CN205012630U - Chimney lining construction hanging flower basket mechanism - Google Patents

Chimney lining construction hanging flower basket mechanism Download PDF

Info

Publication number
CN205012630U
CN205012630U CN201520617941.XU CN201520617941U CN205012630U CN 205012630 U CN205012630 U CN 205012630U CN 201520617941 U CN201520617941 U CN 201520617941U CN 205012630 U CN205012630 U CN 205012630U
Authority
CN
China
Prior art keywords
chimney
hanging basket
wall
wire rope
track wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520617941.XU
Other languages
Chinese (zh)
Inventor
张卫东
徐志华
杨晓娟
张晓强
吕建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Shanxi Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Shanxi Electric Power Construction Co Ltd
Priority to CN201520617941.XU priority Critical patent/CN205012630U/en
Application granted granted Critical
Publication of CN205012630U publication Critical patent/CN205012630U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种烟囱内衬施工吊篮机构,解决了现有的普通吊篮存在电动吊篮垂直上升后不能靠近烟囱筒壁内壁的问题。包括烟囱筒壁(1),在烟囱筒壁(1)的内侧壁上沿上下方向等间隔地均布有轨道钢丝绳(2),在烟囱筒壁(1)的顶端设置有骑马梁(4),在骑马梁(4)上设置有吊环(5),起吊滑轮(6)通过起吊钢丝绳与吊环(5)连接,在起吊滑轮(6)上吊接有电动吊篮(7),在电动吊篮(7)与轨道钢丝绳(2)之间设置有牵引尼龙绳(8)。本实用新型具有拼装简单,易操作,施工速度快和安全系数高的特点。

The utility model discloses a hanging basket mechanism for chimney lining construction, which solves the problem that the electric hanging basket cannot approach the inner wall of the chimney tube wall after the electric hanging basket rises vertically in the existing common hanging basket. Including the chimney wall (1), on the inner wall of the chimney wall (1), track wire ropes (2) are evenly distributed in the up and down direction, and a riding beam (4) is arranged on the top of the chimney wall (1) , a lifting ring (5) is arranged on the riding beam (4), the lifting pulley (6) is connected with the lifting ring (5) through a lifting wire rope, and an electric hanging basket (7) is connected to the lifting pulley (6). A traction nylon rope (8) is arranged between (7) and the track wire rope (2). The utility model has the characteristics of simple assembly, easy operation, fast construction speed and high safety factor.

Description

烟囱内衬施工吊篮机构Chimney lining construction hanging basket mechanism

技术领域 technical field

本实用新型涉及一种吊篮,特别涉及一种在烟囱内衬的施工中使用的吊篮机构。 The utility model relates to a hanging basket, in particular to a hanging basket mechanism used in the construction of chimney lining.

背景技术 Background technique

由于烟囱下面直径大上面直径小,在施工烟囱内衬时,采用普通吊篮存在电动吊篮垂直上升后不能靠近烟囱筒壁内壁,使施工遇到困难。传统的施工方法是定做一套烟囱施工专用环形吊篮,存在购置成本高的问题。 Due to the large diameter at the bottom of the chimney and the small diameter at the top, when constructing the inner lining of the chimney, the electric hanging basket cannot be close to the inner wall of the chimney wall after the ordinary hanging basket is used, which makes the construction difficult. The traditional construction method is to customize a set of special annular hanging baskets for chimney construction, which has the problem of high purchase cost.

发明内容 Contents of the invention

本实用新型提供了一种烟囱内衬施工吊篮机构,解决了现有的普通吊篮存在电动吊篮垂直上升后不能靠近烟囱筒壁内壁的技术问题。 The utility model provides a hanging basket mechanism for chimney lining construction, which solves the technical problem that the electric hanging basket cannot approach the inner wall of the chimney tube wall after the electric hanging basket rises vertically in the existing common hanging basket.

本实用新型是通过以下技术方案解决以上技术问题的: The utility model solves the above technical problems through the following technical solutions:

本实用新型是通过以下技术方案解决以上技术问题的: The utility model solves the above technical problems through the following technical solutions:

一种烟囱内衬施工吊篮机构,包括烟囱筒壁,在烟囱筒壁的内侧壁上沿上下方向等间隔地均布有轨道钢丝绳,在烟囱筒壁的顶端设置有骑马梁,骑马梁每两个一组,在每组骑马梁下方挂一个电动吊篮,在电动吊篮与轨道钢丝绳之间设置有牵引尼龙绳。 A hanging basket mechanism for chimney lining construction, comprising a chimney wall, track wire ropes are evenly distributed on the inner wall of the chimney wall along the up and down direction, and a horse-riding beam is arranged on the top of the chimney wall, and the horse-riding beam every two One group, hang an electric basket under each group of riding beams, and set a traction nylon rope between the electric basket and the track wire rope.

轨道钢丝绳的一端是固定设置在烟囱外壁信号台上的,轨道钢丝绳的另一端是固定在烟囱筒壁内侧的预埋件上。 One end of the track wire rope is fixed on the signal platform on the outer wall of the chimney, and the other end of the track wire rope is fixed on the embedded part inside the chimney wall.

本实用新型具有拼装简单,易操作,施工速度快和安全系数高的特点。 The utility model has the characteristics of simple assembly, easy operation, fast construction speed and high safety factor.

附图说明 Description of drawings

图1是本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2是本实用新型靠近烟囱内侧壁时的结构示意图。 Fig. 2 is a structural schematic view of the utility model when it is close to the inner wall of the chimney.

具体实施方式 detailed description

下面结合附图对本实用新型进行详细说明: Below in conjunction with accompanying drawing, the utility model is described in detail:

一种烟囱内衬施工吊篮机构,包括烟囱筒壁1,在烟囱筒壁1的内侧壁上沿上下方向等间隔地均布有轨道钢丝绳2,在烟囱筒壁1的顶端设置有骑马梁4,骑马梁每两个一组,在骑马梁4上设置有吊环5,吊环5下方通过吊篮钢丝绳6吊接有电动吊篮7,在电动吊篮7与轨道钢丝绳2之间设置有牵引尼龙绳8。 A hanging basket mechanism for chimney lining construction, comprising a chimney tube wall 1, on the inner side wall of the chimney tube wall 1, track steel wire ropes 2 are evenly distributed along the up and down direction, and a riding beam 4 is arranged on the top of the chimney tube wall 1 , two groups of riding beams, a suspension ring 5 is set on the riding beam 4, and an electric hanging basket 7 is connected to the bottom of the hanging ring 5 through the hanging basket steel wire rope 6, and a traction nylon is set between the electric hanging basket 7 and the track steel wire rope 2. rope8.

轨道钢丝绳2的一端是固定设置在烟囱外壁信号台3上的,轨道钢丝绳2的另一端是固定在烟囱筒壁内侧的预埋件上。作业前施工人员乘坐电动吊篮7到达施工位置时,电动吊篮7爬升至指定位置停止爬升,拉紧系在轨道钢丝绳上的牵引尼龙绳8,使电动吊篮7向筒壁移动,直至靠近筒壁满足施工距离。 One end of the track wire rope 2 is fixedly arranged on the chimney outer wall signal platform 3, and the other end of the track wire rope 2 is fixed on the embedded part inside the chimney tube wall. Before the operation, when the construction workers arrive at the construction position by riding the electric hanging basket 7, the electric hanging basket 7 climbs to the designated position and stops climbing, and tightens the traction nylon rope 8 tied on the track wire rope, so that the electric hanging basket 7 moves toward the cylinder wall until it is close to The cylinder wall meets the construction distance.

根据吊篮位置按每组吊篮两条沿烟囱内壁竖直放置若干条轨道钢丝绳2,轨道钢丝绳2的上部固定在烟囱外壁的信号平台3上,下部固定在烟囱内壁的底部预埋件上,采用1吨手拉葫芦拉紧,使轨道钢丝绳2绷紧,每个电动吊篮7用两根牵引尼龙绳8分别于与相邻两条轨道钢丝绳2的旋转货钩连接,确保牵引尼龙绳8可以随电动吊篮7上下顺利滑动,这样电动吊篮7垂直爬升至施工位置后就可通过拉紧牵引尼龙绳8,使电动吊篮7移动至筒壁并紧贴烟囱壁,然后将牵引尼龙绳8系在轨道钢丝绳2上,使施工人员可以在电动吊篮7上作业。由于相邻两条轨道钢丝绳2之间距离大于电动吊篮7的长度,为保证每个吊篮可以将相邻两条轨道绳之间的施工作业完成,可以通过拉电动吊篮7上系的两根牵引尼龙绳8实施。 According to the position of the hanging basket, two hanging baskets of each group are placed vertically along the inner wall of the chimney to place several track wire ropes 2, the upper part of the track steel wire rope 2 is fixed on the signal platform 3 on the outer wall of the chimney, and the lower part is fixed on the bottom embedded part of the inner wall of the chimney. A 1 ton chain hoist is used to tighten the track wire rope 2, and each electric basket 7 is connected with two traction nylon ropes 8 to the rotating cargo hooks of the adjacent two track wire ropes 2 to ensure the traction of the nylon rope 8 It can slide up and down smoothly with the electric hanging basket 7, so that after the electric hanging basket 7 climbs vertically to the construction position, the nylon rope 8 can be tightened to make the electric hanging basket 7 move to the wall of the tube and close to the chimney wall, and then the nylon rope 8 can be pulled Rope 8 is tied on the track wire rope 2, makes construction personnel can work on electric hanging basket 7. Since the distance between two adjacent track wire ropes 2 is greater than the length of the electric hanging basket 7, in order to ensure that each hanging basket can complete the construction work between the adjacent two track ropes, it can be pulled by pulling the electric hanging basket 7. Two traction nylon ropes 8 implement.

Claims (2)

1. a chimney lining construction hanging basket mechanism, comprise chimney wall (1), it is characterized in that, the inside wall of chimney wall (1) is equally spaced evenly equipped with track wire rope (2) along the vertical direction, the top of chimney wall (1) is provided with beam of riding (4), beam of riding (4) is provided with suspension ring (5), and suspension ring (5) are hung by hanging basket wire rope (6) and are connected to driven hanging basket (7), be provided with and draw nylon rope (8) between driven hanging basket (7) and track wire rope (2).
2. a kind of chimney lining construction hanging basket mechanism according to claim 1, it is characterized in that, one end of track wire rope (2) is fixedly installed in chimney outer wall signal station (3), and the other end of track wire rope (2) is fixed on the built-in fitting inside chimney wall.
CN201520617941.XU 2015-08-17 2015-08-17 Chimney lining construction hanging flower basket mechanism Expired - Lifetime CN205012630U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520617941.XU CN205012630U (en) 2015-08-17 2015-08-17 Chimney lining construction hanging flower basket mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520617941.XU CN205012630U (en) 2015-08-17 2015-08-17 Chimney lining construction hanging flower basket mechanism

Publications (1)

Publication Number Publication Date
CN205012630U true CN205012630U (en) 2016-02-03

Family

ID=55211241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520617941.XU Expired - Lifetime CN205012630U (en) 2015-08-17 2015-08-17 Chimney lining construction hanging flower basket mechanism

Country Status (1)

Country Link
CN (1) CN205012630U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111673379A (en) * 2020-05-27 2020-09-18 龙源(北京)碳资产管理技术有限公司 Construction process for welding titanium steel composite short pipe with consistent inclination angle at hole pair of high-altitude chimney

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111673379A (en) * 2020-05-27 2020-09-18 龙源(北京)碳资产管理技术有限公司 Construction process for welding titanium steel composite short pipe with consistent inclination angle at hole pair of high-altitude chimney

Similar Documents

Publication Publication Date Title
CN104027908B (en) The hanger of a kind of anti-fall rope and there is the shaft tower of anti-fall device
GB201209006D0 (en) High rise building elevation concept
CN104444909A (en) Trolley type cable well lid opener
CN204230769U (en) Climb type steel cable ladder
CN103183282B (en) Hoisting tool used for large ring pieces
CN110485290B (en) A three-way movable maintenance device for the inner side of an inverted Y-shaped tower column of a cable-stayed bridge
CN103863938A (en) Safe lifting device for conveying wind tunnel test car
CN203382365U (en) Lifting appliance system for lifting thin, long and thin-wall equipment integrally
CN203128099U (en) Slipping type pipeline lifting device
CN205114843U (en) Prefabricated post hoist device with unhook function
CN201515169U (en) Angle iron cable trolley
CN103964294A (en) Fixing device for lifting circular drum
CN203903768U (en) Adjustable loading and unloading lifting bracket for waste heat boiler module
CN203462739U (en) Double-hook upside down type electric chain hoist
CN202671170U (en) Traction cap of telegraph pole
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN205132977U (en) Movable swing arm tower machine installation wire rope
CN204369461U (en) For the triangle lifting rope structure of driving a vehicle
CN204079223U (en) A kind of steel pipe lifting tool
CN103306618A (en) Casing and drilling tool conveying cableway device
CN204224072U (en) A kind of jumbo bag suspension bracket
CN204714390U (en) A kind of suspender installed for annex in tower cylinder
CN203889941U (en) Long-distance hoisting and transporting device applicable to small space
CN207046658U (en) A kind of vertical coal bunker handling and grouting device
CN203889897U (en) Device for rapidly hoisting lifting machine winding drum steel pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20160203