CN205024603U - Mound kicking block of slug matching precast beam - Google Patents

Mound kicking block of slug matching precast beam Download PDF

Info

Publication number
CN205024603U
CN205024603U CN201520493784.6U CN201520493784U CN205024603U CN 205024603 U CN205024603 U CN 205024603U CN 201520493784 U CN201520493784 U CN 201520493784U CN 205024603 U CN205024603 U CN 205024603U
Authority
CN
China
Prior art keywords
bridge
jacking block
pier
pier jacking
precast beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520493784.6U
Other languages
Chinese (zh)
Inventor
陈鸣
姚平
王晓夫
梁丰
郑红杰
尹波
王敏
李宁
罗平
翟保进
陈少林
张勇
王东志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201520493784.6U priority Critical patent/CN205024603U/en
Application granted granted Critical
Publication of CN205024603U publication Critical patent/CN205024603U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a mound kicking block of slug matching precast beam, include: the roof, it is provided with the preformed hole that is used for the secondary to pour, two foundation crossbeams, its symmetry set up in the horizontal bridge of mound kicking block is to the both sides of axis, and connect the roof with the three web of two foundation crossbeams, wherein, the cross member along horizontal bridge to the outside line with the web along indulge the bridge to the outside line in same plane, the cross member the web with along horizontal bridge to being provided with the baffle between the roof, the preformed hole along horizontal bridge to the sideline with the baffle along indulge the bridge to interior sideline align, the preformed hole along indulge the bridge to the sideline with the web along horizontal bridge to interior sideline align. The utility model has the characteristics of prefabricated convenient, construction strong operability, safe and reliable, application prospect are good etc.

Description

The pier jacking block of slug matching precast beam
Technical field
The utility model relates to bridge engineering slug matching engineering method design field.More particularly, the utility model relates to a kind of pier jacking block of slug matching precast beam.
Background technology
Current domestic continuous girder bridge and continuous rigid frame bridge superstructure box girder construction method mainly comprise the cast-in-place and short-term of Support Method, cantilever and mate prefabricated cantilever method.Slug matching construction is applicable to the bridge construction that segment girder precast quantity is large, construction period is short, bridge site environmental requirement is high.
Slug matching technique major technique can be analyzed to the prefabricated and beam section T framework of beam section short-term coupling and establishes.In the construction of continuous rigid frame bridge slug matching, the pier jacking block of middle pier adopts and hollows out the permanent consolidation construction technology of Dun Liang that is prefabricated and the cast-in-place combination of pier top second coagulation soil.Pier jacking block prefabricated and lifting erection construction require to include: construct workable, work efficiency is high, quality controllability good.The quality of the structure design of pier jacking block is the direct factor affecting construction technology.
The traditional pier jacking block of rigid frame bridge adopts and hollows out precasting process, establishes twice crossbeam, without diaphragm structure at base plate.
As shown in Figure 1, the prominent features of traditional bottom crossbeam is that the preformed hole at top is less, and cross member is arranged on web inner face, and cross member and top board do not arrange baffle plate along direction across bridge, there is huge blank area.
In system pier jacking block prefabrication process, for increasing pier jacking block lateral stiffness, reduce and 1# difficulty of matching, pre-embedded steel slab above crossbeam.
When traditional pier jacking block is installed, base cross members and the embedded bar local conflicts of pier top, need adjust reinforcement location auxiliary pier jacking block by bar bender and be in place; When traditional pier jacking block is transposed, operating personnel utilize shaped steel crossbeam fulcrum to be converted to pier top external support; And traditional pier jacking block secondary is when building, between auxiliary pier jacking block and pier stud 0, build consolidation concrete.
Traditional pier jacking block is installed when positioning, consolidation second pouring and follow-up 1# mate construction exists following problem:
1, twice straining beam and between longitudinal reinforcement, cross wall and pier top reinforcing bar intert difficulty;
2, pier jacking block is without base plate and diaphragm, and positioning, without the strong point, need arrange support, utilize crossbeam fulcrum to be converted to pier top external support;
3, because pier jacking block is without base arrangement, during prefabricated 1# block, pier jacking block cannot be utilized to mate, and also need to arrange 1 road between No. 1 block and to wet seam;
4, pier jacking block and pier stud 0 consolidation second pouring also need peace to tear partition wall end mould open, and work efficiency is low;
5, according to calculating and field actual measurement results, pier jacking block causes lateral deformation large because of rigidity compared with little, brings difficulty to the erection of 1# Block-matching.
6, above problem causes follow-up a lot of work high above the ground, and not only difficulty of construction is large, work efficiency is low, and quality is also difficult to ensure.
Utility model content
An object of the present utility model solves at least the problems referred to above and defect, and the advantage will illustrated after providing.
The utility model also has an object to be to provide a kind of pier jacking block of slug matching precast beam, by by cross member to translation outside beam section, crossbeam outer edge is alignd with beam section web outer edge, reduce it to conflict with the position that Dun Ding reserves anchor bar, make reserved steel bar be easier to through preformed hole bottom pier jacking block, the rapid preliminary realizing pier jacking block is installed.
The utility model also has an object to be by being provided with dividing plate along direction across bridge between any described cross member and described top board, second pouring Side Template when doubling as pier stud and pier jacking block consolidation, thus avoid again install end mould outside pier jacking block, achieve the simplification of operation.
The utility model also has an object to be by expanding the size of preformed hole, make direction across bridge and the dividing plate aligned inside in empty sideline in described preformed hole, in described preformed hole, the vertical bridge in empty sideline aligns to described web inner edge, simplifies pier jacking block second pouring concrete construction.
In order to realize according to these objects of the present utility model and other advantage, provide a kind of slug matching precast beam pier jacking block, it is arranged between bridge floor and pier stud, comprising:
Top board, it is horizontally disposed with, described top board along vertical bridge to middle part be symmetrically arranged with two preformed holes for secondary poured concrete;
Two foundation crossbeams, its plane formed is parallel with described top board, and described two foundation crossbeams are arranged on below described top board along direction across bridge, and are symmetricly set in the both sides of the direction across bridge axis of described pier jacking block; And
Connect three webs of described top board and described two foundation crossbeams, it is along vertical bridge to setting, and described three webs comprise two pieces of edges to be indulged bridge and be erected at the limit web of described two foundation beam-end and one piece of edge to symmetry and indulge bridge and be located at median ventral plate in the middle part of described two foundation crossbeams to vertical rack;
Any described cross member along the outer edge of direction across bridge and described web along vertical bridge to outer edge in same plane;
Described cross member, between described web and described top board, direction across bridge is provided with dividing plate, any one piece of described dividing plate is provided with manhole;
Described preformed hole along sideline and the described dividing plate of direction across bridge along vertical bridge to inner edge align, described preformed hole along vertical bridge to sideline align with the inner edge of described web along direction across bridge.
Wherein, described dividing plate is vertically arranged on described cross member.
Wherein, described manhole accounts for the 10-20% of dividing plate area.
Wherein, described preformed hole area accounts for the 40-60% of the top board gross area.
Wherein, the angle of the horizontal plane at described limit web and cross member place is 110 °-115 °.
Wherein, described dividing plate arranges prestress pipe hole.
Wherein, the thickness of described dividing plate is 200-250mm.
Wherein, the thickness of described dividing plate is 220mm.
The utility model at least comprises following beneficial effect:
1, prefabricated convenience: when novel pier jacking block is prefabricated, only need set up diaphragm template on original box girder formwork basis, and outside adopts sizing punching block, and inner side adopts simple and easy closing in net stencil.
2, application operability is strong:
The improvement of bottom crossbeam structure makes reserved steel bar be easier to through empty in pier jacking block bottom surface, and constructor directly arranges bottom cross member that jack is to regulate pier jacking block position, without the need to arranging special positioning conversion equipment; Without wet seam between pier jacking block and 1# beam section;
Set up dividing plate, when dividing plate doubles as case beam and pier jacking block consolidation, second pouring template, avoids and again install end mould outside pier jacking block, increase pier jacking block lateral stiffness simultaneously, reduces the lateral deformation of pier jacking block, reduces the difficulty of matching during erection of 1# beam section;
Water preformed hole after increasing top board, simplify the concrete construction of pier jacking block second pouring.
3, use prospect good: novel pier ejecting block design more agrees with short-line prefabrication assembling process feature, and shows good technical characterstic and superior economic performance, has a good application prospect.
Part is embodied by explanation below by other advantage of the present utility model, target and feature, part also will by research and practice of the present utility model by those skilled in the art is understood.
Accompanying drawing explanation
Fig. 1: the structural representation of traditional pier jacking block;
Fig. 2: the structural representation of the pier jacking block of the utility model slug matching precast beam;
Fig. 3: the schematic diagram of the construction method step S1 of the pier jacking block of the utility model slug matching precast beam;
Fig. 4: the schematic diagram of the construction method step S2 of the pier jacking block of the utility model slug matching precast beam;
Fig. 5: the schematic diagram of the construction method step S3 of the pier jacking block of the utility model slug matching precast beam;
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail, can implements according to this with reference to manual word to make those skilled in the art.
Should be appreciated that used hereinly such as " to have ", other element one or more do not allotted in " comprising " and " comprising " term or the existence of its combination or interpolation.
As shown in Figure 2, a kind of pier jacking block of slug matching precast beam, it is arranged between bridge floor and pier stud 0, comprising:
Top board 1, it is horizontally disposed with, described top board 1 along vertical bridge to middle part be symmetrically arranged with two preformed holes 101 for secondary poured concrete;
Two foundation crossbeams 2, its plane formed is parallel with described top board 1, and described two foundation crossbeams 2 are arranged on below described top board 1 along direction across bridge, and are symmetricly set in the both sides of the direction across bridge axis of described pier jacking block; And
Connect three webs of described top board 1 and described two foundation crossbeams 2, it is along vertical bridge to setting, and described three webs comprise two pieces of edges to be indulged bridge and be erected at the limit web 301 of described two foundation crossbeam 2 ends and one piece of edge to symmetry and indulge bridge and be located at median ventral plate 302 in the middle part of described two foundation crossbeams 2 to vertical rack;
Any described cross member 2 along the outer edge of direction across bridge and described web along vertical bridge to outer edge in same plane;
Described cross member 2, between described web and described top board 1, direction across bridge is provided with dividing plate 4, any one piece of described dividing plate 4 is provided with manhole 401;
Described preformed hole 101 along sideline and the described dividing plate 4 of direction across bridge along vertical bridge to inner edge align, described preformed hole 101 along vertical bridge to sideline align with the inner edge of described web along direction across bridge.
Wherein, described dividing plate 4 is vertically arranged on described cross member 2.
Wherein, described manhole 401 accounts for the 10-20% of dividing plate area.
Wherein, described preformed hole 101 area accounts for the 40-60% of top board 1 gross area.
Wherein, described limit web 301 is 110 °-115 ° with the angle of the horizontal plane at cross member 2 place.
Wherein, described dividing plate 4 arranges prestress pipe hole.
Wherein, the thickness of described dividing plate 4 is 200-250mm.
Wherein, the thickness of described dividing plate 4 is 220mm.
Form of construction work
The preparation method of the pier jacking block of the utility model slug matching precast beam comprises the following steps:
S01, the colligation of pier jacking block reinforcing cage
In precasting yard, arrange pier jacking block reinforcing cage colligation moulding bed, the colligation in moulding bed of pier jacking block reinforcing cage is shaping;
S02, pier jacking block prefab form are installed
Template system splices installation in precasting yard, and described pier jacking block template system mainly comprises:
Chassis, is positioned at bottom pier jacking block, is the positioning of pier jacking block and conveying arrangement;
Cross member 2 template, the formwork structure of gear cross member 2 concreting;
Side form, a formwork structure that gear web concrete is built;
End mould, the formwork structure of gear diaphragm 4 concreting;
Flange template, the template of gear top board 1 edge of a wing concreting
Internal mold, is arranged on the concreting retaining structure of pier jacking block inside, adopts closing in net stencil;
S03, reinforcing cage handling enter mould;
The shaping cage of reinforcement of colligation adopts straddle truck multiple spot to rise and hangs in mould after acceptance(check), and wherein, each suspension centre place arranges Chain block adjustment cage of reinforcement level;
S04, pier jacking block are built;
Concrete hoisting is entered mould, and the mode adopting artificial vibrating spear to be combined with attached vibrator is vibrated, and the order of building of described pier jacking block is: first build cross member 2, build web again, finally build top board 1.
The construction method of the pier jacking block of the utility model slug matching precast beam greatly reduces difficulty of construction, comprises the following steps:
S1, set up shelf bracket
As shown in Figure 3, two shelf bracket 5 symmetries are arranged on pier stud 0 side, and described shelf bracket 5 is 80-100cm apart from the distance of Dun Ding;
The lifting of S2, pier jacking block and positioning
As shown in Figure 4, at the top embedded bar 6 of pier stud 0, with large-scale crane hoisting equipment 7, described pier jacking block is lifted the top of extremely described pier stud 0, transfer sky in bottom surface that described pier jacking block to described embedded bar 6 inserts pier jacking block, and make the end face of described cross member 2 and described pier stud 0 at sustained height, described shelf bracket 5 arranges three-way jack 8, shores the cross member 2 of described pier jacking block, finely tune the locus of pier jacking block to design attitude by three-way jack 8;
After S3, pier jacking block consolidation, the section of watering is built
As shown in Figure 5, in described pier jacking block, add internal mold 9 along direction across bridge, assign reinforcing bar and concreting subsequently in the space that described internal mold 9 and described dividing plate 4 are formed, realize the consolidation of pier jacking block and pier stud 0.
Subsequently, by all the other sections pier back timber sections in order by Bridge Erector sling one by one and be suspended on hanging suspender on, epoxy resin layer is smeared in each beam section coupling face, fine adjustment, the interim prestressing force of stretch-draw, build wet joint concrete, the wet permanent prestressing tendon of joint concrete intensity post tensioning up to standard, realize 1 assembled across beam section.
The pier jacking block of the utility model slug matching precast beam, it with the beam segment structure method for designing of traditional slug matching and prefabricated cantilever construction technology for relying on.This design, by pier pier jacking block bottom horizontal connection beam structure in improvement, reduces pier jacking block and install positioning difficulty, and simplification is mated operation with adjacent 1# beam section; By optimizing diaphragm 4, top board 1 structure design, strengthened beam section transverse integral rigidity, simplifying pier jacking block and pier stud 0 consolidation concreting operation, reducing pier jacking block and 1# beam section difficulty of matching, and simplifying external prestressing pipeline high-altitude positioning operation operation.
By cross member to translation outside beam section, cross member outer edge is alignd with beam section web outer edge, when advantage is that pier jacking block lifts, reduces it and conflict with the position that Dun Ding reserves anchor bar, make the bottom preformed hole that reserved steel bar is easier to through pier jacking block, the rapid preliminary realizing pier jacking block is installed.
By floor beam to translation outside beam section, directly carry out the positioning of pier jacking block at crossbeam arranged beneath three-way jack, without the need to arranging special positioning conversion equipment.
By the Curve guide impeller of base arrangement, crossbeam outer edge is alignd with beam section web outer edge, avoid between pier jacking block and 1# beam section base plate and build ater-casting.
Dividing plate 4 is set at beam sections two ends, doubles as pier stud 0 and second pouring Side Template during pier jacking block consolidation, thus avoid again install end mould outside pier jacking block, achieve the simplification of operation.
Dividing plate 4 is set at beam sections two ends, reduces the difficulty of matching of pier jacking block and 1# beam section, form complete housing with cross member 2 and web, top board 1, increase the lateral stiffness of case beam, thus subtract small box girder distortion, the difficulty of matching of reduction pier back timber section and 1# beam section.
Dividing plate 4 is set at beam sections two ends, simplifies external prestressing pipeline high-altitude positioning operation operation, in partition wall reinforcing bar precasting yard during colligation, can external prestressing steels location of pipeline be carried out, avoid high-altitude positioning process.
Water preformed hole 101 after increasing top board 1, simplify pier jacking block second pouring concrete construction.
Although embodiment of the present utility model is open as above, it is not restricted to listed in manual and embodiment utilization.It can be applied to various applicable field of the present utility model completely.For those skilled in the art, can easily realize other amendment.Therefore do not deviating under the universal that claim and equivalency range limit, the utility model is not limited to specific details and illustrates here and the legend described.

Claims (8)

1. a pier jacking block for slug matching precast beam, it is arranged between bridge floor and pier stud, comprising:
Top board, it is horizontally disposed with, described top board along vertical bridge to middle part be symmetrically arranged with two preformed holes for secondary poured concrete;
Two foundation crossbeams, its plane formed is parallel with described top board, and described two foundation crossbeams are arranged on below described top board along direction across bridge, and are symmetricly set in the both sides of the direction across bridge axis of described pier jacking block; And
Connect three webs of described top board and described two foundation crossbeams, it is along vertical bridge to setting, and described three webs comprise two pieces of edges to be indulged bridge and be erected at the limit web of described two foundation beam-end and one piece of edge to symmetry and indulge bridge and be located at median ventral plate in the middle part of described two foundation crossbeams to vertical rack;
Wherein, any described cross member along the outer edge of direction across bridge and described web along vertical bridge to outer edge in same plane;
Wherein, described cross member, between described web and described top board, direction across bridge is provided with dividing plate, any one piece of described dividing plate is provided with manhole;
Wherein, described preformed hole along sideline and the described dividing plate of direction across bridge along vertical bridge to inner edge align, described preformed hole along vertical bridge to sideline align with the inner edge of described web along direction across bridge.
2. the pier jacking block of slug matching precast beam as claimed in claim 1, wherein, described dividing plate is vertically arranged on described cross member.
3. the pier jacking block of slug matching precast beam as claimed in claim 2, wherein, the area of described manhole accounts for the 10-20% of the area of described dividing plate.
4. the pier jacking block of slug matching precast beam as claimed in claim 3, wherein, the area of described preformed hole accounts for the 40-60% of the area of described top board.
5. the pier jacking block of slug matching precast beam as claimed in claim 4, wherein, described limit web and described cross member angle are 110 °-115 °.
6. the pier jacking block of slug matching precast beam as claimed in claim 5, wherein, described baffle surface arranges prestress pipe hole.
7. the pier jacking block of slug matching precast beam as claimed in claim 6, wherein, the thickness of described dividing plate is 200-250mm.
8. the pier jacking block of slug matching precast beam as claimed in claim 7, wherein, the thickness of described dividing plate is 220mm.
CN201520493784.6U 2015-07-09 2015-07-09 Mound kicking block of slug matching precast beam Expired - Fee Related CN205024603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520493784.6U CN205024603U (en) 2015-07-09 2015-07-09 Mound kicking block of slug matching precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520493784.6U CN205024603U (en) 2015-07-09 2015-07-09 Mound kicking block of slug matching precast beam

Publications (1)

Publication Number Publication Date
CN205024603U true CN205024603U (en) 2016-02-10

Family

ID=55257148

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520493784.6U Expired - Fee Related CN205024603U (en) 2015-07-09 2015-07-09 Mound kicking block of slug matching precast beam

Country Status (1)

Country Link
CN (1) CN205024603U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019362A (en) * 2015-07-09 2015-11-04 中交第二航务工程局有限公司 Pier top block of precast beam constructed by stub matching method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019362A (en) * 2015-07-09 2015-11-04 中交第二航务工程局有限公司 Pier top block of precast beam constructed by stub matching method

Similar Documents

Publication Publication Date Title
CN101892710B (en) Structure node for steel girder and reinforced column and construction method thereof
CN107023099A (en) Prefabricated superimposed sheet double combined overlapped shear wall and its construction method
CN212200750U (en) Assembled building frame structure combination braced system
CN108086693A (en) A kind of assembled steel reinforced concrete frame structure system method of construction of low multilayer
CN201339250Y (en) Stiffness structure framework beam preformed steel reinforcement framework structure
CN105484403A (en) Assembly type concrete bidirectional ribbed floor and construction method therefor
CN105019362B (en) The pier top block of slug matching precast beam
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN205024603U (en) Mound kicking block of slug matching precast beam
CN106436975A (en) Built-in girder shear wall
CN208152311U (en) A kind of two-sided folded type steel shear wall
CN110005053A (en) One kernel texture assembly assembling frame structure and its method of construction
CN111364680A (en) Preformed column for reserved steel bars
CN208201923U (en) A kind of armpit Angle formwork overlapping assembled comprehensive pipe gallery structure
CN101324086A (en) Construction method of large-span box variable cross-section reinforcement concrete arch
CN216810448U (en) Assembled formwork support integrated shear wall device
CN206396892U (en) Building block and building structure
CN206359993U (en) Stud structure for main transformer fire wall
CN110185254A (en) A kind of Combined aluminum alloy template system and its application method
CN208685617U (en) A kind of foundation underpinning system of old brick foundation building
CN210798063U (en) Prefabricated main beam for cross beam
CN212583050U (en) Preformed column with reserved steel bars
CN213204438U (en) Semi-prefabricated and semi-cast-in-place building component
CN216740678U (en) Ready-package built-up connection shear wall mould
CN211313083U (en) Frame column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20200709

CF01 Termination of patent right due to non-payment of annual fee