CN204802837U - Platform sling promotes structure - Google Patents
Platform sling promotes structure Download PDFInfo
- Publication number
- CN204802837U CN204802837U CN201520071264.6U CN201520071264U CN204802837U CN 204802837 U CN204802837 U CN 204802837U CN 201520071264 U CN201520071264 U CN 201520071264U CN 204802837 U CN204802837 U CN 204802837U
- Authority
- CN
- China
- Prior art keywords
- work dish
- chain
- derrick
- dish
- sets
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a platform sling promotes structure includes hoist engine house, derrick, leading chain, railing, steel fixer work dish, concrete work dish, the chain is led in the promotion and template ann tears the work dish open at least, the hoist engine house sets up the rightmost side at the derrick, the derrick sets up directly over the well head to and with leading the chain connection between the hoist engine house, leading chain setting is on the derrick to imbed in proper order in the steel fixer work dish, steel fixer work dish sets up the downside at the derrick to through leading chain connection between the two, the railing sets up on steel fixer work dish to pass through welded connection, concrete work dish sets up the downside at steel fixer work dish to lead the chain connection through the promotion between the two, template ann tears the work dish open and sets up the downside at concrete work dish, the promotion is led the chain setting and is torn open between the work dish at concrete work dish and template ann, this simple structure, the flexibility is big, and safe and reliable is stable practical, easily uses widely.
Description
Technical field
The utility model relates to well head and promotes applied technical field, especially a kind of hanging scaffold lift structure.
Background technology
Hanging scaffold is used for vertical shaft and tube structure construction, utilize hoisting crane or jack can easy of rise, construction needs are met by vertically mobile, this hanging scaffold have employed three layers of hanging scaffold on arranging, ensure that reinforcing bar watchman's wooden clapper is pricked, template peace is torn open, the operations such as concreting are carried out respectively on different scratch diskettes, decrease inter process interference, jack and the dual lifting of winch are adopted to bottom hanging scaffold, add the flexibility ratio of bottom scratch diskette, substantially increase the construction speed tradition hanging scaffold engineering time, general employing individual layer hanging scaffold, same hanging scaffold needs carry out reinforcing bar binding, the operation such as formwork erection and concreting, because operation is intersected, operating efficiency is not high.Therefore, for these problems, a kind of hanging scaffold lift structure is proposed.
Prior art can not meet the needs of people, and for making up prior art deficiency, it is simple that the utility model aims to provide a kind of structure, and connect closely, alerting ability is good, practical a kind of hanging scaffold lift structure.
For achieving the above object, the utility model by the following technical solutions: a kind of hanging scaffold lift structure, at least comprises hoist house, derrick, leading chain, railing, reinforcing work dish, concrete work dish, lifting guide chain and template peace and tear scratch diskette open; Described hoist house is arranged on the rightmost side of derrick; Described derrick is arranged on directly over well head, and is connected by guide chain with between hoist house; Described leading chain is arranged on derrick, and embeds successively in reinforcing work dish; Described reinforcing work dish is arranged on the downside of derrick, and is connected by leading chain therebetween; Described railing is arranged on reinforcing work dish, and by being welded to connect; Described concrete work dish is arranged on the downside of reinforcing work dish, and connects by promoting guide chain therebetween; Described template peace tears the downside that scratch diskette is arranged on concrete work dish open; Described lifting guide chain is arranged on concrete work dish and template and pacifies and tear open between scratch diskette.
As optimization technique scheme of the present utility model: described lifting guide chain is through reinforcing work dish and concrete work dish, and to promote guide chain be chain structure; Described lifting guide chain is controlled by hoist house.
Compared with prior art, the beneficial effects of the utility model are: described hanging scaffold arranges and have employed three layers of hanging scaffold, ensure that the operations such as reinforcing bar watchman's wooden clapper is pricked, template peace is torn open, concreting are carried out respectively on different scratch diskettes, decrease inter process interference, jack and the dual lifting of winch are adopted to bottom hanging scaffold, add the flexibility ratio of bottom scratch diskette, substantially increase the construction speed tradition hanging scaffold engineering time, and hanging scaffold structure is simple, connects closely, alerting ability is good, practical.
Utility model content
Accompanying drawing explanation
Fig. 1 is the utility model integral structure schematic diagram;
Fig. 2 is the structural representation of hanging scaffold of the present utility model;
Wherein: 1, hoist house, 2, derrick, 3, leading chain, 4, railing, 5, reinforcing work dish, 6, concrete work dish, 7, promote guide chain, 8, template peace tears scratch diskette open.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 ~ 2, in the utility model embodiment, a kind of hanging scaffold lift structure, at least comprises hoist house 1, derrick 2, leading chain 3, railing 4, reinforcing work dish 5, concrete work dish 6, lifting guide chain 7 and template peace and tears scratch diskette 8 open; Described hoist house is arranged on the overall rightmost side; Described derrick 2 is arranged on directly over well head, and is connected by guide chain with between hoist house 1; Described leading chain 3 is arranged on derrick, and embeds successively in reinforcing work dish 5; Described reinforcing work dish 5 is arranged on the downside of derrick, and is connected by leading chain 3 therebetween; Described railing 4 is arranged on reinforcing work dish 5, and by being welded to connect; Described concrete work dish 6 is arranged on the downside of reinforcing work dish 5, and connects by promoting guide chain 7 therebetween; Described template peace tears the downside that scratch diskette 8 is arranged on concrete work dish 6 open; Described lifting guide chain 7 is arranged on concrete work dish 6 and template and pacifies and tear open between scratch diskette 8.
As optimization technique scheme of the present utility model: described lifting guide chain 7 passes reinforcing work dish 5 and concrete work dish 6, and promotes guide chain 7 for chain structure; Described lifting guide chain 7 is controlled by hoist house 1.
As hanging scaffold aufbauprinciple of the present utility model: described hanging scaffold upper strata workplatform and the middle level main platform that works forms hanging scaffold main body, steel rope is adopted to be connected with derrick, along with borehole wall concrete lining shaping employing derrick jack upwards promotes, each hoisting depth is two-layer form height, lower floor's workplatform and hanging scaffold main body are without being fixedly connected with, when needs form removable, adopt jack or winch that this dish is down to form removal position, after form removable, with winch or jack, this dish is promoted to template Zhi Gaodu, four steel ropes are adopted to be fixed on the dish of middle level, Panasonic's suspension hook or jack can carry out next procedure construction.
To those skilled in the art, obvious the utility model is not limited to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present utility model or essential characteristic, can realize the utility model in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the utility model.Any Reference numeral in claim should be considered as the claim involved by limiting.
The above; be only preferred embodiment of the present utility model; not in order to limit the utility model, every above embodiment is done according to technical spirit of the present utility model any trickle amendment, equivalently replace and improve, within the protection domain that all should be included in technical solutions of the utility model.
Claims (3)
1. a hanging scaffold lift structure, at least comprises hoist house (1), derrick (2), leading chain (3), railing (4), reinforcing work dish (5), concrete work dish (6), lifting guide chain (7) and template peace and tears scratch diskette (8) open; Described hoist house (1) is arranged on the rightmost side of derrick (2); Described derrick (2) is arranged on directly over well head, and is connected by guide chain with between hoist house (1); Described leading chain (3) is arranged on derrick (2), and embeds successively in reinforcing work dish (5); Described reinforcing work dish (5) is arranged on the downside of derrick (2), and is connected by leading chain (3) therebetween; Described railing (4) is arranged on reinforcing work dish (5), and by being welded to connect; Described concrete work dish (6) is arranged on the downside of reinforcing work dish (5), and connects by promoting guide chain (7) therebetween; Described template peace tears the downside that scratch diskette (8) is arranged on concrete work dish (6) open; Described lifting guide chain (7) is arranged on concrete work dish (6) and template and pacifies and tear open between scratch diskette (8).
2. a kind of hanging scaffold lift structure according to claim 1, it is characterized in that: described lifting guide chain (7) is through reinforcing work dish (5) and concrete work dish (6), and to promote guide chain (7) be chain structure.
3. a kind of hanging scaffold lift structure according to claim 1, is characterized in that: described lifting guide chain (7) is controlled by hoist house (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520071264.6U CN204802837U (en) | 2015-02-02 | 2015-02-02 | Platform sling promotes structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520071264.6U CN204802837U (en) | 2015-02-02 | 2015-02-02 | Platform sling promotes structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204802837U true CN204802837U (en) | 2015-11-25 |
Family
ID=54587693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520071264.6U Expired - Fee Related CN204802837U (en) | 2015-02-02 | 2015-02-02 | Platform sling promotes structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204802837U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060768A (en) * | 2017-05-25 | 2017-08-18 | 兖州煤业股份有限公司 | Double-deck multipurpose mortar depositing construction platform in pit shaft |
-
2015
- 2015-02-02 CN CN201520071264.6U patent/CN204802837U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060768A (en) * | 2017-05-25 | 2017-08-18 | 兖州煤业股份有限公司 | Double-deck multipurpose mortar depositing construction platform in pit shaft |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205045698U (en) | Reinforcement cage hoisting utensil | |
CN202500567U (en) | Multilayer combined hanging scaffold for concrete liner of well wall of vertical well | |
CN207192616U (en) | A kind of gantry crane for preventing that goods from rocking | |
CN102910532B (en) | Method for butting and hoisting large box type derricks in air | |
CN206767425U (en) | A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage | |
CN204802837U (en) | Platform sling promotes structure | |
CN204342298U (en) | A kind of double track transfer crane | |
CN107161879B (en) | Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane | |
CN204802839U (en) | Jacking equipment for building | |
CN204508591U (en) | A kind of hanging scaffold lift structure | |
CN107420050A (en) | The full-automatic workover rig of mast lift | |
CN207943826U (en) | High-speed railway bridge floor series concrete multi-transportation vehicle | |
CN202729645U (en) | Tower crane with elevator | |
CN201762053U (en) | Simple automatic derrick | |
CN204778496U (en) | Platform sling structure of tower crane | |
CN201105957Y (en) | Tower crane engineering special-purpose gin pole hoist | |
CN203499232U (en) | Attached lifting scaffold | |
CN203345968U (en) | Tower crane | |
CN203187370U (en) | Inner mast hoisting device | |
CN208980193U (en) | The curtain wall hanging apparatus of anticollision | |
CN106276599A (en) | Possesses the tower crane of illumination highlights function | |
CN203925306U (en) | Multifunction drilling tool hoist | |
CN205558818U (en) | A whole lift -type rig | |
CN205687389U (en) | A kind of slipping tail suspension rod for the lifting of tower kind equipment | |
CN205532702U (en) | A platform that is used for high drop shaft unloading station transformation of metal mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20160202 |
|
CF01 | Termination of patent right due to non-payment of annual fee |