CN204902698U - Preheat system's pre -installation platform - Google Patents
Preheat system's pre -installation platform Download PDFInfo
- Publication number
- CN204902698U CN204902698U CN201520432387.8U CN201520432387U CN204902698U CN 204902698 U CN204902698 U CN 204902698U CN 201520432387 U CN201520432387 U CN 201520432387U CN 204902698 U CN204902698 U CN 204902698U
- Authority
- CN
- China
- Prior art keywords
- platform
- installation platform
- tip
- lever support
- locomotive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model belongs to the technical field of locomotive pre -installation platform technique and specifically relates to a preheat system's pre -installation platform, including the pre -installation platform, be equipped with ejector rod base, a plurality of positioning seat and support on the pre -installation platform, ejector rod base installs the tip at the pre -installation platform, and the support is installed at the interval on ejector rod base in front, pre -installation platform mesa, and according to pipeline trend on the locomotive, the positioning seat is installed on the return bend turns to the pre -installation platform mesa of department. Utilize the utility model discloses preassemble the system of preheating, guarantee the accuracy nature after the final installation of the locomotive system of preheating.
Description
Technical field
The utility model relates to locomotive prepackage platform technical field, especially a kind of pre-heating system prepackage platform.
Background technology
Improve locomotive and build quality, device need be utilized to pre-install pre-heating system, but equip without perfect prepackage.
Each system of locomotive is more complicated, parts and pipeline many, if progressively standardization need be realized, need design pre-heating system prepackage platform, simulation locomotive on installation form.
Summary of the invention
In order to overcome the deficiency of existing technology, the utility model provides a kind of pre-heating system prepackage platform.
The utility model solves the technical scheme that its technical matters adopts: a kind of pre-heating system prepackage platform, comprise pre-assembling platform, pre-assembling platform is provided with tip-lever support, some positioning seats and bearing, tip-lever support is arranged on the end of pre-assembling platform, before tip-lever support, in prepackage tabletop of platform, interval is provided with bearing, according to locomotive upper pipeline trend, positioning seat is arranged in the prepackage tabletop of platform of bend pipe turning point.
According to another embodiment of the present utility model, comprise tip-lever support further and be provided with holding screw.
According to another embodiment of the present utility model, comprise tip-lever support further and be provided with the spherojoint matched with workpiece Upper ball joint.
According to another embodiment of the present utility model, comprise tip-lever support, positioning seat and bearing further and be all connected with pre-assembling platform by bolt.
The beneficial effects of the utility model are, utilize the utility model to pre-install pre-heating system, ensure locomotive pre-heating system finally install after accuracy.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is side view of the present utility model.
Fig. 2 is vertical view of the present utility model.
In figure 1, pre-assembling platform, 2, tip-lever support, 21, holding screw, 22, spherojoint, 3, positioning seat, 4, bearing.
Embodiment
As shown in Figure 1-2, a kind of pre-heating system prepackage platform, comprise pre-assembling platform 1, pre-assembling platform 1 is provided with tip-lever support 2, some positioning seats 3 and bearing 4, tip-lever support 2 is arranged on the end of pre-assembling platform 1, and before tip-lever support 2, on pre-assembling platform 1 table top, interval is provided with bearing 4, moves towards according to locomotive upper pipeline, positioning seat 3 is arranged on pre-assembling platform 1 table top of bend pipe turning point, to prevent tube bending.According to the position on locomotive, bearing 4, positioning seat 3 are fixed on pre-assembling platform 1, determine location dimension, tip-lever support 2, positioning seat 3 are all connected with pre-assembling platform by bolt with bearing 4, convenient disassembly.Tip-lever support 2 is provided with holding screw 21, for fastening pipe fitting.Tip-lever support 2 is provided with the spherojoint 22 matched with workpiece Upper ball joint, the installation site on simulation locomotive.
Assemble by Fig. 2 through the curved good pipe of bend pipe handset, in assembling process, carry out the correction of size, thus make pre-heating system assemble basic shaping.The utility model carries out pre-installation on platform, is fixedly connected with the trend of joint and pipeline, after installing in advance, is pulled down by equipment, and when locomotive enters the last assembling stage, pre-heating system assembling can be carried out smoothly.
Utility model is pre-installed pre-heating system, ensure that locomotive pre-heating system finally install after accuracy.
Claims (4)
1. a pre-heating system prepackage platform, it is characterized in that, comprise pre-assembling platform (1), pre-assembling platform (1) is provided with tip-lever support (2), some positioning seats (3) and bearing (4), tip-lever support (2) is arranged on the end of pre-assembling platform (1), before tip-lever support (2), on pre-assembling platform (1) table top, interval is provided with bearing (4), and according to locomotive upper pipeline trend, positioning seat (3) is arranged on pre-assembling platform (1) table top of bend pipe turning point.
2. pre-heating system prepackage platform according to claim 1, it is characterized in that, described tip-lever support (2) is provided with holding screw (21).
3. pre-heating system prepackage platform according to claim 1, it is characterized in that, described tip-lever support (2) is provided with the spherojoint (22) matched with workpiece Upper ball joint.
4. pre-heating system prepackage platform according to claim 1, it is characterized in that, described tip-lever support (2), positioning seat (3) are all connected with pre-assembling platform (1) by bolt with bearing (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520432387.8U CN204902698U (en) | 2015-06-23 | 2015-06-23 | Preheat system's pre -installation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520432387.8U CN204902698U (en) | 2015-06-23 | 2015-06-23 | Preheat system's pre -installation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204902698U true CN204902698U (en) | 2015-12-23 |
Family
ID=54924866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520432387.8U Active CN204902698U (en) | 2015-06-23 | 2015-06-23 | Preheat system's pre -installation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204902698U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104897024A (en) * | 2015-06-23 | 2015-09-09 | 南车戚墅堰机车有限公司 | Preheating system preassembling platform |
-
2015
- 2015-06-23 CN CN201520432387.8U patent/CN204902698U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104897024A (en) * | 2015-06-23 | 2015-09-09 | 南车戚墅堰机车有限公司 | Preheating system preassembling platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204902698U (en) | Preheat system's pre -installation platform | |
CN204799874U (en) | Car seat slide rail riveting clamping mechanism | |
CN204799747U (en) | Novel pipe cut -out press location device | |
CN104897024A (en) | Preheating system preassembling platform | |
CN104525758A (en) | LED street lamp support riveting machine | |
CN201881349U (en) | Crankshaft part assembly device | |
CN104493057A (en) | Riveting lower die for LED (light-emitting diode) street lamp bracket riveting machine | |
CN102886674A (en) | Buckling positioning device | |
CN209303519U (en) | A kind of adjustable straight tube punching jig | |
CN204381732U (en) | Cycle frame magnetic welding tooling | |
CN203210047U (en) | Elbow holder | |
CN203815025U (en) | Lifting positioning device of guard bar of bed | |
CN208557290U (en) | Spring energy-storage axis positioning pin installs fixture | |
CN202845614U (en) | Servo transposition device of multi-station servo transposition cold stamping machine | |
CN103143598A (en) | Elbow pushing device capable of pushing elbow | |
CN105480345B (en) | A kind of Modular electrical motor-car | |
CN201519086U (en) | Stainless steel sink bracket | |
CN205271834U (en) | Rubber tube choke valve installation frock | |
CN203833419U (en) | Novel elevator guide rail support assembly | |
CN203711554U (en) | Tooling for bending tubular workpiece | |
CN204866950U (en) | Simple and easy minor bend machine | |
CN203544128U (en) | Front suspension auxiliary frame with exhaust pipe hook support | |
CN204183206U (en) | A kind of regulating positioning device of staircase | |
CN204114867U (en) | Portable lighting lamp bracing frame | |
CN204321985U (en) | A kind of erection unit of rubber sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |