CN205047537U - Horizontal through -flow pump unit of pressing clearance installation is built in area - Google Patents
Horizontal through -flow pump unit of pressing clearance installation is built in area Download PDFInfo
- Publication number
- CN205047537U CN205047537U CN201520807160.7U CN201520807160U CN205047537U CN 205047537 U CN205047537 U CN 205047537U CN 201520807160 U CN201520807160 U CN 201520807160U CN 205047537 U CN205047537 U CN 205047537U
- Authority
- CN
- China
- Prior art keywords
- flow pump
- built
- pump
- pipe
- pool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title abstract description 12
- 230000037250 Clearance Effects 0.000 title abstract 3
- 230000035512 clearance Effects 0.000 title abstract 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 82
- 230000000694 effects Effects 0.000 abstract description 2
- 238000007789 sealing Methods 0.000 abstract description 2
- 241000893018 Armeria Species 0.000 abstract 1
- 238000000034 method Methods 0.000 description 4
- 241000196324 Embryophyta Species 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 241000209202 Bromus secalinus Species 0.000 description 1
- 210000004279 Orbit Anatomy 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000630 rising Effects 0.000 description 1
Abstract
The utility model provides a horizontal through -flow pump unit of pressing clearance installation is built in area, includes pump hole and through -flow pump, and through -flow pump bottom both sides all are provided with a plurality of wheel pairs, and pump hole one side is provided with the intake pool, and the opposite side is provided with outlet water pool, pump hole bottom is provided with the base, is provided with the into pre -buried pipe of water between intake pool and the pump hole, is provided with out the pre -buried pipe of water between outlet water pool and the pump hole, and the base top surface is provided with the track that is used for the supporting wheel right, the through -flow pump is intake to hold and is provided with the flexible sealing circle, is provided with to build between through -flow pump and the pre -buried pipe of play water and presses the clearance. The utility model has the beneficial effects of: in this device installation, no pipeline hookup, nos bolt -up, operating personnel does not have technical requirement to the installation, low in labor strength, equipment fixing good reproducibility, through -flow pump of whole device installation only need with lifting device with the through -flow pump along the guide rail hang put in the pump hole can, the pump of more traditional through -flow pump is cheated the width and is shortened greatly, has practiced thrift a large amount of civil engineering investment costs.
Description
One, technical field
The utility model relates to a kind of draining power plant, particularly relates to a kind of band and builds the horizontal type through-flow pump-unit installed in pressure gap.
Two, background technique
Tradition horizontal type through-flow pump-unit adopts pipeline connecting mode, namely through-flow pump is installed in the middle of inlet pipeline and rising pipe, for ease of mounting and adjusting, in pipeline, also need the slip joint increasing adjustment axial dimension, connecting between pipeline and between pipeline with through-flow pump is by flange and Bolt Connection.The installation of device connects to be needed to adjust axial dimension, the center high size in pipeline between each equipment, mounting and adjusting is complicated, difficulty is large, high to operator's technical requirements, Bolt Connection between pipeline wastes time and energy, for large-scale through-flow pump, each connecting flange even needs up to a hundred bolts to connect, and labor intensity is large, length consuming time, the installation of usual whole device needs the time of 10 ~ 20 days.In order to reduce labor intensity, reduce device in installation process because the technology of operator, technical ability are on the impact of equipment performance and safe operation, shorten the installation time, in the urgent need to a kind of simple installation, efficiently horizontal type through-flow pump-unit.
Three, model utility content
In order to overcome the deficiency of existing draining power plant, the utility model provides a kind of band and builds the horizontal type through-flow pump-unit installed in pressure gap.
The technical solution of the utility model realizes like this.
The horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band of this programme, comprises pump hole and through-flow pump, and described through-flow pump two bottom sides is provided with to be provided with somely takes turns right, and side, described pump hole is provided with water inlet pool, and opposite side is provided with water outlet pool; Bottom, described pump hole is provided with base, and described water inlet pool and pump are provided with into water built-in pipe between cheating, and described water outlet pool and pump are provided with water outlet built-in pipe between cheating, and described base top surface is provided with for the right track of supporting wheel; Described track extends near the laterally closer water outlet pool side of water inlet pool one; Described through-flow pump feed-water end is provided with flexible seal ring, and described through-flow pump is provided with one end of flexible seal ring towards water inlet built-in pipe; Be provided with between described through-flow pump and water outlet built-in pipe and build pressure gap.
Described through-flow pump is by taking turns moving freely along axis between water inlet built-in pipe and water outlet built-in pipe in orbit.
Described water inlet built-in pipe and water outlet built-in pipe are on same level axis.
Distance between described water inlet built-in pipe and water outlet built-in pipe is through-flow pump length and builds the length sum of pressing gap.
When through-flow pump runs, hydraulic thrust makes through-flow pump feed-water end compress water inlet built-in pipe end face by flexible seal ring and seal.
The water inlet pool outer wall of described water inlet built-in pipe both sides is respectively arranged with the first guide rail and the second guide rail of doing leading role when installing for through-flow pump.
The water outlet pool outer wall of described water outlet built-in pipe both sides is respectively arranged with the 3rd guide rail and the 4th guide rail of doing leading role when installing for through-flow pump.
Usefulness of the present utility model is: in this device installation process, connect without pipeline, have no bolt, operator need not carry out mounting and adjusting to equipment at the scene, to fitting operation personnel without technical requirements, labor intensity is low, and equipment is installed reproducible, whole device is installed a through-flow pump and only need to be hung along guide rail by through-flow pump with hanging device and cheat in pump, within about consuming time ten minutes, can complete.And the pump hole width of the more traditional through-flow pump in pump hole shortens greatly, has saved a large amount of construction investment expense.
Four, accompanying drawing explanation
Fig. 1 is plan view of the present utility model.
Fig. 2 is plan view of the present utility model.
Five, embodiment
Below in conjunction with accompanying drawing, brief description is made to embodiment of the present utility model.
The horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band as shown in the figure, comprises pump hole 1 and through-flow pump 2, and described through-flow pump two bottom sides is provided with to be provided with somely takes turns 3, and side, described pump hole is provided with water inlet pool 4, and opposite side is provided with water outlet pool 5; Bottom, described pump hole is provided with base 6, and described water inlet pool 4 and pump are provided with into water built-in pipe 7 between cheating 1, and described water outlet pool 5 and pump are provided with water outlet built-in pipe 8 between cheating 1, described base 6 end face be provided with for supporting wheel to 3 track 9; Described track 9 extends near water inlet pool 4 one laterally closer water outlet pool 5 side; Described through-flow pump 2 feed-water end is provided with flexible seal ring 10, and described through-flow pump 2 is provided with one end of flexible seal ring 10 towards water inlet built-in pipe 7; Be provided with between described through-flow pump 2 and water outlet built-in pipe 8 and build pressure gap 11.
Described through-flow pump 2 is moved freely along axis 3 by wheel on track 9 between water inlet built-in pipe 7 and water outlet built-in pipe 8.
Described water inlet built-in pipe 7 and water outlet built-in pipe 8 are on same level axis.
Distance between described water inlet built-in pipe 7 and water outlet built-in pipe 8 is through-flow pump 2 length and builds the length sum of pressing gap 11.
When through-flow pump 2 runs, hydraulic thrust makes through-flow pump 2 feed-water end compress water inlet built-in pipe 7 end face by flexible seal ring 10 and seal.
Water inlet pool 4 outer wall of described water inlet built-in pipe 7 both sides is respectively arranged with the first guide rail 12 and the second guide rail 13 doing leading role when installing for through-flow pump 2.
Water outlet pool 5 outer wall of described water outlet built-in pipe 8 both sides is respectively arranged with the 3rd guide rail 14 and the 4th guide rail 15 of doing leading role when installing for through-flow pump 2.
As shown from the above technical solution, this device is when through-flow pump 2 runs, hydraulic thrust direction suffered by through-flow pump 2 is contrary with water (flow) direction, hydraulic thrust makes through-flow pump 2 compress water inlet built-in pipe 7 end face by flexible seal ring 10, form the sealing to feed-water end, formed between through-flow pump 2 and water outlet built-in pipe 8 simultaneously and build pressure gap 11.Current, building pressure gap 11 place owing to having larger speed, are generally 4m/s ~ 6m/s, according to jet effect, and control to build the length in pressure gap 11 by designing requirement, make current can not produce leakage phenomenon building pressure gap 11 place.Whole device in running, current be pressurizeed by water inlet pool 4, water inlet built-in pipe 7, through-flow pump 2, build pressure gap 11, water outlet built-in pipe 8 flows to water outlet pool 5, thus realizes drain function.This device is installed simple, safe and reliable to operation.
In the utility model installation process, connect without pipeline, have no bolt, operator need not carry out mounting and adjusting to equipment at the scene, to fitting operation personnel without technical requirements, labor intensity is low, and equipment is installed reproducible, whole device install a through-flow pump 2 only need with hanging device by through-flow pump along the first guide rail 12, second guide rail 13, the 3rd guide rail 14 and the 4th guide rail 15 hang in pump hole within about 1, consuming time ten minutes, can complete.And the pump hole of pump hole 1 more traditional through-flow pump is shortened greatly, has saved a large amount of construction investment expense.
Above an embodiment of the present utility model has been described in detail, but described content being only preferred embodiment of the present utility model, can not being considered to for limiting practical range of the present utility model.All equalizations done according to the utility model application range change and improve, and all should still belong within patent covering scope of the present utility model.
Claims (7)
1. the horizontal type through-flow pump-unit installed in pressure gap built by a band, comprise pump hole (1) and through-flow pump (2), described through-flow pump two bottom sides is provided with to be provided with somely takes turns (3), side, described pump hole is provided with water inlet pool (4), and opposite side is provided with water outlet pool (5); Bottom, described pump hole is provided with base (6), described water inlet pool (4) and pump are cheated between (1) and are provided with into water built-in pipe (7), described water outlet pool (5) and pump are cheated between (1) and are provided with water outlet built-in pipe (8), it is characterized in that: described base (6) end face is provided with for the track (9) of supporting wheel to (3); Described track (9) extends near water inlet pool (4) laterally closer water outlet pool (5) side; Described through-flow pump (2) feed-water end is provided with flexible seal ring (10), and described through-flow pump (2) is provided with one end of flexible seal ring (10) towards water inlet built-in pipe (7); Be provided with between described through-flow pump (2) and water outlet built-in pipe (8) and build pressure gap (11).
2. the horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band according to claim 1, it is characterized in that: described through-flow pump (2) is moved freely along axis (3) by wheel on track (9) between water inlet built-in pipe (7) and water outlet built-in pipe (8).
3. the horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band according to claim 2, it is characterized in that: described water inlet built-in pipe (7) and water outlet built-in pipe (8) are on same level axis.
4. the horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band according to claim 1, it is characterized in that: the distance between described water inlet built-in pipe (7) and water outlet built-in pipe (8) is through-flow pump (2) length and builds the length sum of pressing gap (11).
5. the horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band according to claim 1, it is characterized in that: when through-flow pump (2) runs, hydraulic thrust makes through-flow pump (2) feed-water end compress water inlet built-in pipe (7) end face by flexible seal ring (10) and seal.
6. the horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band according to claim 1, it is characterized in that: water inlet pool (4) outer wall of described water inlet built-in pipe (7) both sides is respectively arranged with the first guide rail (12) and the second guide rail (13) of doing leading role when installing for through-flow pump (2).
7. the horizontal type through-flow pump-unit that pressure gap is installed built by a kind of band according to claim 1, it is characterized in that: water outlet pool (5) outer wall of described water outlet built-in pipe (8) both sides is respectively arranged with the 3rd guide rail (14) and the 4th guide rail (15) of doing leading role when installing for through-flow pump (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520807160.7U CN205047537U (en) | 2015-10-19 | 2015-10-19 | Horizontal through -flow pump unit of pressing clearance installation is built in area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520807160.7U CN205047537U (en) | 2015-10-19 | 2015-10-19 | Horizontal through -flow pump unit of pressing clearance installation is built in area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205047537U true CN205047537U (en) | 2016-02-24 |
Family
ID=55341120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520807160.7U Active CN205047537U (en) | 2015-10-19 | 2015-10-19 | Horizontal through -flow pump unit of pressing clearance installation is built in area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205047537U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105179324A (en) * | 2015-10-19 | 2015-12-23 | 天津甘泉集团有限公司 | Horizontal type tubular pump device adopting voltage buildup gap installation |
-
2015
- 2015-10-19 CN CN201520807160.7U patent/CN205047537U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105179324A (en) * | 2015-10-19 | 2015-12-23 | 天津甘泉集团有限公司 | Horizontal type tubular pump device adopting voltage buildup gap installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105332384B (en) | Super pressure inhales joint pumping system and its method of work | |
CN205047537U (en) | Horizontal through -flow pump unit of pressing clearance installation is built in area | |
CN105179324A (en) | Horizontal type tubular pump device adopting voltage buildup gap installation | |
CN210423992U (en) | Building pipe for building water supply and drainage pipeline | |
CN103471930A (en) | Hilly region water conveying pipeline pressing testing method and device | |
CN206233172U (en) | A kind of two-way pump station structural shape of integral hoisting | |
CN204457860U (en) | Mine zero power siphon drainage device | |
CN206123542U (en) | Erection equipment is connected to socket joint pipeline | |
CN203200668U (en) | Automatic spraying and maintenance system for highway bridge precast beam field | |
CN205188984U (en) | Joint pumping system is inhaled to super pressure | |
CN201535266U (en) | Automatic coupling device of submersible pump | |
CN205244805U (en) | Lubricating arrangement of table hole radial gate water seal | |
CN201723378U (en) | Wind-water combined generation device | |
CN208650146U (en) | A kind of circulating water supply system | |
CN206491093U (en) | A kind of pumping plant irrigated for irrigation and water conservancy | |
CN206667363U (en) | A kind of submergence type culvert water inlet structure | |
CN207828888U (en) | A kind of Novel siphon type pumping plant water inlet pipe structure | |
CN207088150U (en) | One kind being capable of the water-saving steam-cured pond of concrete tubular pile | |
CN102288384A (en) | Large-scale unsteady flow decompression box | |
CN202023236U (en) | Practical multifunctional floor drain | |
CN205804467U (en) | Be suitable to the anchor block formula drain tap well of long-distance large-caliber surface aqueduct | |
CN205776507U (en) | Pump pressurizer in pipe | |
CN205188985U (en) | Joint pumping system is inhaled to super pressure | |
CN216130162U (en) | Outer drainage of foundation ditch precipitation is with pipeline group | |
CN208535383U (en) | A kind of Pipe installing flange that sealing effect is good |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |