CN204984436U - Tunnel lining equipment under horizontal alternating layers country rock geological conditions - Google Patents

Tunnel lining equipment under horizontal alternating layers country rock geological conditions Download PDF

Info

Publication number
CN204984436U
CN204984436U CN201520456008.9U CN201520456008U CN204984436U CN 204984436 U CN204984436 U CN 204984436U CN 201520456008 U CN201520456008 U CN 201520456008U CN 204984436 U CN204984436 U CN 204984436U
Authority
CN
China
Prior art keywords
support
strut
alternating layers
equipment under
tunnel lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520456008.9U
Other languages
Chinese (zh)
Inventor
李永
易达
魏国涛
王志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201520456008.9U priority Critical patent/CN204984436U/en
Application granted granted Critical
Publication of CN204984436U publication Critical patent/CN204984436U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the technical field of tunnel lining. A tunnel lining equipment under horizontal alternating layers country rock geological conditions, includes two parallel tracks, set up walking wheel on the track, walking bracket, ground engaging wheel's driving motor, set up that the support is strutted in lining cutting on walking bracket, the polylith arc backplate of answering with tunnel inner wall matched pair and set up and prop up backplate and lining cutting at the arc and strut the support cylinder between the support, the lining cutting strut the support and be how many fonts and lining cutting and strut the support bottom and be provided with the crossbeam, the crossbeam on be provided with slurrying bucket, thick liquid pump and pump sending pipeline. The utility model discloses overall structure reasonable in design, it is convenient stable swift to strut, can strut to each construction area section, can play the stable purpose of strutting during to the thick concrete placement of needs, and its whole stability of effectual assurance prevents that the section of jurisdiction warp the defect that leads to construction quality.

Description

Tunnel lining equipment under horizontal alternating layers wall rock geology condition
Technical field
The utility model belongs to tunnel lining technical field, is specifically related to tunnel lining equipment under a kind of horizontal alternating layers wall rock geology condition.
Background technology
Tunnel lining is according to different geologic structures, there is very large difference in it, some stratum due to geology soft, in Bracing Process, sequence number carries out double-deck supporting, to lining segment carry out assembled after, also need to carry out thicker pouring concrete, but existing most of equipment is poured into a mould after being pipe sheet assembling, good prevention is not accomplished for the supporting in casting process, thus under causing section of jurisdiction compressive strain and cast uncompacted problem.
Utility model content
The purpose of this utility model is for above-mentioned Problems existing and deficiency, provides a kind of reasonable in design, tunnel lining equipment under the horizontal alternating layers wall rock geology condition that the good supporting of density is stable.
For achieving the above object, the technical scheme taked is:
Tunnel lining equipment under a kind of horizontal alternating layers wall rock geology condition, comprise two parallel orbits, road wheel be in orbit set, support cylinder that mobile roof support, the drive motors of ground-engaging wheel, the liner supporting support be arranged on mobile roof support mate corresponding polylith arc retaining-plate with tunnel inner wall and are arranged between arc retaining-plate and liner supporting support, described liner supporting support is a few font and liner supporting frame bottom is provided with crossbeam, described crossbeam is provided with cement slurry preparing barrel, slush pump and pumping line.
The described mobile roof support be positioned on two parallel orbits is provided with the drive motors of ground-engaging wheel, two described drive motors synchronous interactions.
Two support cylinders are at least provided with between described liner supporting support and each arc retaining-plate.
Adopt technique scheme, acquired beneficial effect is:
The utility model overall construction design is reasonable, supporting is convenient stable quick, can carry out supporting for each Work sectors, can play stable supporting object for needing during thicker pouring concrete, its whole stability of effective guarantee, prevents segment deformation from causing the defect of construction quality.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Sequence number in figure: 1 be track, 2 be road wheel, 3 be mobile roof support, 4 be drive motors, 5 be liner supporting support, 6 be arc retaining-plate, 7 be support cylinder, 8 be crossbeam, 9 be cement slurry preparing barrel, 10 be slush pump, 11 for pumping line.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is elaborated.
See Fig. 1, tunnel lining equipment under a kind of horizontal alternating layers wall rock geology condition of the utility model, comprise two parallel orbits 1, road wheel 2 is on path 1 set, mobile roof support 3, the drive motors 4 of ground-engaging wheel, be arranged on the liner supporting support 5 on mobile roof support, corresponding polylith arc retaining-plate 6 is mated with tunnel inner wall, and the support cylinder 7 be arranged between arc retaining-plate 6 and liner supporting support 5, described liner supporting support 5 is a few font and is provided with crossbeam 8 bottom liner supporting support 5, described crossbeam 8 is provided with cement slurry preparing barrel 9, slush pump 10 and pumping line 11.
The described mobile roof support 3 be positioned on two parallel orbits 1 is provided with the drive motors 4 of ground-engaging wheel 2, two described drive motors 4 synchronous interactions.
Two support cylinders 7 are at least provided with between described liner supporting support 5 and each arc retaining-plate 6.
The utility model overall construction design is reasonable, supporting is convenient stable quick, can carry out supporting for each Work sectors, can play stable supporting object for needing during thicker pouring concrete, its whole stability of effective guarantee, prevents segment deformation from causing the defect of construction quality.

Claims (3)

1. tunnel lining equipment under a horizontal alternating layers wall rock geology condition, it is characterized in that, comprise two parallel orbits, road wheel be in orbit set, support cylinder that mobile roof support, the drive motors of ground-engaging wheel, the liner supporting support be arranged on mobile roof support mate corresponding polylith arc retaining-plate with tunnel inner wall and are arranged between arc retaining-plate and liner supporting support, described liner supporting support is a few font and liner supporting frame bottom is provided with crossbeam, described crossbeam is provided with cement slurry preparing barrel, slush pump and pumping line.
2. tunnel lining equipment under horizontal alternating layers wall rock geology condition according to claim 1, is characterized in that, the described mobile roof support be positioned on two parallel orbits is provided with the drive motors of ground-engaging wheel, two described drive motors synchronous interactions.
3. tunnel lining equipment under horizontal alternating layers wall rock geology condition according to claim 1, is characterized in that, be at least provided with two support cylinders between described liner supporting support and each arc retaining-plate.
CN201520456008.9U 2015-06-30 2015-06-30 Tunnel lining equipment under horizontal alternating layers country rock geological conditions Expired - Fee Related CN204984436U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520456008.9U CN204984436U (en) 2015-06-30 2015-06-30 Tunnel lining equipment under horizontal alternating layers country rock geological conditions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520456008.9U CN204984436U (en) 2015-06-30 2015-06-30 Tunnel lining equipment under horizontal alternating layers country rock geological conditions

Publications (1)

Publication Number Publication Date
CN204984436U true CN204984436U (en) 2016-01-20

Family

ID=55118815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520456008.9U Expired - Fee Related CN204984436U (en) 2015-06-30 2015-06-30 Tunnel lining equipment under horizontal alternating layers country rock geological conditions

Country Status (1)

Country Link
CN (1) CN204984436U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979280A (en) * 2018-08-30 2018-12-11 中国矿业大学 Close hole Mine Roadway storage tank farm, oil storage method and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979280A (en) * 2018-08-30 2018-12-11 中国矿业大学 Close hole Mine Roadway storage tank farm, oil storage method and construction method

Similar Documents

Publication Publication Date Title
CN104790975A (en) Tunnel segment secondary lining device and method
CN103874803B (en) Method for constructing a structure, in particular for constructing a passage under a service railway or the like
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103939113B (en) A kind of outstanding rail construction trolley
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN109519197B (en) Sliding-mode primary lining excavation and support dual-purpose trolley and application thereof
CN103953366B (en) Construction method of backfilling the original lining cavity at the top of the middle partition wall when the single-cavity tunnel is changed to multiple arches
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN105672337B (en) The construction method of cast-in-place open caisson formwork system
CN206267851U (en) A kind of novel silo development machine
CN105201518A (en) Method for receiving and disassembly of large-diameter slurry balance shield in hole
CN103470272A (en) Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN210086275U (en) Double-wall hollow open caisson foundation
CN104453930A (en) Tunnel initial lining construction device and method
CN103075158A (en) Steel plate and steel reinforced concrete well wall
CN204851287U (en) Big section moving as a whole formula formwork support
CN106759262A (en) The continuous sawing grooving of ground-connecting-wall synchronously irrigates wall-forming device and construction method
CN107083932A (en) Drilling cleaning circulation equipment and installation method of steel pipe columns in pilot tunnels
CN201943086U (en) Underground building wall body
RU2502873C1 (en) Shaft lining, complex for its erection and method of its erection
CN103122642A (en) Construction method of vertical post support change
CN204984436U (en) Tunnel lining equipment under horizontal alternating layers country rock geological conditions
CN106337688A (en) Sleeved inner liner reinforcing structure for electrical operation of cable tunnel and construction method thereof
CN203499697U (en) Trolley used for concrete construction of various cross sections through mining method
CN103573002A (en) Ultra-large dual-layer steel plate concrete silo prestressed technology and structure of ultra-large dual-layer steel plate concrete silo

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20190630

CF01 Termination of patent right due to non-payment of annual fee