CN204917759U - 高层楼塔吊附墙结构 - Google Patents

高层楼塔吊附墙结构 Download PDF

Info

Publication number
CN204917759U
CN204917759U CN201520524706.8U CN201520524706U CN204917759U CN 204917759 U CN204917759 U CN 204917759U CN 201520524706 U CN201520524706 U CN 201520524706U CN 204917759 U CN204917759 U CN 204917759U
Authority
CN
China
Prior art keywords
tower crane
channel
bors
oeuveres
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520524706.8U
Other languages
English (en)
Inventor
陈禹
姚军
杜宏彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONGYUAN CONSTRUCTION GROUP CO Ltd
Original Assignee
LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGYUAN CONSTRUCTION GROUP CO Ltd filed Critical LONGYUAN CONSTRUCTION GROUP CO Ltd
Priority to CN201520524706.8U priority Critical patent/CN204917759U/zh
Application granted granted Critical
Publication of CN204917759U publication Critical patent/CN204917759U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种高层楼塔吊附墙结构,包括剪力墙,其特征在于:所述剪力墙上安装由双拼槽钢形成的三角支架作为建筑物以外的塔吊附着点。所述三角支架由双拼16#b槽钢和双拼16#b槽钢支撑组成,所述双拼16#b槽钢伸出剪力墙部分下面设置双拼16#b槽钢支撑。本实用新型通过在附墙偏至建筑物以外采用高层楼塔吊附墙结构,可以解决塔吊基础定位出现角度,基础位置偏北导致塔吊附墙安装时有一边附墙偏至建筑物以外,附墙无法按正常角度安装的技术问题。并且能满足塔吊安装要求。

Description

高层楼塔吊附墙结构
技术领域
本实用新型涉及一种建筑施工的高层楼塔吊,尤其是一种高层楼塔吊附墙结构。
背景技术
苏州雅戈尔太阳城四期A标段的12楼因塔吊基础定位出现角度,基础位置偏北导致塔吊附墙安装时有一边附墙偏至建筑物以外,附墙无法按正常角度安装。而塔机按照说明书与建筑物附着时,最上面一道附着装置的负荷最大,因此以此道附着杆的负荷作为设计或校核附着杆截面的依据。根据专家意见:
1、塔吊生产厂家已对此塔吊布置状况进行了验算,满足要求。
2、加大了焊缝厚度由原来的4.5加大到6.0。
3、共布置4道附墙,最顶附墙独立高度控制在20米。
4、加强管理,施工过程中控制起吊重量。
5、塔吊位置已补充详细的平面几何尺寸。
因此,需要在建筑物附墙位置增加一钢结构牛腿,作为附墙支撑点。
发明内容
本实用新型是要提供一种高层楼塔吊附墙结构,用于解决塔吊基础定位出现角度,基础位置偏北导致塔吊附墙安装时有一边附墙偏至建筑物以外,附墙无法按正常角度安装的技术问题。
为实现上述目的,本实用新型的技术方案是:一种高层楼塔吊附墙结构,包括剪力墙,其特征在于:所述剪力墙上安装由双拼槽钢形成的三角支架作为建筑物以外的塔吊附着点。
所述三角支架由双拼16#b槽钢和双拼16#b槽钢支撑组成,所述双拼16#b槽钢伸出剪力墙部分下面设置双拼16#b槽钢支撑。
所述双拼16#b槽钢两侧焊接钢板,钢板与剪力墙之间通过紧固件固定连接。
所述剪力墙厚为200mm,水平分布筋Φ8mm200,垂直分布筋Φ10mm200,共布置4道附墙。
本实用新型的有益效果是:本实用新型通过在附墙偏至建筑物以外采用高层楼塔吊附墙结构,可以解决塔吊基础定位出现角度,基础位置偏北导致塔吊附墙安装时有一边附墙偏至建筑物以外,附墙无法按正常角度安装的技术问题。并且能满足塔吊安装要求。
附图说明
图1是工程塔吊采用三角支架作为塔吊附着点的示意图;
图2是本实用新型的结构示意图;
图3是图2中沿A-A剖视图。
具体实施方式
如图1所示,本工程塔吊10附着位置一边无法满足尺寸要求,附着点已在建筑物以外,现采用双拼16#b槽钢形成三角支架11作为塔吊附着点。
如图2,3所示,一种高层楼塔吊附墙结构,包括剪力墙1、双拼16#b槽钢2、双拼16#b槽钢支撑3等。
剪力墙1上安装由双拼槽钢形成的三角支架11作为建筑物以外的塔吊附着点。三角支架11由双拼16#b槽钢2和双拼16#b槽钢支撑3组成,双拼16#b槽钢2伸出剪力墙1部分下面设置双拼16#b槽钢支撑3。双拼16#b槽钢2两侧焊接钢板4,钢板4与剪力墙1之间通过紧固件5固定连接。剪力墙1厚为200mm,水平分布筋Φ8mm200,垂直分布筋Φ10mm200,共布置4道附墙。

Claims (3)

1.一种高层楼塔吊附墙结构,包括剪力墙(1),其特征在于:所述剪力墙(1)上安装由双拼槽钢形成的三角支架(11)作为建筑物以外的塔吊附着点,所述三角支架(11)由双拼16#b槽钢(2)和双拼16#b槽钢支撑(3)组成,所述双拼16#b槽钢(2)伸出剪力墙(1)部分下面设置双拼16#b槽钢支撑(3)。
2.根据权利要求1所述的高层楼塔吊附墙结构,其特征在于:所述剪力墙(1)厚为200mm,水平分布筋Φ8mm200,垂直分布筋Φ10mm200,共布置4道附墙。
3.根据权利要求1所述的高层楼塔吊附墙结构,其特征在于:所述双16#b槽钢(2)两侧焊接钢板(4),钢板(4)与剪力墙(1)之间通过紧固件(5)固定连接。
CN201520524706.8U 2015-07-20 2015-07-20 高层楼塔吊附墙结构 Active CN204917759U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520524706.8U CN204917759U (zh) 2015-07-20 2015-07-20 高层楼塔吊附墙结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520524706.8U CN204917759U (zh) 2015-07-20 2015-07-20 高层楼塔吊附墙结构

Publications (1)

Publication Number Publication Date
CN204917759U true CN204917759U (zh) 2015-12-30

Family

ID=54966907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520524706.8U Active CN204917759U (zh) 2015-07-20 2015-07-20 高层楼塔吊附墙结构

Country Status (1)

Country Link
CN (1) CN204917759U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106829753A (zh) * 2017-01-18 2017-06-13 成张佳宁 基于装配式剪力墙架构的塔机附着锚固结构及锚固方法
CN113128077A (zh) * 2021-05-25 2021-07-16 上海建工四建集团有限公司 一种群塔竖向爬升策划数字仿真优化方法
CN114014174A (zh) * 2021-10-28 2022-02-08 上海建工一建集团有限公司 一种装配式住宅薄壁墙体塔吊扶墙加固装置及加固方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106829753A (zh) * 2017-01-18 2017-06-13 成张佳宁 基于装配式剪力墙架构的塔机附着锚固结构及锚固方法
CN113128077A (zh) * 2021-05-25 2021-07-16 上海建工四建集团有限公司 一种群塔竖向爬升策划数字仿真优化方法
CN113128077B (zh) * 2021-05-25 2024-04-23 上海建工四建集团有限公司 一种群塔竖向爬升策划数字仿真优化方法
CN114014174A (zh) * 2021-10-28 2022-02-08 上海建工一建集团有限公司 一种装配式住宅薄壁墙体塔吊扶墙加固装置及加固方法

Similar Documents

Publication Publication Date Title
CN204917759U (zh) 高层楼塔吊附墙结构
CN201704833U (zh) 用于混凝土幕墙板和主体结构之间的可调连接装置
CN202164825U (zh) 调节位置紧固件
CN205296831U (zh) 一种承插型盘扣支架配套使用的承载型托梁
CN203877739U (zh) 一种风管整体吊装的托架
CN204627001U (zh) Pc结构楼板拼装预制柱斜撑支撑体系
CN103291042B (zh) 一种可三维调节的幕墙挂件
CN101694126B (zh) 用于建筑整体升降脚手架在钢梁上附着的机构
CN203346897U (zh) 基础筏板埋入式钢柱定位支架
CN204299180U (zh) 阳台成型模板
CN203022329U (zh) 一种无配重块吊篮架
CN202323727U (zh) 钢箱梁水平位置调整装置
CN203359725U (zh) 一种可调节的电梯缓冲墩
CN202227489U (zh) 钢结构连接装置
CN201850679U (zh) 可拆装的石材幕墙挂设组件
CN202323693U (zh) 一种适用于支座的抗拉拔连接装置
CN102383613B (zh) 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置
CN206319628U (zh) 一种建筑装配式墙板安装机
CN202543903U (zh) 一种混凝土预制管桩
CN204173802U (zh) 附着式吊装架
CN203684709U (zh) 钢结构桁架组装倾角的调整装置
CN202849941U (zh) 一种墩柱抱箍
CN205804999U (zh) 预制装配式建筑塔吊的连接结构
CN204530748U (zh) 一种楼顶塔机埋件焊接基础
CN204781904U (zh) 一种施工升降机工具式空间支撑点附墙的装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant