CN204894176U - Prefabricated bathroom mould - Google Patents
Prefabricated bathroom mould Download PDFInfo
- Publication number
- CN204894176U CN204894176U CN201520625390.1U CN201520625390U CN204894176U CN 204894176 U CN204894176 U CN 204894176U CN 201520625390 U CN201520625390 U CN 201520625390U CN 204894176 U CN204894176 U CN 204894176U
- Authority
- CN
- China
- Prior art keywords
- mold
- corner
- frame
- prefabricated
- corner head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Toilet Supplies (AREA)
Abstract
本实用新型公开了一种预制卫生间模具,包括内胆模、连接在所述内胆模内周的框架、以及至少一组连接在内胆模对角处的角头之间、通过转动带动内胆模的角头往内胆模内侧方向移动的角头移动机构;角头移动机构包括撑杆、以及对应角头安装在框架两对角处的两组轴承组件,撑杆的两端分别可转动穿过轴承组件并连接角头。本实用新型在内胆模内增设框架以及角头移动机构,在拆模时先通过角头移动机构将内胆模的角头往内侧移动以脱离混凝土面,再通过龙门吊等吊装设备吊装框架,可将内胆模整体吊出,有效降低龙门吊的使用次数、降低工人劳动强度、提高效率且减少预制卫生间产品在拆模过程中的崩烂危险,保证预制卫生间产品的质量。
The utility model discloses a prefabricated toilet mould, which comprises an inner tank mold, a frame connected to the inner circumference of the inner tank mold, and at least one group of corner heads connected to opposite corners of the inner tank mold, which drives the inner mold through rotation. The corner head moving mechanism for the corner head of the tank mold to move toward the inner side of the inner tank mold; the corner head moving mechanism includes a strut and two sets of bearing assemblies corresponding to the corner head installed at the two opposite corners of the frame. Turn through the bearing assembly and attach the corner head. The utility model adds a frame and a corner head moving mechanism in the inner tank mold. When the mold is removed, the corner head of the inner tank mold is first moved to the inner side by the corner head moving mechanism to separate from the concrete surface, and then the frame is hoisted by hoisting equipment such as a gantry crane. The inner tank mold can be hoisted out as a whole, effectively reducing the number of times of use of the gantry crane, reducing the labor intensity of workers, improving efficiency and reducing the risk of collapse of prefabricated toilet products during the demoulding process, ensuring the quality of prefabricated toilet products.
Description
技术领域technical field
本实用新型涉及建筑领域,特别涉及一种预制卫生间模具。The utility model relates to the construction field, in particular to a prefabricated toilet mold.
背景技术Background technique
传统的整体预制卫生间模具采用立式生产,然后再二次浇筑顶部成型。传统的整体预制卫生间模具的内胆斜分成四块,在内胆角头位置采用斜刀口相接,通过螺丝定位的形式将其固定。在装模时,需使用龙门吊将零散的四块拼起来,然后螺丝定位,若出现板面拼接缝太大,则需重新调整平整度。组装完成后,再将内胆吊进模具。拆装时也需要使用四次龙门吊,拆装困难大,工作效率低,且内胆的平整度和垂直度很难控制,导致预制卫生间产品的质量无法保证。The traditional overall prefabricated toilet mold is produced vertically, and then the top is poured twice. The inner container of the traditional overall prefabricated bathroom mold is divided into four obliquely, and the corners of the inner container are connected by oblique knife edges, and are fixed by screw positioning. When installing the mold, it is necessary to use a gantry crane to put together the four scattered pieces, and then position them with screws. If the seam of the board surface is too large, the flatness needs to be readjusted. After the assembly is completed, the liner is hoisted into the mould. Four gantry cranes are also required for disassembly and assembly, which is difficult to assemble and disassemble, and the work efficiency is low, and the flatness and verticality of the inner tank are difficult to control, resulting in the quality of prefabricated bathroom products cannot be guaranteed.
实用新型内容Utility model content
本实用新型要解决的技术问题在于,针对现有相关技术存在的缺陷,提供一种实现内胆模整体拆装的预制卫生间模具。The technical problem to be solved by the utility model is to provide a prefabricated toilet mold which realizes the integral disassembly and assembly of the inner tank mold in view of the defects existing in the related art.
本实用新型解决其技术问题所采用的技术方案是:提供一种预制卫生间模具,包括内胆模、连接在所述内胆模内周的供吊装设备吊装的框架、以及至少一组连接在所述内胆模对角处的角头之间、通过转动带动所述内胆模的角头往所述内胆模内侧方向移动的角头移动机构;The technical solution adopted by the utility model to solve the technical problem is: provide a prefabricated bathroom mould, including an inner tank mold, a frame connected to the inner periphery of the inner tank mold for hoisting by hoisting equipment, and at least one group connected to the Between the corners at the opposite corners of the inner bladder mold, the corner head moving mechanism that drives the corners of the inner bladder mold to move toward the inner side of the inner bladder mold by rotation;
所述角头移动机构包括横向设置在所述内胆模相对的两个角头之间的撑杆、以及对应所述角头安装在所述框架两相对对角处的两组轴承组件,所述撑杆的两端分别可转动穿过所述轴承组件并连接所述角头。The corner head moving mechanism includes a strut horizontally arranged between two opposite corner heads of the inner bladder mold, and two sets of bearing assemblies installed at two opposite corners of the frame corresponding to the corner heads. The two ends of the strut are respectively rotatable through the bearing assembly and connected to the corner head.
优选地,所述内胆模包括两个呈直角弯折的内模架、以及两个所述角头;两个所述内模架相向对接,两个所述角头分别连接在所述内模架的对接处,与所述内模架共同围成一框体结构;Preferably, the inner bladder mold includes two inner mold frames bent at right angles, and two corner heads; the two inner mold frames face each other, and the two corner heads are connected to the inner mold frames respectively. The butt joint of the mold base forms a frame structure together with the inner mold base;
所述内模架对接处的端面为斜面,所述角头对应所述内模架的两侧面对应所述端面设置;所述斜面的倾斜方向与所述内胆模对角线相平行。The end face of the butt joint of the inner mold frame is an inclined plane, and the two sides of the inner mold base corresponding to the corner head are set corresponding to the end faces; the inclined direction of the inclined plane is parallel to the diagonal line of the inner mold base.
优选地,所述角头包括夹角为直角的对角部、以及自所述对角部的两侧向平行所述内胆模的对角线方向延伸的角板;所述角头配合在两个所述内模架的对接处,两个所述角板分别与所述内模架的所述端面相接,从而两个所述角头和两个所述内模架相连接形成横截面为四边形的框体结构。Preferably, the corner head includes a diagonal part with a right angle, and a corner plate extending from both sides of the diagonal part to a direction parallel to the diagonal of the inner bladder mold; the corner head fits in At the joints of the two inner formworks, the two corner plates are connected to the end surfaces of the inner formworks respectively, so that the two corners and the two inner formworks are connected to form a transverse A frame structure with a quadrilateral cross section.
优选地,所述撑杆的两端分别设有螺纹,所述角头对应设有螺纹连接部,所述撑杆的两端分别通过所述螺纹配合在对应的所述螺纹连接部内。Preferably, both ends of the strut are respectively provided with threads, and the corner head is correspondingly provided with a threaded connection portion, and the two ends of the strut are respectively fitted into the corresponding threaded connection portions through the threads.
优选地,所述螺纹连接部包括连接座以及设置在所述连接座上的螺纹孔。Preferably, the threaded connection part includes a connection seat and a threaded hole provided on the connection seat.
优选地,所述内胆模还包括设置在所述内模架远离所述框架的侧面上的面板,所述面板与所述角头远离所述框架的表面相接。Preferably, the inner bladder mold further includes a panel arranged on a side of the inner formwork away from the frame, and the panel is in contact with the surface of the corner head away from the frame.
优选地,所述轴承组件包括轴承及轴承座,所述轴承通过所述轴承座安装在所述框架对角处;所述撑杆的两端分别穿过对应的所述轴承,并可相对所述轴承转动。Preferably, the bearing assembly includes a bearing and a bearing seat, and the bearing is installed at a diagonal position of the frame through the bearing seat; the two ends of the strut pass through the corresponding bearing respectively, and can be opposite to the The bearings rotate.
优选地,所述撑杆上设有把手,所述把手位于所述框架之中。Preferably, a handle is provided on the pole, and the handle is located in the frame.
优选地,该预制卫生间模具还包括至少一组将所述框架连接在所述内胆模内的连接组件。Preferably, the prefabricated toilet mold further includes at least one set of connecting components for connecting the frame in the inner mold.
优选地,所述连接组件包括分别固定在所述内胆模和框架上的第一连接座和第二连接座、配合在所述第一连接座和第二连接座之间的连接杆、以及穿设在所述第一连接座和连接杆上以及所述第二连接座和连接杆上的固定栓。Preferably, the connecting assembly includes a first connecting seat and a second connecting seat respectively fixed on the inner bladder mold and the frame, a connecting rod fitted between the first connecting seat and the second connecting seat, and A fixing bolt passing through the first connecting seat and the connecting rod and the second connecting seat and the connecting rod.
本实用新型的预制卫生间模具,在内胆模内增设框架以及角头移动机构,在拆模时先通过角头移动机构将内胆模的角头往内侧移动以脱离混凝土面,再通过龙门吊等吊装设备吊装框架,可将内胆模整体吊出,有效降低龙门吊的使用次数、降低工人劳动强度、提高效率且减少预制卫生间产品在拆模过程中的崩烂危险,保证预制卫生间产品的质量。本实用新型具有部件少、结构简单、可靠耐用、造价便宜和使用方便等特点。In the prefabricated toilet mold of the present utility model, a frame and a corner head moving mechanism are added in the inner tank mold, and the corner head of the inner tank mold is first moved to the inner side by the corner head moving mechanism to separate from the concrete surface when the mold is removed, and then the corner head of the inner tank mold is moved through the gantry crane, etc. Hoisting equipment The hoisting frame can lift out the inner tank mold as a whole, effectively reducing the number of times of use of the gantry crane, reducing the labor intensity of workers, improving efficiency and reducing the risk of collapse of prefabricated toilet products during the demoulding process, ensuring the quality of prefabricated toilet products. The utility model has the characteristics of few parts, simple structure, reliability and durability, low cost and convenient use.
附图说明Description of drawings
下面将结合附图及实施例对本实用新型作进一步说明,附图中:The utility model will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:
图1是本实用新型一实施例的预制卫生间模具组装后的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram after the prefabricated toilet mold assembly of an embodiment of the present invention;
图2是图1所示预制卫生间模具拆装时的俯视结构示意图;Fig. 2 is a top view structure schematic diagram when the prefabricated toilet mold shown in Fig. 1 is disassembled;
图3是图2所示预制卫生间模具沿A-A线的剖面结构示意图;Fig. 3 is the sectional structure schematic diagram of the prefabricated toilet mold shown in Fig. 2 along A-A line;
图4是图1所示预制卫生间模具的内模架的结构示意图;Fig. 4 is a schematic structural view of the inner formwork of the prefabricated toilet mold shown in Fig. 1;
图5是图1所示预制卫生间模具的角头的结构示意图;Fig. 5 is a schematic structural view of the corner head of the prefabricated bathroom mold shown in Fig. 1;
图6是角头和内模架的连接结构放大图。Fig. 6 is an enlarged view of the connection structure between the corner head and the inner formwork.
具体实施方式Detailed ways
为了对本实用新型的技术特征、目的和效果有更加清楚的理解,现对照附图详细说明本实用新型的具体实施方式。In order to have a clearer understanding of the technical features, purposes and effects of the utility model, the specific implementation of the utility model is described in detail with reference to the accompanying drawings.
如图1、2所示,本实用新型一实施例的预制卫生间模具,包括内胆模10、框架20以及至少一组角头移动机构30。框架20连接在内胆模10内周,且供吊装设备吊装,在吊装内胆模10时,通过吊装该框架20将内胆模10整体吊起;角头移动机构30连接在内胆模10对角处的角头12之间,通过转动带动内胆模10的角头12往内胆模10内侧方向移动,使得角头12脱离成型的预制卫生间的混凝土面,方便内胆模10脱出成型的预制卫生间。As shown in FIGS. 1 and 2 , the prefabricated bathroom mold according to an embodiment of the present invention includes a liner mold 10 , a frame 20 and at least one set of corner head moving mechanisms 30 . The frame 20 is connected to the inner circumference of the liner mold 10, and is used for hoisting by the hoisting equipment. When the liner mold 10 is hoisted, the frame 20 is used to lift the liner mold 10 as a whole; the angle head moving mechanism 30 is connected to the liner mold 10 Between the corner heads 12 at the opposite corners, the corner heads 12 of the liner mold 10 are driven to move toward the inner side of the liner mold 10 by rotation, so that the corner heads 12 are separated from the concrete surface of the formed prefabricated toilet, and the inner liner mold 10 is conveniently released for forming prefabricated bathrooms.
其中,如图2、3所示,角头移动机构30可包括撑杆31以及两组轴承组件32,撑杆31横向设置在内胆模10相对的两个角头12之间,两组轴承组件32对应角头12安装在框架20两相对的对角处,撑杆31的两端分别穿过轴承组件32并可转动连接角头12。在撑杆31向一方向转动时,其两端的角头12可沿撑杆31轴向向内胆模10内侧移动;在撑杆31向反方向转动时,其两端的角头12可沿撑杆31轴向向内胆模10外侧移动以复位。Wherein, as shown in Figures 2 and 3, the angle head moving mechanism 30 can include a strut 31 and two groups of bearing assemblies 32, the strut 31 is laterally arranged between the two angle heads 12 opposite to the liner mold 10, and the two groups of bearings The assembly 32 is installed at two opposite corners of the frame 20 corresponding to the corner head 12 , and the two ends of the strut 31 respectively pass through the bearing assembly 32 and are rotatably connected to the corner head 12 . When the strut 31 rotates in one direction, the corner heads 12 at both ends can move toward the inside of the inner bladder mold 10 along the axial direction of the strut 31; The rod 31 moves axially to the outside of the inner bladder mold 10 to reset.
轴承组件32包括轴承及轴承座,轴承通过轴承座安装在框架20对角处。撑杆31的两端分别穿过对应的轴承,并可相对轴承转动。The bearing assembly 32 includes a bearing and a bearing seat, and the bearing is installed at the opposite corners of the frame 20 through the bearing seat. Both ends of the strut 31 pass through corresponding bearings respectively, and can rotate relative to the bearings.
撑杆31的两端分别设有螺纹311,角头12对应设有螺纹连接部120,撑杆31的两端分别通过螺纹311配合在对应的螺纹连接部120内,通过螺纹连接方式,使得撑杆31转动带动角头12移动。Both ends of the strut 31 are respectively provided with threads 311, and the corner head 12 is correspondingly provided with a threaded connection portion 120, and the two ends of the strut 31 are fitted in the corresponding threaded connection portion 120 through the threads 311 respectively, and through the threaded connection, the strut The rotation of the rod 31 drives the corner head 12 to move.
另外,撑杆31上还设有把手33,把手33位于框架20之中,方便操作人员转动撑杆31。In addition, a handle 33 is provided on the strut 31 , and the handle 33 is located in the frame 20 , so that the operator can turn the strut 31 conveniently.
优选地,该预制卫生间模具包括至少两组上下间隔设置的角头移动机构30。至少两组角头移动机构30可分别横向连接在内胆模10上端和下端的对角处之间。Preferably, the prefabricated toilet mold includes at least two sets of corner head moving mechanisms 30 arranged up and down at intervals. At least two groups of corner head moving mechanisms 30 can be transversely connected between the upper end and the lower end of the inner bladder mold 10 at the opposite corners.
如图1、2及图4所示,内胆模10包括两个呈直角弯折的内模架11、以及两个角头12;两个内模架11相向对接,两个角头12分别连接在内模架11的对接处,与内模架11共同围成一框体结构。为增强该框体结构的强度,避免其变形,内模架11的内侧面还固定有槽钢110。槽钢110可横向和/或竖向固定在内模架11上。As shown in Figures 1, 2 and 4, the inner bladder mold 10 includes two inner mold frames 11 bent at right angles and two corner heads 12; the two inner mold frames 11 are oppositely connected, and the two corner heads 12 are respectively It is connected to the joint of the inner mold frame 11 and forms a frame structure together with the inner mold frame 11 . In order to enhance the strength of the frame structure and avoid its deformation, channel steel 110 is also fixed on the inner surface of the inner formwork 11 . The channel steel 110 can be fixed on the inner formwork 11 horizontally and/or vertically.
如图4所示,根据预制卫生间的设置,内模架11上还开设有窗口和/或门部112。As shown in FIG. 4 , according to the configuration of the prefabricated toilet, windows and/or doors 112 are also opened on the inner formwork 11 .
内模架11对接处的端面111为斜面,角头12对应内模架11的两侧面对应端面111设置;斜面的倾斜方向与内胆模10对角线相平行,使得角头12可沿端面111在对角线方向上来回移动。The end face 111 at the butt joint of the inner mold frame 11 is an inclined plane, and the corner head 12 is arranged corresponding to the two sides of the inner mold frame 11 corresponding to the end face 111; 111 moves back and forth in a diagonal direction.
如图2、5所示,角头12可由钢板经弯折形成,其可包括夹角为直角的对角部121、以及自对角部121的两侧向外延伸的角板122;角板122的延伸方向与内胆模10的对角线相平行。角头12配合在两个内模架11的对接处,两个角板122分别与内模架11的端面111相接,从而两个角头12和两个内模架11相连接形成横截面为四边形的框体结构。As shown in Figures 2 and 5, the corner head 12 can be formed by bending a steel plate, which can include a diagonal part 121 with a right angle, and a corner plate 122 extending outward from both sides of the diagonal part 121; The extension direction of 122 is parallel to the diagonal of liner mold 10 . The corner head 12 fits at the joint of the two inner formwork frames 11, and the two corner plates 122 respectively connect with the end surfaces 111 of the inner formwork frames 11, so that the two corner heads 12 and the two inner formwork frames 11 are connected to form a cross section It is a quadrilateral frame structure.
如图6所示,角头12可通过紧固组件50(如螺栓组件等)与内模架11可拆卸连接。参考图5及图4所示,角头12上设有数个沿其高度方向间隔分布的第一连接孔123,内模架11的端面111上对应设有第二连接孔113,通过紧固组件50穿设在相对连通的第一连接孔123和第二连接孔113内将角头12和内模架11连接。As shown in FIG. 6 , the corner head 12 can be detachably connected to the inner formwork 11 through a fastening assembly 50 (such as a bolt assembly, etc.). 5 and 4, the angle head 12 is provided with several first connection holes 123 spaced along its height direction, and the end surface 111 of the inner formwork 11 is correspondingly provided with a second connection hole 113, through the fastening assembly 50 is passed through the relatively communicating first connecting hole 123 and second connecting hole 113 to connect the corner head 12 with the inner mold frame 11 .
与撑杆31配合的螺纹连接部120可包括连接座以及设置在连接座上的螺纹孔,连接座可固定焊接在角头12上,也可通过紧固件可拆卸安装在角头12上,可拆卸安装方式方便撑杆31的连接位置的变换。角头12内可设有多个间隔的加强板124,螺纹连接部120可安装在加强板124上。The threaded connection part 120 matched with the strut 31 may include a connecting seat and a threaded hole provided on the connecting seat, the connecting seat may be fixedly welded on the corner head 12, or may be detachably installed on the corner head 12 by fasteners, The detachable installation mode facilitates the transformation of the connecting position of the strut 31 . A plurality of spaced reinforcing plates 124 may be provided in the corner head 12 , and the threaded connection portion 120 may be installed on the reinforcing plates 124 .
内胆模10为钢材料制成。Liner mold 10 is made of steel material.
内胆模10还包括设置在内模架11远离框架10的侧面上的面板13,面板13与角头12远离框架10的表面相接。面板13优选为钢板。The inner mold 10 also includes a panel 13 arranged on the side of the inner mold frame 11 away from the frame 10 , and the panel 13 is in contact with the surface of the corner head 12 away from the frame 10 . The panel 13 is preferably steel plate.
进一步地,该预制卫生间模具还包括至少一组将框架20连接在内胆模10内的连接组件40。Further, the prefabricated bathroom mold also includes at least one set of connecting components 40 connecting the frame 20 to the inner bladder mold 10 .
如图2所示,在本实施例中,连接组件40包括分别固定在内胆模10和框架20上的第一连接座41和第二连接座42、配合在第一连接座41和第二连接座2之间的连接杆43、以及固定栓44;固定栓44分别穿设在第一连接座41和连接杆43上、以及第二连接座42和连接杆43上,将连接杆43的两端连接在第一连接座41和第二连接座42上,从而实现框架20固定在内胆模10内。第一连接座41和第二连接座42分别可通过焊接方式固定在内胆模10和框架20上;固定栓44可为螺栓。As shown in FIG. 2 , in this embodiment, the connecting assembly 40 includes a first connecting seat 41 and a second connecting seat 42 respectively fixed on the liner mold 10 and the frame 20 , fitted on the first connecting seat 41 and the second connecting seat 41 . The connecting rod 43 between the connecting seat 2 and the fixed bolt 44; the fixed bolt 44 is respectively passed through the first connecting seat 41 and the connecting rod 43, and on the second connecting seat 42 and the connecting rod 43, and the connecting rod 43 The two ends are connected to the first connecting seat 41 and the second connecting seat 42 , so that the frame 20 is fixed in the inner bladder mold 10 . The first connecting seat 41 and the second connecting seat 42 can be respectively fixed on the liner mold 10 and the frame 20 by welding; the fixing bolt 44 can be a bolt.
优选地,框架20的每一对角均通过至少一组连接组件40与内胆模10连接,使得两者连接更为稳固平衡,方便框架20带动内胆模10脱离预制卫生间。Preferably, each opposite corner of the frame 20 is connected to the inner container mold 10 through at least one set of connecting components 40, so that the connection between the two is more stable and balanced, and it is convenient for the frame 20 to drive the inner container mold 10 out of the prefabricated toilet.
可以理解地,连接组件40并不限于上述结构,还可包括连接杆和螺母等配合组件。It can be understood that the connecting component 40 is not limited to the above structure, and may also include matching components such as connecting rods and nuts.
进一步地,该预制卫生间模具还包括配合在内胆模10外围的外模(未图示),外模内周形状大致对应内胆模10的外周形状设置。Further, the prefabricated bathroom mold also includes an outer mold (not shown) matched with the outer periphery of the inner bladder mold 10 , and the inner peripheral shape of the outer mold roughly corresponds to the outer peripheral shape of the inner bladder mold 10 .
在装模时,使用龙门吊将内模架11、角头12在框架20外周拼装成内胆模10并连接框架20起来,保证内胆模10连接处的平整度,角头移动机构30连接在内胆模10对角之间。组装完成后吊装框架20将其与内胆模10吊进外模内。将混凝土浇筑在内胆模10和外模之间的环形空间内,成型后形成预制卫生间。When loading the mold, use the gantry crane to assemble the inner mold frame 11 and the corner head 12 on the outer periphery of the frame 20 into the inner container mold 10 and connect the frame 20 to ensure the flatness of the joint of the inner container mold 10, and the corner head moving mechanism 30 is connected to the Between the 10 diagonals of the inner bladder mold. After the assembly is completed, the hoisting frame 20 hangs it and the inner bladder mold 10 into the outer mold. Concrete is poured into the annular space between the inner tank mold 10 and the outer mold, and the prefabricated toilet is formed after molding.
在脱模时,只需轻松的转动撑杆31,内胆模10的角头12向内侧移动从而脱离预制卫生间的混凝土面,然后用龙门吊吊起框架20。在起吊的时候,与角头12相连的面板13也会随着吊链往内收缩而脱离混凝土面,使得内胆模10脱离预制卫生间的混凝土面而不破坏混凝土。通过一次吊起即可将内胆模10脱出预制卫生间,有效降低龙门吊的使用次数、降低工人劳动强度、提高效率且减少预制卫生间产品在拆模过程中的崩烂危险,保证预制卫生间产品的质量。When demolding, only need to rotate the strut 31 easily, the corner head 12 of the liner mold 10 moves inboard so as to break away from the concrete surface of the prefabricated toilet, and then lift the frame 20 with the gantry crane. When hoisting, the panel 13 that links to each other with angle head 12 also can break away from the concrete surface along with suspension chain inward contraction, makes liner mold 10 break away from the concrete surface of prefabricated toilet and does not destroy concrete. The liner mold 10 can be pulled out of the prefabricated toilet by one lifting, effectively reducing the number of times of use of the gantry crane, reducing the labor intensity of workers, improving efficiency and reducing the risk of collapse of prefabricated toilet products during the demoulding process, and ensuring the quality of prefabricated toilet products .
以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above is only an embodiment of the utility model, and does not limit the patent scope of the utility model. Any equivalent structure or equivalent process conversion made by using the utility model specification and accompanying drawings, or directly or indirectly used in other Related technical fields are all included in the patent protection scope of the present utility model in the same way.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520625390.1U CN204894176U (en) | 2015-08-19 | 2015-08-19 | Prefabricated bathroom mould |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520625390.1U CN204894176U (en) | 2015-08-19 | 2015-08-19 | Prefabricated bathroom mould |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204894176U true CN204894176U (en) | 2015-12-23 |
Family
ID=54916385
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520625390.1U Expired - Lifetime CN204894176U (en) | 2015-08-19 | 2015-08-19 | Prefabricated bathroom mould |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204894176U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107891510A (en) * | 2017-12-11 | 2018-04-10 | 安徽海龙建筑工业有限公司 | A kind of split type prefabricated components toilet mould and its into mold technique |
| CN108481527A (en) * | 2018-05-21 | 2018-09-04 | 浙江庄辰建筑科技有限公司 | A kind of door and window frame mould of easy disassembly |
-
2015
- 2015-08-19 CN CN201520625390.1U patent/CN204894176U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107891510A (en) * | 2017-12-11 | 2018-04-10 | 安徽海龙建筑工业有限公司 | A kind of split type prefabricated components toilet mould and its into mold technique |
| CN108481527A (en) * | 2018-05-21 | 2018-09-04 | 浙江庄辰建筑科技有限公司 | A kind of door and window frame mould of easy disassembly |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110847050B (en) | Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof | |
| CN203712840U (en) | Small box girder concrete pouring mold | |
| JP2012047021A (en) | Form device | |
| CN106917505B (en) | A kind of transparent plastic template for building and preparation method thereof | |
| CN106703403A (en) | Pouring formwork and wall pouring equipment | |
| CN205369286U (en) | Prefabricated isolated footing mould | |
| CN112360469A (en) | Super-deep shaft sequential-lining single-side formwork-erecting lifting formwork and construction method | |
| CN208009891U (en) | Assembled template for elevator | |
| CN104308961A (en) | Integrally-drawing-type prefabricated box beam inner die device | |
| CN105484496A (en) | Formwork assembling and disassembling method for shear wall deformation joint | |
| CN104453217A (en) | Elevator shaft whole formwork lifting construction method | |
| CN211114737U (en) | A construction operation platform in elevator well for tower crane promotes | |
| CN108582426A (en) | A kind of producing device and production method of stiffened column | |
| CN204235678U (en) | A kind of overall pulling type prefabricated box girder inner formwork device | |
| CN207863567U (en) | Non-prestressed flange assembles electric pole special flange disk | |
| CN117071880A (en) | Building formwork system | |
| CN214989702U (en) | Prefabricated post drawing of patterns stands up rings device | |
| CN205654082U (en) | Half tunnel formwork | |
| CN210067423U (en) | A kind of aluminum alloy formwork hanging system | |
| CN107724672A (en) | A kind of steel construction skyscraper cast-in-situ floor formwork support structure | |
| CN205077863U (en) | Whole stair template structure | |
| CN201802076U (en) | Plane vibration device | |
| CN216612839U (en) | A bucket elevator fixing mechanism | |
| CN206859661U (en) | A kind of U beam forms | |
| CN204456897U (en) | A kind of arm support connection device, boom and concrete mixer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee | ||
| CP03 | Change of name, title or address |
Address after: 518000 Guangdong province Shenzhen city Longhua District Guanlan street community residents around the old gentleman cloth small head hill area Patentee after: SHENZHEN HAILONG BUILDING TECHNOLOGY Co.,Ltd. Address before: 518110 Guangdong city of Shenzhen province Baoan District Guanlan gentleman cloth Xingfa Road No. eight Patentee before: SHENZHEN HAILONG CONSTRUCTION PRODUCTS CO.,LTD. |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: No. 8, junzi buxingfa Road, Guanlan street, Longhua District, Shenzhen, Guangdong 518000 Patentee after: CSCEC Hailong Technology Co.,Ltd. Address before: 518000 paishan District, laowei resident group leader, junzibu community, Guanlan street, Longhua New District, Shenzhen City, Guangdong Province Patentee before: SHENZHEN HAILONG BUILDING TECHNOLOGY Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20151223 |