CN204858424U - Cable Tunnel Inspection Shaft Traction and Laying Cable Combination Device - Google Patents
Cable Tunnel Inspection Shaft Traction and Laying Cable Combination Device Download PDFInfo
- Publication number
- CN204858424U CN204858424U CN201520599152.8U CN201520599152U CN204858424U CN 204858424 U CN204858424 U CN 204858424U CN 201520599152 U CN201520599152 U CN 201520599152U CN 204858424 U CN204858424 U CN 204858424U
- Authority
- CN
- China
- Prior art keywords
- cable
- crossbearer
- well head
- inspection shaft
- cabling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000003365 glass fiber Substances 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 150000001875 compounds Chemical class 0.000 claims 1
- 239000000463 material Substances 0.000 claims 1
- 230000001737 promoting effect Effects 0.000 claims 1
- 230000001105 regulatory effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 6
- 239000002131 composite material Substances 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
【技术领域】【Technical field】
本实用新型属于电缆施工技术,涉及一种电缆隧道检查井牵引敷设电缆组合装置。The utility model belongs to the cable construction technology and relates to a combined device for pulling and laying cables in a cable tunnel inspection shaft.
【背景技术】【Background technique】
电缆敷设施工过程中,目前没有针对隧道检查井的牵引力导向装置,也没有可以适应各种检查井口的组合设备。During the cable laying construction process, there is currently no traction guide device for tunnel inspection wells, nor is there any combined equipment that can adapt to various inspection wellheads.
现场施工常规方法是:1、破坏部分检查井壁,让牵引钢丝绳以>90°的角度,强行从隧道内拉出,使机动绞磨出力加大,钢丝绳出现夹角受力,加速钢丝绳磨损,敷设风险加大。2、固定机动绞磨需要安装地锚,但城市隧道检查井周围均为硬化地面,无法安装地锚,给施工带来不便。3、采用双转向滑轮组合,钢丝绳需通过2个90°导向,绞磨牵引力约30-40%出力用来克服夹角合力,但动力未能全部转化为牵引力,加剧绞磨及钢丝绳的磨损,工作效率低下。The conventional method of on-site construction is: 1. Check the well wall for the damaged part, and force the traction wire rope to be pulled out of the tunnel at an angle > 90°, so that the output force of the motorized winch will be increased, and the steel wire rope will be stressed at an angle, which will accelerate the wear of the wire rope. Laying risks increase. 2. The fixed mobile winch needs to be installed with ground anchors, but the ground around the urban tunnel inspection shaft is hardened, and the ground anchors cannot be installed, which brings inconvenience to the construction. 3. The combination of double steering pulleys is adopted, and the wire rope needs to be guided by two 90° guides. About 30-40% of the traction force of the winch is used to overcome the resultant force of the angle, but the power cannot be fully converted into traction, which will intensify the wear of the winch and the wire rope. Work efficiency is low.
【实用新型内容】【Content of utility model】
为解决上述问题,本实用新型提供了一种电缆隧道检查井牵引敷设电缆组合装置,简化了装置结构,提高了牵引效率,减轻绞磨及钢丝绳的磨损。In order to solve the above problems, the utility model provides a cable tunnel inspection shaft traction and laying cable combination device, which simplifies the structure of the device, improves the traction efficiency, and reduces the wear of the winch and the wire rope.
为达到上述目的,本实用新型的技术方案如下:In order to achieve the above object, the technical scheme of the utility model is as follows:
电缆隧道检查井牵引敷设电缆组合装置,包括分别设置在井口上方和下方的井口横架和支撑横架,井口横架和支撑横架通过连杆连接,用于提升牵引钢丝绳的机动绞磨固定在井口横架上,支撑横架上安装有转向滑轮,通过转向滑轮将钢丝绳进行90°导向。Cable tunnel inspection shaft traction and laying cable combination device, including wellhead horizontal frame and support horizontal frame respectively arranged above and below the wellhead. On the horizontal frame of the wellhead, the steering pulley is installed on the supporting horizontal frame, and the wire rope is guided by 90° through the steering pulley.
进一步,所述井口横架和支撑横架通过能够调节长度的可调节连杆连接。Further, the wellhead cross frame and the supporting cross frame are connected by an adjustable connecting rod capable of adjusting the length.
进一步,所述包括设置在电缆隧道内支撑电缆的滑车。Further, it includes a pulley arranged in the cable tunnel to support the cable.
进一步,所述井口横架和支撑横架由玻璃纤维复合材料制成。Further, the wellhead horizontal frame and the supporting horizontal frame are made of glass fiber composite material.
进一步,所述机动绞磨采用凹形收线盘。Further, the motorized winch adopts a concave take-up reel.
本实用新型包括设置在井口上方和下方的井口横架和支撑横架,在支撑横架上安装有转向滑轮,改变牵引力方向,解决隧道内电缆敷设,水平方向牵引问题。将机动绞磨架设在检查井口,垂直提升,提高动力转化效率,同时不需要安装地锚,简便实用。The utility model includes a wellhead horizontal frame and a supporting horizontal frame arranged above and below the wellhead, and a steering pulley is installed on the supporting horizontal frame to change the direction of the traction force and solve the problem of cable laying in the tunnel and horizontal direction traction. The motorized winch is erected at the head of the inspection well and lifted vertically to improve the power conversion efficiency. At the same time, there is no need to install ground anchors, which is simple and practical.
进一步,井口横架和支撑横架通过能够调节长度的可调节连杆连接,通过调整连杆长度,可以适合不同深度、不同井壁厚薄的检查井类型。装置设计简便实用,组装快捷,提高功效。Further, the wellhead cross frame and the support cross frame are connected by an adjustable connecting rod capable of adjusting the length, and by adjusting the length of the connecting rod, it can be suitable for inspection wells of different depths and different well wall thicknesses. The design of the device is simple and practical, the assembly is quick, and the efficacy is improved.
【附图说明】【Description of drawings】
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图中:1-井口横架,2-机动绞磨,3-支撑横架,4-转向滑轮,5-可调节连杆,6-电缆,7-滑车,8-井口,9-钢丝绳。In the figure: 1-wellhead horizontal frame, 2-motorized winch, 3-supporting horizontal frame, 4-turning pulley, 5-adjustable connecting rod, 6-cable, 7-pull block, 8-wellhead, 9-wire rope.
【具体实施方式】【Detailed ways】
下面结合附图对本实用新型进行详细描述:The utility model is described in detail below in conjunction with accompanying drawing:
参见图1,本实用新型所采用的技术方案是:包括上半部分的井口横架1,固定机动绞磨2,并承担提升牵引钢丝绳9的作用。下半部分的支撑横架3,固定1只转向滑轮4,将钢丝绳90°导向,井口横架1和支撑横架3分别设置在井口8上方和下方,可调节连杆5,连接固定上下横架,适应不同深度的隧道构造,同时支撑整个装置,保持装置稳定。Referring to Fig. 1, the technical scheme that the utility model adopts is: comprise the wellhead horizontal frame 1 of upper half, fix motor winch 2, and undertake the effect of lifting traction wire rope 9. The supporting horizontal frame 3 in the lower part fixes a steering pulley 4 and guides the wire rope at 90°. The wellhead horizontal frame 1 and the supporting horizontal frame 3 are respectively arranged above and below the wellhead 8. The connecting rod 5 can be adjusted to connect and fix the upper and lower horizontal frames. The frame adapts to the tunnel structure of different depths, supports the whole device at the same time, and keeps the device stable.
在于检查井牵引敷设电缆过程中,能够将牵引力倒向,并且不需要机动绞磨的反向拉力,特别适合城市电缆隧道内的电缆敷设,适用于电缆隧道检查井敷设施工,现场可移动式安装、方便快捷效率高的组合装置。根据现场检查井情况,能随时在各种规格现状、深浅不一的环境中使用,对检查井无破坏;克服了城市硬化地面无法安装地锚的缺点。改进普遍采用的2个90°转向滑轮的方式,简化了装置,动力几乎全部转化为牵引力,提高效率,减轻机动绞磨及钢丝绳的磨损。本实用新型所述的检查井牵引敷设电缆组合装置,组装简单实用。In the process of pulling and laying cables in the inspection well, the traction force can be reversed, and the reverse pulling force of the motorized winch is not required. It is especially suitable for cable laying in urban cable tunnels. It is suitable for the laying construction of cable tunnel inspection wells and can be installed on site. , Convenient and efficient combined device. According to the conditions of the on-site inspection well, it can be used in environments with various specifications and different shades at any time, without damage to the inspection well; it overcomes the disadvantage that ground anchors cannot be installed on urban hardened ground. Improve the commonly used two 90° turning pulleys, simplify the device, almost all the power is converted into traction, improve efficiency, and reduce the wear and tear of the motorized winch and wire rope. The assembly device for traction and laying of cables in inspection wells described in the utility model is simple and practical in assembly.
另外,在电缆隧道内设置有支撑电缆6的滑车7,所述井口横架1和支撑横架3由玻璃纤维复合材料制成,所述机动绞磨2采用凹形收线盘。In addition, a trolley 7 supporting the cable 6 is provided in the cable tunnel, the wellhead cross frame 1 and the support cross frame 3 are made of glass fiber composite material, and the motor winch 2 adopts a concave take-up reel.
在施工之前,将下半部分的支撑横架先放入检查井内,调成水平位置。同时将上半部分的井口横架在检查井口摆放完成。用调节连杆连接上下横架,并根据检查井壁厚度,调节连杆位置,确保装置整体稳定。Before construction, put the lower part of the support horizontal frame into the inspection well and adjust it to a horizontal position. At the same time, the top half of the wellhead horizontal frame is placed at the inspection wellhead to complete. The upper and lower horizontal frames are connected by adjusting connecting rods, and the position of the connecting rods is adjusted according to the thickness of the inspection shaft wall to ensure the overall stability of the device.
将隧道内牵引钢丝绳穿过下半部分的支撑横架的转向滑轮,向检查井口送出与机动绞磨连接。Pass the traction wire rope in the tunnel through the diverting pulley of the lower half of the supporting horizontal frame, and send it to the inspection wellhead to connect with the motorized winch.
调节设备正常后,通知敷设施工开始,启动机动绞磨,卷收钢丝绳,同时牵引电缆在隧道内水平移动。After the adjustment equipment is normal, the laying construction is notified to start, the motorized winch is started, the steel wire rope is retracted, and the traction cable moves horizontally in the tunnel.
本实用新型结构简单、操作方便,安全可靠,可有效地施工的时间,避免了检修的繁杂工序及检修过程中可能出现的其他问题,可大幅降低检修成本,可在类似行业领域内推广使用。The utility model has the advantages of simple structure, convenient operation, safety and reliability, can effectively save the construction time, avoids complicated maintenance procedures and other problems that may occur during the maintenance process, can greatly reduce the maintenance cost, and can be popularized and used in similar industries.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520599152.8U CN204858424U (en) | 2015-08-10 | 2015-08-10 | Cable Tunnel Inspection Shaft Traction and Laying Cable Combination Device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520599152.8U CN204858424U (en) | 2015-08-10 | 2015-08-10 | Cable Tunnel Inspection Shaft Traction and Laying Cable Combination Device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204858424U true CN204858424U (en) | 2015-12-09 |
Family
ID=54748943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520599152.8U Active CN204858424U (en) | 2015-08-10 | 2015-08-10 | Cable Tunnel Inspection Shaft Traction and Laying Cable Combination Device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204858424U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107814256A (en) * | 2017-12-02 | 2018-03-20 | 安徽工程大学 | A kind of underground guy-line equipment and its application method |
CN107938673A (en) * | 2017-12-12 | 2018-04-20 | 储茂松 | A kind of buried 35KV cross-linked polrvinyl chlorides insulated power cable automatic mounting machine |
CN110233467A (en) * | 2019-07-08 | 2019-09-13 | 贵州水利水电职业技术学院 | A kind of tubular hydropower generator main lead improvement mechanism |
CN110829294A (en) * | 2018-08-08 | 2020-02-21 | 中国电建集团华东勘测设计研究院有限公司 | Fixed structure, construction structure and establishment method of cables in narrow space with high drop |
CN111532881A (en) * | 2020-05-16 | 2020-08-14 | 杨明清 | Municipal works cable interlude device |
CN116014631A (en) * | 2022-12-31 | 2023-04-25 | 金川集团股份有限公司 | Cable laying auxiliary device and use method thereof |
-
2015
- 2015-08-10 CN CN201520599152.8U patent/CN204858424U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107814256A (en) * | 2017-12-02 | 2018-03-20 | 安徽工程大学 | A kind of underground guy-line equipment and its application method |
CN107814256B (en) * | 2017-12-02 | 2023-04-18 | 安徽工程大学 | Underground wire pulling equipment and using method thereof |
CN107938673A (en) * | 2017-12-12 | 2018-04-20 | 储茂松 | A kind of buried 35KV cross-linked polrvinyl chlorides insulated power cable automatic mounting machine |
CN110829294A (en) * | 2018-08-08 | 2020-02-21 | 中国电建集团华东勘测设计研究院有限公司 | Fixed structure, construction structure and establishment method of cables in narrow space with high drop |
CN110233467A (en) * | 2019-07-08 | 2019-09-13 | 贵州水利水电职业技术学院 | A kind of tubular hydropower generator main lead improvement mechanism |
CN111532881A (en) * | 2020-05-16 | 2020-08-14 | 杨明清 | Municipal works cable interlude device |
CN116014631A (en) * | 2022-12-31 | 2023-04-25 | 金川集团股份有限公司 | Cable laying auxiliary device and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204858424U (en) | Cable Tunnel Inspection Shaft Traction and Laying Cable Combination Device | |
CN207581227U (en) | A kind of underwater equipment extension and retraction system peculiar to vessel | |
CN213171204U (en) | Construction equipment hoisting device | |
CN202832296U (en) | Drill rod lifting device on drilling equipment | |
CN201902199U (en) | Power combined type oil pumping machine with ultra long stroke for a plurality of wells | |
CN205977138U (en) | Device for connecting be used for coiled tubing and fill head butt joint | |
CN210103322U (en) | Self-driven urban underground prefabricated comprehensive pipe gallery laying and hoisting machine | |
CN109346996B (en) | Electric power construction line tightening device and method | |
CN109713612B (en) | High-altitude tightening device for Dinima rope | |
CN203359890U (en) | Small-sized electric pole hoisting device | |
CN108751063A (en) | Electric power pylon automatic lifting safety pole | |
CN205605150U (en) | Geological drilling is complete, and core equipment is got fast to angle | |
CN204552615U (en) | Truck-mounted drilling rig and mast mechanism thereof | |
CN201620778U (en) | Retractable arm for connecting and disconnecting drill rod and casing mechanism | |
CN201102869Y (en) | Large arm device of midair-disassembling horizontal lazy-arm type tower crane | |
CN212258265U (en) | Cable continuous laying device | |
CN212462610U (en) | Novel cable threading apparatus | |
CN104278946B (en) | Grafting assembled water drilling rig | |
CN203486824U (en) | Automatic distance-adjustment mechanism for coupling movable pulley block | |
CN209633461U (en) | A kind of steering drill core device | |
CN202997427U (en) | Portable electric cable pay-off rack | |
CN201666967U (en) | Guide frame for laying underground pipeline optical cable | |
CN205724767U (en) | Insulation strain wedge wire clip winding device | |
CN221591003U (en) | Novel slurry discharging device | |
CN220011970U (en) | Traction balancing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |