentee after: TAIYUAN THERMAL GROUP Co.,Ltd. Address before: 030012 Kangle street, Yingze District, Taiyuan, Shanxi 48 Patentee before: TAIYUAN HEATING POWER Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160302 |