CN204919604U - Genuine reconstruction structure and Y type connection structure thereof - Google Patents

Genuine reconstruction structure and Y type connection structure thereof Download PDF

Info

Publication number
CN204919604U
CN204919604U CN201520557533.XU CN201520557533U CN204919604U CN 204919604 U CN204919604 U CN 204919604U CN 201520557533 U CN201520557533 U CN 201520557533U CN 204919604 U CN204919604 U CN 204919604U
Authority
CN
China
Prior art keywords
wall
tunnel
type
section
variable cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520557533.XU
Other languages
Chinese (zh)
Inventor
姜炯
刘发前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201520557533.XU priority Critical patent/CN204919604U/en
Application granted granted Critical
Publication of CN204919604U publication Critical patent/CN204919604U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a genuine reconstruction structure and Y type connection structure thereof between integral tunnel and two adjacent disconnect -type tunnels, connects through the structure changeover portion, the two pass wall that sets up through Y type variable cross section wall in the structure changeover portion is connected with corresponding with two adjacent side walls of certain distance interval arrangement in two disconnect -type tunnels, and pass through the single track wall that Y type variable cross section wall set up corresponds with the mid -board arranged between the two adjacent rooms in the integral tunnel and is connected. The utility model discloses make construction structures economical more, reasonable to can the furthest volume of reducing the engineering.

Description

A kind of reconstruction structure of tunnel and Y type syndeton thereof
Technical field
The utility model relates to a kind of reconstruction structure and Y type syndeton thereof of tunnel.
Background technology
Compared to viaduct, genuine do not take ground resource, feature that landscape effect is good because of it, be used widely in the rapid transformation of urban road.Single-box multi-cell integral frame structure due to advantages such as its mechanical characteristic are good, floor space is little, underpass form first-selected often.But consider the factors such as the demand of the distribution of present situation underground building, engineering time phasing in Practical Project, part tunnel is still designed to several separate type single box single chamber frame constructions.Along with the development in city, transport need increases day by day, and above-mentioned separate type tunnel needs original place to reconstruct and extends (being referred to as reconstruction below).
During genuine reconstruction, should at utmost utilize existing underpass, under normal circumstances, the structure in reconstruction tunnel should be consistent with road, original place, with the continuity that holding structure is stressed.But, under the prerequisite that engineering specifications allows, if the genuine monolithic construction that can adopt single-box multi-cell of reconstruction, excavation of foundation pit area can be reduced, save the concrete depressed place work amount of underpass, reduce construction costs.Based on this imagination, as how a kind of constructing structure, existing separate type is genuine to be effectively connected with the monolithic of reconstruction is genuine, to guarantee not leak between the two, differential settlement etc., be the problem needing solution badly.
Utility model content
The utility model is intended to the reconstruction structure and the Y type syndeton thereof that provide a kind of tunnel, separate type tunnel can be reconstructed integrally formula tunnel (hereinafter " integration reconstruction "), or monolithic tunnel is reconstructed into separate type tunnel.
In order to achieve the above object, a technical scheme of the present utility model is to provide a kind of Y type syndeton, and described Y type syndeton is the Y type variable cross-section wall be arranged in structural transition section, is connected in monolithic tunnel with adjacent two separate type tunnels;
Wherein, the two pass wall that described Y type variable cross-section wall is arranged, connects with in two separate type tunnels, spaced apart two adjacent side walls are corresponding at a certain distance;
The single track wall that described Y type variable cross-section wall is arranged, correspondingly with the mid-board arranged between two Room adjacent in monolithic tunnel connects.
Preferably, in the two pass wall of described Y type variable cross-section wall, the wall thickness of any wall, identical with the wall thickness of the side wall in separate type tunnel;
The wall thickness of the single track wall of described Y type variable cross-section wall is identical with the wall thickness of the mid-board in monolithic tunnel;
Spacing in described separate type tunnel between two adjacent side walls, corresponding to the spacing in two pass wall between twice wall, for being doubled in the thickness of side wall.
Preferably, in the gap in the two pass wall of described Y type variable cross-section wall between twice wall, for tamping the plain concrete in this gap.
Preferably, described Y type variable cross-section wall comprises any one following structure or its any combination:
The inwall length of described two pass wall is 1m ~ 2m;
The peripheral wall length of described two pass wall is the twice of inwall length;
The angle θ at the body of wall variable cross-section place of described Y type variable cross-section wall is 135 degree.
Another technical scheme of the present utility model is to provide a kind of reconstruction structure of tunnel, between monolithic tunnel and adjacent two separate type tunnels, is connected by structural transition section;
The Y type variable cross-section wall above described in any one is provided with in described structural transition section;
By the two pass wall that described Y type variable cross-section wall is arranged, connect with in two separate type tunnels, spaced apart two adjacent side walls are corresponding at a certain distance;
And by the single track wall that described Y type variable cross-section wall is arranged, correspondingly with the mid-board arranged between two Room adjacent in monolithic tunnel to connect.
Preferably, the deformation joint between structural transition section and separate type tunnel, makes the side wall in the top board of structural transition section, base plate, outside, and the side wall in top board genuine respective with two separate types respectively, base plate, outside is corresponding to be connected;
Deformation joint between structural transition section and monolithic tunnel, makes the side wall in the top board of structural transition section, base plate, outside, correspondingly with the side wall in the top board in monolithic tunnel, base plate, outside respectively connects.
Preferably, the reconstruction structure in described tunnel comprises any one following structure or its combination:
The both sides base plate of the deformation joint between structural transition section and separate type tunnel is provided with the perforate of grouting, under hole, side is formed with continuous strengthing body;
The both sides base plate of the deformation joint between structural transition section and monolithic tunnel is provided with the perforate of grouting, under hole, side is formed with continuous strengthing body.
Preferably, be connected by tongue-and-groove between the base plate of the genuine or described structural transition section of base plate and the separate type of described structural transition section;
Or, the below of the base plate of described structural transition section and separate type is genuine or monolithic is genuine back plate connections is provided with bored pile.
Preferably, the gap plain concrete between two pass wall tamps after building by Y type variable cross-section wall.
The reconstruction structure in tunnel described in the utility model and Y type syndeton thereof, its meaning that actively improves is:
(1), during genuine construction, several open-cut foundation ditch are merged into a foundation ditch, decrease space enclosing structure engineering quantity and excavation of foundation pit area, the traffic organization being conducive to ground is dredged.
(2) the twice side wall in separate type tunnel is merged into the mid-board in monolithic tunnel, decrease concrete work amount.
(3), after integration reconstruction, genuine globality improves, stressed evenly, make total more economically, rationally, farthest reduce engineering quantity, reach economical and maximize.
(4) the Y type connecting structure that the utility model proposes, can be connected genuine for two separate types side wall with the genuine mid-board of a monolithic.
(5) this method is equally applicable to the genuine integration reconstruction of multiple separate type, and a Y type connecting structure can be used for the mid-board of the adjacent side wall in the separate type tunnel of every two vicinities in multiple separate type tunnel with adjacent two Room in monolithic tunnel corresponding to be with it connected.
(6) if site condition is complicated, when monolithic tunnel need be reconstructed into separate type tunnel, also structure of the present utility model can be adopted.
Accompanying drawing explanation
Fig. 1 is the separate type genuine integration reconstruction implementing procedure figure that the utility model proposes;
Fig. 2 is the structure transverse face figure in separate type tunnel in the utility model;
Fig. 3 is the structure transverse face figure in monolithic tunnel in the utility model;
Fig. 4 is the structural representation of Y type variable cross-section wall in the utility model;
Fig. 5 is the schematic diagram of the structural transition section arrangement of integration reconstruction in the utility model embodiment.
Detailed description of the invention
Illustrate the utility model below in conjunction with a case history, participate in accompanying drawing 5, it is the embodiment schematic diagram that application the utility model carries out the genuine integration reconstruction of separate type.This tunnel was two separate type list box structures originally, now its open section structure will be cut, and by two separate types secretly the section of burying extended structure reconstruct into a monolithic construction.Between separate type is genuine genuine with monolithic, be formed with structural transition section be used for being connected two kinds of underpass.But a monolithic tunnel is reconstructed into except going in multiple separate type tunnel by the utility model; Can also be applicable to equally a monolithic tunnel be reconstructed into multiple separate type tunnel.
Two separate type list box structures as shown in Figure 2, are provided with the top board 1 in separate type tunnel, base plate 2, side wall 3 separately, the genuine inner kerbstone 4 arranged in side wall 3/3A and base plate 2 junction, and genuine inner bottom surface mat formation 5.Symbol 14 is the track clearance in separate type tunnel.Wherein the side wall of these two adjacent sides of separate type list box structure is adjacent side wall 3A to be reconstructed.In the present embodiment, the spacing between two adjacent side wall 3A to be reconstructed is about the thickness of one times of side wall.
Monolithic tunnel is as shown in Figure 3 single-box multi-cell (two Room) integral frame structure, comprise the top board 6 in the monolithic tunnel extending to two Room width, base plate 7, the mid-board 9 of genuine adjacent side, two Room, two Room are genuine mutually away from the side wall 8 of side, the genuine inner kerbstone 10 arranged with base plate 7 junction in side wall 8 or mid-board 9 in each room, and tunnel, each room inner bottom surface mat formation 11.Symbol 14 is the track clearance in tunnel, each room.
As shown in Figure 1, in the present embodiment, the integration in separate type tunnel is reconstructed, comprise the following steps:
(1) perforate slip casting 16 on the base plate of the both sides of the deformation joint 12 between structural transition section and separate type tunnel, the continuous strengthing body 17 of square one-tenth certain thickness, the degree of depth under hole, be intended to the differential settlement reducing tunnel, both sides, and double as water-stop curtain when reconstructing genuine foundation pit construction.
(2) again space enclosing structure is applied outward in the space enclosing structure in separate type tunnel, while excavation of foundation pit, cut the open section structure in separate type tunnel to deformation joint 12 place, retain buried rubber fastening band and shear reinforcement in deformation joint 12, utilized when pouring structure changeover portion.
(3) be connected genuine for two separate types with monolithic tunnel by structural transition section.At deformation joint 12 place, make top board 1, the base plate 2 in the top board of structural transition section, base plate 21, outside side wall 22 and separate type tunnel, outside side wall 3 is corresponding connects; Further, in structural transition section, a Y type variable cross-section wall 15(Fig. 4 is provided with), be connected with the adjacent side wall 3A in separate type tunnel by the two pass wall 18 of this Y type variable cross-section wall 15;
Deformation joint 20 place between structural transition section and monolithic tunnel, make the single track wall 19 of the top board of structural transition section, base plate 21, outside side wall 22, Y type variable cross-section wall 15, with top board 6, base plate 7, the outside side wall 8 in monolithic tunnel, mid-board 9 is corresponding connects.
In a preferred embodiment, the wall thickness of the two pass wall 18 of described Y type variable cross-section wall 15 should be identical with the wall thickness of the side wall 3A in separate type tunnel, and the wall thickness of single track wall 19 should be identical with the mid-board 9 in monolithic tunnel; The length of the corresponding Y type fork mouth of the inwall length A(of two pass wall 18) be preferably 1 ~ 2m, the length of the corresponding Y type fork mouth of peripheral wall length B(of two pass wall 18 adds the length of one section of body of wall below Y type fork mouth) be preferably the twice of A; The angle θ at body of wall variable cross-section place is preferably 135 degree.But in other example, the dimensional parameters at each position of Y type variable cross-section wall can be adjusted, to adapt to its and monolithic genuine actual conditions of being connected genuine with separate type.
(4), after Y type structure wall is built, the gap plain concrete between two pass wall 18 should be tamped; For ensureing genuine waterproof effect, except underpass adopts water-tight concrete, still can brush water-repellent paint at genuine inwall.
(5) deformation joint 12 arranged between structural transition section and two adjacent segments and deformation joint 20 place, carry out waterproof measure.The base plate that structural transition section is genuine with separate type and monolithic is genuine is connected by tongue-and-groove, or arranges bored pile below base plate, with the uneven subsidence solving underpass form, hole subsoil body difference is brought.
In other some examples, be necessary if actual, or when monolithic tunnel being transformed into separate type and being genuine, see describing above, such as can deformation joint 20 between structural transition section and monolithic tunnel both sides base plate on perforate slip casting, the continuous strengthing body of square one-tenth certain thickness, the degree of depth under hole.Or the open section structure cutting monolithic tunnel is to deformation joint 20, retains buried rubber fastening band and shear reinforcement in deformation joint 20, utilized when pouring structure changeover portion, etc.
Although content of the present utility model has done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to restriction of the present utility model.After those skilled in the art have read foregoing, for multiple amendment of the present utility model and substitute will be all apparent.Therefore, protection domain of the present utility model should be limited to the appended claims.

Claims (8)

1. a Y type syndeton, is characterized in that,
Described Y type syndeton is Y type variable cross-section wall (15) be arranged in structural transition section, is connected in monolithic tunnel with adjacent two separate type tunnels;
Wherein, the two pass wall (18) that described Y type variable cross-section wall (15) is arranged, connects with in two separate type tunnels, spaced apart two adjacent side walls (3A) are corresponding at a certain distance;
The single track wall (19) that described Y type variable cross-section wall is arranged, correspondingly with the mid-board (9) arranged between two Room adjacent in monolithic tunnel connects.
2. Y type syndeton as claimed in claim 1, is characterized in that,
In the two pass wall (18) of described Y type variable cross-section wall (15), the wall thickness of any wall, identical with the wall thickness of the side wall (3A) in separate type tunnel;
The wall thickness of the single track wall (19) of described Y type variable cross-section wall (15) is identical with the wall thickness of the mid-board (9) in monolithic tunnel;
Spacing in described separate type tunnel between two adjacent side walls (3A), corresponding to the spacing between twice wall in two pass wall (18), for being doubled in the thickness of side wall (3A).
3. Y type syndeton as claimed in claim 1, is characterized in that,
In gap in the two pass wall (18) of described Y type variable cross-section wall (15) between twice wall, for tamping the plain concrete in this gap.
4. Y type syndeton as claimed in claim 1, is characterized in that,
Described Y type variable cross-section wall (15) comprises any one following structure or its any combination:
The inwall length (A) of described two pass wall (18) is 1m ~ 2m;
The twice that the peripheral wall length (B) of described two pass wall (18) is inwall length (A);
The angle θ at the body of wall variable cross-section place of described Y type variable cross-section wall (15) is 135 degree.
5. a genuine reconstruction structure, is characterized in that,
Between monolithic tunnel and adjacent two separate type tunnels, connected by structural transition section;
Y type variable cross-section wall (15) in claim 1 ~ 4 described in any one is provided with in described structural transition section;
By the two pass wall (18) that described Y type variable cross-section wall (15) is arranged, connect with in two separate type tunnels, spaced apart two adjacent side walls (3A) are corresponding at a certain distance;
And by the single track wall (19) that described Y type variable cross-section wall is arranged, correspondingly with the mid-board (9) arranged between two Room adjacent in monolithic tunnel to connect.
6. reconstruction structure genuine as claimed in claim 5, is characterized in that,
Deformation joint (12) place between structural transition section and separate type tunnel, make the side wall (22) in the top board of structural transition section, base plate (21), outside, the side wall (3) in top board (1) genuine respective with two separate types respectively, base plate (2), outside is corresponding to be connected;
Deformation joint (20) place between structural transition section and monolithic tunnel, makes the side wall (22) in the top board of structural transition section, base plate (21), outside, correspondingly with the side wall (8) in the top board (6) in monolithic tunnel, base plate (7), outside respectively connects.
7. reconstruction structure genuine as claimed in claim 5, is characterized in that,
The reconstruction structure in described tunnel comprises any one following structure or its combination:
The both sides base plate of the deformation joint (12) between structural transition section and separate type tunnel is provided with the perforate of grouting, under hole, side is formed with continuous strengthing body (17);
The both sides base plate of the deformation joint (20) between structural transition section and monolithic tunnel is provided with the perforate of grouting, under hole, side is formed with continuous strengthing body.
8. reconstruction structure genuine as claimed in claim 6, is characterized in that,
Be connected by tongue-and-groove between the base plate of the base plate of described structural transition section or described structural transition section genuine with separate type;
Or, the below of the base plate of described structural transition section and separate type is genuine or monolithic is genuine back plate connections is provided with bored pile.
CN201520557533.XU 2015-07-29 2015-07-29 Genuine reconstruction structure and Y type connection structure thereof Withdrawn - After Issue CN204919604U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520557533.XU CN204919604U (en) 2015-07-29 2015-07-29 Genuine reconstruction structure and Y type connection structure thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520557533.XU CN204919604U (en) 2015-07-29 2015-07-29 Genuine reconstruction structure and Y type connection structure thereof

Publications (1)

Publication Number Publication Date
CN204919604U true CN204919604U (en) 2015-12-30

Family

ID=54968748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520557533.XU Withdrawn - After Issue CN204919604U (en) 2015-07-29 2015-07-29 Genuine reconstruction structure and Y type connection structure thereof

Country Status (1)

Country Link
CN (1) CN204919604U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019474A (en) * 2015-07-29 2015-11-04 上海市政工程设计研究总院(集团)有限公司 Reconstruction structure and method for tunnels

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019474A (en) * 2015-07-29 2015-11-04 上海市政工程设计研究总院(集团)有限公司 Reconstruction structure and method for tunnels
CN105019474B (en) * 2015-07-29 2017-09-26 上海市政工程设计研究总院(集团)有限公司 A kind of genuine reconstruction structure and its reconstruction method

Similar Documents

Publication Publication Date Title
CN103669399B (en) Concrete slab reinforced soil retaining wall and construction method thereof
CN104404974B (en) The thick sand-pebble layer deep basal pit of high artesian slip casting back cover structure and construction technology thereof
CN101597904B (en) Waterproof sheet pile cofferdam and construction method thereof
CN101285305B (en) Folded line type concrete panel rock-fill dam and construction method thereof
CN104099943B (en) Diaphram wall and discarded underground civil defense engineering intersection processing method
CN105464134B (en) Multi-layer underground space is along inverse combining construction method and supporting construction under existing facility
CN103806453A (en) Reinforced soil structure and slide-resistant pile combined composite retaining structure
CN102071689B (en) Optimized construction method of static pressure pile close to existing tunnel
CN104895111B (en) The construction method of integrated pipe canal in weak soil ground
CN206457842U (en) A kind of underground combination and the precast concrete pile for the underground combination
CN207512777U (en) Assembled underground pipe gallery
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN103835310A (en) Crib gravity retaining wall
CN204919604U (en) Genuine reconstruction structure and Y type connection structure thereof
CN211738217U (en) Pipeline passes through river course and buries laying structure
CN107724189A (en) A kind of box road structure of railway engineering thin-walled
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN204252148U (en) High artesian thick sand-pebble layer deep foundation ditch slip casting back cover structure
CN206070573U (en) It is a kind of be applied under wear the big of heavily loaded highway and reinforce foundation ditch combinative structure across open trench tunnel and steel pipe
CN105625299B (en) A kind of wall board type Novel underground diaphragm wall and its construction method
CN211200274U (en) Assembled channel shore protection structure
CN105019474A (en) Reconstruction structure and method for tunnels
CN104213543B (en) A kind of for the clay filling construction method between two walls of earth and rockfill dam bottom
CN207512521U (en) A kind of box road structure of railway engineering thin-walled
CN106854874B (en) Underground spliced wall and precast concrete pile for same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151230

Effective date of abandoning: 20170926

AV01 Patent right actively abandoned