CN204980974U - Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig - Google Patents

Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig Download PDF

Info

Publication number
CN204980974U
CN204980974U CN201520772288.4U CN201520772288U CN204980974U CN 204980974 U CN204980974 U CN 204980974U CN 201520772288 U CN201520772288 U CN 201520772288U CN 204980974 U CN204980974 U CN 204980974U
Authority
CN
China
Prior art keywords
pulley
wire rope
drill pipe
hoisting wire
drilling rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520772288.4U
Other languages
Chinese (zh)
Inventor
廖勇
曹弌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN201520772288.4U priority Critical patent/CN204980974U/en
Application granted granted Critical
Publication of CN204980974U publication Critical patent/CN204980974U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型公开了一种地质钻机的钻杆提升钢丝绳导向用滑轮装置,包括滑轮支架、用于将钻杆提升钢丝绳由竖直方向引导至水平方向的第一滑轮和用于将钻杆提升钢丝绳由水平方向引导至竖直方向的第二滑轮,所述第一滑轮和第二滑轮均设置在所述滑轮支架上,所述滑轮支架安装在地质钻机的井架上,所述钻杆提升钢丝绳的一端缠绕在地质钻机的卷扬机滚筒上,所述钻杆提升钢丝绳的一端依次绕过第一滑轮和第二滑轮并与钻杆上的提篮相连接。该滑轮装置结构简单、使用方便、能够确保钻杆提升钢丝绳受力方向为竖直,从而使卷扬机卷筒缠绳均匀、钻杆起吊时不会出现偏斜现象,确保了施工安全,也减少了机械磨损,保证了施工安全。

The utility model discloses a pulley device for guiding a drill pipe hoisting wire rope of a geological drilling rig, comprising a pulley bracket, a first pulley for guiding the drill pipe hoisting wire rope from a vertical direction to a horizontal direction, and a steel wire rope used for lifting a drill pipe. The second pulley that is guided from the horizontal direction to the vertical direction, the first pulley and the second pulley are all arranged on the pulley bracket, the pulley bracket is installed on the derrick of the geological drilling rig, and the drill pipe lifts the wire rope One end is wound on the hoist drum of the geological drilling rig, and one end of the drill pipe hoisting wire rope is wound around the first pulley and the second pulley in turn and connected with the basket on the drill pipe. The pulley device has a simple structure and is easy to use. It can ensure that the force direction of the steel wire rope for lifting the drill pipe is vertical, so that the hoist drum is evenly wrapped around the rope, and there will be no deflection when the drill pipe is hoisted. This ensures construction safety and reduces Mechanical wear ensures construction safety.

Description

地质钻机的钻杆提升钢丝绳导向用滑轮装置Drill pipe hoisting wire rope guide pulley device for geological drilling rig

技术领域technical field

本实用新型涉及一种滑轮装置,具体涉及一种地质钻机的钻杆提升钢丝绳导向用滑轮装置。The utility model relates to a pulley device, in particular to a pulley device for guiding a drill pipe hoisting wire rope of a geological drilling rig.

背景技术Background technique

地质钻机的钻杆在提升时是由动力机提供动力与卷扬联结,再由卷扬上钢丝绳通过滑轮与钻杆连接。When the drill pipe of the geological drilling rig is lifted, it is powered by a power machine and connected to the winch, and then the steel wire rope on the winch is connected to the drill pipe through a pulley.

目前施工中使用的滑轮都是单滑轮,钢丝绳受力时成八字型,导致滑轮与钢丝绳受力大,且受力方向不垂直。在施工中一方面容易导致卷扬机钢丝绳緾绳不均衡,同时起吊的重物偏斜受力,另一方面机械损耗严重。The pulleys used in the current construction are all single pulleys, and the steel wire rope forms a figure-eight shape when it is stressed, resulting in a large force on the pulley and the steel wire rope, and the direction of the force is not perpendicular. During the construction, on the one hand, it is easy to cause the hoisting machine wire rope to be unbalanced, and the heavy objects to be hoisted are deflected and stressed, and on the other hand, the mechanical loss is serious.

如何设计一种能够有效引导钻杆提升钢丝绳、使起吊重物竖直受力的滑轮装置,是相关领域技术人员亟待解决的技术问题。How to design a pulley device that can effectively guide the drill pipe to lift the wire rope and make the lifting weight vertically stressed is a technical problem to be solved urgently by those skilled in the art.

实用新型内容Utility model content

本实用新型的目的在于克服上述现有技术中的不足,提供一种地质钻机的钻杆提升钢丝绳导向用滑轮装置。该滑轮装置结构简单、使用方便、能够确保钻杆提升钢丝绳受力方向为竖直,从而使卷扬机卷筒缠绳均匀、钻杆起吊时不会出现偏斜现象,确保了施工安全,也减少了机械磨损,保证了施工安全。The purpose of the utility model is to overcome the deficiencies in the above-mentioned prior art, and to provide a pulley device for drilling rod hoisting wire rope guide of geological drilling rig. The pulley device has a simple structure and is easy to use. It can ensure that the force direction of the steel wire rope for lifting the drill pipe is vertical, so that the winding of the hoist drum is uniform, and there will be no deflection when the drill pipe is hoisted. This ensures construction safety and reduces Mechanical wear ensures construction safety.

为实现上述目的,本实用新型采用的技术方案是:地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:包括滑轮支架、用于将钻杆提升钢丝绳由竖直方向引导至水平方向的第一滑轮和用于将钻杆提升钢丝绳由水平方向引导至竖直方向的第二滑轮,所述第一滑轮和第二滑轮均设置在所述滑轮支架上,所述滑轮支架安装在地质钻机的井架上,所述钻杆提升钢丝绳的一端缠绕在地质钻机的卷扬机滚筒上,所述钻杆提升钢丝绳的一端依次绕过第一滑轮和第二滑轮并与钻杆上的提篮相连接。In order to achieve the above purpose, the technical solution adopted by the utility model is: the pulley device for guiding the drill pipe hoisting wire rope of the geological drilling rig, which is characterized in that it includes a pulley bracket and is used to guide the drill pipe hoisting wire rope from the vertical direction to the horizontal direction. The first pulley and the second pulley used to guide the drill pipe hoisting wire rope from the horizontal direction to the vertical direction, the first pulley and the second pulley are all arranged on the pulley bracket, and the pulley bracket is installed on the geological drilling rig On the derrick, one end of the drill pipe hoisting wire rope is wound on the hoist drum of the geological drilling rig, and one end of the drill pipe hoisting wire rope goes around the first pulley and the second pulley in turn and is connected with the basket on the drill pipe.

上述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述滑轮支架上设置有用于与所述井架上的挂环挂接配合的挂钩。The above-mentioned pulley device for guiding the drill pipe hoisting wire rope of the geological drilling rig is characterized in that: the pulley bracket is provided with a hook for hooking and cooperating with the hanging ring on the derrick.

上述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述挂环和挂钩的数量均为两个,两个所述挂环和两个所述挂钩一一对应挂接。The above-mentioned pulley device for guiding the drill pipe hoisting wire rope of the geological drilling rig is characterized in that: there are two hanging rings and two hooks, and the two hanging rings and the two hooks are linked one by one.

上述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述滑轮支架包括相互平行的第一支架板和第二支架板,所述第一滑轮和第二滑轮均设置在第一支架板与第二支架板之间,所述第一支架板的顶部和第二支架板的顶部通过连接板相连接,所述连接板上设置有竖杆,所述挂钩设置在所述竖杆的上端。The above-mentioned pulley device for guiding the drill pipe of the geological drilling rig is characterized in that: the pulley bracket includes a first bracket plate and a second bracket plate parallel to each other, and the first pulley and the second pulley are both arranged on the first Between the support plate and the second support plate, the top of the first support plate and the top of the second support plate are connected through a connecting plate, and a vertical bar is arranged on the connecting plate, and the hook is arranged on the vertical bar the upper end.

上述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述第一支架板上设置有多个用于观察钻杆提升钢丝绳在第一滑轮上缠绕情况的第一观察孔和多个用于观察所述钻杆提升钢丝绳在第二滑轮上缠绕情况的第二观察孔,所述第二支架板上设置有多个用于观察钻杆提升钢丝绳在第一滑轮上缠绕情况的第三观察孔和多个用于观察所述钻杆提升钢丝绳在第二滑轮上缠绕情况的第四观察孔。The above-mentioned pulley device for guiding the drill pipe hoisting wire rope of the geological drilling rig is characterized in that: the first support plate is provided with a plurality of first observation holes for observing the winding of the drill pipe hoisting wire rope on the first pulley and multiple observation holes. A second observation hole for observing the winding situation of the drill pipe hoisting wire rope on the second pulley, and a plurality of first observation holes for observing the winding situation of the drilling pipe hoisting wire rope on the first pulley are arranged on the second support plate Three observation holes and a plurality of fourth observation holes for observing the winding situation of the drilling rod hoisting wire rope on the second pulley.

上述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述第一滑轮的外圆周面上开设有与所述钻杆提升钢丝绳相适配的第一引导槽,所述第二滑轮的外圆周面上开设有与所述钻杆提升钢丝绳相适配的第二引导槽。The above-mentioned pulley device for guiding the drill pipe hoisting wire rope of the geological drilling rig is characterized in that: a first guide groove matching the drill pipe hoisting wire rope is opened on the outer peripheral surface of the first pulley, and the second The outer peripheral surface of the pulley is provided with a second guide groove suitable for the hoisting wire rope of the drill pipe.

本实用新型与现有技术相比具有以下优点:Compared with the prior art, the utility model has the following advantages:

1、本实用新型的结构简单,设计新颖合理。1. The structure of the utility model is simple, and the design is novel and reasonable.

2、本实用新型在受力上由两个滑轮分担受力,使单个滑轮受力变小,并且双滑轮比单滑轮更具有稳定性。施工中受力方向也由斜向下变成垂直向下,使卷扬机卷筒缠绕均匀,同时起吊的重物受力垂直向上,不会出现偏斜受拉。2. In the utility model, two pulleys are used to share the force, so that the force of a single pulley becomes smaller, and the double pulley is more stable than the single pulley. During the construction, the direction of force is also changed from oblique downward to vertical downward, so that the winding of the hoist drum is even, and at the same time, the force of the hoisted heavy object is vertical upward, and there will be no deflection and tension.

3、本实用新型通过将所述挂环和所述挂钩的数量均设计为两个,从而确保滑轮支架能够稳定的连接在井架上,确保滑轮支架不会出现晃动。3. In the utility model, the number of the hanging rings and the hooks are both designed to be two, so as to ensure that the pulley bracket can be stably connected to the derrick and ensure that the pulley bracket does not shake.

4、本实用新型通过设置第一观察孔和所述第三观察孔,能够有效的观察钻杆提升钢丝绳在第一滑轮上的缠绕情况,通过设置第二观察孔和所述第四观察孔,能够有效的观察钻杆提升钢丝绳在第二滑轮上的缠绕情况,进而能够及时发现钻杆提升钢丝绳从第一滑轮和第二滑轮上的脱落现象。4. The utility model can effectively observe the winding situation of the drill pipe hoisting wire rope on the first pulley by setting the first observation hole and the third observation hole. By setting the second observation hole and the fourth observation hole, The winding condition of the drill pipe hoisting wire rope on the second pulley can be effectively observed, and then the shedding phenomenon of the drill pipe hoisting wire rope from the first pulley and the second pulley can be found in time.

5、本实用新型的实现成本低,使用效果好,便于推广使用。5. The utility model has the advantages of low cost, good application effect and convenient popularization and use.

综上所述,本实用新型结构简单,设计新颖合理,工作可靠性高,使用寿命长,使用效果好,便于推广使用。To sum up, the utility model has the advantages of simple structure, novel and reasonable design, high working reliability, long service life, good use effect and easy popularization and use.

下面通过附图和实施例,对本实用新型的技术方案做进一步的详细描述。The technical solutions of the present utility model will be further described in detail through the drawings and embodiments below.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型滑轮支架的结构示意图。Fig. 2 is a structural schematic diagram of the pulley bracket of the present invention.

图3为本实用新型第一滑轮和第二滑轮的结构示意图。Fig. 3 is a structural schematic diagram of the first pulley and the second pulley of the present invention.

附图标记说明:Explanation of reference signs:

1—滑轮支架;1-1—第一支架板;1-2—第二支架板;1—pulley support; 1-1—the first support plate; 1-2—the second support plate;

1-3—连接板;1-4—挂钩;1-5—竖杆;1-3—connecting plate; 1-4—hook; 1-5—vertical bar;

1-6—第一观察孔;1-7—第二观察孔;2—第二滑轮;1-6—the first observation hole; 1-7—the second observation hole; 2—the second pulley;

2-1—第二引导槽;2-2—第二滑轮中心轴;3—挂环;2-1—the second guide groove; 2-2—the central axis of the second pulley; 3—hanging ring;

4—提篮;5—第一滑轮;5-1—第一引导槽;4—basket; 5—the first pulley; 5-1—the first guide groove;

5-2—第一滑轮中心轴;6—井架;7—卷扬机滚筒;5-2—the central axis of the first pulley; 6—the derrick; 7—the hoist drum;

8—动力机;9—钻杆;10—钻杆提升钢丝绳。8—power machine; 9—drill pipe; 10—drill pipe lifting wire rope.

具体实施方式detailed description

如图1所示的一种地质钻机的钻杆提升钢丝绳导向用滑轮装置,包括滑轮支架1、用于将钻杆提升钢丝绳10由竖直方向引导至水平方向的第一滑轮5和用于将钻杆提升钢丝绳10由水平方向引导至竖直方向的第二滑轮2,所述第一滑轮5和第二滑轮2均设置在所述滑轮支架1上,所述滑轮支架1安装在地质钻机的井架6上,所述钻杆提升钢丝绳10的一端缠绕在地质钻机的卷扬机滚筒7上,所述钻杆提升钢丝绳10的一端依次绕过第一滑轮5和第二滑轮2并与钻杆9上的提篮4相连接。As shown in Figure 1, a drill pipe hoisting wire rope guiding pulley device for a geological drilling rig comprises a pulley bracket 1, a first pulley 5 for guiding the drill pipe hoisting wire rope 10 from a vertical direction to a horizontal direction, and a first pulley 5 for guiding The drill pipe lifting wire rope 10 is guided from the horizontal direction to the second pulley 2 in the vertical direction, and the first pulley 5 and the second pulley 2 are all arranged on the pulley bracket 1, and the pulley bracket 1 is installed on the geological drilling machine. On the derrick 6, one end of the drill pipe hoisting wire rope 10 is wound on the hoist drum 7 of the geological drilling rig, and one end of the drill pipe hoisting wire rope 10 is wound around the first pulley 5 and the second pulley 2 in turn and connected with the drill pipe 9. Baskets 4 are connected.

本实施例中,该滑轮装置在使用时,地质钻机的动力机8带动卷扬机,所述卷扬机带动卷扬机滚筒7转动对钻杆提升钢丝绳10进行收卷,由于钻杆提升钢丝绳10经过第一滑轮5和第二滑轮2这两个滑轮的导向作用,能够确保钻杆提升钢丝绳10受力方向为竖直,即卷扬机滚筒7上方的一段钻杆提升钢丝绳10基本保持竖直,确保了使卷扬机卷筒缠绳均匀,钻杆9上方的一端钻杆提升钢丝绳10保持竖直,使钻杆9不会出现偏斜现象,确保了施工安全,也减少了机械磨损,保证了施工安全。In this embodiment, when the pulley device is in use, the power machine 8 of the geological drilling rig drives the hoist, and the hoist drives the hoist drum 7 to rotate to wind up the drill pipe hoisting wire rope 10. Since the drill pipe hoisting wire rope 10 passes through the first pulley 5 and The guiding effect of the two pulleys of the second pulley 2 can ensure that the direction of force of the drill pipe hoisting wire rope 10 is vertical, that is, a section of the drill pipe hoisting wire rope 10 above the hoist drum 7 remains vertical substantially, ensuring that the hoist drum is wound Rope is even, and one end drill pipe lifting wire rope 10 above drill pipe 9 keeps vertical, makes drill pipe 9 deflection phenomenon, has guaranteed construction safety, has also reduced mechanical wear and tear, has guaranteed construction safety.

如图1所示,所述滑轮支架1上设置有用于与所述井架6上的挂环3挂接配合的挂钩1-4。通过设置挂环3和挂钩1-4,能够快速有效的实现挂环3和挂钩1-4的挂接配合,并同时方便了滑轮支架1的拆卸。As shown in FIG. 1 , the pulley bracket 1 is provided with a hook 1-4 for hanging and cooperating with the hanging ring 3 on the derrick 6 . By arranging the hanging ring 3 and the hook 1-4, it is possible to quickly and effectively realize the coupling of the hanging ring 3 and the hook 1-4, and at the same time facilitate the disassembly of the pulley bracket 1.

本实施例中,所述挂环3和挂钩1-4的数量均为两个,两个所述挂环3和两个所述挂钩1-4一一对应挂接。通过将所述挂环3和所述挂钩1-4的数量均设计为两个,从而确保滑轮支架1能够稳定的连接在井架6上,确保滑轮支架1不会出现晃动。In this embodiment, the number of the hanging rings 3 and the hooks 1-4 are two, and the two hanging rings 3 and the two hooks 1-4 are linked one by one. By designing the number of the hanging rings 3 and the hooks 1-4 to two, it is ensured that the pulley bracket 1 can be stably connected to the derrick 6 and that the pulley bracket 1 will not shake.

如图2所示,所述滑轮支架1包括相互平行的第一支架板1-1和第二支架板1-2,所述第一滑轮5和第二滑轮2均设置在第一支架板1-1与第二支架板1-2之间,所述第一支架板1-1的顶部和第二支架板1-2的顶部通过连接板1-3相连接,所述连接板1-3上设置有竖杆1-5,所述挂钩1-4设置在所述竖杆1-5的上端。As shown in Figure 2, the pulley bracket 1 includes a first bracket plate 1-1 and a second bracket plate 1-2 parallel to each other, and the first pulley 5 and the second pulley 2 are all arranged on the first bracket plate 1 -1 and the second support plate 1-2, the top of the first support plate 1-1 and the top of the second support plate 1-2 are connected by a connecting plate 1-3, and the connecting plate 1-3 A vertical bar 1-5 is arranged on the top, and the hook 1-4 is arranged on the upper end of the vertical bar 1-5.

本实施例中,所述滑轮支架1结构简单,加工方便,所述第一滑轮5的第一滑轮中心轴5-2的一端铰接在第一支架板1-1上,所述第一滑轮中心轴5-2的另一端铰接在第二支架板1-2上,所述第二滑轮2的第二滑轮中心轴2-2的一端铰接在第一支架板1-1上,所述第二滑轮中心轴2-2的另一端铰接在第二支架板1-2上。In this embodiment, the pulley bracket 1 is simple in structure and easy to process. One end of the first pulley center shaft 5-2 of the first pulley 5 is hinged on the first bracket plate 1-1, and the center of the first pulley The other end of the shaft 5-2 is hinged on the second support plate 1-2, and one end of the second pulley center shaft 2-2 of the second pulley 2 is hinged on the first support plate 1-1, and the second The other end of the pulley center shaft 2-2 is hinged on the second support plate 1-2.

如图2所示,所述第一支架板1-1上设置有多个用于观察钻杆提升钢丝绳10在第一滑轮5上缠绕情况的第一观察孔1-6和多个用于观察所述钻杆提升钢丝绳10在第二滑轮2上缠绕情况的第二观察孔1-7,所述第二支架板1-2上设置有多个用于观察钻杆提升钢丝绳10在第一滑轮5上缠绕情况的第三观察孔和多个用于观察所述钻杆提升钢丝绳10在第二滑轮2上缠绕情况的第四观察孔。As shown in Figure 2, the first support plate 1-1 is provided with a plurality of first observation holes 1-6 for observing the winding of the drill pipe hoisting wire rope 10 on the first pulley 5 and a plurality of observation holes for observing The second observation hole 1-7 of the winding condition of the drill pipe hoisting wire rope 10 on the second pulley 2, the second support plate 1-2 is provided with a plurality of holes for observing the drill pipe hoisting wire rope 10 on the first pulley. 5 and a plurality of fourth observation holes for observing the winding situation of the drill pipe hoisting wire rope 10 on the second pulley 2 .

如图2所示,本实施例中,多个所述第一观察孔1-6和多个所述第三观察孔均绕第一滑轮5的圆周方向布设,多个所述第二观察孔1-7和多个所述第四观察孔均绕第二滑轮2的圆周方向布设。多个所述第一观察孔1-6和多个所述第三观察孔一一对应,多个所述第二观察孔1-7和多个所述第四观察孔一一对应。As shown in Figure 2, in this embodiment, a plurality of the first observation holes 1-6 and a plurality of the third observation holes are arranged around the circumferential direction of the first pulley 5, and a plurality of the second observation holes 1-7 and a plurality of fourth observation holes are all arranged around the circumferential direction of the second pulley 2 . A plurality of the first observation holes 1-6 corresponds to a plurality of the third observation holes one to one, and a plurality of the second observation holes 1-7 corresponds to a plurality of the fourth observation holes one to one.

本实施例中,通过设置第一观察孔1-6和所述第三观察孔,能够有效的观察钻杆提升钢丝绳10在第一滑轮5上的缠绕情况,通过设置第二观察孔1-7和所述第四观察孔,能够有效的观察钻杆提升钢丝绳10在第二滑轮2上的缠绕情况,进而能够及时发现钻杆提升钢丝绳10从第一滑轮5和第二滑轮2上的脱落现象。In this embodiment, by setting the first observation hole 1-6 and the third observation hole, it is possible to effectively observe the winding situation of the drill pipe hoisting wire rope 10 on the first pulley 5, and by setting the second observation hole 1-7 and the fourth observation hole, can effectively observe the winding situation of the drill pipe hoisting wire rope 10 on the second pulley 2, and then can find the shedding phenomenon of the drill pipe hoisting wire rope 10 from the first pulley 5 and the second pulley 2 in time .

如图3所示,所述第一滑轮5的外圆周面上开设有与所述钻杆提升钢丝绳10相适配的第一引导槽5-1,所述第二滑轮2的外圆周面上开设有与所述钻杆提升钢丝绳10相适配的第二引导槽2-1。通过设置第一引导槽5-1,能够有效的引导钻杆提升钢丝绳10,确保钻杆提升钢丝绳10不会从第一滑轮5上滑落;通过设置第二引导槽2-1,能够有效的引导钻杆提升钢丝绳10,确保钻杆提升钢丝绳10不会从第二滑轮2上滑落。As shown in Figure 3, a first guide groove 5-1 compatible with the drill pipe hoisting wire rope 10 is provided on the outer circumference of the first pulley 5, and the outer circumference of the second pulley 2 A second guide groove 2-1 adapted to the drill pipe hoisting wire rope 10 is provided. By arranging the first guide groove 5-1, the drill pipe hoisting wire rope 10 can be effectively guided to ensure that the drill pipe hoisting wire rope 10 will not slip off the first pulley 5; by setting the second guide groove 2-1, it can be effectively guided The drill pipe hoisting wire rope 10 ensures that the drilling pipe hoisting wire rope 10 will not slip off from the second pulley 2 .

以上所述,仅是本实用新型的较佳实施例,并非对本实用新型作任何限制,凡是根据本实用新型技术实质对以上实施例所作的任何简单修改、变更以及等效结构变换,均仍属于本实用新型技术方案的保护范围内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any simple modifications, changes and equivalent structural transformations made to the above embodiments according to the technical essence of the present utility model still belong to Within the scope of protection of the technical solution of the utility model.

Claims (6)

1.地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:包括滑轮支架(1)、用于将钻杆提升钢丝绳(10)由竖直方向引导至水平方向的第一滑轮(5)和用于将钻杆提升钢丝绳(10)由水平方向引导至竖直方向的第二滑轮(2),所述第一滑轮(5)和第二滑轮(2)均设置在所述滑轮支架(1)上,所述滑轮支架(1)安装在地质钻机的井架(6)上,所述钻杆提升钢丝绳(10)的一端缠绕在地质钻机的卷扬机滚筒(7)上,所述钻杆提升钢丝绳(10)的一端依次绕过第一滑轮(5)和第二滑轮(2)并与钻杆(9)上的提篮(4)相连接。1. The pulley device for guiding the drill pipe hoisting wire rope of a geological drilling rig, characterized in that it includes a pulley bracket (1), and a first pulley (5) for guiding the drill pipe hoisting wire rope (10) from the vertical direction to the horizontal direction And the second pulley (2) that is used to guide the drilling rod hoisting wire rope (10) from the horizontal direction to the vertical direction, the first pulley (5) and the second pulley (2) are all arranged on the pulley bracket ( 1), the pulley support (1) is installed on the derrick (6) of the geological drilling rig, and one end of the lifting wire rope (10) of the drilling rod is wound on the hoist drum (7) of the geological drilling rig, and the lifting of the drilling rod One end of the wire rope (10) goes around the first pulley (5) and the second pulley (2) in turn and is connected with the basket (4) on the drill pipe (9). 2.根据权利要求1所述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述滑轮支架(1)上设置有用于与所述井架(6)上的挂环(3)挂接配合的挂钩(1-4)。2. The drill pipe hoisting wire rope guiding pulley device of geological drilling rig according to claim 1, characterized in that: the pulley bracket (1) is provided with a hanging ring (3) for connecting with the derrick (6) Hitch the mating hooks (1-4). 3.根据权利要求2所述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述挂环(3)和挂钩(1-4)的数量均为两个,两个所述挂环(3)和两个所述挂钩(1-4)一一对应挂接。3. the drilling rod hoisting wire rope guide pulley device of geological drilling rig according to claim 2, is characterized in that: the quantity of described hanging ring (3) and hook (1-4) is two, two described The link (3) and the two hooks (1-4) are connected in one-to-one correspondence. 4.根据权利要求2所述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述滑轮支架(1)包括相互平行的第一支架板(1-1)和第二支架板(1-2),所述第一滑轮(5)和第二滑轮(2)均设置在第一支架板(1-1)与第二支架板(1-2)之间,所述第一支架板(1-1)的顶部和第二支架板(1-2)的顶部通过连接板(1-3)相连接,所述连接板(1-3)上设置有竖杆(1-5),所述挂钩(1-4)设置在所述竖杆(1-5)的上端。4. The drill pipe hoisting wire rope guide pulley device of geological drilling rig according to claim 2, characterized in that: the pulley bracket (1) includes a first bracket plate (1-1) and a second bracket plate parallel to each other (1-2), the first pulley (5) and the second pulley (2) are both arranged between the first support plate (1-1) and the second support plate (1-2), the first The top of the support plate (1-1) and the top of the second support plate (1-2) are connected through the connecting plate (1-3), and the vertical bar (1-5) is arranged on the connecting plate (1-3). ), the hook (1-4) is arranged on the upper end of the vertical bar (1-5). 5.根据权利要求4所述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述第一支架板(1-1)上设置有多个用于观察钻杆提升钢丝绳(10)在第一滑轮(5)上缠绕情况的第一观察孔(1-6)和多个用于观察所述钻杆提升钢丝绳(10)在第二滑轮(2)上缠绕情况的第二观察孔(1-7),所述第二支架板(1-2)上设置有多个用于观察钻杆提升钢丝绳(10)在第一滑轮(5)上缠绕情况的第三观察孔和多个用于观察所述钻杆提升钢丝绳(10)在第二滑轮(2)上缠绕情况的第四观察孔。5. The drill pipe hoisting wire rope guide pulley device of geological drilling rig according to claim 4, characterized in that: the first support plate (1-1) is provided with a plurality of hoisting wire ropes (10) for observing the drill pipe. ) a first observation hole (1-6) on the winding condition of the first pulley (5) and a plurality of second observation holes for observing the winding condition of the drill pipe hoisting wire rope (10) on the second pulley (2) holes (1-7), the second support plate (1-2) is provided with a plurality of third observation holes and multiple A fourth observation hole for observing the winding situation of the drill pipe hoisting wire rope (10) on the second pulley (2). 6.根据权利要求1所述的地质钻机的钻杆提升钢丝绳导向用滑轮装置,其特征在于:所述第一滑轮(5)的外圆周面上开设有与所述钻杆提升钢丝绳(10)相适配的第一引导槽(5-1),所述第二滑轮(2)的外圆周面上开设有与所述钻杆提升钢丝绳(10)相适配的第二引导槽(2-1)。6. The pulley device for guiding the drill pipe hoisting wire rope of the geological drilling rig according to claim 1, characterized in that: the outer circumferential surface of the first pulley (5) is provided with a wire rope (10) for hoisting the drill pipe. Matching first guide groove (5-1), the outer peripheral surface of the second pulley (2) is provided with a second guide groove (2- 1).
CN201520772288.4U 2015-09-30 2015-09-30 Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig Expired - Lifetime CN204980974U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520772288.4U CN204980974U (en) 2015-09-30 2015-09-30 Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520772288.4U CN204980974U (en) 2015-09-30 2015-09-30 Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig

Publications (1)

Publication Number Publication Date
CN204980974U true CN204980974U (en) 2016-01-20

Family

ID=55115363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520772288.4U Expired - Lifetime CN204980974U (en) 2015-09-30 2015-09-30 Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig

Country Status (1)

Country Link
CN (1) CN204980974U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100563A (en) * 2017-05-08 2017-08-29 天津中新安德科技有限公司 A kind of drilling well automates delivery system with drilling rod
CN111559714A (en) * 2019-02-14 2020-08-21 中石化石油工程技术服务有限公司 Multi-azimuth rotating guide wheel structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100563A (en) * 2017-05-08 2017-08-29 天津中新安德科技有限公司 A kind of drilling well automates delivery system with drilling rod
CN111559714A (en) * 2019-02-14 2020-08-21 中石化石油工程技术服务有限公司 Multi-azimuth rotating guide wheel structure
CN111559714B (en) * 2019-02-14 2024-06-07 中石化石油工程技术服务股份有限公司 Multidirectional rotary guide wheel structure

Similar Documents

Publication Publication Date Title
CN103545751B (en) Overhead transmission line ground wire optical fiber cable fitting changes support
CN106744263A (en) Hook mechanism and its working state conversion method and tower crane
CN202030434U (en) Large-span whole-section hoisting sling for steel box girder
CN104649120A (en) Balance hoisting equipment
CN202492276U (en) Main engine sling for container ship
CN205419580U (en) A hoist and mount system for dismantling tower crane overlength pull rod
CN204342257U (en) A kind of large-scale component turning device
CN202558444U (en) Steel penstock hoisting balance beam device
CN206970077U (en) A kind of construction site hoist engine
CN205772956U (en) Novel tower crane counterweight is from dismantling device
CN205132903U (en) Steel wire slings
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN207645607U (en) A kind of anchor winch experiment loading unit
CN217376992U (en) A hoisting accessory for gearbox maintenance
CN109809310B (en) Swing arm tower crane pull rod and installation method thereof
CN201907924U (en) Spreading wing-type winding drum lifting device
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN205132977U (en) Movable swing arm tower machine installation wire rope
CN204162345U (en) A kind of anti-tangle rope electric hoist
CN203474190U (en) Anti-winding device for changing mine hoisting rope
CN202704797U (en) Hoisting device of guide wheel
CN202967882U (en) Combined lifting hook and crane with same
CN208037902U (en) A kind of novel unfolding construction of cable
CN207890902U (en) A kind of dual-purpose electric elevator shackle hook
CN207158598U (en) A kind of board suspender

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20160120