CN204886055U - Cable bridge installation - Google Patents

Cable bridge installation Download PDF

Info

Publication number
CN204886055U
CN204886055U CN201520665130.7U CN201520665130U CN204886055U CN 204886055 U CN204886055 U CN 204886055U CN 201520665130 U CN201520665130 U CN 201520665130U CN 204886055 U CN204886055 U CN 204886055U
Authority
CN
China
Prior art keywords
crane span
span structure
cell body
structure cell
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520665130.7U
Other languages
Chinese (zh)
Inventor
陈作海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING EAST GRAND CONSTRUCTION GROUP Co Ltd
Original Assignee
BEIJING EAST GRAND CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING EAST GRAND CONSTRUCTION GROUP Co Ltd filed Critical BEIJING EAST GRAND CONSTRUCTION GROUP Co Ltd
Priority to CN201520665130.7U priority Critical patent/CN204886055U/en
Application granted granted Critical
Publication of CN204886055U publication Critical patent/CN204886055U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a cable bridge installation, includes rectangle crane span structure cell body, apron and connecting plate, and crane span structure cell body lateral wall top is equipped with the hem tongue and detains, and hem tongue knot is outside outstanding, and apron both sides limit lower part is equipped with the slot that incurves, and the slot is mutually supported with hem tongue knot, and crane span structure cell body tip is equipped with triangular configuration's connecting hole, is equipped with on the rectangle connecting plate to correspond the hole of arranging with the connecting hole, through connecting plate bolted connection between the crane span structure cell body. A simultaneously, reduced bolt installation volume, improved the installation effectiveness, cable bridge installation overall structure is simple, handsome in appearance, configuration flexibility that cable bridge installation, crane span structure cell body are equipped with the hem tongue and detain, with the ditch slot combination on the apron, realize the spiral -lock of apron or pump the installation, connect through the connecting plate between the crane span structure cell body, and the connecting hole is triangular configuration's hole, guarantees stability and a corrode that easy maintenance effectively prevents the inside paired cable of making of rainwater entering crane span structure.

Description

A kind of cable testing bridge
Technical field
The utility model relates to a kind of cable testing bridge, relates to mechanical and electric equipment installation field.
Background technology
Cable testing bridge in sector applications such as oil, chemical industry, electric power, light industry, telecommunications widely, mainly plays the protective effect to electric wire, cable finished product.Cable testing bridge is divided into slot type, pellet type and the structure such as ladder-type, grid type, is made up of support, trailing arm and installation accessories etc.In building, crane span structure can independently set up, and also can be attached on various buildings or structures and piping lane support.
Existing cable testing bridge, in order to ensure bearing capacity, often increases thickness and quality, and the cover plate of most of cable testing bridge and cell body are pumping slot formula is connected, easy water inlet, make the corrosion and damage of paired cable, connected by many group bolts between crane span structure, installation effectiveness is lower.
Utility model content
The utility model for the deficiency that prior art exists, provides a kind of cable testing bridge just.
For solving the problem, technical solution adopted in the utility model is as follows:
A kind of cable testing bridge, comprise rectangle crane span structure cell body, cover plate and connecting plate, bridge trough body sidewall top is provided with flanging tongue button, and flanging tongue button outwardly, cover plate dual-side bottom is provided with aduncate groove, and groove and flanging tongue button cooperatively interact, and bridge trough end of body is provided with the connecting hole of triangular arrangement, rectangular connecting panels is provided with the hole arranged corresponding to connecting hole, is connected between crane span structure cell body by connecting plate bolt.
Further, described connecting plate is arranged on the inside and outside both sides of bridge trough body sidewall respectively.
Further, described crane span structure cell body bottom land is provided with the protrusion rib plate being interrupted and arranging.
Compared with prior art, implementation result of the present utility model is as follows for the utility model:
A kind of cable testing bridge described in the utility model, crane span structure cell body is provided with flanging tongue button, and the ditch slot fit with on cover plate, realizes the spiral-lock of cover plate or pump installation, connected by connecting plate between crane span structure cell body, connecting hole is the hole of triangular arrangement, while ensureing stability, decreases bolt installation, improve installation effectiveness, cable testing bridge overall structure is simple, handsome in appearance, flexible configuration and easy to maintenance, effectively prevent rainwater from entering corrosion that paired cable is made in crane span structure inside.
Accompanying drawing explanation
Fig. 1 is a kind of cable testing bridge structural representation described in the utility model;
Fig. 2 be in Fig. 1 A to partial enlargement structural representation.
Embodiment
Below in conjunction with specific embodiments content of the present utility model is described.
As depicted in figs. 1 and 2, a kind of cable testing bridge, comprise rectangle crane span structure cell body 1, cover plate 2 and connecting plate 3, crane span structure cell body 1 top side wall is provided with flanging tongue button 4, and flanging tongue button 4 outwardly, and cover plate 2 dual-side bottom is provided with aduncate groove 5, groove 5 and flanging tongue button 4 cooperatively interact, crane span structure cell body 1 end is provided with the connecting hole 6 of triangular arrangement, and rectangular connecting panels 3 is provided with the hole arranged corresponding to connecting hole 6, is connected between crane span structure cell body 1 by connecting plate 3 bolt.
The crane span structure cell body 1 of described cable testing bridge is provided with flanging tongue button 4, coordinate with the groove 5 on cover plate 2, realize the spiral-lock of cover plate 2 or pump installation, mounting means is easy, connected by connecting plate 3 between crane span structure cell body 1, connecting hole 6 is the hole of triangular arrangement, while ensureing stability, decrease bolt installation, improve installation effectiveness, cable testing bridge overall structure is simple, handsome in appearance, flexible configuration and easy to maintenance, effectively prevent rainwater from entering the inner corrosion of making paired cable of crane span structure, improve the useful life of cable.
Described connecting plate 3 is arranged on the inside and outside both sides of crane span structure cell body 1 sidewall respectively, further enhances the intensity of junction between crane span structure cell body 1, ensures installation quality.
The bottom land of described crane span structure cell body 1 is provided with the protrusion rib plate 7 being interrupted and arranging, while facilitating cable distribution, improves the resistance to compression of crane span structure cell body, tensile strength, and the quality increased is less, and production cost is lower, and useful life improves greatly.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection range of the present utility model.

Claims (3)

1. a cable testing bridge, it is characterized in that, comprise rectangle crane span structure cell body, cover plate and connecting plate, bridge trough body sidewall top is provided with flanging tongue button, and flanging tongue button outwardly, and cover plate dual-side bottom is provided with aduncate groove, groove and flanging tongue button cooperatively interact, bridge trough end of body is provided with the connecting hole of triangular arrangement, and rectangular connecting panels is provided with the hole arranged corresponding to connecting hole, is connected between crane span structure cell body by connecting plate bolt.
2. a kind of cable testing bridge according to claim 1, is characterized in that, described connecting plate is arranged on the inside and outside both sides of bridge trough body sidewall respectively.
3. a kind of cable testing bridge according to claim 1, is characterized in that, described crane span structure cell body bottom land is provided with the protrusion rib plate being interrupted and arranging.
CN201520665130.7U 2015-08-29 2015-08-29 Cable bridge installation Active CN204886055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520665130.7U CN204886055U (en) 2015-08-29 2015-08-29 Cable bridge installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520665130.7U CN204886055U (en) 2015-08-29 2015-08-29 Cable bridge installation

Publications (1)

Publication Number Publication Date
CN204886055U true CN204886055U (en) 2015-12-16

Family

ID=54830387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520665130.7U Active CN204886055U (en) 2015-08-29 2015-08-29 Cable bridge installation

Country Status (1)

Country Link
CN (1) CN204886055U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106981847A (en) * 2017-06-01 2017-07-25 上海熠搜能源科技有限公司 A kind of comprehensive trough type bridge frame
CN107591753A (en) * 2017-10-18 2018-01-16 上海申捷管业科技有限公司 One kind is without group hole anti-corrosion gusset piece
CN107994519A (en) * 2016-10-26 2018-05-04 上海上电漕泾发电有限公司 It is a kind of that sealing blocking treatment process is carried out to cable testing bridge
CN108429200A (en) * 2017-02-13 2018-08-21 伊顿智能动力有限公司 Splice plate for cable tray accessory
CN109230188A (en) * 2018-11-15 2019-01-18 肖娜 Mucking machine delivery chute groove body connection structure
CN110137870A (en) * 2019-06-13 2019-08-16 安徽金迪电器有限公司 It is a kind of to be integrally formed stainless reinforced plastic cable bridge frame and preparation method thereof
CN110311334A (en) * 2019-07-29 2019-10-08 宝上电缆有限公司 A kind of cable testing bridge and its application method
CN110323701A (en) * 2019-07-01 2019-10-11 王星 A kind of winding displacement gantry convenient for wiring
CN110661216A (en) * 2019-09-30 2020-01-07 北京无线电测量研究所 Flexible wiring harness binding device capable of assembling internal structure of simulation antenna
CN111924263A (en) * 2020-07-27 2020-11-13 南通四建集团有限公司 Dissimilar metal groove box connecting structure
CN111969522A (en) * 2020-08-21 2020-11-20 贵州正能电气有限公司 Cable bridge convenient to installation

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107994519A (en) * 2016-10-26 2018-05-04 上海上电漕泾发电有限公司 It is a kind of that sealing blocking treatment process is carried out to cable testing bridge
CN108429200A (en) * 2017-02-13 2018-08-21 伊顿智能动力有限公司 Splice plate for cable tray accessory
US11686334B2 (en) 2017-02-13 2023-06-27 Eaton Intelligent Power Limited Splice plate for cable tray fitting
CN108429200B (en) * 2017-02-13 2021-12-07 伊顿智能动力有限公司 Splice plate for cable tray fitting
US10935060B2 (en) 2017-02-13 2021-03-02 Cooper Technologies Company Splice plate for cable tray fitting
CN106981847A (en) * 2017-06-01 2017-07-25 上海熠搜能源科技有限公司 A kind of comprehensive trough type bridge frame
CN107591753A (en) * 2017-10-18 2018-01-16 上海申捷管业科技有限公司 One kind is without group hole anti-corrosion gusset piece
CN109230188A (en) * 2018-11-15 2019-01-18 肖娜 Mucking machine delivery chute groove body connection structure
CN110137870B (en) * 2019-06-13 2020-06-16 安徽金迪电器有限公司 Integrally-formed stainless steel cable bridge and preparation method thereof
CN110137870A (en) * 2019-06-13 2019-08-16 安徽金迪电器有限公司 It is a kind of to be integrally formed stainless reinforced plastic cable bridge frame and preparation method thereof
CN110323701A (en) * 2019-07-01 2019-10-11 王星 A kind of winding displacement gantry convenient for wiring
CN110311334A (en) * 2019-07-29 2019-10-08 宝上电缆有限公司 A kind of cable testing bridge and its application method
CN110661216A (en) * 2019-09-30 2020-01-07 北京无线电测量研究所 Flexible wiring harness binding device capable of assembling internal structure of simulation antenna
CN111924263A (en) * 2020-07-27 2020-11-13 南通四建集团有限公司 Dissimilar metal groove box connecting structure
CN111969522A (en) * 2020-08-21 2020-11-20 贵州正能电气有限公司 Cable bridge convenient to installation

Similar Documents

Publication Publication Date Title
CN204886055U (en) Cable bridge installation
CN204403561U (en) Cable testing bridge
CN107386758A (en) A kind of double back transmission line cut-offs steel pipe tower and system
CN205882591U (en) Cable bridge
CN204311818U (en) A kind of DC linear tower tower head
CN204760981U (en) Novel cable support device
CN204435470U (en) The prefabricated pumping plant of a kind of novel many pit shafts glass fiber reinforced plastic
CN203617637U (en) Cable ladder plane connecting piece
CN205791383U (en) A kind of anti-bird insulating sheath of pair of cross-arm beam electric force pole tower
CN202811225U (en) Wind driven generator cabin cover
CN209709625U (en) A kind of novel clamping bus duct
CN104344084A (en) Layered horizontal tee joint
CN204081555U (en) Portable sentry box
CN203782991U (en) Fixing point of inhaul cable on steel-structured roof
CN203850771U (en) Rainproof cover plate for cable tray
CN201723839U (en) Novel reticular cable bridge rack
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN204349389U (en) A kind of novel bus duct
CN202227763U (en) Tower in compact structure
CN206558976U (en) Pellet type crane span structure
CN209233364U (en) A kind of Combined type trapezoid ripple bottom high-strength cable tray side panels
CN205688923U (en) A kind of wire rounded projections arranged two circuit tower
CN204559028U (en) A kind of wire casing structure of pressure alarm fence
CN207245028U (en) A kind of plug-in mounting structure of steel structure ceiling gutter
CN203948426U (en) A kind of open electric vehicle rectangle locked spacer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant