CN204917669U - Overhead hoist for wind generating set - Google Patents

Overhead hoist for wind generating set Download PDF

Info

Publication number
CN204917669U
CN204917669U CN201520697608.4U CN201520697608U CN204917669U CN 204917669 U CN204917669 U CN 204917669U CN 201520697608 U CN201520697608 U CN 201520697608U CN 204917669 U CN204917669 U CN 204917669U
Authority
CN
China
Prior art keywords
lifting
generating set
wind power
power generating
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520697608.4U
Other languages
Chinese (zh)
Inventor
金鑫
梁欢
刘宏磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinfeng Technology Co ltd
Original Assignee
Xinjiang Goldwind Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Goldwind Science and Technology Co Ltd filed Critical Xinjiang Goldwind Science and Technology Co Ltd
Priority to CN201520697608.4U priority Critical patent/CN204917669U/en
Application granted granted Critical
Publication of CN204917669U publication Critical patent/CN204917669U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model provides an overhead hoist for wind generating set. This overhead hoist includes: the handling roof beam, the supporting part, the handling roof beam sets up on the top of supporting part, and the supporting part is at least two, and the position of supporting part on the handling roof beam is adjustable, and every supporting part includes support piece, and support piece includes first landing leg and the second landing leg that connects gradually at least, the second landing leg stretches out the adjustable length of first landing leg, handling portion, handling portion sets up on the handling roof beam. Use the change of the completion converter module that this overhead hoist for wind generating set can labour saving and time saving, and have conveniently carry, advantages such as easy assembly and disassembly, easy operation.

Description

风力发电机组用吊运装置Lifting device for wind turbine

技术领域technical field

本实用新型涉及风力发电设备辅助设备领域,尤其涉及一种风力发电机组用吊运装置。The utility model relates to the field of auxiliary equipment for wind power generating equipment, in particular to a lifting device for a wind power generating set.

背景技术Background technique

随着风力发电技术的迅速发展,大批的风力发电机组被安装运行,并且对这些批量安装的风力发电机组进行后续维护涉及的工作量和工作强度特别大。尤其是自主变流柜体设计布置在一层平台下边的风力发电机组,其IGBT等一些重要模块的更换是一个耗费工作时间、影响工作效率的大问题。With the rapid development of wind power generation technology, a large number of wind power generators are installed and operated, and the workload and work intensity involved in the follow-up maintenance of these wind power generators installed in batches are particularly large. Especially for wind turbines whose independent converter cabinets are designed and arranged under the first-floor platform, the replacement of some important modules such as IGBT is a big problem that consumes working time and affects work efficiency.

目前,对风力发电机组变流器模块的更换主要采用人工更换的方式,通常需要5-6个人进行现场拆卸和更换工作。更换时,需要工人从塔底将要更换的模块拆卸下来,再用绳子从塔底将拆下的模块运至塔筒平台,再将其从塔筒平台运至地面,然后将新的模块依上述路径从地面运至塔底并安装。由于模块的质量非常重、塔内工作空间狭小、爬梯坡度大等原因使得工作人员的劳动强度非常大,且存在工作人员受伤的风险、容易发生事故。At present, the replacement of the converter module of the wind power generating set is mainly done manually, which usually requires 5-6 people to disassemble and replace on site. When replacing, workers need to disassemble the module to be replaced from the bottom of the tower, and then use ropes to transport the removed module from the bottom of the tower to the tower platform, and then transport it from the tower platform to the ground, and then install the new module according to the above The path is transported from the ground to the bottom of the tower and installed. Due to the very heavy weight of the modules, the narrow working space in the tower, and the large gradient of the climbing ladder, the labor intensity of the staff is very high, and there is a risk of injury to the staff, which is prone to accidents.

实用新型内容Utility model content

本实用新型的实施例提供一种风力发电机组用吊运装置,以解决风力发电机组更换部件困难的技术问题。The embodiment of the utility model provides a lifting device for a wind power generating set to solve the technical problem of difficulty in replacing parts of the wind power generating set.

为达到上述目的,本实用新型的实施例采用如下技术方案:In order to achieve the above object, the embodiments of the present utility model adopt the following technical solutions:

一种风力发电机组用吊运装置,包括:吊运梁;支撑部,吊运梁设置在支撑部的顶端,支撑部包括支撑件,支撑部为至少两个,且支撑部在吊运梁上的位置可调,每个支撑件至少包括依次连接的第一支腿和第二支腿,第二支腿伸出第一支腿的长度可调;吊运部,吊运部设置在吊运梁上。A lifting device for a wind power generating set, comprising: a lifting beam; a supporting part, the lifting beam is arranged on the top of the supporting part, the supporting part includes a supporting part, there are at least two supporting parts, and the supporting part is on the lifting beam The position of the support is adjustable, and each support includes at least a first leg and a second leg connected in sequence, and the length of the second leg protruding from the first leg is adjustable; the lifting part, the lifting part is set in the lifting on the beam.

进一步地,支撑部还包括横梁,支撑件为两个,两个支撑件的顶部均与横梁连接。Further, the supporting part further includes a crossbeam, there are two support pieces, and the tops of the two support pieces are connected to the crossbeam.

进一步地,两个支撑件的底部之间的距离大于两个支撑件的顶部之间的距离。Further, the distance between the bottoms of the two supports is greater than the distance between the tops of the two supports.

进一步地,横梁上设置有插接槽,吊运梁插入横梁的插接槽内。Further, the crossbeam is provided with an insertion slot, and the lifting beam is inserted into the insertion slot of the crossbeam.

进一步地,横梁包括两个容纳支撑件的容纳框和连接在两个容纳框之间的连接块,插接槽位于连接块的下部,连接块上设置有与插接槽连通的第一通孔,吊运装置还包括与第一通孔配合并抵紧吊运梁的防滑件。Further, the crossbeam includes two accommodation frames for accommodating the supports and a connection block connected between the two accommodation frames, the insertion slot is located at the lower part of the connection block, and the connection block is provided with a first through hole communicating with the insertion slot , the hoisting device also includes an anti-skid piece that fits with the first through hole and presses against the hoisting beam.

进一步地,吊运梁的第一端上设置有第一限位孔,第一限位孔内可拆卸地设置有限位块。Further, the first end of the lifting beam is provided with a first limiting hole, and a limiting block is detachably arranged in the first limiting hole.

进一步地,第二支腿上具有多个沿伸出方向依次设置的第二限位孔,吊运装置还包括与其中一个第二限位孔配合并限定第二支腿伸出长度的限位销。Further, the second outrigger has a plurality of second limiting holes sequentially arranged along the extending direction, and the hoisting device also includes a limiting hole that cooperates with one of the second limiting holes and limits the extending length of the second outrigger. pin.

进一步地,支撑部还包括脚轮,脚轮设置在支撑件底端。Further, the supporting part further includes casters, and the casters are arranged at the bottom of the supporting part.

进一步地,吊运梁上设置有滑轨,吊运部沿滑轨可移动地设置在滑轨上。Further, a slide rail is provided on the lifting beam, and the lifting part is movably arranged on the slide rail along the slide rail.

进一步地,吊运部为电动葫芦。Further, the lifting part is an electric hoist.

本实用新型的实施例的风力发电机组用吊运装置可以设置在风力发电机组的塔筒内,然后通过设置在吊运梁上的吊运部吊运需更换的部件,不需工作人员背负部件移动,可以省时省力地完成风力发电机组内部件的更换,降低更换作业时的风险,保证工作人员的安全。The hoisting device for the wind power generating set in the embodiment of the present invention can be set in the tower of the wind power generating set, and then the parts to be replaced are hoisted by the lifting part arranged on the lifting beam, without the need for the staff to carry the parts Moving can save time and effort to complete the replacement of the internal parts of the wind turbine, reduce the risk of the replacement operation, and ensure the safety of the staff.

附图说明Description of drawings

图1为本实用新型实施例的风力发电机组用吊运装置的结构示意图;Fig. 1 is the schematic structural view of the lifting device for the wind power generating set of the embodiment of the present invention;

图2为图1中吊运梁的结构示意图;Fig. 2 is the structural representation of lifting beam in Fig. 1;

图3为图1中吊运装置的局部放大图;Fig. 3 is the partial enlarged view of hoisting device in Fig. 1;

图4为图1中支撑部的局部放大图;Fig. 4 is a partial enlarged view of the support portion in Fig. 1;

图5为本实用新型实施例的风力发电机组用吊运装置处于第一工作位置的示意图;Fig. 5 is a schematic diagram of a lifting device for a wind power generating set in a first working position according to an embodiment of the present invention;

图6为本实用新型实施例的风力发电机组用吊运装置处于第二工作位置的示意图;Fig. 6 is a schematic diagram of a lifting device for a wind power generating set in a second working position according to an embodiment of the present invention;

图7为本实用新型实施例的风力发电机组用吊运装置处于第三工作位置的示意图;Fig. 7 is a schematic diagram of the lifting device for the wind power generating set in the third working position according to the embodiment of the present invention;

图8为本实用新型实施例的风力发电机组用吊运装置处于第四工作位置的示意图。Fig. 8 is a schematic diagram of the lifting device for the wind power generating set in the fourth working position according to the embodiment of the present utility model.

附图标记说明:Explanation of reference signs:

1、吊运梁;11、吊运梁第一端;12、第一限位孔;13、滑轨;2、支撑部;21、横梁;211、容纳框;212、连接块;213、插接槽;214、第一通孔;215、第二通孔;22、第一支腿;23、第二支腿;24、连接部;25、脚轮;26、支撑脚;27、第二限位孔;3、吊运部;4、塔筒;5、观察孔;6、爬梯平台;61、爬梯护栏。1. Lifting beam; 11. First end of lifting beam; 12. First limit hole; 13. Slide rail; 2. Support part; 21. Beam; 211. Receiving frame; 212. Connecting block; 214, the first through hole; 215, the second through hole; 22, the first outrigger; 23, the second outrigger; 24, the connecting part; 25, casters; Position hole; 3. Hoisting department; 4. Tower tube; 5. Observation hole; 6. Ladder platform; 61. Ladder guardrail.

具体实施方式Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,下面结合附图及实施例对本实用新型的风力发电机组用吊运装置进行详细描述。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the lifting device for the wind power generating set of the utility model will be described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

图1为本实用新型实施例的风力发电机组用吊运装置的结构示意图,在本实施例中,该装置应用于对设置在塔底的风力发电机组的变流器模块进行吊装。在其它实施例中,该装置可以用于吊装其它部件,如风力发电机组的其它模块,也可以将该装置应用至其它环境。Fig. 1 is a schematic structural diagram of a lifting device for a wind power generating set according to an embodiment of the present invention. In this embodiment, the device is applied to hoisting a converter module of a wind generating set at the bottom of a tower. In other embodiments, the device can be used to hoist other components, such as other modules of the wind power generating set, and the device can also be applied to other environments.

如图1所示,该风力发电机组用吊运装置包括吊运梁1、支撑部2和吊运部3,吊运梁1设置在支撑部2的顶端,吊运部3设置在吊运梁1上。其中,支撑部2至少两个,且支撑部2在吊运梁1上的位置可调,这样可以保证整个吊运装置的整体的结构稳定性,还能够根据支撑需要方便地调节支撑部2在吊运梁1上的位置,每个支撑部2包括支撑件,支撑件至少包括依次连接的第一支腿22和第二支腿23,第二支腿23伸出第一支腿22的长度可以调节,进而使得该吊运装置的高度可以调节,使该吊运装置适应性更好,能够在风力发电机组的塔筒内使用,方便省力地吊运变流器模块,保证变流器模块的更换工作安全快速。As shown in Figure 1, the lifting device for the wind power generating set includes a lifting beam 1, a supporting part 2 and a lifting part 3, the lifting beam 1 is arranged on the top of the supporting part 2, and the lifting part 3 is arranged on the top of the lifting beam 1 on. Wherein, there are at least two support parts 2, and the position of the support part 2 on the lifting beam 1 can be adjusted, so that the overall structural stability of the whole lifting device can be guaranteed, and the position of the support part 2 can be easily adjusted according to the support needs. The position on the lifting beam 1, each support part 2 includes a support member, the support member at least includes a first leg 22 and a second leg 23 connected in sequence, and the second leg 23 extends out the length of the first leg 22 It can be adjusted, so that the height of the hoisting device can be adjusted, so that the hoisting device has better adaptability, can be used in the tower of the wind power generating set, and is convenient and labor-saving to hoist the converter module and ensure the power of the converter module. The replacement work is safe and fast.

吊运梁1可以通过焊接、螺栓连接或铆接的方式设置在支撑部2的顶端。The lifting beam 1 can be arranged on the top end of the supporting part 2 by means of welding, bolting or riveting.

如图2所示,吊运梁1具有与支撑部2连接的上插接梁和用于安装吊运部3的滑轨13,上插接梁与滑轨13之间通过立板连接。As shown in FIG. 2 , the lifting beam 1 has an upper plug-in beam connected to the supporting part 2 and a slide rail 13 for installing the lifting part 3 , and the upper plug-in beam and the slide rail 13 are connected by a vertical plate.

优选地,为了使该吊运装置在进行吊运的过程中可以将吊运物吊运至更合适的位置,吊运部3通过滑轮可滑动地设置在滑轨13上。具体地,吊运梁1可以选择起重专用铝材制作,这样有利于实现吊运梁1的轻量化,同时保证其强度可以满足需求。滑轨13可以选用高博原装美国进口C型铝制内包式起重设备专用滑轨,该滑轨不易损坏,安全可靠,且能够承受变流器模块的重量(重约150Kg)。Preferably, in order to enable the lifting device to lift the lifting object to a more suitable position during the lifting process, the lifting part 3 is slidably arranged on the slide rail 13 through pulleys. Specifically, the hoisting beam 1 can be made of a special aluminum material for hoisting, which is conducive to realizing the weight reduction of the hoisting beam 1 while ensuring that its strength can meet the demand. The slide rail 13 can be selected from Gaobo’s original American imported C-shaped aluminum inner-wrapped lifting equipment special slide rail. The slide rail is not easy to damage, safe and reliable, and can bear the weight of the converter module (about 150Kg).

优选地,吊运梁第一端11上设置有第一限位孔12,该第一限位孔12用于防止支撑部2从吊运梁1上脱出。限位块(图中未示出)可拆卸地设置在第一限位孔12上以实现止挡作用,防止支撑部2滑出。第一限位孔12可以为螺孔,限位块是与该螺孔相配合的按压螺钉。Preferably, a first limit hole 12 is provided on the first end 11 of the lifting beam, and the first limit hole 12 is used to prevent the supporting part 2 from detaching from the lifting beam 1 . A limiting block (not shown in the figure) is detachably arranged on the first limiting hole 12 to realize a stop function and prevent the support part 2 from sliding out. The first limiting hole 12 may be a screw hole, and the limiting block is a pressing screw matched with the screw hole.

在本实施例中,支撑部2的数量为2个,沿吊运梁1的长度方向间隔设置,以实现对吊运梁1的稳固支撑,进而保证吊运安全。当然,在其它实施例中,支撑部2的数量可以多于2个,并根据需要调节其在吊运梁1上的位置,使得吊运装置可以更稳定地进行吊运工作。In this embodiment, the number of supporting parts 2 is two, which are arranged at intervals along the length direction of the lifting beam 1 to achieve stable support for the lifting beam 1 and ensure the safety of lifting. Of course, in other embodiments, the number of supporting parts 2 can be more than two, and their positions on the lifting beam 1 can be adjusted as required, so that the lifting device can carry out the lifting work more stably.

优选地,支撑部2还包括用于与吊运梁1的上插接梁连接的横梁21,以实现支撑件和吊运梁1的稳定可靠连接。如图3所示,支撑部2包括的支撑件的数量为两个,且沿支撑件的长度方向两个支撑件相互远离(当然,在其他实施例中,两个支撑件可以是平行间隔设置)。横梁21包括两个容纳支撑件的容纳框211和连接在两个容纳框211之间的连接块212,两个支撑件一一对应地插入容纳框211内。Preferably, the supporting part 2 further includes a crossbeam 21 for connecting with the upper plug-in beam of the lifting beam 1 , so as to realize a stable and reliable connection between the supporting part and the lifting beam 1 . As shown in Figure 3, the number of support members included in the support part 2 is two, and the two support members are away from each other along the length direction of the support members (of course, in other embodiments, the two support members can be arranged in parallel and spaced apart. ). The beam 21 includes two accommodating frames 211 for accommodating supports and a connecting block 212 connected between the two accommodating frames 211 , and the two supporting members are inserted into the accommodating frames 211 correspondingly.

在本实施例中,容纳框211上设置有第二通孔215,支撑件上设置有与第二通孔215同轴的螺纹孔,连接时,螺栓(图中未示出)穿过第二通孔215并与支撑件上的螺纹孔螺纹连接实现紧固。采用螺栓连接的方式能够方便拆卸、组装横梁21和支撑件,进而使得该吊运装置可以方便地携带到不同作业地点进行吊运作业。In this embodiment, the receiving frame 211 is provided with a second through hole 215, and the support member is provided with a threaded hole coaxial with the second through hole 215. When connecting, a bolt (not shown) passes through the second through hole 215. The through hole 215 is threadedly connected with the threaded hole on the support to realize fastening. The method of bolt connection can facilitate the disassembly and assembly of the crossbeam 21 and the supporting member, so that the hoisting device can be conveniently carried to different work locations for hoisting operations.

连接块212上设置有用于安装吊运梁1的上插接梁的插接槽213。插接槽213位于连接块212的下部,插接槽213的开口朝下以供立板穿过。吊运梁1与横梁21连接时,上插接梁插入插接槽213内。The connection block 212 is provided with an insertion groove 213 for installing the upper insertion beam of the lifting beam 1 . The insertion slot 213 is located at the lower part of the connection block 212, and the opening of the insertion slot 213 faces downward for the vertical plate to pass through. When the lifting beam 1 is connected with the crossbeam 21, the upper insertion beam is inserted into the insertion groove 213.

优选地,为了保证横梁21在吊运梁1上的位置固定,进而保证吊运时吊运装置稳固可靠,在连接块212上设置有与插接槽213连通的第一通孔214,当横梁21在吊运梁1上的位置调节合适后,防滑件(图中未示出)穿过第一通孔214并抵紧吊运梁1的上表面,防止吊运梁1相对于横梁21滑动,从而稳定该吊运装置。第一通孔214和防滑件是但不限于是相配合的螺栓孔与螺栓。Preferably, in order to ensure that the position of the crossbeam 21 on the lifting beam 1 is fixed, and thus ensure that the lifting device is stable and reliable during lifting, a first through hole 214 communicating with the insertion groove 213 is provided on the connecting block 212, when the crossbeam After the position of 21 on the lifting beam 1 is properly adjusted, the anti-skid piece (not shown in the figure) passes through the first through hole 214 and presses against the upper surface of the lifting beam 1 to prevent the lifting beam 1 from sliding relative to the beam 21 , thereby stabilizing the lifting device. The first through hole 214 and the anti-slip member are, but not limited to, bolt holes and bolts that match.

在吊运梁第一端11插入插接槽213之后,设置第一限位孔12和限位块可以防止吊运梁1从插接槽213中滑出。在拆卸该吊运装置的时候,可以拆掉限位块,并控制上述防滑件不抵接吊运梁1,将吊运梁1从插接槽中抽出。After the first end 11 of the lifting beam is inserted into the insertion slot 213 , setting the first limiting hole 12 and the limiting block can prevent the lifting beam 1 from slipping out of the insertion slot 213 . When disassembling the lifting device, the limit block can be removed, and the above-mentioned anti-skid parts are controlled not to abut against the lifting beam 1, and the lifting beam 1 is pulled out from the insertion groove.

作为一种可实施方式,支撑件只包括第一支腿22和第二支腿23,如图4所示,第二支腿23可插入第一支腿22内,第二支腿23上具有多个沿伸出方向依次设置的第二限位孔27,且该吊运装置还包括与其中一个第二限位孔27配合并限定第二支腿23伸出长度的限位销(图中未示出)。较优地,上述多个第二限位孔27设置为大小及形状都相同的第二限位孔27。当第二支腿23的伸出长度调节合适后,将限位销插入第一支腿22与第二支腿23连接处的第二限位孔27中,来限定第二支腿23伸出第一支腿22的长度。通过这种方式可以调节吊运装置的高度,以适应不同的工作环境。第二支腿23还可以从第一支腿22中抽出,在吊运工作完成后,可以将该吊运装置进行拆卸,方便该吊运装置的搬运及携带。As a possible implementation, the support only includes the first leg 22 and the second leg 23, as shown in Figure 4, the second leg 23 can be inserted into the first leg 22, and the second leg 23 has A plurality of second limiting holes 27 arranged in sequence along the extending direction, and the hoisting device also includes a limiting pin that cooperates with one of the second limiting holes 27 and limits the extending length of the second leg 23 (in the figure not shown). Preferably, the plurality of second limiting holes 27 are set as second limiting holes 27 with the same size and shape. After the stretching length of the second leg 23 is properly adjusted, the limit pin is inserted into the second limit hole 27 at the junction of the first leg 22 and the second leg 23 to limit the extension of the second leg 23. The length of the first leg 22. In this way, the height of the lifting device can be adjusted to suit different working environments. The second support leg 23 can also be extracted from the first support leg 22. After the lifting work is completed, the lifting device can be disassembled to facilitate the handling and carrying of the lifting device.

较优地,第一支腿22和第二支腿23之间设置有连接部24,在该吊运装置安装完成后,可以通过绷带(或绳索等)穿过连接部24并固定到塔筒栏杆或其他固定位置,进而固定该吊运装置,增加该吊运装置工作过程的安全性。Preferably, a connecting portion 24 is provided between the first leg 22 and the second leg 23, and after the installation of the hoisting device is completed, a bandage (or rope, etc.) can pass through the connecting portion 24 and be fixed to the tower Railings or other fixed positions, and then fix the lifting device, increasing the safety of the lifting device in the working process.

在这里说明,本实施例中,支撑件的高度可以调节,支撑件可以包括数量多于两个的支腿(包括第一支腿22和第二支腿23),支腿间的连接方式优选为,但不限于上述的可伸缩连接,可以使支撑件的高度可调节的连接方式都可用于本实施例的吊运装置。It is explained here that in this embodiment, the height of the support can be adjusted, and the support can include more than two legs (including the first leg 22 and the second leg 23), and the connection between the legs is preferably For, but not limited to, the telescopic connection mentioned above, any connection method that can make the height of the support member adjustable can be used in the hoisting device of this embodiment.

为了实现吊运装置的轻量化,吊运装置的材料优选为铝合金材料。支撑件的第一支腿22(重约8.5Kg)和第二支腿23(重约7.5Kg)拆卸分开之后,与横梁21连接的只有第一支腿22,可以不再进行拆卸,也不会因为太重而影响操作人员搬运装置。因此,横梁21与支撑件也可以固定连接在一起,比如采用焊接的方式。In order to reduce the weight of the lifting device, the material of the lifting device is preferably an aluminum alloy material. After the first leg 22 (about 8.5Kg in weight) and the second leg 23 (about 7.5Kg in weight) of the support are disassembled and separated, only the first leg 22 is connected with the crossbeam 21, which can no longer be disassembled, nor It will affect the operator's handling of the device because it is too heavy. Therefore, the beam 21 and the supporting member can also be fixedly connected together, such as by welding.

为了便于移动吊运装置,支撑部2底端设置有脚轮25。因为通常情况下,吊运梁1的滑轨13的长度有限(滑轨长度较优地设置为2米,过长会导致该吊运装置的不方便携带和在受限空间里不能使用),而吊运物要被吊运的距离会超过滑轨13的长度,这种情况下通过脚轮25可以方便地移动吊运装置以将吊运物吊运更远的距离,提高适应性。In order to facilitate the movement of the lifting device, casters 25 are provided at the bottom of the support part 2 . Because usually, the length of the slide rail 13 of the lifting beam 1 is limited (the length of the slide rail is preferably set to 2 meters, too long will cause the lifting device to be inconvenient to carry and cannot be used in a confined space), The distance to be hoisted by the hoisted objects will exceed the length of the slide rail 13. In this case, the casters 25 can be used to easily move the hoisting device to hoist the hoisted objects for a longer distance, improving adaptability.

具体地,在第二支腿23底端固定设置支撑脚26,脚轮25设置在支撑脚26底部,支撑脚26用于连接支撑部2和脚轮25。脚轮25与支撑脚26的连接方式优选为可拆卸连接。Specifically, a support foot 26 is fixedly provided at the bottom of the second leg 23 , and a caster 25 is provided at the bottom of the support foot 26 , and the support foot 26 is used for connecting the support part 2 and the caster 25 . The connection mode between the casters 25 and the support feet 26 is preferably a detachable connection.

较优地,脚轮25为万向轮,从而使得该吊运装置可以多方向移动,增加调运范围;较优地,脚轮25上带有刹车,使得在不需要移动该吊运装置时,通过刹车控制脚轮25不能滑动,进而稳定该吊运装置。Preferably, the casters 25 are universal wheels, so that the lifting device can move in multiple directions and increase the range of transportation; preferably, the casters 25 are equipped with brakes, so that when the lifting device does not need to be moved, the lifting device can be Control caster 25 can not slide, and then stabilizes this hoisting device.

本实施例中的吊运部3较优地选择为电动葫芦,因为电动葫芦质量较轻(约16KG),方便携带且容易搬运到风力发电机组塔筒平台。电动葫芦的钢丝绳索吊长约9米,能够满足风力发电机组塔筒平台的吊运高度;且电动葫芦的可悬吊物重超过变流器模块的重量(重约150Kg)。电动葫芦通过设置在滑轨13内的滑轮与吊运梁1连接,即可保证电动葫芦沿滑轨13滑动。The hoisting part 3 in this embodiment is preferably selected as an electric hoist, because the electric hoist is light in weight (about 16KG), easy to carry and easy to transport to the tower platform of the wind power generating set. The wire rope of the electric hoist is about 9 meters long, which can meet the lifting height of the tower platform of the wind turbine; and the weight of the suspended object of the electric hoist exceeds the weight of the converter module (about 150Kg). The electric hoist is connected with the lifting beam 1 through the pulley arranged in the slide rail 13 , so that the electric hoist can slide along the slide rail 13 .

如图1所示的吊运装置在使用之前需要组装,组装步骤包括:The hoisting device shown in Figure 1 needs to be assembled before use, and the assembly steps include:

a,将每个支撑件的第一支腿22和第二支腿23组装在一起,将两个支撑件与一个横梁21连接起来组成一个支撑部2;a, the first leg 22 and the second leg 23 of each support are assembled together, and the two supports are connected with a beam 21 to form a support part 2;

b,将吊运梁第一端11插入一个支撑部2的插接槽213中,用防滑件抵紧吊运梁1,并将限位块插入第一限位孔12中;b. Insert the first end 11 of the lifting beam into the insertion slot 213 of a supporting part 2, press against the lifting beam 1 with an anti-skid member, and insert the limiting block into the first limiting hole 12;

c,将吊运梁1插入第二个支撑部2的插接槽213中,并利用防滑件抵紧吊运梁1;c. Insert the lifting beam 1 into the insertion slot 213 of the second support part 2, and use the anti-slip parts to press against the lifting beam 1;

d,将电动葫芦安装到吊运梁的滑轨13上。d. Install the electric hoist on the slide rail 13 of the lifting beam.

将吊运装置组装完成后,就可用于更换风力发电机组变流器模块。通常,在更换变流器模块时,要将塔底处的旧模块拆卸下来并换上新模块,本次操作仅需两个操作人员就可以完成。After the lifting device is assembled, it can be used to replace the converter module of the wind power generating set. Usually, when replacing a converter module, the old module at the bottom of the tower needs to be dismantled and replaced with a new one. This operation can be completed by only two operators.

先由操作人员将吊运装置的各部件搬运到风力发电机组塔筒平台,再依据上述的步骤进行组装,然后就可以利用电动葫芦的绳索吊起模块。起吊时,通过控制电动葫芦沿滑轨13滑动和滑动脚轮25可以调节电动葫芦的位置,以更好地适应需要移动的模块的位置。通过控制电动葫芦升降绳索就可以完成模块到高低位置的移动。Firstly, the operator transports the components of the hoisting device to the tower platform of the wind power generating set, and then assembles them according to the above steps, and then the module can be hoisted by the rope of the electric hoist. When lifting, the position of the electric hoist can be adjusted by controlling the electric hoist to slide along the slide rail 13 and the sliding casters 25, so as to better adapt to the position of the module that needs to be moved. The movement of the module to the high and low positions can be completed by controlling the lifting rope of the electric hoist.

下面结合图5~8介绍如何利用该装置完成风力发电机组变流器模块的更换。The following describes how to use the device to complete the replacement of the converter module of the wind power generating set with reference to FIGS. 5 to 8 .

图5所示该吊运装置的工作状态,可以将旧模块从塔底吊运到塔筒平台和将新模块从塔筒平台吊运到塔底。首先,将该吊运装置安装在远离塔筒门处的观察孔5上方,由于受到塔筒平台的空间限制,该吊运装置应处于尽量低的应用状态,即调节第二支腿23插入第一支腿22内一定长度,并用限位销将第二支腿23相对于第一支腿22固定好,然后将电动葫芦安装到吊运梁1的滑轨13上。值得注意的是,在使用该吊运装置时,为了将装置固定好,更稳定地进行吊运工作,需要将脚轮25刹车,并用专用绷带将四个支撑件固定好。Figure 5 shows the working state of the lifting device, the old module can be lifted from the tower bottom to the tower platform and the new module can be lifted from the tower platform to the tower bottom. First, install the hoisting device above the observation hole 5 away from the tower door. Due to the space limitation of the tower platform, the hoisting device should be in the lowest possible application state, that is, adjust the second leg 23 to insert the first One leg 22 has a certain length, and the second leg 23 is fixed relative to the first leg 22 with a limit pin, and then the electric hoist is installed on the slide rail 13 of the lifting beam 1 . It is worth noting that, when using the lifting device, in order to fix the device and carry out the lifting work more stably, it is necessary to brake the caster 25 and fix the four supports with special bandages.

具体地,在将旧模块从塔底吊运到塔筒平台时,一个操作人员在塔底负责拆卸掉旧模块,一个操作人员在塔筒平台上负责操作电动葫芦沿滑轨13滑动至观察孔5上方,并将绳索降到塔底变流器处,由塔底操作人员将旧模块吊在绳索上之后,再操作电控葫芦将绳索升到塔筒平台,滑动电动葫芦将旧模块放置在塔筒平台上。然后,可以将上述脚轮刹车和专用绷带解开,推动吊运装置移动至塔筒门处,将旧模块放置到塔筒门处。Specifically, when hoisting the old module from the bottom of the tower to the tower platform, one operator is responsible for dismantling the old module at the bottom of the tower, and one operator is responsible for operating the electric hoist on the tower platform to slide along the slide rail 13 to the observation hole 5, and lower the rope to the converter at the bottom of the tower. After the operator at the bottom of the tower hangs the old module on the rope, he operates the electric hoist to raise the rope to the tower platform, and slides the electric hoist to place the old module on the on the tower platform. Then, the above-mentioned caster brakes and special bandages can be untied, the lifting device is pushed to move to the tower door, and the old module is placed at the tower door.

在将新模块从塔筒平台吊运到塔底时,塔筒平台操作人员负责用绳索将新模块吊起,并滑动电控葫芦滑动至观察孔5上方,将绳索降到塔底变流器处,由塔底操作人员将新模块取下并进行安装。When hoisting the new module from the tower platform to the bottom of the tower, the operator of the tower platform is responsible for hoisting the new module with a rope, and sliding the electric control hoist to the top of the observation hole 5, and lowering the rope to the converter at the bottom of the tower , the operator at the bottom of the tower removes the new module and installs it.

图6所示的该吊运装置的工作状态和图5的基本一致,是通过靠近塔筒门处的观察孔5更换变流器模块,具体工作过程参见图5所示工作状态的相应内容。此时,吊运梁1也可以伸至塔筒门外,进而将旧模块从塔底吊运到塔筒平台之后,滑动电动葫芦至塔筒门外并将旧模块放置在塔筒门外。The working state of the lifting device shown in Fig. 6 is basically the same as that in Fig. 5, and the converter module is replaced through the observation hole 5 near the tower door. For the specific working process, refer to the corresponding content of the working state shown in Fig. 5 . At this time, the lifting beam 1 can also be extended to the outside of the tower tube door, and then the old module is hoisted from the bottom of the tower to the tower tube platform, and then the electric hoist is slid to the outside of the tower tube door and the old module is placed outside the tower tube door.

图7所示的该吊运装置的工作状态,可以将模块从塔筒门外的爬梯平台6吊运至塔筒内和从塔筒内吊运至爬梯平台6。在安装该吊运装置时,将四个支撑件保持在塔筒内,吊运梁1延伸到塔筒外,调节第二支腿23伸出第一支腿22的长度,以控制该吊运装置的高度适应塔筒门的高度。In the working state of the lifting device shown in FIG. 7 , the module can be lifted from the ladder platform 6 outside the tower door to the inside of the tower and from the inside of the tower to the ladder platform 6 . When installing the hoisting device, keep the four supports in the tower, the hoisting beam 1 extends out of the tower, and adjust the length of the second leg 23 protruding from the first leg 22 to control the hoisting. The height of the device is adapted to the height of the tower door.

具体地,在将模块从塔筒内吊运至爬梯平台6,只需一个操作人员就可以完成吊运工作,由操作人员用绳索吊起模块,并滑动电动葫芦至塔筒外,将模块放置在爬梯平台6上。同理,图7所示的该吊运装置的工作状态,也可以将在将新模块从爬梯平台6吊运至塔筒内,还可以再通过滑动脚轮25移动该吊运装置,将塔筒门处的新模块吊运到塔筒平台的两个观察孔5处。Specifically, when lifting the module from the tower to the ladder platform 6, only one operator can complete the lifting work. The operator lifts the module with a rope, slides the electric hoist to the outside of the tower, and places the module On the ladder platform 6. Similarly, in the working state of the lifting device shown in Figure 7, the new module can also be lifted from the ladder platform 6 into the tower, and the lifting device can also be moved by sliding casters 25 to lift the tower The new module at the door is hoisted to the two observation holes 5 on the tower platform.

图8所示的该吊运装置的工作状态,可以将模块从塔筒的爬梯平台6运至地面和从地面吊运至爬梯平台6。在安装该吊运装置时,可以将第二支腿23伸出第一支腿22的长度调节到最大,使装置处于最高状态;然后将吊运梁1伸出爬梯护栏61,并将电动葫芦安装在吊运梁1上,以方便将模块吊运至爬梯护栏61外。同时还可以将四个支撑件的脚轮25拆卸下来,使吊运装置通过支撑脚26架设在爬梯平台6上,控制支撑脚26尽量靠近爬梯平台6的边缘并将之固定。此时,四个支撑脚26的面积和装置的机械强度应该严格设计,以满足爬梯平台6面积的要求。In the working state of the lifting device shown in FIG. 8 , the module can be transported from the ladder platform 6 of the tower to the ground and from the ground to the ladder platform 6 . When installing the lifting device, the length of the second leg 23 extending out of the first leg 22 can be adjusted to the maximum, so that the device is in the highest state; then the lifting beam 1 is stretched out from the ladder guardrail 61, and the electric hoist Installed on the lifting beam 1 to facilitate the lifting of the module to the outside of the ladder guardrail 61. The casters 25 of the four supports can also be disassembled simultaneously, so that the hoisting device is erected on the ladder platform 6 by the support feet 26, and the control support feet 26 are fixed as close as possible to the edge of the ladder platform 6. At this time, the area of the four supporting feet 26 and the mechanical strength of the device should be strictly designed to meet the requirements for the area of the ladder platform 6 .

具体地,在将模块从塔筒的爬梯平台6吊运至地面时,一个操作人员在爬梯平台6上用绳索将模块吊起,控制电动葫芦提升模块,使其高度超过爬梯护栏61,再滑动电动葫芦至爬梯护栏61外,控制绳索缓慢降低至地面或者车、船平台,由其他操作人员将模块从绳索上取下。同理,按照上述路径也可以将模块地面吊运至爬梯平台6。Specifically, when lifting the module from the ladder platform 6 of the tower to the ground, an operator lifts the module with a rope on the ladder platform 6, controls the electric hoist to lift the module so that its height exceeds the ladder guardrail 61, and then slides The electric hoist is outside the ladder guardrail 61, and the control rope is slowly lowered to the ground or the vehicle and ship platform, and the module is taken off the rope by other operators. Similarly, the module can also be lifted from the ground to the ladder platform 6 according to the above path.

在这里说明,在使用该吊运装置进行更换变流器模块时,具体操作时,只需要组装一次该吊运装置,可通过调节第二支腿23伸出第一支腿22的长度、滑动脚轮25、调节横梁21与吊运梁1的相对位置等,来实现图5~8所示的工作状态之间的相互转换。例如,由图7到图8所示工作状态的转换,需要通过滑动脚轮25使装置移动至爬梯平台6,调节第二支腿23伸出第一支腿22的长度至最大,再拆掉脚轮25并固定支撑脚来完成。而由图5到图6所示工作状态的转换,只需要通过滑动脚轮25来移动吊运装置就可以完成。It is explained here that when using the lifting device to replace the converter module, the lifting device only needs to be assembled once during the specific operation. The casters 25, adjusting the relative position of the beam 21 and the lifting beam 1, etc., realize the mutual conversion between the working states shown in FIGS. 5-8. For example, to switch from the working state shown in Figure 7 to Figure 8, it is necessary to move the device to the ladder platform 6 by sliding the caster 25, adjust the length of the second leg 23 extending out of the first leg 22 to the maximum, and then remove the caster 25 and fix the supporting feet to complete. And by the conversion of working state shown in Fig. 5 to Fig. 6, only need move lifting device by sliding caster 25 and just can finish.

本实用新型的风力发电机组用吊运装置具有如下效果:The lifting device for the wind power generating set of the present utility model has the following effects:

通过调节第二支腿伸出第一支腿的长度可以调节支撑部的高度,通过滑动脚轮可以移动吊运装置,通过滑动吊运部可以移动吊运物,能够省时省力的完成变流器模块的更换;The height of the supporting part can be adjusted by adjusting the length of the second leg protruding from the first leg, the lifting device can be moved by sliding the casters, and the lifting object can be moved by sliding the lifting part, which can save time and effort to complete the converter Module replacement;

吊运梁、支撑部、吊运部的可拆卸连接,使得吊运装置容易组装和拆卸;The detachable connection of lifting beam, supporting part and lifting part makes the lifting device easy to assemble and disassemble;

通过连接部、刹车等可以固定吊运装置,使得吊运过程可以安全进行;The lifting device can be fixed through the connection part, brake, etc., so that the lifting process can be carried out safely;

该吊运装置还具有方便携带、易组装拆卸、操作简单等优点。The lifting device also has the advantages of convenient portability, easy assembly and disassembly, and simple operation.

以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以所述权利要求的保护范围为准。The above is only a specific embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or changes within the technical scope disclosed by the utility model Replacement should be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be based on the protection scope of the claims.

Claims (10)

1.一种风力发电机组用吊运装置,其特征在于,包括:1. A hoisting device for a wind power generating set, characterized in that it comprises: 吊运梁(1);Lifting beam (1); 支撑部(2),所述吊运梁(1)设置在所述支撑部(2)的顶端,所述支撑部(2)为至少两个,且所述支撑部(2)在所述吊运梁(1)上的位置可调,每个所述支撑部(2)包括支撑件,所述支撑件至少包括依次连接的第一支腿(22)和第二支腿(23),所述第二支腿(23)伸出所述第一支腿(22)的长度可调;A support part (2), the lifting beam (1) is arranged on the top end of the support part (2), there are at least two support parts (2), and the support part (2) is on the The position on the transport beam (1) is adjustable, and each of the support parts (2) includes a support, and the support includes at least a first leg (22) and a second leg (23) connected in sequence, so The length of the second supporting leg (23) extending out from the first supporting leg (22) is adjustable; 吊运部(3),所述吊运部(3)设置在所述吊运梁(1)上。A lifting part (3), the lifting part (3) is arranged on the lifting beam (1). 2.根据权利要求1所述的风力发电机组用吊运装置,其特征在于,所述支撑部(2)还包括横梁(21),所述支撑件为两个,两个所述支撑件的顶部均与所述横梁(21)连接。2. The hoisting device for a wind power generating set according to claim 1, characterized in that, the support part (2) further comprises a beam (21), and there are two support members, and the two support members The tops are all connected with the beams (21). 3.根据权利要求2所述的风力发电机组用吊运装置,其特征在于,两个所述支撑件的底部之间的距离大于两个所述支撑件的顶部之间的距离。3 . The hoisting device for a wind power generating set according to claim 2 , wherein the distance between the bottoms of the two supports is greater than the distance between the tops of the two supports. 4 . 4.根据权利要求2或3所述的风力发电机组用吊运装置,其特征在于,所述横梁(21)上设置有插接槽(213),所述吊运梁(1)插入所述横梁(21)的插接槽(213)内。4. The lifting device for wind power generating set according to claim 2 or 3, characterized in that, the crossbeam (21) is provided with an insertion slot (213), and the lifting beam (1) is inserted into the In the slot (213) of the beam (21). 5.根据权利要求4所述的风力发电机组用吊运装置,其特征在于,所述横梁(21)包括两个容纳所述支撑件的容纳框(211)和连接在两个所述容纳框(211)之间的连接块(212),所述插接槽(213)位于所述连接块(212)的下部,所述连接块(212)上设置有与所述插接槽(213)连通的第一通孔(214),所述吊运装置还包括与所述第一通孔(214)配合并抵紧所述吊运梁(1)的防滑件。5. The hoisting device for a wind power generating set according to claim 4, characterized in that, the beam (21) comprises two accommodation frames (211) for accommodating the support members and a frame connected to the two accommodation frames (211) between the connection block (212), the insertion slot (213) is located at the bottom of the connection block (212), the connection block (212) is provided with the insertion slot (213) connected to the first through hole (214), and the hoisting device further includes an anti-skid member that cooperates with the first through hole (214) and presses against the hoisting beam (1). 6.根据权利要求1所述的风力发电机组用吊运装置,其特征在于,所述吊运梁(1)的第一端上设置有第一限位孔(12),所述第一限位孔(12)内可拆卸的设置有限位块。6. The lifting device for wind power generating set according to claim 1, characterized in that, a first limit hole (12) is provided on the first end of the lifting beam (1), and the first limit hole (12) is A limit block is detachably arranged in the bit hole (12). 7.根据权利要求1所述的风力发电机组用吊运装置,其特征在于,所述第二支腿(23)上具有多个沿伸出方向依次设置的第二限位孔(27),所述吊运装置还包括与其中一个所述限位孔配合并限定所述第二支腿(23)伸出长度的限位销。7. The hoisting device for a wind power generating set according to claim 1, characterized in that, the second leg (23) has a plurality of second limiting holes (27) sequentially arranged along the extending direction, The hoisting device also includes a limit pin that cooperates with one of the limit holes and limits the extension length of the second leg (23). 8.根据权利要求1所述的风力发电机组用吊运装置,其特征在于,所述支撑部(2)还包括脚轮(25),所述脚轮(25)设置在所述支撑件底端。8. The hoisting device for a wind power generating set according to claim 1, characterized in that, the support part (2) further includes casters (25), and the casters (25) are arranged at the bottom of the support. 9.根据权利要求1所述的风力发电机组用吊运装置,其特征在于,所述吊运梁(1)上设置有滑轨(13),所述吊运部(3)沿所述滑轨(13)可移动地设置在所述滑轨(13)上。9. The lifting device for wind power generating set according to claim 1, characterized in that, a slide rail (13) is provided on the lifting beam (1), and the lifting part (3) moves along the sliding rail (13). The rail (13) is movably arranged on the slide rail (13). 10.根据权利要求1所述的风力发电机组用吊运装置,其特征在于,所述吊运部(3)为电动葫芦。10. The lifting device for a wind power generating set according to claim 1, characterized in that, the lifting part (3) is an electric hoist.
CN201520697608.4U 2015-09-09 2015-09-09 Overhead hoist for wind generating set Expired - Lifetime CN204917669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520697608.4U CN204917669U (en) 2015-09-09 2015-09-09 Overhead hoist for wind generating set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520697608.4U CN204917669U (en) 2015-09-09 2015-09-09 Overhead hoist for wind generating set

Publications (1)

Publication Number Publication Date
CN204917669U true CN204917669U (en) 2015-12-30

Family

ID=54966817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520697608.4U Expired - Lifetime CN204917669U (en) 2015-09-09 2015-09-09 Overhead hoist for wind generating set

Country Status (1)

Country Link
CN (1) CN204917669U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107445083A (en) * 2017-08-15 2017-12-08 重庆美的通用制冷设备有限公司 Compressor transporter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107445083A (en) * 2017-08-15 2017-12-08 重庆美的通用制冷设备有限公司 Compressor transporter

Similar Documents

Publication Publication Date Title
CN102155089B (en) Self-jacking construction platform integrating vertical transportation equipment and mold base
CN202000646U (en) Self-lifting construction platform integrating vertical transportation device and mould frame
CN205687426U (en) Indoor middle-size and small-size equipment boom hoisting
CN105162036A (en) Electric power maintenance platform
CN201323398Y (en) Small-sized electric power equipment landing gear
CN105366567A (en) Intelligent assisting platform for dismounting and mounting of GIS (Gas Insulated Substation)
CN216889833U (en) Climbing system
CN204324741U (en) Load switch of transformer suspended core apparatus
CN202333531U (en) Hydraulic elevating type tool car
CN205990204U (en) Cable overhauls manhole cover lifting device
CN204897278U (en) Cable well cover opening device
CN104134942A (en) Operation method of 10 kV circuit breaker multifunctional maintenance platform
CN204897280U (en) Movable hoist height adjustable portable crane
CN207418154U (en) A kind of large size roof ventilator motor disassembling handling apparatus
CN201817243U (en) Platform and device for replacing conductor rail
CN201737611U (en) Lifting device for power capacitor tower
CN207108299U (en) A kind of loop wheel machine
CN206172810U (en) Portable lifting device
CN206263919U (en) Packaged type Standardized operation tool box
CN214899827U (en) High-altitude outdoor cable terminal work platform
CN204162350U (en) Electric power cover plate hydraulic hanging device
CN214762961U (en) Movable telescopic device for hanging safety belt
CN105668410A (en) Installation method for monolithic movement type crane beam
CN204899759U (en) Ladder is rushed to repair to electric power cable
CN103896153A (en) Zig-zag derrick for replacing disconnecting link

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 830026 No. 107, Shanghai Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region

Patentee after: Jinfeng Technology Co.,Ltd.

Address before: 830026 No. 107, Shanghai Road, Urumqi economic and Technological Development Zone, the Xinjiang Uygur Autonomous Region

Patentee before: XINJIANG GOLDWIND SCIENCE & TECHNOLOGY Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20151230