CN204877529U - 一种煤层注水与卸压炮联合防冲防尘装置 - Google Patents
一种煤层注水与卸压炮联合防冲防尘装置 Download PDFInfo
- Publication number
- CN204877529U CN204877529U CN201520420815.5U CN201520420815U CN204877529U CN 204877529 U CN204877529 U CN 204877529U CN 201520420815 U CN201520420815 U CN 201520420815U CN 204877529 U CN204877529 U CN 204877529U
- Authority
- CN
- China
- Prior art keywords
- water injection
- water
- pressure
- pressure relief
- coal seam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Measuring Fluid Pressure (AREA)
Abstract
本实用新型公开了一种煤层注水与卸压炮联合防冲防尘装置,包括卸压炮爆破工艺和注水装置,所述卸压炮爆破工艺采用药壶爆破法。通过爆破在煤体内产生预生裂隙,沟通注水通道,压力注水继续延伸裂隙,达到双重卸压目的。所述压力注水装置包括注水供水管、储水箱、压差式渗透剂连续定量添加泵、回水管、注水泵、水质过滤器、压力表、总管路截止阀、分流器、动压分管路、分管路截止阀和流量表。
Description
技术领域
本发明涉及煤矿采煤工作面灾害防治领域,针对一种冲击地压显现强烈及注水困难厚煤层开采矿井。
背景技术
目前,随着我国煤矿开采的发展,冲击地压、地温、高粉尘等自然灾害的危害程度不断升级,灾害事故频繁发生,威胁着我国煤矿的安全高效开采及井下工人的身心健康。煤层注水是防治矿井多种灾害的重要技术手段。通过煤层注水预先湿润煤体,可有效地降低煤体破碎时的产尘量,防止冲击矿压,并通过增大煤体的导热系数,降低煤体温度,预防煤层自然发火,降低瓦斯异常涌出频率,减少了人员伤亡及经济损失。冲击地压是在矿山生产中发生的一种煤岩动力灾害,对井下生产系统具有严重的破坏作用,会造成重大的人员伤亡和经济损失。采取放卸压炮,深孔断顶等防治措施,有效地减少了冲击地压的发生频率,从而减少了人员伤亡及经济损失。
发明内容
为了有效解决注水困难的问题,本发明提出一种煤层注水与卸压炮联合防冲防尘装置。该工艺方法及装置结构简单,注水量大,可以有效防治煤层开采过程中冲击地压、煤尘和高温等灾害事故的发生。
本发明所采用的技术方案如下:
一种煤层注水与卸压炮联合防冲防尘装置,用于向多个注水孔中注水,包括包括卸压炮工艺、注水装置,卸压注水工艺为联合爆破工艺与注水工艺。
述卸压工艺包括以下步骤:
①卸压炮工艺采用药壶爆破法,既能使煤体内产生预生裂隙通道,形成卸压裂隙区,又能保证后期注水封孔段的完整性。
②以1~3个钻孔为一组,根据煤层压力情况,确定卸压范围,通过控制药量,形成可控爆破松动圈,迫使煤层内部原有的封闭裂隙相互沟通或直接在煤层内形成新的裂隙网,形成卸压区。
所述注水工艺为一般压力注水工艺,包括以下步骤:
①将所述一组1~3个卸压孔当做注水孔组孔连接至注水装置;
②在水中添加渗透剂提高水渗透进煤体的能力,在水压为煤层垂直应力1倍左右的状态下向煤层注入1~3h的水,在煤层内部形成水力冲击现象,继续在煤层内部逾裂、扩展使水渗透到煤体内部相互关联的孔隙-裂隙网;
所述注水装置包括注水供水管、储水箱、压差式渗透剂连续定量添加泵、回水管、注水泵、水质过滤器、压力表、总管路截止阀、分流器、分管路、分管路截止阀和流量表,所述压差式渗透剂连续定量添加泵并联连接在所述注水供水管上,所述储水箱、所述水质过滤器、所述注水泵、所述压力表、所述动压总管路截止阀依次串联连接在注水供水管上,所述回水管连接在所述注水泵和所述储水箱之间,所述分流器的数量与注水孔的数量相同,串联在所述注水供水管上且位于所述总管路截止阀的下游,每个动压分流器连接一个分管路,每个分管路串联有一个流量计和一个分管路截止阀。
本发明的有益效果:
本发明提出一种煤层注水与卸压炮联合防冲防尘装置。将采煤工作面分为卸压区和卸压后注水区,当钻孔位于采煤工作面煤层静压区时先用卸压爆破法形成卸压裂隙区,然后采用注水工艺,将各注水孔中的注水管分别连接对应注水装置中的各分管路,使水注入煤层中。有效降低了工作面的温度和冲击地压发生的可能性,减小了生产中的产尘量,并延长了煤层的自然发火期。
附图说明
图1是本发明提出一种煤层注水与卸压炮联合防冲防尘结构示意图。
图中:1—压力注水供水管;2—压差式渗透剂连续定量添加泵;3—储水箱;4—水质过滤器;5—注水泵;6—回水管;7—压力表;8—总管路截止阀;9—分流器;10—分管路截止阀;11—流量表;12—封孔器;14—钻孔;15—孔隙-裂隙网络。
图2A-A断面示意图。
具体实施方式
下面结合附图和具体实施方式对本发明做进一步的说明。
根据采煤工作面煤层的矿压测定结果确定出采煤工作面煤层每个钻孔的爆破松动圈范围,在工作面煤层每隔15~25m设置1个钻孔,钻孔的长度为工作面长度的1/2左右,孔径为60~100mm,角度与煤层角度基本一致。选取1~3个钻孔为一组,形成工作卸压孔组,采用药壶爆破法,将炸药按照规章制度装进,迫使煤层内部原有的封闭裂隙相互沟通或直接在煤层内形成新的裂隙网,形成卸压区。
卸压区形成后,待煤层稳定安全,将注水管插入注水孔中,注水管的末端1~2节为花管,在距注水孔入口6~10m处安设1个封孔器,以防止注入的水从注水孔外溢。选取如上所述卸压孔组为一组,形成工作注水孔组,本发明以3个注水孔为例,连接动压注水装置。注水期间,继续按照上述在后方依次钻孔卸压、注水。
注水开始后,打开总管路截止阀和分管路截止阀,并调节注水泵的压力,使注水压力达到煤层垂直应力的1倍左右,注水供水管中的水一部分经过与注水供水管相并联的压差式渗透剂连续定量添加泵,将一定量的渗透剂压入注水供水管中,与另一部分水按一定比例混合后进入储水箱,并经过水质过滤器后被吸入注水泵。吸入注水泵的水,加压后依次经过压力表、总管路截止阀、分流器、分管路截止阀和流量表流入注水管,进入煤层中,若进入注水管中的水量小于注水泵的排水额定流量,多余的水将通过回水管返回到储水箱中。
以上所述爆破范围、压力注水都为本领域公知的工艺,对其限定的仅仅是为了区分其设置在不同煤层地质条件下,而不是对其功能的限定,所述爆破参数等可通过各煤层的基本参数查阅计算。
如上所述,为本发明专利最优的具体实施方式,任何关于本发明的变化或替换,都应涵盖在本发明专利的保护范围之内。
Claims (3)
1.一种煤层注水与卸压炮联合防冲防尘装置,用于煤层中爆破卸压并注水,其特征在于,包括卸压炮工艺、注水装置;
所述卸压炮工艺采用药壶爆破法,既能使煤体内产生预生裂隙通道,形成卸压裂隙区,又能保证后期注水封孔段的完整性;
所述注水装置包括注水供水管、储水箱、压差式渗透剂连续定量添加泵、回水管、注水泵、水质过滤器、压力表、总管路截止阀、分流器、分管路、分管路截止阀和流量表,所述压差式渗透剂连续定量添加泵连接在所述注水供水管上,所述储水箱、所述水质过滤器、所述注水泵、所述压力表、所述总管路截止阀依次串联连接在注水供水管上,所述回水管连接在所述注水泵和所述储水箱之间,所述分流器的数量与注水孔的数量相同,串联在所述注水供水管上且位于所述总管路截止阀的下游,每个动压分流器连接一个分管路,每个分管路串联有一个流量计和一个分管路截止阀。
2.根据权利要求1所述的煤层注水与卸压炮联合防冲防尘装置,其特征在于,以1~3个钻孔为一组,根据煤层压力情况,确定卸压范围,通过控制药量,形成可控爆破松动圈,注水孔采用封孔器封孔,将采煤工作面分为卸压区和卸压后注水区,当钻孔位于采煤工作面煤层静压区时先卸压爆破法形成卸压裂隙区,然后采用注水工艺,将各注水孔中的注水管分别连接对应注水装置中的各分管路,使水注入煤层中。
3.根据权利要求1所述的煤层注水与卸压炮联合防冲防尘装置,其特征在于:卸压注水工艺为联合爆破工艺与注水工艺,在爆破裂隙基础上通过压力注水继续延伸裂隙长度,既取得湿润煤体的效果又能达到双重卸压目的。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520420815.5U CN204877529U (zh) | 2015-06-18 | 2015-06-18 | 一种煤层注水与卸压炮联合防冲防尘装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520420815.5U CN204877529U (zh) | 2015-06-18 | 2015-06-18 | 一种煤层注水与卸压炮联合防冲防尘装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204877529U true CN204877529U (zh) | 2015-12-16 |
Family
ID=54821912
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520420815.5U Expired - Fee Related CN204877529U (zh) | 2015-06-18 | 2015-06-18 | 一种煤层注水与卸压炮联合防冲防尘装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204877529U (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108708702A (zh) * | 2018-04-10 | 2018-10-26 | 山东科技大学 | 一种低孔隙率煤层交变强化注水增渗润湿的装置和方法 |
| CN108843371A (zh) * | 2018-05-08 | 2018-11-20 | 山东科技大学 | 一种基于采动卸压的煤层分区动态注水工艺方法 |
| CN110185448A (zh) * | 2019-05-19 | 2019-08-30 | 中铁十九局集团矿业投资有限公司 | 一种地面压裂和井下爆破控制深部矿体岩爆方法 |
| WO2019205355A1 (zh) * | 2018-04-25 | 2019-10-31 | 山东科技大学 | 一种多级式煤层注水钻孔封孔系统及注水钻孔封孔方法 |
-
2015
- 2015-06-18 CN CN201520420815.5U patent/CN204877529U/zh not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108708702A (zh) * | 2018-04-10 | 2018-10-26 | 山东科技大学 | 一种低孔隙率煤层交变强化注水增渗润湿的装置和方法 |
| WO2019205355A1 (zh) * | 2018-04-25 | 2019-10-31 | 山东科技大学 | 一种多级式煤层注水钻孔封孔系统及注水钻孔封孔方法 |
| CN108843371A (zh) * | 2018-05-08 | 2018-11-20 | 山东科技大学 | 一种基于采动卸压的煤层分区动态注水工艺方法 |
| CN108843371B (zh) * | 2018-05-08 | 2019-11-26 | 山东科技大学 | 一种基于采动卸压的煤层分区动态注水工艺方法 |
| CN110185448A (zh) * | 2019-05-19 | 2019-08-30 | 中铁十九局集团矿业投资有限公司 | 一种地面压裂和井下爆破控制深部矿体岩爆方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102322285B (zh) | 一种高地压低孔隙率低渗透率煤层注水装置及其使用工艺 | |
| Huang et al. | Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams | |
| CN102619552B (zh) | 导向槽定向水力压穿增透及消突方法 | |
| CN103696800B (zh) | 一种钻割压抽方法 | |
| CN104653161B (zh) | 煤矿井下脉冲水力割缝‑压裂一体化增透抽采装置及方法 | |
| WO2016019825A1 (zh) | 一种低透气性煤层水力相变致裂强化瓦斯抽采方法 | |
| CN101666241B (zh) | 一种区域瓦斯治理钻爆压抽一体化防突方法 | |
| AU2015299588B2 (en) | Freezing cross-cut coal cutting method based on hydraulic seam-cutting | |
| CN105370256B (zh) | 一种分段预裂提高低透气性煤层高压注水湿润半径的方法 | |
| CN103939099B (zh) | 一种强冲击危险煤层群冲击地压的防治方法 | |
| CN104213932B (zh) | 一种突出煤层水力相变致裂石门揭煤方法 | |
| CN106761740A (zh) | 一种坚硬煤层顶板耦合致裂方法 | |
| CN105239983B (zh) | 一种预裂与高压注水相结合的低透气性煤层弱化增透方法 | |
| CN204877529U (zh) | 一种煤层注水与卸压炮联合防冲防尘装置 | |
| CN104632174A (zh) | 煤层液态二氧化碳压裂装置及方法 | |
| CN105239984A (zh) | 一种煤矿井下压裂裂缝扩展控制方法 | |
| CN105422164A (zh) | 水压致裂增透辅助煤层高效注水方法及设备 | |
| CN108180002B (zh) | 一种煤矿井下煤层水力压-割耦合增透方法 | |
| CN204754895U (zh) | 煤矿井下脉冲水力割缝-压裂一体化增透抽采装置 | |
| CN105003294B (zh) | 一种基于水热耦合压裂煤体石门揭煤方法 | |
| CN104775787A (zh) | 一种破碎围岩水力压裂穿层钻孔上仰孔封孔方法 | |
| CN110173295A (zh) | 一种利用顺层定向钻孔抽采瓦斯和防灭火的方法 | |
| CN102889094B (zh) | 煤层注水系统 | |
| CN104612644A (zh) | 一种低渗煤层气相压裂瓦斯快速抽采方法 | |
| CN108708722B (zh) | 一种用于低透气性煤层的高效防治冲击地压的方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151216 Termination date: 20160618 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |