CN204983859U - Straight tube communication tower - Google Patents
Straight tube communication tower Download PDFInfo
- Publication number
- CN204983859U CN204983859U CN201520608752.6U CN201520608752U CN204983859U CN 204983859 U CN204983859 U CN 204983859U CN 201520608752 U CN201520608752 U CN 201520608752U CN 204983859 U CN204983859 U CN 204983859U
- Authority
- CN
- China
- Prior art keywords
- communication
- tower
- concrete
- tube
- communication antenna
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Support Of Aerials (AREA)
Abstract
本实用新型公开了一种直管通信塔,它包括管塔塔体、通信天线抱杆和混凝土配重块,所述通信天线抱杆与所述管塔塔体固定连接,所述管塔塔体与所述混凝土配重块通过法兰可拆卸连接,所述混凝土配重块横向设有通孔,螺栓穿过所述通孔将所述混凝土配重块紧固在一起。其有益效果在于:本实用新型提供的一种直管通信塔,结构简单,整体美观大方,并且采用外爬设计,安装快速,不需要现场浇筑,减少前期基础施工的时间和减少现场土地的破坏,节约占地,且安装不受季节的影响。
The utility model discloses a straight tube communication tower, which comprises a tube tower body, a communication antenna pole and a concrete counterweight block, the communication antenna pole is fixedly connected with the tube tower body, the tube tower The body and the concrete counterweight are detachably connected through flanges, and the concrete counterweight is provided with through holes in the transverse direction, and bolts pass through the through holes to fasten the concrete counterweights together. Its beneficial effects are: a straight-pipe communication tower provided by the utility model has a simple structure, an overall beautiful appearance, and adopts an external climbing design, which can be installed quickly and does not require on-site pouring, which reduces the time of early foundation construction and reduces the damage to the site land , saving land, and the installation is not affected by the season.
Description
【技术领域】【Technical field】
本实用新型涉及通信设备技术领域,尤其涉及一种用于无线通信用的直管通信塔。The utility model relates to the technical field of communication equipment, in particular to a straight-pipe communication tower for wireless communication.
【背景技术】【Background technique】
随着4G时代的来临,通信基站需求量日益增加,原有便携式通信塔加工工艺复杂,通常需要事先在土基中浇筑混凝土基台,再在基台上搭建钢架结构,其连接结构较多,施工难度加大,制造成本高,加工速度慢,混凝土配重块数量多,加工周期长,已经不能满足快速建站需要。With the advent of the 4G era, the demand for communication base stations is increasing day by day. The processing technology of the original portable communication tower is complicated. Usually, it is necessary to pour concrete abutment in the soil foundation in advance, and then build a steel frame structure on the abutment. There are many connection structures. , the construction difficulty is increased, the manufacturing cost is high, the processing speed is slow, the number of concrete counterweights is large, and the processing cycle is long, which can no longer meet the needs of rapid station construction.
【实用新型内容】【Content of utility model】
本实用新型的目的在于有效克服上述技术的不足,提供一种安装快速、节省安装时间、结构简单、能节约占地且不受季节影响的直管通信塔。The purpose of the utility model is to effectively overcome the shortcomings of the above-mentioned technologies, and provide a straight-pipe communication tower that is quick to install, saves installation time, has a simple structure, can save land, and is not affected by seasons.
本实用新型的技术方案是这样实现的:本实用新型的一种直管通信塔,其改进之处在于:它包括管塔塔体、通信天线抱杆和混凝土配重块,所述通信天线抱杆与所述管塔塔体固定连接,所述管塔塔体与所述混凝土配重块通过法兰可拆卸连接,所述混凝土配重块横向设有通孔,螺栓穿过所述通孔将所述混凝土配重块紧固在一起。The technical scheme of the utility model is realized in the following way: a straight-tube communication tower of the utility model is improved in that it includes a tube tower body, a communication antenna holding rod and a concrete counterweight, and the communication antenna holds The rod is fixedly connected to the pipe tower body, and the pipe tower body is detachably connected to the concrete counterweight through a flange. The concrete counterweight is provided with a through hole in the horizontal direction, and the bolt passes through the through hole The concrete weights are fastened together.
上述结构中,所述管塔塔体的底部设有馈线孔。In the above structure, the bottom of the tube tower body is provided with a feeder hole.
上述结构中,所述管塔塔体的顶部安装有避雷针。In the above structure, a lightning rod is installed on the top of the tube tower body.
上述结构中,所述通信天线抱杆焊接在所述管塔塔体的侧壁上。In the above structure, the communication antenna pole is welded on the side wall of the pipe tower body.
上述结构中,所述通信天线抱杆上挂接有通信天线,所述通信天线的线路通过所述馈线孔穿出。In the above structure, the communication antenna is hung on the communication antenna pole, and the line of the communication antenna passes through the feeder hole.
本实用新型的有益效果在于:本实用新型提供的直管通信塔,结构简单,并且采用外爬设计,安装快速,不需要现场浇筑,减少前期基础施工的时间和减少现场土地的破坏,节约占地,且安装不受季节的影响。The beneficial effect of the utility model is that: the straight-pipe communication tower provided by the utility model has a simple structure, and adopts an external climbing design, which is fast to install, does not require on-site pouring, reduces the time of the early stage foundation construction and reduces the destruction of the site land, and saves The ground, and the installation is not affected by the season.
【附图说明】【Description of drawings】
图1为本实用新型一种直管通信塔的主视图。Fig. 1 is a front view of a straight pipe communication tower of the present invention.
图中:1、避雷针;2、通信天线抱杆;3、通信天线;4、管塔塔体;5、混凝土配重块;6、起吊环;7、螺栓;8、馈线孔。In the figure: 1. lightning rod; 2. communication antenna pole; 3. communication antenna; 4. pipe tower body; 5. concrete counterweight; 6. lifting ring; 7. bolt; 8. feeder hole.
【具体实施方式】【detailed description】
下面结合附图和实施例对本实用新型作进一步的描述。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
参照图1所示,本实用新型揭示的一种直管通信塔,它包括管塔塔体4、通信天线抱杆2和混凝土配重块5,通信天线抱杆2与管塔塔体4固定连接,管塔塔体4与混凝土配重块5通过法兰可拆卸连接,混凝土配重块5横向设有通孔,螺栓7穿过所述通孔将混凝土配重块5紧固在一起。该通信塔的各结构之间均采用可拆卸,便组装的结构,很大程度上提高了通信塔的基建效率;同时凝土配重块5可以按照所需等级强度混凝土在工厂提前预置,达到养生期,并通过强度测试,运输到现场即可安装,不需要现场浇筑,减少了前期基础施工的时间和减少现场土地的破坏,快速安装,施工不受季节的影响。Referring to Fig. 1, a straight-pipe communication tower disclosed by the utility model includes a pipe tower body 4, a communication antenna pole 2 and a concrete counterweight 5, and the communication antenna pole 2 is fixed to the pipe tower body 4. Connection, the pipe tower body 4 and the concrete counterweight 5 are detachably connected through flanges, the concrete counterweight 5 is provided with through holes in the transverse direction, and the bolts 7 pass through the through holes to fasten the concrete counterweights 5 together. Each structure of the communication tower adopts a detachable and easy-to-assemble structure, which greatly improves the infrastructure efficiency of the communication tower; at the same time, the concrete counterweight 5 can be preset in the factory in advance according to the required grade of concrete. After reaching the health preservation period and passing the strength test, it can be installed after being transported to the site without on-site pouring, which reduces the time of foundation construction in the early stage and reduces the damage to the site land. It is installed quickly and the construction is not affected by the season.
进一步地,管塔塔体4的底部设有馈线孔8,用于天线馈线和电缆的进出。Further, the bottom of the tube tower body 4 is provided with a feeder hole 8 for the entry and exit of antenna feeders and cables.
进一步地,管塔塔体4的顶部安装有避雷针1,防止雷雨天气对通信设备的影响。Further, a lightning rod 1 is installed on the top of the tube tower body 4 to prevent thunderstorms from affecting communication equipment.
进一步地,通信天线抱杆2焊接在管塔塔体4的侧壁上。Further, the communication antenna pole 2 is welded on the side wall of the tube tower body 4 .
进一步地,通信天线抱杆2上挂接有通信天线,通信天线的线路通过馈线孔8穿出,不但可以避免管外走线容易老化。Furthermore, a communication antenna is mounted on the communication antenna pole 2, and the line of the communication antenna passes through the feeder hole 8, which can not only avoid the aging of the line outside the pipe.
进一步地,混凝土配重块5的顶面上设有起吊环6,便于将混凝土配重块5搬运至规划区域,使用设备组装,提升直管通信塔的建设效率。Further, a lifting ring 6 is provided on the top surface of the concrete counterweight 5, which is convenient for transporting the concrete counterweight 5 to the planned area, and assembling with equipment, so as to improve the construction efficiency of the straight-pipe communication tower.
以上所描述的仅为本实用新型的较佳实施例,上述具体实施例不是对本实用新型的限制。在本实用新型的技术思想范畴内,可以出现各种变形及修改,凡本领域的普通技术人员根据以上描述所做的润饰、修改或等同替换,均属于本实用新型所保护的范围。The above descriptions are only preferred embodiments of the present utility model, and the above specific embodiments do not limit the present utility model. Within the scope of the technical ideas of the present utility model, various deformations and modifications can occur, and any retouching, modification or equivalent replacement made by those skilled in the art according to the above descriptions all belong to the protection scope of the present utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520608752.6U CN204983859U (en) | 2015-08-12 | 2015-08-12 | Straight tube communication tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520608752.6U CN204983859U (en) | 2015-08-12 | 2015-08-12 | Straight tube communication tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204983859U true CN204983859U (en) | 2016-01-20 |
Family
ID=55118241
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520608752.6U Expired - Fee Related CN204983859U (en) | 2015-08-12 | 2015-08-12 | Straight tube communication tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204983859U (en) |
-
2015
- 2015-08-12 CN CN201520608752.6U patent/CN204983859U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203559531U (en) | Metal roof forming and transportation integrated construction device | |
| CN204023319U (en) | For the triangular tower of cableway of constructing | |
| CN204920400U (en) | Tower room integration communication base station | |
| CN204983859U (en) | Straight tube communication tower | |
| CN204927485U (en) | Roof counterweight pole communication device | |
| CN203846839U (en) | Extensible multi-loop incoming line door type pole and tower | |
| CN203769406U (en) | Height-adjustable tower support for wireless private network equipment | |
| CN202380475U (en) | Device for connecting reinforced concrete rod with foundation | |
| CN201526180U (en) | Tower mast with communication machine room | |
| CN206174583U (en) | Integration ready -package integrated communication tower | |
| CN206923053U (en) | A kind of integrated base station of Fast Construction | |
| CN204899374U (en) | Low -cost television tower | |
| CN203334758U (en) | Pi connection special-shape steel pipe rod | |
| CN201878339U (en) | Integrated communication base station | |
| CN206360452U (en) | A kind of glass reinforced plastic pipe communication tower | |
| CN206035063U (en) | Tripod support's integrated communication tower | |
| CN205447177U (en) | Equipment for power transmission and distribution rack | |
| CN204960465U (en) | Many carries, communication tower that maintenance is convenient, column foot counter -force is little | |
| CN216105624U (en) | Simple device for pipeline transportation and positioning | |
| CN202284402U (en) | Weight type four-column communication base station tower | |
| CN203769410U (en) | Communication tower mast device | |
| CN203701662U (en) | Integrated fast assembling base station | |
| CN202467303U (en) | Sectional type signal tower body | |
| CN207177418U (en) | Communicate triangle tower | |
| CN204609419U (en) | Novel all-in-one communication base station |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160120 |